Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Firhan Oktavian Wijaya - 12030115140141

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 289

PT TINOMASTEX

YOGYAKARTA

Jurnal Pembelian
Bulan : Januari 1988

Debit
Tanggal Keterangan No. Faktur Persediaan Bahan Persediaan Bahan Bakar
Pembungkus 1145 dan Pelumas 1146
11/01/1988 CV ACI OLI 100/F Rp 785,000.00
13/01/1988 PT Patal Mataram F131

15/01/1988 Toko Mayasari 000311 Rp 30,000.00


16/01/1988 Percetakan Rahayu F054 Rp 75,000.00
17/01/1988 CV Gagak Rimang F761 Rp 750,000.00
18/01/1988 CV ACI OLI 150/F Rp 1,500,000.00
21/01/1988 PT Sumber Agung F310

29/01/1988 CV Gagak Rimang F810 Rp 180,000.00


29/01/1988 Percetakan Rahayu F83 Rp 77,500.00

Jumlah Rp 1,112,500.00 Rp 2,285,000.00

Jurnal Penjualan
Bulan : Januari 1988

Debit Kredit
Tanggal Keterangan No. Faktur
Piutang Dagang 1131 PPN Keluaran 2103
02/01/1988 PT Batik Kencana 001/F/I/1988 Rp 14,520,000.00 Rp 1,320,000.00
04/01/1988 PT Busana Adi 002/F/I/1988 Rp 23,760,000.00 Rp 2,160,000.00
05/01/1988 CV Batik Rahayu 003/F/I/1988 Rp 9,240,000.00 Rp 840,000.00
07/01/1988 PT Gaya Busana 004/F/I/1989 Rp 35,640,000.00 Rp 3,240,000.00
10/01/1988 CV Batik Abadi 005/F/I/1988 Rp 26,400,000.00 Rp 2,400,000.00
15/01/1988 PT Batik Kencana 006/F/I/1988 Rp 36,960,000.00 Rp 3,360,000.00
17/01/1988 PT Busana Adi 007/F/I/1988 Rp 46,200,000.00 Rp 4,200,000.00
25/01/1988 CV Batik Rahayu 008/F/I/1988 Rp 17,160,000.00 Rp 1,560,000.00
28/01/1988 CV Batik Abadi 009/F/I/1988 Rp 25,080,000.00 Rp 2,280,000.00
Jumlah Rp 234,960,000.00 Rp 21,360,000.00
X

8
Halaman :
Debit Kredit
Lain-lain
Utang Dagang 2101
No. Rek Jumlah
Rp 785,000.00
1144 Rp 101,440,000.00 Rp 111,584,000.00
1151 Rp 10,144,000.00
Rp 30,000.00
1151 Rp 7,500.00 Rp 82,500.00
1151 Rp 75,000.00 Rp 825,000.00
Rp 1,500,000.00
1147 Rp 120,000.00 Rp 132,000.00
1151 Rp 12,000.00
1151 Rp 18,000.00 Rp 198,000.00
1151 Rp 7,750.00 Rp 85,250.00

Rp 111,824,250.00 Rp 115,221,750.00

Halaman :
Kredit
Hasil Penjualan Kain
Grey 4101
Rp 13,200,000.00
Rp 21,600,000.00
Rp 8,400,000.00
Rp 32,400,000.00
Rp 24,000,000.00
Rp 33,600,000.00
Rp 42,000,000.00
Rp 15,600,000.00
Rp 22,800,000.00
Rp 213,600,000.00
Rekapitulasi
Debit Kredit
No. Rek Jumlah No. Rek Jumlah
1144 Rp 101,440,000.00 2101 Rp 115,221,750.00
1145 Rp 1,112,500.00
1146 Rp 2,285,000.00
1147 Rp 120,000.00
1151 Rp 10,264,250.00

Total Rp 115,221,750.00 Total Rp 115,221,750.00

Rekapitulasi
Debit Kredit
No. Rek Jumlah No. Rek Jumlah
1131 Rp 234,960,000.00 2103 Rp 21,360,000.00
4101 Rp 213,600,000.00
Total Rp 234,960,000.00 Total Rp 234,960,000.00
Keterangan Tanggal Tanda Tangan
Dibuat oleh : Firhan
Oktavian Wijaya
23 Agustus 2016

Dibukukan oleh : 23 Agustus 2016


Firhan Oktavian
Wijaya

Keterangan Tanggal Tanda Tangan


Dibuat oleh : Firhan
Oktavian Wijaya
23 Agustus 2016

Dibukukan oleh :
Firhan Oktavian
Wijaya 23 Agustus 2016
PT TINO
YOGYA

Jurnal Pene
Bulan : Ja

Tanggal Keterangan No. BKM


Kas 1111
02/01/1988 PT Batik Kencana, Solo 1/BKM Rp 3,102,000.00
03/01/1988 PT Busana Adi, Yogyakarta 2/BKM Rp 4,356,000.00
05/01/1988 PT Gaya Busana, Semarang 3/BKM Rp 5,544,000.00
07/01/1988 Investasi Saham Jangka Panjang 4/BKM Rp 4,602,500.00

