169930v1 0 PDF
169930v1 0 PDF
169930v1 0 PDF
Prepared for:
Todd Cage
Submitted by:
Ayodeji Daramola
125 W Missouri Ave Ste 300
Midland, TX - 79701-5204
USA
COG Operating LLC
CUATRO HIJOS FEE 008H
Contents
1 Foreword ...............................................................................................................................................................................3
2 Cuatro Hijos Fee #8H............................................................................................................................................................4
2.1 Executive Summary ......................................................................................................................................................4
2.2 Well Details...................................................................................................................................................................5
2.2.1 Wellbore ................................................................................................................................................................5
2.2.2 Tubulars.................................................................................................................................................................5
2.2.3 Perforations ...........................................................................................................................................................5
2.2.4 Formations.............................................................................................................................................................6
2.2.5 Parameters .............................................................................................................................................................7
2.3 Procedure.......................................................................................................................................................................8
2.3.1 Job Fluids ..............................................................................................................................................................8
2.3.2 Job Totals ............................................................................................................................................................10
2.3.3 Treatment Interval 1 ............................................................................................................................................11
2.3.4 Treatment Interval 2 ............................................................................................................................................14
2.3.5 Treatment Interval 3 ............................................................................................................................................17
2.3.6 Treatment Interval 4 ............................................................................................................................................20
2.3.7 Treatment Interval 5 ............................................................................................................................................23
2.3.8 Treatment Interval 6 ............................................................................................................................................26
2.3.9 Treatment Interval 7 ............................................................................................................................................29
2.3.10 Treatment Interval 8 ............................................................................................................................................32
2.3.11 Treatment Interval 9 ............................................................................................................................................35
2.3.12 Treatment Interval 10 ..........................................................................................................................................38
2.3.13 Treatment Interval 11 ..........................................................................................................................................41
2.3.14 Treatment Interval 12 ..........................................................................................................................................44
