13 Centering and shuttering including strutting, propping etc and
removal of form work for foundation, footings, base for columns .
22 Brick work with common burnt clay (non modular) bricks of class
designation 7.5 in foundation and plinth including curing in: Cement
mortar 1:6 (1 cement: 6 coarse sand)
23 Extra for Brick work with common burnt clay bricks/cement concrete
bricks in superstructure above plinth level up to floor five level
LS 1 60000.00
37 Supply , installation and commissioning of level transmitter in sump LS 1 80000.00
and overhead tanks, Ultrasonic type having range ( 0-8m) with 24-
48VDC connections including cabling, conduiting as per technical
specifications complete
38 Laying, fitting, of pipes in centrifugally cast (spun) Ductile Iron pipe of 100 1234.95
Class designation K - 9, conforming to IS : 8329 including labour for
mechanical joints and cost of jointing material (bolts, nuts, gaskets,
washers, rubber insertion etc),including providing and installing DI
specials of class K-12 suitable for push-on jointing as per IS : 9523
(with external bitumen coating and internal cement mortar
lining).such as puddle pipes, heel bends, bends of any angle, flanged
and socketed tees, gap pieces with machined socketed and spigot
ends, double flange tapers, flanged gap pieces, tail pieces (one side
flanged & other socketed), blind ends with flange etc. with jointing
materials complete testing, disinfection and commissioning,
complete as per the direction of the Engineer in charge including
Providing & fixing CI Double Flanged manually operated Sluice Valve
(with cap wheels) as per specifications (IS:14846) for control purpose
in proposed pipe of following dia including jointing material (bolts,
nuts, gaskets, washers, rubber insertions etc.) complete including
testing. 1.6 MPa(16 kg/cm2) 100 mm dia
39 Providing & installation of Sign Board of size 8ft x 6ft with angle Iron LS 1 20000.00
frame of size 50 x 50 x 6 mm PBI sheet of 1.25mm thickness
including painting and writing as directed by Engineer- In- charge.
The Job also includes writing with black paint on the storage tank
depicting capacity and other feature of the OHT
41 Providing and fixing UPVC plain, bends 80mm dia Each 8.00 300.00
Total (A)
MATERIAL CONSUMPTION CHART
Item Detail Qty Rate Cement Rate Sand Rate Bajri Rate
No.
43 Carriage of soling stone by Mechanical Transport from source (to be Cum 20.85
identified by engineer in charge) to site of work/dumping place (To be
identified by engineer in charge) including cost for loading and
unloading. For an av. distance of __________.
Qty. vide item No. 33 =31.655 Cum
44 Carriage of Bricks from brick kiln (to be identified by engineer in Nos. 2893
charge) by Mechanical Transport to site of work /dumping place (To
be identified by engineer in charge)including cost for loading and
unloading. For an av. distance of _______.
Total B
6486
1297
29826
3473
9082
51816
39599
2121138
15397
44723
41403
23156
8341
8254
81631
47217
60000
80000
123495
20000
20000
2400
3450770
Bricks
--
--
--
--
--
--
3259
--
--
2893
Detailed Estimate for Construction Of 0.40 Lacs Gallons Over Head Tank
Pillars Above
6 16.30 0.45 0.45 19.80
G/L
Beam 30 2.06 0.30 0.50 9.27
18 2.40 43.20
169.46 m 169.46
21 Extra for Reinforced cement concrete work in super structure above floor 5 level
for each four floor or part thereof
Top ring beam 1.36
Walling 17.00
Stair slope
179.00
13.10
Landing 80
Gallery 90
Top Landing 12
Top stairs 16
Top stairs 12
Total 368.30
MS flat 40x6mm
2 16 1.20 38.40
2 1 1.00 2.00
2 9 2.50 45.00
2 2 2.00 8.00
4 1 27.00 108.00
4 1 10.00 40.00
2 2 10.00 40.00
299.05
1.00 LS 1.00
38 Supply , installation and commissioning of level transmitter in sump and
overhead tanks, Ultrasonic type having range ( 0-8m) with 24-48VDC
connections including cabling, conduiting as per technical specifications
complete
1.00 LS 1.00
39 Providing, Laying, Erecting & fitting, of pipes in centrifugally cast (spun) Ductile
Iron pipe of Class designation K - 9, conforming to IS : 8329 including labour for
mechanical/flanged joints and cost of jointing material (bolts, nuts, gaskets,
washers, rubber insertion etc),including providing and installing DI specials of
class K-12 suitable for push-on jointing as per IS : 9523 (with external bitumen
coating and internal cement mortar lining).such as puddle pipes, heel bends,
bends of any angle, flanged and socketed tees, gap pieces with machined
socketed and spigot ends, double flange tapers, flanged gap pieces, tail pieces
(one side flanged & other socketed), blind ends with flange ,&clumps etc. with
jointing materials complete testing, disinfection and commissioning, complete
as per the direction of the Engineer in charge.