11/01/1988 PT Batik Kencana, Solo 5/BKM Rp 14,256,000.00


12/01/1988 Investasi Obligasi Jangka Panjang 6/BKM Rp 10,050,000.00

14/01/1988 PT Busana Adi, Yogyakarta 7/BKM Rp 23,328,000.00


15/01/1988 CV Batik Rahayu, Yogyakarta 8/BKM Rp 9,072,000.00
17/01/1988 PT Gaya Busana, Semarang 9/BKM Rp 34,992,000.00
20/01/1988 CV Batik Abadi, Pekalongan 10/BKM Rp 25,920,000.00
27/01/1988 PT Busana Adi, Yogyakarta 11/BKM Rp 45,360,000.00
29/01/1988 PT Batik Kencana, Solo 12/BKM Rp 36,960,000.00
30/01/1988 UD Mahkota, Bantul 13/BKM Rp 5,500,000.00

Jumlah Rp 223,042,500.00

Jurnal Pengeluaran Ka
Bulan : Januari 1988

Debit
Tanggal Keterangan No. BKK
Utang Dagang 2101
02/01/1998 CV Aci Oil, Yogyakarta 1/BKK Rp 1,270,000.00
02/01/1998 CV Gagak Rimang 2/BKK Rp 825,000.00
02/01/1998 Pembayaran Persekot Premi Asuransi 3/BKK
03/01/1998 Toko Mayasari Yogyakarta 4/BKK Rp 21,000.00
04/01/1998 Kas Kecil 5/BKK
Biaya Rapat dan Pertemuan
Macam - macam biaya pemasaran
04/01/1998 Toko Besi Awet 6/BKK Rp 3,000,000.00
06/01/1998 Biaya Pemeliharaan Taman 7/BKK
10/01/1998 Pembayaran Biaya Pemasaran 8/BKK
10/01/1998 Utang Pajak Penghasilan 9/BKK
10/01/1998 PPN Keluaran 10/BKK
10/01/1998 PPh Badan 11/BKK
10/01/1998 Biaya Reparasi Mebel - Adm. Umum 12/BKK
Biaya Reparasi Mebel - Pemasaran
11/01/1998 Pembayaran Biaya Pemasaran 13/BKK
13/01/1998 Perbaikan Peralatan Kantor - Pemasaran 14/BKK
14/01/1998 Pembayaran Biaya Konsultan 15/BKK
16/01/1998 Biaya Reparasi Peralatan Kantor - Adm.Umum 16/BKK
Biaya Reparasi Peralatan Kantor - Pemasaran
17/01/1998 Percetakan Rahayu, Yogyakarta 17/BKK Rp 82,500.00
17/01/1998 Biaya Cetak Fotocopy 18/BKK
Biaya Pos dan Telepon
Biaya Langganan Surat Kabar
19/01/1998 Perbaikan Mesin Tulis Kantor - Adm. Umum 19/BKK
20/01/1998 Toko Mayasari Yogyakarta 20/BKK Rp 30,000.00
24/01/1998 PT Patal Mataram, Yogyakarta 21/BKK Rp 111,584,000.00
25/01/1998 Pembayaran gaji dan upah 22/BKK
25/01/1998 Pembayaran upah lembur 23/BKK
25/01/1998 Pembayaran biaya pengobatan 24/BKK
25/01/1998 Pembelian sertifikat deposito BRI 25/BKK
29/01/1998 Pembelian saham PT RVI 26/BKK
30/01/1998 Percetakan Rahayu, Yogyakarta 27/BKK Rp 85,250.00
30/01/1998 CV Gagak Rimang 28/BKK Rp 1,023,000.00
30/01/1998 Pembayaran biaya perjalanan dinas - Adm. Umum 29/BKK
Pembayaran biaya perjalanan dinas - Pemasaran
30/01/1998 Pembayaran biaya angkut 30/BKK
31/01/1998 Pembelian kendaraan 31/BKK

31/01/1998 Kontrak pembangunan gudang barang jadi 32/BKK

Jumlah Rp 117,920,750.00
PT TINOMASTEX
YOGYAKARTA

Jurnal Penerimaan Kas


Bulan : Januari 1988

Debit Kredit
Potongan Penjualan Lain-lain
Piutang Dagang 1131
4201 No. Rek Jumlah
Rp 3,102,000.00
Rp 4,356,000.00
Rp 5,544,000.00

Rp 264,000.00 Rp 14,520,000.00
6203 Rp 250,000.00

Rp 432,000.00 Rp 23,760,000.00
Rp 168,000.00 Rp 9,240,000.00
Rp 648,000.00 Rp 35,640,000.00
Rp 480,000.00 Rp 26,400,000.00
Rp 840,000.00 Rp 46,200,000.00
Rp 36,960,000.00
1327 Rp 5,000,000.00