2.3.15 Treatment Interval 13 ..........................................................................................................................................47
2.3.16 Treatment Interval 14 ..........................................................................................................................................50
2.3.17 Treatment Interval 15 ..........................................................................................................................................53
2.3.18 Treatment Interval 16 ..........................................................................................................................................56
2.3.19 Treatment Interval 17 ..........................................................................................................................................59
2.3.20 Treatment Interval 18 ..........................................................................................................................................62
2.3.21 Treatment Interval 19 ..........................................................................................................................................65
2.4 Cost Estimate ..............................................................................................................................................................68
3 Conditions ...........................................................................................................................................................................71
4 Appendix .............................................................................................................................................................................72
4.1 Gold Medal Standards.................................................................................................................................................72
4.2 LOTO ..........................................................................................................................................................................73
1 Foreword
CEMENTING: CEMENTING:
Steve Luscombe / Joe Briseno Louis Sosa / Jaime Gonzales
Teddy Johnson / Mike Kilgore Clay Erwin
STIMULATION: STIMULATION:
Robert Rodriguez Robert Rodriguez
John Perez / Juan Jimenez John Perez / Juan Jimenez
TOOLS & TESTING, PROD. SVCS, TOOLS & TESTING, PROD. SVCS,
TCP, COMPL. PRODUCTS: TCP, COMPL. PRODUCTS:
Steve Engleman / Kevin Warren Jim Tillman / Doak Shannon
SPERRY:
David Oakley / David Carroll
.
Wellbore Details
WellBore Condition
BH Static Temperature: 148.0 (degF)
2.2.2 Tubulars
2.2.3 Perforations
2.2.4 Formations
Name / Depth (ft) Pore Press. (psig) BHST (degF) Frac Gradient (psi/ft)
1st Bone Spring Sand / 10098 - 13585 148.0 0.750
2.2.5 Parameters
Parameters
Rate 80 bpm
Anticipated WHTP 5600 psi
Maximum Allowable WHTP 8500 psi
Treat Via 5-1/2 Casing
Average TVD in Lateral 9,845
KOP 9,411
EOC 10,330 @ TVD 9,924
BHST 148 deg F
Anticipated Frac Gradient (psi/ft) 0.75
Halliburton to supply
- 111,000 gallons of 7.5% NEFE Acid
- 9,500 lb of Scalechek SCP-2 (500 lb/stg)
3rd Party to supply
- 4,598 lb of Parasorb (242 lb/stg)
- 806 gallons of Scaletrol (0.25 gpt the whole job)
2.3 Procedure
2.3.1 Job Fluids
Base Fluid FRESH WATER 940500 (Gal) Biocide BE-6 10.00 (lbm)
1000.00 (gal/Mgal) 0.01 (lbm/Mgal)
Biocide BE-9 471.00 (Gal) Clay Control CLA-Web 471.00 (Gal)
0.50 (gal/Mgal) 0.50 (gal/Mgal)
Breaker SP Breaker 236.00 (lbm) Crosslinker CL-31 471.00 (Gal)
0.25 (lbm/Mgal) 0.50 (gal/Mgal)
Surfactant LOSURF-360 471.00 (Gal) Breaker Optiflo-III 941.00 (lbm)
0.50 (gal/Mgal) 1.00 (lbm/Mgal)
Base Fluid HCL ACID 111000 (Gal) Surfactant LOSURF-360 111.00 (Gal)
1000.00 (gal/Mgal) 1.00 (gal/Mgal)
Corrosion HAI-OS 222.00 (Gal)
Inhibitor 2.00 (gal/Mgal)
Base Fluid FRESH WATER 855000 (Gal) Biocide BE-9 428.00 (Gal)
1000.00 (gal/Mgal) 0.50 (gal/Mgal)
Biocide BE-6 9.00 (lbm) Breaker Optiflo-III 214.00 (lbm)
0.01 (lbm/Mgal) 0.25 (lbm/Mgal)
Clay Control CLA-Web 428.00 (Gal) Surfactant LOSURF-360 428.00 (Gal)
0.50 (gal/Mgal) 0.50 (gal/Mgal)
Breaker SP Breaker 18.00 (lbm)
0.02 (lbm/Mgal)
Base Fluid FRESH WATER 1132685 (Gal) Biocide BE-6 17.00 (lbm)
1000.00 (gal/Mgal) 0.02 (lbm/Mgal)
Breaker Optiflo-III 284.00 (lbm) Biocide BE-9 567.00 (Gal)
0.25 (lbm/Mgal) 0.50 (gal/Mgal)
Breaker SP Breaker 23.00 (lbm) Surfactant LOSURF-360 567.00 (Gal)
