Cantrol Panel Estimate
Cantrol Panel Estimate
excavation
43.875 cum 185 8116.875
base conc.
3.2955 cum
4.64386 cum
1.4625 cum
9.40186 cum 4163 39139.94
colm/footing/PB formwork
10.14 sqm
20.28 sqm
30.42 sqm 139 4228.38
PB CONC.
2.25 cum
0.48 cum
0.99 cum
0.792 cum
0.66 cum
35.682 cum 3821 3785.318
12.84 sqm
25.68 sqm
38.52 sqm 202 7781.04
81.07 sqm
46.9 sqm
11.39 sqm
11.8925 sqm
7.5 sqm
1.6 sqm
3.3 sqm
2.64 sqm
2.2 sqm
134.0125 sqm 91.5 12262.14
107.1 sqm
62.9 sqm
30.175 sqm
200.175 sqm 127 25422.23
Flooring in side room/ entrance
45.15 sqm
10.54 sqm
11.16 sqm
2.1 sqm
3 sqm
1.08 sqm
1.86 sqm
74.89 sqm 897 67176.33
7.14 sqm
8.16 sqm
5.04 sqm
1.2 sqm
19.14 sqm 692 13244.88
POP on wall
393.7975 sqm 94.5 37213.86
Painting on slab
wooden Doors/window
2.64 sqm
3.3 sqm
5.94 sqm 2034 12081.96
2.2 sqm 1688 3713.6
Total 15795.56
39.6 Kg
3 Kg
4.5 Kg
3.6 Kg
10.8 Kg
0.89 Kg
1.335 Kg
1.068 Kg
64.793 Kg 68 4405.924
187.5 kg 75 14062.5
40 kg 67.5 2700
6.6 sqm
5.28 sqm
4.4 sqm
15 sqm
1.6 sqm
32.88 sqm 47 1545.36
each 2899 2899
each 61 61
each 38 76
Each 382
Each 1248
each 394
each 432
olm up to PB
lab beam/slab
m/ entrance