Rp 2,832,000.00 Rp 5,250,000.00 Rp 205,722,000.00

Jurnal Pengeluaran Kas


Bulan : Januari 1988

Debit Kredit
Lain-lain Lain-lain
Kas 1111
No. Rek Jumlah No. Rek
Rp 1,270,000.00
Rp 825,000.00
1154 Rp 3,500,000.00 Rp 3,500,000.00
Rp 21,000.00
1112 Rp 70,000.00
5301.65 Rp 118,500.00 Rp 268,500.00
5401 Rp 80,000.00
Rp 3,000,000.00
5301.31 Rp 300,000.00 Rp 300,000.00
5401.71 Rp 400,000.00 Rp 400,000.00
2102 Rp 846,600.00 Rp 846,600.00
2103 Rp 21,600,000.00 Rp 3,412,800.00 1151
1152 Rp 8,150,000.00 Rp 8,150,000.00
5301.35 Rp 500,000.00
Rp 620,000.00
5401.35 Rp 120,000.00
5401.71 Rp 500,000.00 Rp 500,000.00
5401.35 Rp 10,000.00 Rp 10,000.00
5301.66 Rp 2,500,000.00 Rp 2,500,000.00
5301.35 Rp 700,000.00
Rp 808,000.00
5401.35 Rp 108,000.00
Rp 82,500.00
5301.61 Rp 150,000.00
5301.62 Rp 117,500.00 Rp 292,500.00
5301.64 Rp 25,000.00
5301.35 Rp 230,000.00 Rp 230,000.00
Rp 30,000.00
Rp 111,584,000.00
1601.21 Rp 8,853,100.00 Rp 8,147,850.00 2102
1601.22 Rp 1,633,420.00 Rp 1,502,770.00 2102
1601.23 Rp 718,090.00 Rp 718,090.00
1123 Rp 20,000,000.00 Rp 20,000,000.00
1121 Rp 16,500,000.00 Rp 16,500,000.00
Rp 85,250.00
Rp 1,023,000.00
5301.63 Rp 500,000.00
Rp 850,000.00
5401.63 Rp 350,000.00
5401 Rp 4,250,000.00 Rp 4,250,000.00
1317 Rp 12,500,000.00
Rp 13,500,000.00
1151 Rp 1,000,000.00
1502 Rp 800,000.00 Rp 800,000.00

Rp 107,130,210.00 Rp 206,027,860.00
Halaman : 1
Kredit Rekapitulasi
Lain-lain Debit
No. Rek Jumlah No. Rek Jumlah
1111 Rp 223,042,500.00
1327 Rp 5,000,000.00
4201 Rp 2,832,000.00
1201 Rp 4,567,500.00 6203 Rp 250,000.00
6105 Rp 35,000.00

1202 Rp 10,100,000.00
6101 Rp 200,000.00

1317 Rp 10,000,000.00
6104 Rp 500,000.00

Rp 25,402,500.00
Total Rp 231,124,500.00

Halaman : Rekapitulasi
edit Debit
Lain-lain No. Rek Jumlah
Jumlah 1112 Rp 70,000.00
1121 Rp 16,500,000.00
1123 Rp 20,000,000.00
1151 Rp 1,000,000.00
1152 Rp 8,150,000.00
1154 Rp 3,500,000.00
1317 Rp 12,500,000.00
1502 Rp 800,000.00
1601 Rp 11,204,610.00
2101 Rp 117,920,750.00
2102 Rp 846,600.00
2103 Rp 21,600,000.00
Rp 18,187,200.00 5301 Rp 5,141,000.00
5401 Rp 5,818,000.00

Total Rp 225,050,960.00

Rp 705,250.00
Rp 130,650.00

Rp 19,023,100.00
Rekapitulasi Keterangan Tanggal
Kredit Dibuat oleh : Firhan
No. Rek Jumlah Oktavian Wijaya
30 Agustus 2016
1131 Rp 205,722,000.00
1201 Rp 4,567,500.00
1202 Rp 10,100,000.00 Dibukukan oleh :
1317 Rp 10,000,000.00 Firhan Oktavian Wijaya
30 Agustus 2016
6101 Rp 200,000.00
6104 Rp 500,000.00
6105 Rp 35,000.00

Total Rp 231,124,500.00

Rekapitulasi Keterangan Tanggal


Dibuat oleh : Firhan
Kredit Oktavian Wijaya
No. Rek Jumlah 20 November 2017
1111 Rp 206,027,860.00
1151 Rp 18,187,200.00
2102 Rp 835,900.00 Dibukukan oleh : 20 November 2017
Firhan Oktavian Wijaya
Total Rp 225,050,960.00
Tanda Tangan

Tanda Tangan
Tanggal Keterangan

01/01/1988 Produksi - Persiapan (Benang)


02/01/1988 Produksi - Listrik (Premium & Solar)
03/01/1988 Reparasi & Pem. Mesin - Persiapan (Minyak Pelumas)
04/01/1988 Produksi - Persiapan (Benang)
05/01/1988 Reparasi & Pem. Mesin - Persiapan (Spare Part Mesin)
06/01/1988 Reparasi & Pem. Gedung - Adm. & Umum (Seng)
07/01/1988 Reparasi & Pem. Mesin - Pertenunan (Spare Part Mesin)
08/01/1988 Produksi - Persiapan (Benang)
09/01/1988 Reparasi & Pem. Mesin - Pertenunan (Minyak Pelumas)
10/01/1988 Produksi - Pertenunan (Kayu Penggulung Kain, Plastik Pembungkus & Etiket Kecil)
10/01/1988 Reparasi & Pem. Mesin - Listrik (Kabel Listrik & Spare Part Generator)
12/01/1988 Reparasi & Pem. Gedung - Listrik (Seng, Asbes & Cat Kayu)
12/01/1988 Reparasi & Pem. Emplasemen - Umum Pabrik (Obat Anti Hama)
12/01/1988 Produksi - Persiapan (Benang)
12/01/1988 Reparasi & Pem. Gedung - Persiapan (Kayu Jati & Cat Kayu)
13/01/1988 Produksi - Pertenunan (Kayu Penggulung Kain)
14/01/1988 Reparasi & Pem. Mesin - Bengkel (Mesin bubut)
15/01/1988 Produksi - Persiapan (Benang)
15/01/1988 Reparasi & Pem. Mebel - Pertenunan (Kayu Jati, Plitur & Cat)
16/01/1988 Reparasi & Pem. Peralatan Pabrik - Umum Pabrik (Spare Part Timbangan)
17/01/1988 Reparasi & Pem. Emplasemen - Umum Pabrik (Aspal & Semen)
19/01/1988 Produksi - Persiapan (Benang)
19/01/1988 Reparasi & Pem. Kendaraan - Pemasaran (Cat Mobil, Ban Mobil & Kaca Mobil)
19/01/1988 Reparasi & Pem. Gedung - Umum Pabrik (Cat & Hardboard)
20/01/1988 Produksi - Pertenunan (Kayu Penggulung Kain, Plastik Pembungkus & Etiket Kecil)
20/01/1988 Produksi - Listrik (Minyak Pelumas)
21/01/1988 Produksi - Bengkel (Premium & Solar)
22/01/1988 Reparasi & Pem. Gedung - Umum Pabrik (Cat Tembok)
23/01/1988 Reparasi & Pem. Kendaraan - Umum Pabrik (Accu Mobil)
23/01/1988 Reparasi & Pem. Gedung - Persiapan (Seng Asbes & Cat)
24/01/1988 Produksi - Persiapan (Benang)
25/01/1988 Produksi - Pertenunan (Etiket Besar & Peti Kayu)
27/01/1988 Produksi - Bengkel (Minyak Pelumas)
27/01/1988 Reparasi & Pem. Kendaraan - Adm. & Umum (Accu Mobil, Ban Mobil & Kaca Mobil)
27/01/1988 Reparasi & Pem. Gedung - Pertenunan (Seng Asbes, Cat Tembok & Kayu Jati)
29/01/1988 Produksi - Pertenunan (Kayu Penggulung Kain)
30/01/1988 Produksi - Persiapan (Benang)
30/01/1988 Reparasi & Pem. Gedung - Pemasaran (Kaca, Plywood, Cat & Plamir)