0.02 (lbm/Mgal) 0.50 (gal/Mgal)
Clay Control CLA-Web 567.00 (Gal)
0.50 (gal/Mgal)
Base Fluid FRESH WATER 294116 (Gal) Biocide BE-6 5.00 (lbm)
1000.00 (gal/Mgal) 0.02 (lbm/Mgal)
Biocide BE-9 148.00 (Gal) Surfactant LOSURF-360 148.00 (Gal)
0.50 (gal/Mgal) 0.50 (gal/Mgal)
Clay Control Cla-Sta(R) XP 883.00 (Gal) Clay Control CLA-Web 148.00 (Gal)
3.00 (gal/Mgal) 0.50 (gal/Mgal)
Fluids
Biocide BE-6 41.00(lbm) Scale Control Scalechek Scp-2 Scale Inhibitor 9501.00(lbm)
Additive
Defoamer D-AIR 3000L 524(Gal) Biocide BE-9 1614(Gal)
Clay Control CLA-Web 1614(Gal) Breaker SP Breaker 277.00(lbm)
Crosslinker CL-31 471(Gal) Surfactant LOSURF-360 1725(Gal)
Breaker Optiflo-III 1439.00(lbm) Corrosion HAI-OS 222(Gal)
Inhibitor
Clay Control Cla-Sta(R) XP 883(Gal)
Proppants
CUATRO HIJOS
Well Name FEE/008H Water Frac G - R(3) 59615
Job Name Cuatro Hijos Fee #8H Hybor G - R(15) 49500
Mid Perf MD 13520(ft) Water Frac G - R(15) 45000
No. of Perfs/Jets 36 7.5% NEFE Acid 3000
Estimated Pump Time 60.70(min) Treated Water 5000
Common White-100 Mesh,
BHST 148.0(degF) SSA-2 10000
Max. Pressure Allowed 8500.0(psig) CRC Premium-40/70 32500
Frac Gradient 0.750 (psi/ft) CRC Premium-30/50 112500
Pw BHTP - Ph + Pf + Ppf 8667.1 (psig) - 4747.6 (psig) + 2671.4 (psig) + 742.0 7332.8 (psig)
(psig)
HHP (Liquid) (Pw x Rate) / 40.8 Required on Location 7332.8 (psig) x 80.0 (bbl/min) / 40.8 14378.06 (hp)
(Recommended:
21000.00 (hp))
CUATRO HIJOS
Well Name FEE/008H Water Frac G - R(3) 59615
Job Name Cuatro Hijos Fee #8H Hybor G - R(15) 49500
Mid Perf MD 13325(ft) Water Frac G - R(15) 45000
No. of Perfs/Jets 36 7.5% NEFE Acid 6000
Estimated Pump Time 94.18(min) Treated Water 16062
Common White-100 Mesh,
BHST 148.0(degF) SSA-2 10000
Max. Pressure Allowed 8500.0(psig) CRC Premium-40/70 32500
Frac Gradient 0.750 (psi/ft) CRC Premium-30/50 112500
BHTP Fracture Gradient x Mid Interval Depth( TVD) 0.750 (psi/ft) x 9845 (ft) 8667.1 (psig)
Ph Fluid Density x Mid Interval Depth (TVD) x 0.05195 8.33 (lbm/gal) x 9845 (ft) x 0.05195 4747.6 (psig)
Pf Friction Loss in Pipe @ rate 2671.4 (psig)
Ppf Friction Loss in perfs @ rate 742.0 (psig)
Pw BHTP - Ph + Pf + Ppf 8667.1 (psig) - 4747.6 (psig) + 2671.4 (psig) + 742.0 7332.8 (psig)
(psig)
HHP (Liquid) (Pw x Rate) / 40.8 Required on Location 7332.8 (psig) x 80.0 (bbl/min) / 40.8 14378.06 (hp)
(Recommended:
21000.00 (hp))
CUATRO HIJOS
Well Name FEE/008H Water Frac G - R(3) 59615
Job Name Cuatro Hijos Fee #8H Hybor G - R(15) 49500
Mid Perf MD 13137(ft) Water Frac G - R(15) 45000
No. of Perfs/Jets 36 7.5% NEFE Acid 6000
Estimated Pump Time 94.18(min) Treated Water 16062
Common White-100 Mesh,
BHST 148.0(degF) SSA-2 10000
Max. Pressure Allowed 8500.0(psig) CRC Premium-30/50 112500
Frac Gradient 0.750 (psi/ft) CRC Premium-40/70 32500
BHTP Fracture Gradient x Mid Interval Depth( TVD) 0.750 (psi/ft) x 9845 (ft) 8667.1 (psig)
Ph Fluid Density x Mid Interval Depth (TVD) x 0.05195 8.33 (lbm/gal) x 9845 (ft) x 0.05195 4747.6 (psig)
Pf Friction Loss in Pipe @ rate 2671.4 (psig)
Ppf Friction Loss in perfs @ rate 742.0 (psig)
Pw BHTP - Ph + Pf + Ppf 8667.1 (psig) - 4747.6 (psig) + 2671.4 (psig) + 742.0 7332.8 (psig)
(psig)
HHP (Liquid) (Pw x Rate) / 40.8 Required on Location 7332.8 (psig) x 80.0 (bbl/min) / 40.8 14378.06 (hp)
(Recommended:
21000.00 (hp))
CUATRO HIJOS
Well Name FEE/008H Water Frac G - R(3) 59615
Job Name Cuatro Hijos Fee #8H Hybor G - R(15) 49500
Mid Perf MD 13010(ft) Water Frac G - R(15) 45000
No. of Perfs/Jets 36 7.5% NEFE Acid 6000
Estimated Pump Time 94.18(min) Treated Water 16062
Common White-100 Mesh,
BHST 148.0(degF) SSA-2 10000
Max. Pressure Allowed 8500.0(psig) CRC Premium-40/70 32500
Frac Gradient 0.750 (psi/ft) CRC Premium-30/50 112500
BHTP Fracture Gradient x Mid Interval Depth( TVD) 0.750 (psi/ft) x 9845 (ft) 8667.1 (psig)
Ph Fluid Density x Mid Interval Depth (TVD) x 0.05195 8.33 (lbm/gal) x 9845 (ft) x 0.05195 4747.6 (psig)
Pf Friction Loss in Pipe @ rate 2671.4 (psig)
Ppf Friction Loss in perfs @ rate 742.0 (psig)
Pw BHTP - Ph + Pf + Ppf 8667.1 (psig) - 4747.6 (psig) + 2671.4 (psig) + 742.0 7332.8 (psig)
(psig)
HHP (Liquid) (Pw x Rate) / 40.8 Required on Location 7332.8 (psig) x 80.0 (bbl/min) / 40.8 14378.06 (hp)
(Recommended:
21000.00 (hp))
CUATRO HIJOS
Well Name FEE/008H Water Frac G - R(3) 59615
Job Name Cuatro Hijos Fee #8H Hybor G - R(15) 49500
Mid Perf MD 12909(ft) Water Frac G - R(15) 45000