Providing & fixing CI Double Flanged manually operated Sluice Valve (with cap
wheels) as per specifications (IS:14846) for control purpose in proposed pipe of
following dia including jointing material (bolts, nuts, gaskets, washers, rubber
insertions etc.) complete including testing. 1.6 MPa(16 kg/cm2) 100 mm dia
5 Each 5.00
40
Providing & installation of Sign Board of size 8ft x 6ft with angle Iron frame of
size 50 x 50 x 6 mm PBI sheet of 1.25mm thickness including painting and
writing as directed by Engineer- In- charge. The Job also includes writing with
black paint on the storage tank depicting capacity and other feature of the OHT
1.00 LS 1.00
41
Providing and fitting concealed internal Electrification of room including 4 Nos
LED lights, Fan points 2 No., Fuse box 1 No., 2 no 15 Amp sockets with switch,
5 Amp 2 no. sockets with switch - of approved brand and 04 nos LED security
lights 30 watts, Main switch with complete wiring, with MS bracket for pole
mounting complete including service line up to a length of 10 meters.
1.00 LS 1.00
42 Providing and fixing UPVC plain, bends 80mm dia
8.00 LS 8.00
7 M30 above
71.51 10.00 715.08 0.43 30.75 0.86 61.50
Plinth
8 C.Conc1:1.5: 3 5.77 8.00 46.16 0.43 2.48 0.86 4.96
9 M25 Above
17.05 8.00 136.43 0.43 7.33 0.86 14.67
Plinth
24 Brick work 1:6 6.86 1.25 8.58 0.26 1.78 -- --
25 Plaster 1:3 183.97 0.19 35.03 0.013 2.39 -- --
26 Plaster 1:4 152.28 0.11 16.51 0.014 2.13 -- --
32 Vitrified tile 19.91 0.24 4.78 1.4178 28.23
Cum 24.53
94.57 MT 94.57
20.58 MT 20.58
Grand Total
Rate Amount
(RS)
539.35 85444
188.75 44853
81.65 9239
4419.85 54212
486.80 11942
4943.40 45475
7293.75 617545
8558.95 612036
9458.65 54572
8457.25 144225
262.30 6486
52.46 1297
680.15 119734
502.85 63310
2086.80 143737
1008.45 48486
573.85 149130
114.77 29826
635.60 82120
127.12 16424
242.30 41060
280.95 11213
802.80 3631
1605.60 7263
2408.40 10894
3211.20 14526
267.60 652
802.80 1957
1338.00 3261
1605.60 3914
1873.20 4566
2408.40 5870
2676.00 6523
3211.20 7827
267.60 385
802.80 1156
1338.00 1927
1605.60 2312
1873.20 2697
2408.40 3468
2676.00 3853
3211.20 4624
3746.40 102344
6183.75 42427
1323.65 9082
343.75 63239
260.05 39599
79.25 1631352
133.30 241591
4189.60 15397
298.15 44723
57.90 41403
1728.65 34419
400.00 8341
121.95 8254
91.80 74722
198.70 47217
60000.00 60000
80000.00 80000
1763.30 176330
4597.85 22989
20000.00 20000
20000.00 20000
300.00 2400
Rate Bricks
-- --
-- --
-- --
-- --
-- --
-- --
475 3259
-- --
-- --
3259
Nos
265.46 2899
244.22 69290
287.32 7048
0.70758 2306
159.44 15078
159.44 3282
Total B 99903
A+B 5369408