JUMLAH

PT TINOMASTEX
YOGYAKARTA
Jurnal Memorial
Bulan : Januari 1988

Tanggal Keterangan
01/01/1988 PDP Awal Ke BDP Seksi Persiapan

01/01/1988 PDP Awal ke BDP Seksi Pertenunan

05/01/1988 Penghapusan Piutang CV Progo Busana

05/01/1988 Sumbangan Tanah

26/01/1988 Retur Barang CV Batik Rahayu


Total
PT TINOMASTEX
YOGYAKARTA

Jurnal Pemakaian Bahan


Bulan : Januari 1988

Kredit
No. Persediaan Bahan
Persediaan Bahan Persediaan Bahan Persediaan Suku
BPPB Bakar dan Pelumas
Baku 1144 Pembungkus 1145 Cadang 1147
1146

1/BPB Rp 16,484,000.00
2/BPB Rp 1,150,000.00
3/BPB Rp 612,825.00
4/BPB Rp 20,288,000.00
5/BPB Rp 2,417,500.00
6/BPB
7/BPB Rp 2,319,000.00
8/BPB Rp 15,216,000.00
9/BPB Rp 562,500.00
10/BPB Rp 398,000.00
11/BPB Rp 103,000.00
12/BPB
13/BPB
14/BPB Rp 17,752,000.00
15/BPB
16/BPB Rp 300,000.00
17/BPB Rp 335,000.00
18/BPB Rp 16,484,000.00
19/BPB
20/BPB Rp 115,000.00
21/BPB
22/BPB Rp 15,216,000.00
23/BPB Rp 815,000.00
24/BPB
25/BPB Rp 319,000.00
26/BPB Rp 405,700.00
27/BPB Rp 310,000.00
28/BPB
29/BPB Rp 50,000.00
30/BPB
31/BPB Rp 12,680,000.00
32/BPB Rp 180,200.00
33/BPB Rp 165,000.00
34/BPB Rp 425,000.00
35/BPB
36/BPB Rp 375,000.00
37/BPB Rp 17,752,000.00
38/BPB

Rp 131,872,000.00 Rp 1,572,200.00 Rp 3,206,025.00 Rp 6,579,500.00

PT TINOMASTEX
YOGYAKARTA
Jurnal Memorial
Bulan : Januari 1988

Debit Kredit
No. BM
No. Rek Jumlah No. Rek Jumlah
1/BM 5231 Rp 7,100,800.00 1142 Rp 8,528,300.00
5232 Rp 209,625.00
5233 Rp 1,217,875.00

2/BM 5241 Rp 14,050,700.00 1143 Rp 16,724,700.00


5242 Rp 828,000.00
5243 Rp 1,846,000.00

3/BM 1132 Rp 200,000.00 1131 Rp 200,000.00

4/BM 1311 Rp 15,000,000.00 3004 Rp 15,000,000.00

5/BM 4202 Rp 3,600,000.00 1131 Rp 3,960,000.00


2103 Rp 360,000.00 5101 Rp 2,346,000.00
1141 Rp 2,346,000.00
Rp 46,759,000.00 Rp 46,759,000.00
Debit (Pusat Biaya)
Seksi Umum Pabrik Seksi Pertenunan Seksi Persiapan Lain-lain
Persediaan Bahan Biaya Overhead Biaya Overhead Barang Dalam Proses
Lain-lain 1148 Pabrik Sesungguhnya Pabrik Sesungguhnya Biaya Bahan Baku No. Rek
5213 5222 5231
Rp 16,484,000.00
5211
5221
Rp 20,288,000.00
5221
Rp 187,500.00 5301
Rp 2,319,000.00
Rp 15,216,000.00
Rp 562,500.00
Rp 398,000.00
5211
Rp 50,000.00 5211
Rp 40,000.00 Rp 40,000.00
Rp 17,752,000.00
Rp 267,500.00 5221
Rp 300,000.00
5212
Rp 16,484,000.00
Rp 508,600.00 Rp 508,600.00
Rp 115,000.00
Rp 135,000.00 Rp 135,000.00
Rp 15,216,000.00
5401
Rp 23,940.00 Rp 23,940.00
Rp 319,000.00
5211
5212
Rp 10,000.00 Rp 10,000.00
Rp 50,000.00
Rp 261,800.00 5221
Rp 12,680,000.00
Rp 180,200.00
5212
5301
Rp 1,452,700.00 Rp 1,452,700.00
Rp 375,000.00
Rp 17,752,000.00
Rp 72,500.00 5401