No. of Perfs/Jets 36 7.5% NEFE Acid 6000
Estimated Pump Time 94.18(min) Treated Water 16062
Common White-100 Mesh,
BHST 148.0(degF) SSA-2 10000
Max. Pressure Allowed 8500.0(psig) CRC Premium-30/50 112500
Frac Gradient 0.750 (psi/ft) CRC Premium-40/70 32500
BHTP Fracture Gradient x Mid Interval Depth( TVD) 0.750 (psi/ft) x 9845 (ft) 8667.1 (psig)
Ph Fluid Density x Mid Interval Depth (TVD) x 0.05195 8.33 (lbm/gal) x 9845 (ft) x 0.05195 4747.6 (psig)
Pf Friction Loss in Pipe @ rate 2671.4 (psig)
Ppf Friction Loss in perfs @ rate 742.0 (psig)
Pw BHTP - Ph + Pf + Ppf 8667.1 (psig) - 4747.6 (psig) + 2671.4 (psig) + 742.0 7332.8 (psig)
(psig)
HHP (Liquid) (Pw x Rate) / 40.8 Required on Location 7332.8 (psig) x 80.0 (bbl/min) / 40.8 14378.06 (hp)
(Recommended:
21000.00 (hp))
CUATRO HIJOS
Well Name FEE/008H Water Frac G - R(3) 59615
Job Name Cuatro Hijos Fee #8H Hybor G - R(15) 49500
Mid Perf MD 12738(ft) Water Frac G - R(15) 45000
No. of Perfs/Jets 36 7.5% NEFE Acid 6000
Estimated Pump Time 94.18(min) Treated Water 16062
Common White-100 Mesh,
BHST 148.0(degF) SSA-2 10000
Max. Pressure Allowed 8500.0(psig) CRC Premium-40/70 32500
Frac Gradient 0.750 (psi/ft) CRC Premium-30/50 112500
BHTP Fracture Gradient x Mid Interval Depth( TVD) 0.750 (psi/ft) x 9845 (ft) 8667.1 (psig)
Ph Fluid Density x Mid Interval Depth (TVD) x 0.05195 8.33 (lbm/gal) x 9845 (ft) x 0.05195 4747.6 (psig)
Pf Friction Loss in Pipe @ rate 2671.4 (psig)
Ppf Friction Loss in perfs @ rate 742.0 (psig)
Pw BHTP - Ph + Pf + Ppf 8667.1 (psig) - 4747.6 (psig) + 2671.4 (psig) + 742.0 7332.8 (psig)
(psig)
HHP (Liquid) (Pw x Rate) / 40.8 Required on Location 7332.8 (psig) x 80.0 (bbl/min) / 40.8 14378.06 (hp)
(Recommended:
21000.00 (hp))
CUATRO HIJOS
Well Name FEE/008H Water Frac G - R(3) 59615
Job Name Cuatro Hijos Fee #8H Hybor G - R(15) 49500
Mid Perf MD 12523(ft) Water Frac G - R(15) 45000
No. of Perfs/Jets 36 7.5% NEFE Acid 6000
Estimated Pump Time 94.18(min) Treated Water 16062
Common White-100 Mesh,
BHST 148.0(degF) SSA-2 10000
Max. Pressure Allowed 8500.0(psig) CRC Premium-40/70 32500
Frac Gradient 0.750 (psi/ft) CRC Premium-30/50 112500
BHTP Fracture Gradient x Mid Interval Depth( TVD) 0.750 (psi/ft) x 9845 (ft) 8667.1 (psig)
Ph Fluid Density x Mid Interval Depth (TVD) x 0.05195 8.33 (lbm/gal) x 9845 (ft) x 0.05195 4747.6 (psig)
Pf Friction Loss in Pipe @ rate 2671.4 (psig)
Ppf Friction Loss in perfs @ rate 742.0 (psig)
Pw BHTP - Ph + Pf + Ppf 8667.1 (psig) - 4747.6 (psig) + 2671.4 (psig) + 742.0 7332.8 (psig)
(psig)
HHP (Liquid) (Pw x Rate) / 40.8 Required on Location 7332.8 (psig) x 80.0 (bbl/min) / 40.8 14378.06 (hp)
(Recommended:
21000.00 (hp))
CUATRO HIJOS
Well Name FEE/008H Water Frac G - R(3) 59615
Job Name Cuatro Hijos Fee #8H Hybor G - R(15) 49500
Mid Perf MD 12420(ft) Water Frac G - R(15) 45000
No. of Perfs/Jets 36 7.5% NEFE Acid 6000
Estimated Pump Time 94.18(min) Treated Water 16062
Common White-100 Mesh,
BHST 148.0(degF) SSA-2 10000
Max. Pressure Allowed 8500.0(psig) CRC Premium-30/50 112500
Frac Gradient 0.750 (psi/ft) CRC Premium-40/70 32500
BHTP Fracture Gradient x Mid Interval Depth( TVD) 0.750 (psi/ft) x 9845 (ft) 8667.1 (psig)
Ph Fluid Density x Mid Interval Depth (TVD) x 0.05195 8.33 (lbm/gal) x 9845 (ft) x 0.05195 4747.6 (psig)
Pf Friction Loss in Pipe @ rate 2671.4 (psig)
Ppf Friction Loss in perfs @ rate 742.0 (psig)
Pw BHTP - Ph + Pf + Ppf 8667.1 (psig) - 4747.6 (psig) + 2671.4 (psig) + 742.0 7332.8 (psig)
(psig)
HHP (Liquid) (Pw x Rate) / 40.8 Required on Location 7332.8 (psig) x 80.0 (bbl/min) / 40.8 14378.06 (hp)
(Recommended:
21000.00 (hp))
CUATRO HIJOS
Well Name FEE/008H Water Frac G - R(3) 59615
Job Name Cuatro Hijos Fee #8H Hybor G - R(15) 49500
Mid Perf MD 12235(ft) 7.5% NEFE Acid 6000
No. of Perfs/Jets 36 Treated Water 16062
Estimated Pump Time 94.18(min) Water Frac G - R(15) 45000
Common White-100 Mesh,
BHST 148.0(degF) SSA-2 10000
Max. Pressure Allowed 8500.0(psig) CRC Premium-40/70 32500
Frac Gradient 0.750 (psi/ft) CRC Premium-30/50 112500
BHTP Fracture Gradient x Mid Interval Depth( TVD) 0.750 (psi/ft) x 9845 (ft) 8667.1 (psig)
Ph Fluid Density x Mid Interval Depth (TVD) x 0.05195 8.33 (lbm/gal) x 9845 (ft) x 0.05195 4747.6 (psig)
Pf Friction Loss in Pipe @ rate 2671.4 (psig)
Ppf Friction Loss in perfs @ rate 742.0 (psig)
Pw BHTP - Ph + Pf + Ppf 8667.1 (psig) - 4747.6 (psig) + 2671.4 (psig) + 742.0 7332.8 (psig)
