TECHNICAL SPECIFICATIONS
A1

General Description of the Project


and
Extent of Works
Substations Extension, Contract SE-1 General Description

TABLE OF CONTENTS

PAGE

A1. GENERAL DESCRIPTION OF THE PROJECT AND EXTENT OF WORKS .................................. 1


1.1) INTRODUCTION ...................................................................................................................................... 1
1.2) STATION FUNCTION .............................................................................................................................. 1
1.3) STATMENT OF WORKS FOR SUBSTATION ....................................................................................... 1
1.3.1) General .............................................................................................................................................. 1
1.3.2) LIMIT OF SUPPLY .......................................................................................................................... 3
1.3.3) LIMIT OF WORKS ........................................................................................................................... 3

A1.docx Section A1 Page A1 - i


Substations Extension, Contract SE-1 General Description

A1. GENERAL DESCRIPTION OF THE PROJECT AND EXTENT OF WORKS

1.1) INTRODUCTION

The works covered by these technical specifications form part of the Substation Extension and
construction of new substations under Universal Electricity Access Program. This part of the
project consists of design, manufacture, test, supply, erection and commissioning of 132 kV, 66 kV
substations at Gefersa, Muger, Wolisso, Assebe Teferi, Nura Era, Awash 7-kilo, Alemaya and
Chelenko including civil works and operators dewelling houses.

1.2) STATION FUNCTION

At the above listed substations all the required equipment shall be supplied and
constructed as listed in part B1Scope Of Supply. The function of this substation will be to
deliver the energy transmitted to the distribution networks originating from the station.

The layout of all the substations is conceived in such a manner to allow future extensions
for additional lines and/or transformers.

The bus bars will be aluminium alloy tube for new substations and with equipment
connections consisting of aluminium stranded conductors. This solution has been chosen
for its simplicity, economy and space saving.

It will be possible to control the various items of equipment (circuit Breakers and
disconnectors, power transformers) either from the control room or local to the equipment
itself and from national load dispatch center.

1.3) STATMENT OF WORKS FOR SUBSTATION

1.3.1) General

The purpose of this section is to specify basic conditions for the design, manufacture, test, and
deliver to site of erection including port clearances and insurance from warehouse to ware house,
civil construction, erection, commissioning and guarantee of materials and the equipment
including the substation civil works.

All work not expressly called for in these specifications, but necessary for the complete and
proper installation and operation of the equipment and accessories shall be performed and
furnished by the Contractor at no additional cost to the Employer.

The work includes design, manufacture, test, supply FOB delivery to Port of shipment, inland
transport from Djibouti Port to site of erection including port clearances and insurance from port
warehouse to site ware house, civil construction, erection, commissioning and guarantee and
setting to work of the following but are not necessarily limited to the following:-

Line landing gantries, steel structures and framework for the 132 kV, 66 kV, 33 kV and
15 kV systems including all connection materials.
Compact Air Insulated Switchgear consisting of circuit breakers, instrument
transformers, disconnectors, post insulators and lightning arrestors complete with their
accessories.
RTU and SCADA interfacing cubicles, communication equipment with fiber optic
terminals complete with all accessories and tools.
33/0.4 kV auxiliary transformers and 33 kV Earthing transformers

A1.docx Section A1 Page A1 - 1


Substations Extension, Contract SE-1 General Description

15/0.4 kV auxiliary transformers and 15 kV Earthing transformers


L.V. power and control cables to interconnect the equipment provided under this
contract.
33 kV GIS switchgear.
15 kV switchgear.
125V and 48V DC systems (batteries and rectifier - chargers) for protection, control,
emergency lighting and fiber optic equipment.
AC and DC distribution panels, boards and cubicles.
Terminal cabinets (Marshaling Kiosks).
Protection, control, signaling, metering, and synchronizing panels/cubicles.
Substation/switchyard lighting systems.
Substations grounding systems,
Supply and erect all steelworks embedded in concrete including anchor bolts,
channels and transformer mounting rails.
Prepare switchyard equipment foundation layout drawings, including arrangement of
structures, equipment, cable trenches, rails, fencing based on the bid drawings and
other documents to be provided by EEPCO at the request of the Contractor.
Construction of substation Civil works at Semera & Ditchoto substations.
Construction of operators dwelling houses at Semera & Ditchoto substations.
Prepare and submit all drawings including switchyard electrical layout plans and
sections, schematic diagrams, equipment arrangement drawings, cable
interconnection diagrams and all other drawings required for the design, construction
and commissioning of the stations and control buildings.
Prepare and submit all type of civil drawings.
Prepare and submit the protection relay co-ordination study complete with detailed
relay setting calculations.
Prepare and submit the protection selectivity study including the protection systems
of the Combolcha, Semera & Ditchoto substations.
Prepare and submit the batteries and DC systems capacity calculations.
Prepare and submit the detailed calculations of the earthing systems.
Prepare and submit the detailed calculations of the lighting level systems.
Prepare and submit the detailed calculations of equipment air clearance.
It is not the intention of these specifications to specify any design detail. It is left to the
experience and practice of the Contractor, who shall furnish equipment, which shall meet, in all
respects; the basic requirements as specified herein with regard to performance, durability and
satisfactory operation.
Certain materials, features and design requirements are specified herein. Any deviations from
these specific requirements must be listed on the Schedule of Departure from the Requirement
of the Specifications" and must be approved by the Corporation in writing.
The work shall include furnishing of all drawings and other information required herein including
operation and maintenance manuals and design calculations. General, detailed and shop
drawings and design calculations are required, complete with parts lists, of all equipment and
As - Built drawings of all plants and equipment installed.
The Contractor should have his own erection materials and testing/commissioning instruments,
i.e. the Employer will not provide any material or equipment for the work.

A1.docx Section A1 Page A1 - 2


Substations Extension, Contract SE-1 General Description

1.3.2) LIMIT OF SUPPLY

During tender evaluation, favorable consideration will be given to Tenderers who limit the Supply
of major electrical equipment to one reputable manufacturer. For instance, having circuit
breakers, disconnectors, current transformers, and capacitive voltage transformers
manufactured by the same Supplier.

The followig equipment shall be supplied from the following reputable manufacturers:-

Equipment Manufacturesr

ABB or AREVA or SIEMENS


132, 66 kV Circuit beakers
ABB or AREVA or SIEMENS or MESA or COELME
132, 66, 33 and 15 kV disconnectors
ABB or AREVA or SIEMENS
All protection relays
ABB or AREVA or SIEMENS
33 kV GIS switchgear
ABB or AREVA or SIEMENS
Telephone exchange
ABB or AREVA or SIEMENS
PLC (power line carrier) equipment
ABB or AREVA or SIEMENS
RTU

1.3.3) LIMIT OF WORKS

The provision of connectors and the termination of all connection to overhead lines and
transformers are included.

The supply of Power Transformers including the supply and termination of all High Voltage
conductors, Control Signaling and Power Cables Protection relays and Voltage Regulation
equipment are included in this Contract.

A1.docx Section A1 Page A1 - 3