Rp 3,009,540.00 Rp 373,940.00 Rp 6,415,000.00 Rp 131,872,000.00


Lain-lain

Jumlah

Rekapitulasi
Rp 1,150,000.00 Debit
Rp 612,825.00 No. Rek Jumlah
5211 Rp 1,708,700.00
Rp 2,417,500.00 5212 Rp 810,000.00
Rp 187,500.00 5213 Rp 373,940.00
5221 Rp 3,559,625.00
5222 Rp 6,415,000.00
5231 Rp 131,872,000.00
5301 Rp 612,500.00
Rp 103,000.00 5401 Rp 887,500.00
Rp 50,000.00

Rp 267,500.00

Rp 335,000.00

Rp 815,000.00

Total Rp 146,239,265.00
Rp 405,700.00
Rp 310,000.00

Rp 261,800.00

Rp 165,000.00
Rp 425,000.00
Rp 72,500.00

Rp 7,578,325.00
Rekapitulasi
Kredit
No. Rek Jumlah
1144 Rp 131,872,000.00
1145 Rp 1,572,200.00
1146 Rp 3,206,025.00
1147 Rp 6,579,500.00
1148 Rp 3,009,540.00

Total Rp 146,239,265.00
Keterangan Tanggal Tanda Tangan
Dibuat oleh : Firhan Oktavian
Wijaya
06 September 2016

Dibukukan oleh : Firhan 06 September 2016


Oktavian Wijaya
PT TINOMASTEX
YOGYAKARTA

REKENING PEMBANTU :
Piutang CV Progo Busana

Tanggal Keterangan Ref.


01/01/1988 Saldo
05/01/1988 JM-1

REKENING PEMBANTU :
Piutang PT Busana Adi

Tanggal Keterangan Ref.


01/01/1988 Saldo
03/01/1988 JKM-1
04/01/1988 JPn-1
14/01/1988 JKM-1
17/01/1988 JPn-1
27/01/1988 JKM-1
REKENING PEMBANTU :
Piutang CV Batik Rahayu

Tanggal Keterangan Ref.


01/01/1988 Saldo
05/01/1988 JPn-1
15/01/1988 JKM-1
25/01/1988 JPn-1
26/01/1988 JM-1

REKENING PEMBANTU :
Utang CV Aci Oil

Tanggal Keterangan Ref.


01/01/1988 Saldo
02/01/1988 JKK-1
11/01/1988 JPb-1
18/01/1988 JPb-1
REKENING PEMBANTU :
Utang Toko Mayasari

Tanggal Keterangan Ref.


01/01/1988 Saldo
03/01/1988 JKK-1
15/01/1988 JPb-1
20/01/1998 JKK-1

REKENING PEMBANTU :
Utang CV Gagak Rimang

Tanggal Keterangan Ref.


01/01/1988 Saldo
02/01/1998 JKK-1
17/01/1988 JPb-1
29/01/1988 JPb-1
30/01/1998 JKK-1
REKENING PEMBANTU :
Utang Toko Besi Awet

Tanggal Keterangan Ref.


01/01/1988 Saldo
04/01/1998 JKK-1

REKENING PEMBANTU :
Biaya Bahan Pelumas

Tanggal Keterangan Ref.


20/01/1988 Produksi - Listrik (Minyak Pelumas) JPBhn-1
REKENING PEMBANTU :
Biaya Lembur

Tanggal Keterangan Ref.


31/01/1988 Distribusi JM-1

REKENING PEMBANTU :
Biaya Reparasi dan Pemeliharaan Gedung

Tanggal Keterangan Ref.


12/01/1988 Reparasi & Pem. Gedung - Listrik (Seng, Asbes & Cat Kayu) JPBhn-1
REKENING PEMBANTU :
Biaya Penyusutan Gedung

Tanggal Keterangan Ref.


31/01/1988 Distribusi JM-1

REKENING PEMBANTU :
Biaya Asuransi Aktiva Tetap
Tanggal Keterangan Ref.
31/01/1988 Distribusi JM-1

REKENING PEMBANTU :
Biaya Bahan Bakar

Tanggal Keterangan Ref.


21/01/1988 Produksi - Bengkel (Premium & Solar) JPBhn-1

REKENING PEMBANTU :
Biaya Gaji dan Upah

Tanggal Keterangan Ref.


31/01/1988 Distribusi JM-1

REKENING PEMBANTU :
Biaya Pengobatan dan Perawatan

Tanggal Keterangan Ref.


31/01/1988 Distribusi JM-1
REKENING PEMBANTU :
Biaya Penyusutan Gedung

Tanggal Keterangan Ref.


31/01/1988 Distribusi JM-1

REKENING PEMBANTU :
Biaya Asuransi Aktiva Tetap

Tanggal Keterangan Ref.