(psig)
HHP (Liquid) (Pw x Rate) / 40.8 Required on Location 7332.8 (psig) x 80.0 (bbl/min) / 40.8 14378.06 (hp)
(Recommended:
21000.00 (hp))
CUATRO HIJOS
Well Name FEE/008H Water Frac G - R(3) 59615
Job Name Cuatro Hijos Fee #8H Hybor G - R(15) 49500
Mid Perf MD 12037(ft) Water Frac G - R(15) 45000
No. of Perfs/Jets 36 7.5% NEFE Acid 6000
Estimated Pump Time 94.18(min) Treated Water 16062
Common White-100 Mesh,
BHST 148.0(degF) SSA-2 10000
Max. Pressure Allowed 8500.0(psig) CRC Premium-30/50 112500
Frac Gradient 0.750 (psi/ft) CRC Premium-40/70 32500
BHTP Fracture Gradient x Mid Interval Depth( TVD) 0.750 (psi/ft) x 9845 (ft) 8667.1 (psig)
Ph Fluid Density x Mid Interval Depth (TVD) x 0.05195 8.33 (lbm/gal) x 9845 (ft) x 0.05195 4747.6 (psig)
Pf Friction Loss in Pipe @ rate 2671.4 (psig)
Ppf Friction Loss in perfs @ rate 742.0 (psig)
Pw BHTP - Ph + Pf + Ppf 8667.1 (psig) - 4747.6 (psig) + 2671.4 (psig) + 742.0 7332.8 (psig)
(psig)
HHP (Liquid) (Pw x Rate) / 40.8 Required on Location 7332.8 (psig) x 80.0 (bbl/min) / 40.8 14378.06 (hp)
(Recommended:
21000.00 (hp))
CUATRO HIJOS
Well Name FEE/008H Water Frac G - R(3) 59615
Job Name Cuatro Hijos Fee #8H Hybor G - R(15) 49500
Mid Perf MD 11835(ft) Water Frac G - R(15) 45000
No. of Perfs/Jets 36 7.5% NEFE Acid 6000
Estimated Pump Time 94.18(min) Treated Water 16062
Common White-100 Mesh,
BHST 148.0(degF) SSA-2 10000
Max. Pressure Allowed 8500.0(psig) CRC Premium-30/50 112500
Frac Gradient 0.750 (psi/ft) CRC Premium-40/70 32500
BHTP Fracture Gradient x Mid Interval Depth( TVD) 0.750 (psi/ft) x 9845 (ft) 8667.1 (psig)
Ph Fluid Density x Mid Interval Depth (TVD) x 0.05195 8.33 (lbm/gal) x 9845 (ft) x 0.05195 4747.6 (psig)
Pf Friction Loss in Pipe @ rate 2671.4 (psig)
Ppf Friction Loss in perfs @ rate 742.0 (psig)
Pw BHTP - Ph + Pf + Ppf 8667.1 (psig) - 4747.6 (psig) + 2671.4 (psig) + 742.0 7332.8 (psig)
(psig)
HHP (Liquid) (Pw x Rate) / 40.8 Required on Location 7332.8 (psig) x 80.0 (bbl/min) / 40.8 14378.06 (hp)
(Recommended:
21000.00 (hp))
CUATRO HIJOS
Well Name FEE/008H Water Frac G - R(3) 59615
Job Name Cuatro Hijos Fee #8H Hybor G - R(15) 49500
Mid Perf MD 11623(ft) Water Frac G - R(15) 45000
No. of Perfs/Jets 36 7.5% NEFE Acid 6000
Estimated Pump Time 94.18(min) Treated Water 16062
Common White-100 Mesh,
BHST 148.0(degF) SSA-2 10000
Max. Pressure Allowed 8500.0(psig) CRC Premium-30/50 112500
Frac Gradient 0.750 (psi/ft) CRC Premium-40/70 32500
BHTP Fracture Gradient x Mid Interval Depth( TVD) 0.750 (psi/ft) x 9845 (ft) 8667.1 (psig)
Ph Fluid Density x Mid Interval Depth (TVD) x 0.05195 8.33 (lbm/gal) x 9845 (ft) x 0.05195 4747.6 (psig)
Pf Friction Loss in Pipe @ rate 2671.4 (psig)
Ppf Friction Loss in perfs @ rate 742.0 (psig)
Pw BHTP - Ph + Pf + Ppf 8667.1 (psig) - 4747.6 (psig) + 2671.4 (psig) + 742.0 7332.8 (psig)
(psig)
HHP (Liquid) (Pw x Rate) / 40.8 Required on Location 7332.8 (psig) x 80.0 (bbl/min) / 40.8 14378.06 (hp)
(Recommended:
21000.00 (hp))
CUATRO HIJOS
Well Name FEE/008H Water Frac G - R(3) 59615
Job Name Cuatro Hijos Fee #8H Hybor G - R(15) 49500
Mid Perf MD 11450(ft) Water Frac G - R(15) 45000
No. of Perfs/Jets 36 7.5% NEFE Acid 6000
Estimated Pump Time 94.18(min) Treated Water 16062
Common White-100 Mesh,
BHST 148.0(degF) SSA-2 10000
Max. Pressure Allowed 8500.0(psig) CRC Premium-40/70 32500
Frac Gradient 0.750 (psi/ft) CRC Premium-30/50 112500
BHTP Fracture Gradient x Mid Interval Depth( TVD) 0.750 (psi/ft) x 9845 (ft) 8667.1 (psig)
Ph Fluid Density x Mid Interval Depth (TVD) x 0.05195 8.33 (lbm/gal) x 9845 (ft) x 0.05195 4747.6 (psig)
Pf Friction Loss in Pipe @ rate 2671.4 (psig)
Ppf Friction Loss in perfs @ rate 742.0 (psig)
Pw BHTP - Ph + Pf + Ppf 8667.1 (psig) - 4747.6 (psig) + 2671.4 (psig) + 742.0 7332.8 (psig)
(psig)
HHP (Liquid) (Pw x Rate) / 40.8 Required on Location 7332.8 (psig) x 80.0 (bbl/min) / 40.8 14378.06 (hp)
(Recommended:
21000.00 (hp))
CUATRO HIJOS
Well Name FEE/008H Water Frac G - R(3) 59615
Job Name Cuatro Hijos Fee #8H Water Frac G - R(15) 45000
Mid Perf MD 11237(ft) 7.5% NEFE Acid 6000
No. of Perfs/Jets 36 Treated Water 16062
Estimated Pump Time 94.18(min) Hybor G - R(15) 49500
Common White-100 Mesh,
BHST 148.0(degF) SSA-2 10000
Max. Pressure Allowed 8500.0(psig) CRC Premium-30/50 112500
Frac Gradient 0.750 (psi/ft) CRC Premium-40/70 32500
BHTP Fracture Gradient x Mid Interval Depth( TVD) 0.750 (psi/ft) x 9845 (ft) 8667.1 (psig)
