Introduction
Controls
Summary
STACK ABSORBER
WATER
SPRAY TOWER
ABSORBER
ELECTROSTATIC MAKE-UP
PRECIPITATOR TO BALL WATER
MILL TANK
CHLORIDE
PURGE
LIMESTONE
HYDROCLONE
GYPSUM
DEWATERING
FROM MW
TANK
REAGENT
BALL MILL
PREPARATION
Introduction
Controls
Summary
Absorber
Spray Switchgear
Pumps
Oxidation
Compressors
Highly corrosive
environment
SO3 condensation
Deposits/splash-back
Design/construction
Solid 3/16 thick C-276
10 slope toward absorber
Extends 10-15 ft. from shell
Internal overhead deflector
and side shields
Test ports and emergency
quench nozzles
Gas velocity 3,000-3,600
ft/min
Flared-Side Straight-Side
Spray flow
Typical afternoon
thunderstorm 1-2 in/hr
Spray tower 10 ft/min
Design Approach
Intimate gas/liquid contact
No gas sneakage
Multiple spray stages depending
on SO2 inlet and removal
efficiency
Overall spray coverage (>200% at
3-feet) and nozzle distribution to
provide even distribution and
prevent gas sneakage.
Wall rings to prevent gas
sneakage near side walls.
Pressure drop vs. pumping power
trade-off
Mist Eliminator
Spray Zone
Carryover
5 10 15 20 25
Gas Velocity (ft/sec)
Gas Flow
70,000
60,000
50,000
40,000
Flow (gpm)
30,000
20,000
10,000
Day Bin
Classifier
Ball Mill
Feed
Tank
REAGENT
SILO
CLASSIFIER
TO
ABSORBER
FROM MW TANK
BALL MILL
REAGENT
BALL MILL
FEED
RECYCLE
TANK
TANK
Limestone grinding
Horizontal/vertical
wet ball mills
On-site vs. off-site
preparation
Product ground to
90-95% < 44 ; 30% solids
Rubber-lined with
hardened steel balls
Hydroclone
Belt Filter
Vacuum
Pump
WPCA Wet FGD Seminar - December 1, 2008
Primary Dewatering
Initial solid/liquid separation
step
Feed: 15-20% TSS
Underflow: 50-55% TSS
Overflow: 3-5% TSS
Overflow enriched with
CaCO3 due to particle size
difference; improved reagent
utilization
Steel casing with rubber,
urethane, and ceramic
internals
Typical specification:
>95% CaSO42H2O
<0.51.0% CaSO3H2O
<100 ppm Cl
<10% moisture
pH 68
3040 MMD
Requires:
High purity limestone (95
96%)
High efficiency ESP/FF
99+% oxidation
Belt filter
Cake washing
Introduction
Controls
Summary
STACK
ELECTROSTATIC
PRECIPITATOR
ID FAN
STACK
ABSORBER
ELECTROSTATIC
PRECIPITATOR
ID FAN
STACK
ABSORBER
ELECTROSTATIC
PRECIPITATOR
BOOSTER
ID FAN
FAN
STACK
ABSORBER
ELECTROSTATIC
PRECIPITATOR BOOSTER
FAN
ID FAN
Introduction
Controls
Summary
Remote Remote
I/O I/O
pH L
Make-Up
Reagent Water
Feed D
Solids /
Gypsum
Bleed
WPCA Wet FGD Seminar - December 1, 2008
pH / Reagent Feed Control
z Scrubbing Liquor pH
Most important process variable
to be controlled in WFGD
continuous, in-line monitoring,
daily lab verification
Indication of the amount of
CaCO3 in scrubbing solution 0 7 14
acid Neutral base
Scrubbing liquor below desired
range lower SO2 removal H2O
efficiency
Scrubber liquor above desired 5.3 5.8
range higher SO2 removal Scrubbing
efficiency, excess CaCO3 and Liquor pH
reduced gypsum byproduct purity
LS Flow Controller
Absorber
FE Limestone
slurry
Reaction Tank
pH
pH
pH Controller
LOCAL
DISPLAY
PANELS
TRANSMITTERS
pH PROBES
PROCESS
PIPING
Flue Gas
z Scrubber Slurry Solids Water Vapor
Important WFGD process
variable, verified daily with
laboratory samples Mist
Eliminator
Scrubber slurry solids: gypsum, Wash Water
Dewatering
limestone, flyash, inerts Return
Flue Gas Make-up
Numerous inputs affecting water Water Vapor Water
balance and solids concentration
Control solids concentration Limestone Slurry
Absorber
within narrow range: 14-16 wt.% Oxidation Air Bleed Stream
z Solids Control Sat. Water
Return to
Absorber
Absorber
Primary
Dewatering
Hydroclones
Reaction Tank
L
L Secondary
LEVEL Dewatering
DE
DENSITY
ABSORBER BLEED
PUMPS
WPCA Wet FGD Seminar - December 1, 2008
Density Measurement
Nuclear Density Meters
Source emits gamma
radiation through process
Detector measures energy
of radiation
Capable of detecting
process variations within
desired narrow range
Safe Nuclear Density Meter
Accurate
Simple calibration
Verify with laboratory
analyses
PROCESS
SLURRY LOCAL
DISPLAY
PANEL
DENSITY
METER
Level Controller
Absorber
Make-up water
Reaction Tank
L f(x)
OX AIR
L f(x)
DE DY
DENSITY
NEW STACK
EXISTING
STACK
F
STACK REVERSE FLOW ID Fan Load,
Boiler MW
DUCT PRESSURE
ZY
VANE PITCH
CONTROL
SPRAY TOWER
ABSORBER
BOOSTER FANS
ID FANS
SO2
TREATED FLUE
GAS
EXISTING
STACK
UNTREATED
FLUE GAS ID FAN LOAD,
(BYPASS) BOILER (MW)
ZY
DUCT
PRESSURE VANE PITCH
CONTROL
ID FANS P
SPRAY TOWER
ABSORBER
BOOSTER FANS
ID FANS
WPCA Wet FGD Seminar - December 1, 2008
Emergency Quench
OUTLET (CLEAN)
FLUE GAS
TY QUENCH
WATER
INLET FLUE
GAS
SPRAY TOWER
ABSORBER
WPCA Wet FGD Seminar - December 1, 2008
Agenda
Introduction
Controls
Summary