31/01/1988 Distribusi JM-1
REKENING PEMBANTU :
Biaya Gaji dan Upah

Tanggal Keterangan Ref.


31/01/1988 Distribusi JM-1

REKENING PEMBANTU :
Biaya Pengobatan dan Perawatan

Tanggal Keterangan Ref.


31/01/1988 Distribusi JM-1
REKENING PEMBANTU :
Biaya Reparasi dan Pemeliharaan Gedung

Tanggal Keterangan Ref.


19/01/1988 Reparasi & Pem. Gedung - Umum Pabrik (Cat & Hardboard) JPBhn-1
22/01/1988 Reparasi & Pem. Gedung - Umum Pabrik (Cat Tembok) JPBhn-1

REKENING PEMBANTU :
Biaya Reparasi dan Pemeliharaan Peralatan Pabrik

Tanggal Keterangan Ref.


16/01/1988 Reparasi & Pem. Peralatan Pabrik - Umum Pabrik (Spare Par JPBhn-1
REKENING PEMBANTU :
Biaya Reparasi dan Pemeliharaan Kendaraan

Tanggal Keterangan Ref.


23/01/1988 Reparasi & Pem. Kendaraan - Umum Pabrik (Accu Mobil) JPBhn-1

REKENING PEMBANTU :
Biaya Penyusutan Gedung

Tanggal Keterangan Ref.


31/01/1988 Distribusi JM-1
REKENING PEMBANTU :
Biaya Penyusutan Kendaraan

Tanggal Keterangan Ref.


31/01/1988 Distribusi JM-1

REKENING PEMBANTU :
Biaya Asuransi Persediaan
Tanggal Keterangan Ref.
31/01/1988 Distribusi JM-1

REKENING PEMBANTU :
Biaya Bahan Pelumas

Tanggal Keterangan Ref.


03/01/1988 Reparasi & Pem. Mesin - Persiapan (Minyak Pelumas) JPBhn-1
REKENING PEMBANTU :
Biaya Reparasi dan Pemeliharaan Mesin-mesin

Tanggal Keterangan Ref.


05/01/1988 Reparasi & Pem. Mesin - Persiapan (Spare Part Mesin) JPBhn-1

REKENING PEMBANTU :
Biaya Penyusutan Mesin-mesin

Tanggal Keterangan Ref.


31/01/1988 Distribusi JM-1
REKENING PEMBANTU :
Biaya Asuransi Aktiva Tetap

Tanggal Keterangan Ref.


31/01/1988 Distribusi JM-1

REKENING PEMBANTU :
Biaya yang Diterima Dari Seksi Lain

Tanggal Keterangan Ref.


31/01/1988 JP-2
31/01/1988 JP-2
31/01/1988 JP-2
REKENING PEMBANTU :
Biaya Bahan Pelumas

Tanggal Keterangan Ref.


09/01/1988 Reparasi & Pem. Mesin - Pertenunan (Minyak Pelumas) JPbhn-1

REKENING PEMBANTU :
Biara Reparasi dan Pemeliharaan Mesin-mesin

Tanggal Keterangan Ref.


07/01/1988 Reparasi & Pem. Mesin - Pertenunan (Spare Part Mesin) JPBhn-1
REKENING PEMBANTU :
Biaya Penyusutan Gedung

Tanggal Keterangan Ref.


31/01/1988 Distribusi JM-1

REKENING PEMBANTU :
Biaya Penyusutan Peralatan Pabrik

Tanggal Keterangan Ref.


31/01/1988 Distribusi JM-1
REKENING PEMBANTU :
Biaya Asuransi Persediaan

Tanggal Keterangan Ref.


31/01/1988 Distribusi JM-1

REKENING PEMBANTU :
Biaya Bahan Baku
Tanggal Keterangan Ref.

01/01/1988 Produksi - Persiapan (Benang) JPBhn-1


04/01/1988 Produksi - Persiapan (Benang) JPBhn-1
08/01/1988 Produksi - Persiapan (Benang) JPBhn-1
12/01/1988 Produksi - Persiapan (Benang) JPBhn-1
15/01/1988 Produksi - Persiapan (Benang) JPBhn-1
19/01/1988 Produksi - Persiapan (Benang) JPBhn-1
24/01/1988 Produksi - Persiapan (Benang) JPBhn-1
30/01/1988 Produksi - Persiapan (Benang) JPBhn-1

REKENING PEMBANTU :
Biaya Lembur

Tanggal Keterangan Ref.


31/01/1988 Distribusi JM-1

REKENING PEMBANTU :
Biaya Gaji dan Upah

Tanggal Keterangan Ref.

31/01/1988 Distribusi JM-1

REKENING PEMBANTU :
Biaya Pengobatan dan Perawatan

Tanggal Keterangan Ref.


31/01/1988 Distribusi JM-1
REKENING PEMBANTU :
Biaya Lembur

Tanggal Keterangan Ref.


31/01/1988 Distribusi JM-1

REKENING PEMBANTU :
Biaya Reparasi dan Pemeliharaan Emplasemen

Tanggal Keterangan Ref.


06/01/1998 Biaya Pemeliharaan Taman JKK-1
REKENING PEMBANTU :
Biaya Reparasi dan Pemeliharaan Mebel dan Peralatan Ka

Tanggal Keterangan Ref.


10/01/1998 Biaya Reparasi Mebel - Adm. Umum JKK-1
16/01/1998 Biaya Reparasi Peralatan Kantor - Adm.Umum JKK-1
19/01/1998 Perbaikan Mesin Tulis Kantor - Adm. Umum JKK-1

REKENING PEMBANTU :
Biaya Penyusutan Emplasemen

Tanggal Keterangan Ref.