Ph Fluid Density x Mid Interval Depth (TVD) x 0.05195 8.33 (lbm/gal) x 9845 (ft) x 0.05195 4747.6 (psig)
Pf Friction Loss in Pipe @ rate 2671.4 (psig)
Ppf Friction Loss in perfs @ rate 742.0 (psig)
Pw BHTP - Ph + Pf + Ppf 8667.1 (psig) - 4747.6 (psig) + 2671.4 (psig) + 742.0 7332.8 (psig)
(psig)
HHP (Liquid) (Pw x Rate) / 40.8 Required on Location 7332.8 (psig) x 80.0 (bbl/min) / 40.8 14378.06 (hp)
(Recommended:
21000.00 (hp))
CUATRO HIJOS
Well Name FEE/008H Water Frac G - R(3) 59615
Job Name Cuatro Hijos Fee #8H Hybor G - R(15) 49500
Mid Perf MD 11048(ft) Water Frac G - R(15) 45000
No. of Perfs/Jets 36 7.5% NEFE Acid 6000
Estimated Pump Time 94.18(min) Treated Water 16062
Common White-100 Mesh,
BHST 148.0(degF) SSA-2 10000
Max. Pressure Allowed 8500.0(psig) CRC Premium-40/70 32500
Frac Gradient 0.750 (psi/ft) CRC Premium-30/50 112500
BHTP Fracture Gradient x Mid Interval Depth( TVD) 0.750 (psi/ft) x 9845 (ft) 8667.1 (psig)
Ph Fluid Density x Mid Interval Depth (TVD) x 0.05195 8.33 (lbm/gal) x 9845 (ft) x 0.05195 4747.6 (psig)
Pf Friction Loss in Pipe @ rate 2671.4 (psig)
Ppf Friction Loss in perfs @ rate 742.0 (psig)
Pw BHTP - Ph + Pf + Ppf 8667.1 (psig) - 4747.6 (psig) + 2671.4 (psig) + 742.0 7332.8 (psig)
(psig)
HHP (Liquid) (Pw x Rate) / 40.8 Required on Location 7332.8 (psig) x 80.0 (bbl/min) / 40.8 14378.06 (hp)
(Recommended:
21000.00 (hp))
CUATRO HIJOS
Well Name FEE/008H Water Frac G - R(3) 59615
Job Name Cuatro Hijos Fee #8H Hybor G - R(15) 49500
Mid Perf MD 10856(ft) Water Frac G - R(15) 45000
No. of Perfs/Jets 36 7.5% NEFE Acid 6000
Estimated Pump Time 94.18(min) Treated Water 16062
Common White-100 Mesh,
BHST 148.0(degF) SSA-2 10000
Max. Pressure Allowed 8500.0(psig) CRC Premium-40/70 32500
Frac Gradient 0.750 (psi/ft) CRC Premium-30/50 112500
BHTP Fracture Gradient x Mid Interval Depth( TVD) 0.750 (psi/ft) x 9845 (ft) 8667.1 (psig)
Ph Fluid Density x Mid Interval Depth (TVD) x 0.05195 8.33 (lbm/gal) x 9845 (ft) x 0.05195 4747.6 (psig)
Pf Friction Loss in Pipe @ rate 2671.4 (psig)
Ppf Friction Loss in perfs @ rate 742.0 (psig)
Pw BHTP - Ph + Pf + Ppf 8667.1 (psig) - 4747.6 (psig) + 2671.4 (psig) + 742.0 7332.8 (psig)
(psig)
HHP (Liquid) (Pw x Rate) / 40.8 Required on Location 7332.8 (psig) x 80.0 (bbl/min) / 40.8 14378.06 (hp)
(Recommended:
21000.00 (hp))
CUATRO HIJOS
Well Name FEE/008H Water Frac G - R(3) 59615
Job Name Cuatro Hijos Fee #8H Hybor G - R(15) 49500
Mid Perf MD 10608(ft) Water Frac G - R(15) 45000
No. of Perfs/Jets 36 7.5% NEFE Acid 6000
Estimated Pump Time 94.18(min) Treated Water 16062
Common White-100 Mesh,
BHST 148.0(degF) SSA-2 10000
Max. Pressure Allowed 8500.0(psig) CRC Premium-30/50 112500
Frac Gradient 0.750 (psi/ft) CRC Premium-40/70 32500
BHTP Fracture Gradient x Mid Interval Depth( TVD) 0.750 (psi/ft) x 9845 (ft) 8667.1 (psig)
Ph Fluid Density x Mid Interval Depth (TVD) x 0.05195 8.33 (lbm/gal) x 9845 (ft) x 0.05195 4747.6 (psig)
Pf Friction Loss in Pipe @ rate 2671.4 (psig)
Ppf Friction Loss in perfs @ rate 742.0 (psig)
Pw BHTP - Ph + Pf + Ppf 8667.1 (psig) - 4747.6 (psig) + 2671.4 (psig) + 742.0 7332.8 (psig)
(psig)
HHP (Liquid) (Pw x Rate) / 40.8 Required on Location 7332.8 (psig) x 80.0 (bbl/min) / 40.8 14378.06 (hp)
(Recommended:
21000.00 (hp))
CUATRO HIJOS
Well Name FEE/008H Water Frac G - R(3) 59615
Job Name Cuatro Hijos Fee #8H Hybor G - R(15) 49500
Mid Perf MD 10412(ft) Water Frac G - R(15) 45000
No. of Perfs/Jets 36 7.5% NEFE Acid 6000
Estimated Pump Time 94.18(min) Treated Water 16062
Common White-100 Mesh,
BHST 148.0(degF) SSA-2 10000
Max. Pressure Allowed 8500.0(psig) CRC Premium-30/50 112500
Frac Gradient 0.750 (psi/ft) CRC Premium-40/70 32500
BHTP Fracture Gradient x Mid Interval Depth( TVD) 0.750 (psi/ft) x 9845 (ft) 8667.1 (psig)
Ph Fluid Density x Mid Interval Depth (TVD) x 0.05195 8.33 (lbm/gal) x 9845 (ft) x 0.05195 4747.6 (psig)
Pf Friction Loss in Pipe @ rate 2671.4 (psig)
Ppf Friction Loss in perfs @ rate 742.0 (psig)
Pw BHTP - Ph + Pf + Ppf 8667.1 (psig) - 4747.6 (psig) + 2671.4 (psig) + 742.0 7332.8 (psig)
(psig)
HHP (Liquid) (Pw x Rate) / 40.8 Required on Location 7332.8 (psig) x 80.0 (bbl/min) / 40.8 14378.06 (hp)
(Recommended:
21000.00 (hp))
CUATRO HIJOS
Well Name FEE/008H Water Frac G - R(3) 59615
Job Name Cuatro Hijos Fee #8H Hybor G - R(15) 49500
Mid Perf MD 10183(ft) Water Frac G - R(15) 45000
No. of Perfs/Jets 36 7.5% NEFE Acid 6000