31/01/1988 Distribusi JM-1
REKENING PEMBANTU :
Biaya Penyusutan Mebel dan Peralatan Kantor

Tanggal Keterangan Ref.


31/01/1988 Distribusi JM-1

REKENING PEMBANTU :
Biaya Amortisasi - Biaya Pendirian yang Ditangguhkan

Tanggal Keterangan Ref.


31/01/1988 Distribusi JM-1
REKENING PEMBANTU :
Biaya Cetak, Alatu Tulis, Photocopy, Photo Serta Lightdr

Tanggal Keterangan Ref.


17/01/1998 Biaya Cetak Fotocopy JKK-1

REKENING PEMBANTU :
Biaya Perjalanan Dinas

Tanggal Keterangan Ref.


30/01/1998 Pembayaran biaya perjalanan dinas - Adm. Umum JKK-1
REKENING PEMBANTU :
Biaya Rapat dan Pertemuan

Tanggal Keterangan Ref.


04/01/1998 Biaya Rapat dan Pertemuan JKK-1

REKENING PEMBANTU :
Biaya Administrasi dan Umum Lain-lain
Tanggal Keterangan Ref.
31/01/1988 Distribusi JM-1

REKENING PEMBANTU :
Biaya Gaji dan Upah

Tanggal Keterangan Ref.


31/01/1988 Distribusi JM-1
REKENING PEMBANTU :
Biaya Pengobatan dan Perawatan

Tanggal Keterangan Ref.


31/01/1988 Distribusi JM-1

REKENING PEMBANTU :
Biaya Reparasi dan Pemeliharaan Mebel dan Peralatan Ka

Tanggal Keterangan Ref.


10/01/1998 Biaya Reparasi Mebel - Pemasaran JKK-1
13/01/1998 Perbaikan Peralatan Kantor - Pemasaran JKK-1
16/01/1998 Biaya Reparasi Peralatan Kantor - Pemasaran JKK-1
REKENING PEMBANTU :
Biaya Penyusutan Gedung

Tanggal Keterangan Ref.


31/01/1988 Distribusi JM-1

REKENING PEMBANTU :
Biaya Penyusutan Kendaraan

Tanggal Keterangan Ref.


31/01/1988 Distribusi JM-1
REKENING PEMBANTU :
Biaya Perjalanan Dinas

Tanggal Keterangan Ref.


30/01/1998 Pembayaran biaya perjalanan dinas - Pemasaran JKK-1

REKENING PEMBANTU :
Biaya Angkut Kain Grey

Tanggal Keterangan Ref.


30/01/1998 Pembayaran biaya angkut JKK-1
REKENING PEMBANTU :
Biaya Pemasaran Lain-lain

Tanggal Keterangan Ref.


04/01/1998 Macam - macam biaya pemasaran JKK-1
PT TINOMASTEX
YOGYAKARTA

REKENING PEMBANTU :
Piutang CV Progo Busana

No. Kode Rekening : 1131-1


Debit Kredit Saldo
Rp 200,000.00
Rp 200,000.00 Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

REKENING PEMBANTU :
Piutang PT Busana Adi

No. Kode Rekening : 1131-3


Debit Kredit Saldo
Rp 4,356,000.00
Rp 4,356,000.00 Rp -
Rp 23,760,000.00 Rp 23,760,000.00
Rp 23,760,000.00 Rp -
Rp 46,200,000.00 Rp 46,200,000.00
Rp 46,200,000.00 Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

REKENING PEMBANTU :
Piutang CV Batik Rahayu

No. Kode Rekening : 1131-5


Debit Kredit Saldo
Rp -
Rp 9,240,000.00 Rp 9,240,000.00
Rp 9,240,000.00 Rp -
Rp 17,160,000.00 Rp 17,160,000.00
Rp 3,960,000.00 Rp 13,200,000.00
Rp 13,200,000.00
Rp 13,200,000.00
Rp 13,200,000.00
Rp 13,200,000.00
Rp 13,200,000.00
Rp 13,200,000.00
Rp 13,200,000.00
Rp 13,200,000.00
Rp 13,200,000.00
Rp 13,200,000.00
Rp 13,200,000.00
Rp 13,200,000.00
Rp 13,200,000.00

REKENING PEMBANTU :
Utang CV Aci Oil

No. Kode Rekening : 2101-1


Debit Kredit Saldo
Rp 1,270,000.00
Rp 1,270,000.00 Rp -
Rp 785,000.00 Rp 785,000.00
Rp 1,500,000.00 Rp 2,285,000.00
Rp 2,285,000.00
Rp 2,285,000.00
Rp 2,285,000.00
Rp 2,285,000.00
Rp 2,285,000.00
Rp 2,285,000.00
Rp 2,285,000.00
Rp 2,285,000.00
Rp 2,285,000.00
Rp 2,285,000.00
Rp 2,285,000.00
Rp 2,285,000.00
Rp 2,285,000.00
Rp 2,285,000.00

REKENING PEMBANTU :
Utang Toko Mayasari

No. Kode Rekening : 2101-3


Debit Kredit Saldo
Rp 21,000.00
Rp 21,000.00 Rp -
Rp 30,000.00 Rp 30,000.00
Rp 30,000.00 Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