Estimated Pump Time 94.18(min) Treated Water 16062
Common White-100 Mesh,
BHST 148.0(degF) SSA-2 10000
Max. Pressure Allowed 8500.0(psig) CRC Premium-30/50 112500
Frac Gradient 0.750 (psi/ft) CRC Premium-40/70 32500
BHTP Fracture Gradient x Mid Interval Depth( TVD) 0.750 (psi/ft) x 9845 (ft) 8667.1 (psig)
Ph Fluid Density x Mid Interval Depth (TVD) x 0.05195 8.33 (lbm/gal) x 9845 (ft) x 0.05195 4747.6 (psig)
Pf Friction Loss in Pipe @ rate 2671.4 (psig)
Ppf Friction Loss in perfs @ rate 742.0 (psig)
Pw BHTP - Ph + Pf + Ppf 8667.1 (psig) - 4747.6 (psig) + 2671.4 (psig) + 742.0 7332.8 (psig)
(psig)
HHP (Liquid) (Pw x Rate) / 40.8 Required on Location 7332.8 (psig) x 80.0 (bbl/min) / 40.8 14378.06 (hp)
(Recommended:
21000.00 (hp))
Unit
Mtrl Nbr Description Qty UOM Gross Amt Discount $ Net Amount
Price
CHEM, CLA-WEB - TOTE
CLA-WEB - TOTE (101985045)
101985045 1,612.00 GAL 474.30 764,571.60 688,114.44 53,902.30
Svc-Commodity / Global Discount:
22,554.86
CHEM-OPTIFLO-III DELAYED
RELEASE
100003801 OPTIFLO-III (100003801) 1,438.00 LB 89.59 128,830.42 115,947.38 9,082.54
Svc-Commodity / Global Discount:
3,800.50
CHEM-CLA-STA XP - TOTE TANK
CLA-STA(R) XP (100003733)
100003733 883.00 GAL 211.16 186,454.28 167,808.85 13,145.03
Svc-Commodity / Global Discount:
5,500.40
CHEM-SCALECHEK SCP-2 SCL
INHIB,50LB DRM
SCALECHEK SCP-2 SCALE
101710151 9,500.00 LB 61.28 582,160.00 523,944.00 41,042.28
INHIBITOR, 50 LB DRUM (101710151)
Svc-Commodity / Global Discount:
17,173.72
CHEM-SP BREAKER - 10# BOX
100003624 SP BREAKER, 10# (100003624) 275.00 LB 39.20 10,780.00 9,702.00 759.99
Svc-Commodity / Global Discount: 318.01
Chem-D-Air 3000L, Tote Tank
D-AIR 3000L, TOTETANK (101396181)
101396181 523.00 GAL 140.55 73,507.65 66,156.89 5,182.29
Svc-Commodity / Global Discount:
2,168.47
Sand-Common White-100 Mesh, SSA-2,
bulk
SAND - PREMIUM - 100 MESH, BULK,
100003676 1,900.00 SK 150.00 285,000.00 270,037.50 10,548.56
SK (100003676)
Svc-Commodity / Global Discount:
4,413.94
Sand-CRC Premium-40/70, bulk
SAND-CRC PREMIUM-40/70, BULK
101357964 (101357964) 617,500.00 LB 2.75 1,698,125.00 1,507,085.94 134,682.54
Svc-Commodity / Global Discount:
56,356.52
SAND, CRC PREMIUM - 30/50, BULK
SAND-CRC PREMIUM30/50, BULK
101822155 (101822155) 2,137,500.00 LB 2.75 5,878,125.00 5,216,835.94 466,208.79
Svc-Commodity / Global Discount:
195,080.27
Solution pricing master line items
PE SAND TRANSPORTATION CHARGE
905010 Svc-Commodity / Global Discount: 29,450.00 CWT 0.90 26,505.00 18,686.02
7,818.98
PE PROPPANT HANDLING/STORAGE
SOL CHARGE
216319 Proppant Handl & Stor. Sol Chg Per lb 2,945,000.00 LB 0.09 265,050.00 245,171.25 14,014.52
Svc-Commodity / Global Discount:
5,864.23
PE PROPPANT DEL SOL CHARGE PER
TON MILE
216318 Proppant Del Sol Chg, per ton mile 88,350.00 TNM 4.05 357,817.50 330,981.19 18,919.60
Svc-Commodity / Global Discount:
7,916.71
Additional Items
PE REMOTE DATA TRANSMISSION
18402 SETUP CHARGE 1.00 EA 2,837.00 2,837.00 2,624.23 150.00
Svc-Commodity / Global Discount: 62.77
NUMBER OF UNITS 1
Unit
Mtrl Nbr Description Qty UOM Gross Amt Discount $ Net Amount
Price
PE RTRS-DATA TRANSMISSION 2HR
97821 MIN/ADD HR 19.00 EA 1,180.00 22,420.00 20,738.50 1,185.46
Svc-Commodity / Global Discount: 496.04
HR/DAY/WEEK/MTH/YEAR/JOB/RUN H
HOURS OR FRACTION (MIN2) 1
PE INSITE Anywhere Srvc per job, per day
231877 1.00 JOB 1,446.00 5,784.00 5,350.20 305.83
Svc-Commodity / Global Discount: 127.97
DAYS OR PARTIAL DAY(WHOLE NO.) 4
PE STIMULATION REGISTRY FEE
683872 1.00 EA 1,000.00 1,000.00 705.00
Svc-Commodity / Global Discount: 295.00
UNIT OF MEASURE - STAGE STG
PROCESSING PER STAGE/PLUS ADDT 19
426460 PE Customer Funded Bonus 1.00 EA 12,000.00 12,000.00 12,000.00
372628 Administration fee 1.00 EA 3,000.00 3,000.00 3,000.00
Total Gross Amount 24,185,405.32
Total Item Discounts 22,324,861.36
Total Svc-Commodity / Global Discount: 544,435.47
Total Net Amount USD 1,316,108.49
3 Conditions
The cost in this analysis is good for the materials and/or services outlined within and shall be valid for 30 days
from the date of this proposal. In order to meet your needs under this proposal with a high quality of service and
responsive timing, Halliburton will be allocating limited resources and committing valuable equipment and
materials to your area of operations. Accordingly, the discounts reflected in this proposal are available only for
materials and services awarded on a first-call basis. Alternate pricing may apply in the event that Halliburton is
awarded work on any basis other than as a first-call provider.
The unit prices stated in the proposal are based on our current published prices. The projected equipment,
personnel, and material needs are only estimates based on information about the work presently available to us.
At the time the work is actually performed, conditions then existing may require an increase or decrease in the
equipment, personnel, and/or material needs. Charges will be based upon unit prices in effect at the time the work
is performed and the amount of equipment, personnel, and/or material actually utilized in the work. Taxes, if any,
are not included. Applicable taxes, if any, will be added to the actual invoice.
It is understood and agreed between the parties that with the exception of the subject discounts, all services
performed and equipment and materials sold are provided subject to Halliburtons General Terms and Conditions
contained in our current price list, (which include LIMITATION OF LIABILITY and WARRANTY provisions),
and pursuant to the applicable Halliburton Work Order Contract (whether or not executed by you), unless a
Master Service and/or Sales Contract applicable to the services, equipment, or materials supplied exists between
your company and Halliburton, in which case the negotiated Master Contract shall govern the relationship
between the parties. A copy of the latest version of our General Terms and Conditions is available from your
Halliburton representative or at: http://www.halliburton.com/terms for your convenient review, and we would
appreciate receiving any questions you may have about them. Should your company be interested in negotiating a
Master Contract with Halliburton, our Law Department would be pleased to work with you to finalize a mutually
agreeable contract. In this connection, it is also understood and agreed that Customer will continue to execute
Halliburton usual field work orders and/or tickets customarily required by Halliburton in connection with the
furnishing of said services, equipment, and materials.
Any terms and conditions contained in purchase orders or other documents issued by the customer shall be of no
effect except to confirm the type and quantity of services, equipment, and materials to be supplied to the
customer.
If customer does not have an approved open account with Halliburton or a mutually executed written contract
with Halliburton, which dictates payment terms different than those set forth in this clause, all sums due are
payable in cash at the time of performance of services or delivery of equipment, products, or materials. If
customer has an approved open account, invoices are payable on the twentieth day after date of invoice.
Customer agrees to pay interest on any unpaid balance from the date payable until paid at the highest lawful
contract rate applicable, but never to exceed 18% per annum. In the event Halliburton employs an attorney for
collection of any account, customer agrees to pay attorney fees of 20% of the unpaid account, plus all collection
and court costs.
4 Appendix
4.1 Gold Medal Standards
Gold Medal Level II - Designed for engineering design and improvement in real time, Level II includes
Level I plus onsite FRACPROTM, and on-site pumping diagnostic tests, and remote data transmission.
Gold Medal Level III - Designed to meet the requirements of critical wells, Level III includes Level II
plus on-site Fann-50 rheology testing
.
Setting the industrys standard for fracturing quality wasnt
enough...so we raised it!
4.2 LOTO
Technical Discussion
A Lock and/or Tag will be the first Halliburton equipment installed at the well-head prior
to a rig-up or rig-down operations. Whenever the well-head master valve is in a closed
position, it will be Locked and Tagged.
When using a remote operated master valve, power hoses must be disconnected (and if
permitted by the customer locked out) at the control panel when the valve is in the
closed position. This applies to remote operated valves provided by 3rd parties and
those from Halliburton.
The rig-up and rig-down procedure used will make the connection of our iron at the well-
head the last operation in rig-up and first operation when rigging down to reduce
exposure time to the potential pressure present at the well-head.