REKENING PEMBANTU :
Utang CV Gagak Rimang

No. Kode Rekening : 2101-5


Debit Kredit Saldo
Rp 825,000.00
Rp 825,000.00 Rp -
Rp 825,000.00 Rp 825,000.00
Rp 198,000.00 Rp 1,023,000.00
Rp 1,023,000.00 Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

REKENING PEMBANTU :
Utang Toko Besi Awet

No. Kode Rekening : 2101-6


Debit Kredit Saldo
Rp 3,000,000.00
Rp 3,000,000.00 Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

REKENING PEMBANTU :
Biaya Bahan Pelumas
Halaman : 1
Kode Tempat Biaya : 5211
Kode Jenis Biaya : 14
Debit Kredit Saldo
Rp 405,700.00 Rp 405,700.00
Rp 405,700.00
Rp 405,700.00
Rp 405,700.00
Rp 405,700.00
Rp 405,700.00
Rp 405,700.00
Rp 405,700.00
Rp 405,700.00
Rp 405,700.00
Rp 405,700.00
Rp 405,700.00
Rp 405,700.00
Rp 405,700.00
Rp 405,700.00
Rp 405,700.00
Rp 405,700.00
Rp 405,700.00

REKENING PEMBANTU :
Biaya Lembur
Halaman : 1
Kode Tempat Biaya : 5211
Kode Jenis Biaya : 22
Debit Kredit Saldo
Rp 40,300.00 Rp 40,300.00
Rp 40,300.00
Rp 40,300.00
Rp 40,300.00
Rp 40,300.00
Rp 40,300.00
Rp 40,300.00
Rp 40,300.00
Rp 40,300.00
Rp 40,300.00
Rp 40,300.00
Rp 40,300.00
Rp 40,300.00
Rp 40,300.00
Rp 40,300.00
Rp 40,300.00
Rp 40,300.00
Rp 40,300.00

REKENING PEMBANTU :
parasi dan Pemeliharaan Gedung
Halaman : 1
Kode Tempat Biaya : 5211
Kode Jenis Biaya : 32
Debit Kredit Saldo
Rp 50,000.00 Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00

REKENING PEMBANTU :
Biaya Penyusutan Gedung
Halaman : 1
Kode Tempat Biaya : 5211
Kode Jenis Biaya : 42
Debit Kredit Saldo
Rp 250,000.00 Rp 250,000.00
Rp 250,000.00
Rp 250,000.00
Rp 250,000.00
Rp 250,000.00
Rp 250,000.00
Rp 250,000.00
Rp 250,000.00
Rp 250,000.00
Rp 250,000.00
Rp 250,000.00
Rp 250,000.00
Rp 250,000.00
Rp 250,000.00
Rp 250,000.00
Rp 250,000.00
Rp 250,000.00
Rp 250,000.00

REKENING PEMBANTU :
aya Asuransi Aktiva Tetap
Halaman : 1
Kode Tempat Biaya : 5211
Kode Jenis Biaya : 51
Debit Kredit Saldo
Rp 400,000.00 Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00

REKENING PEMBANTU :
Biaya Bahan Bakar
Halaman : 1
Kode Tempat Biaya : 5212
Kode Jenis Biaya : 13
Debit Kredit Saldo
Rp 310,000.00 Rp 310,000.00
Rp 310,000.00
Rp 310,000.00
Rp 310,000.00
Rp 310,000.00
Rp 310,000.00
Rp 310,000.00
Rp 310,000.00
Rp 310,000.00
Rp 310,000.00
Rp 310,000.00
Rp 310,000.00
Rp 310,000.00
Rp 310,000.00
Rp 310,000.00
Rp 310,000.00
Rp 310,000.00
Rp 310,000.00

REKENING PEMBANTU :
Biaya Gaji dan Upah
Halaman : 1
Kode Tempat Biaya : 5212
Kode Jenis Biaya : 21
Debit Kredit Saldo
Rp 143,900.00 Rp 143,900.00
Rp 143,900.00
Rp 143,900.00
Rp 143,900.00
Rp 143,900.00
Rp 143,900.00
Rp 143,900.00
Rp 143,900.00
Rp 143,900.00
Rp 143,900.00
Rp 143,900.00
Rp 143,900.00
Rp 143,900.00
Rp 143,900.00
Rp 143,900.00
Rp 143,900.00
Rp 143,900.00
Rp 143,900.00

REKENING PEMBANTU :
a Pengobatan dan Perawatan
Halaman : 1
Kode Tempat Biaya : 5212
Kode Jenis Biaya : 23
Debit Kredit Saldo
Rp 11,340.00 Rp 11,340.00
Rp 11,340.00
Rp 11,340.00
Rp 11,340.00
Rp 11,340.00
Rp 11,340.00
Rp 11,340.00
Rp 11,340.00
Rp 11,340.00
Rp 11,340.00
Rp 11,340.00
Rp 11,340.00
Rp 11,340.00
Rp 11,340.00
Rp 11,340.00
Rp 11,340.00
Rp 11,340.00
Rp 11,340.00

REKENING PEMBANTU :
Biaya Penyusutan Gedung
Halaman : 1
Kode Tempat Biaya : 5212
Kode Jenis Biaya : 42
Debit Kredit Saldo
Rp 200,000.00 Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00

REKENING PEMBANTU :
aya Asuransi Aktiva Tetap
Halaman : 1
Kode Tempat Biaya : 5212
Kode Jenis Biaya : 51
Debit Kredit Saldo
Rp 400,000.00 Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00

REKENING PEMBANTU :
Biaya Gaji dan Upah
Halaman : 1
Kode Tempat Biaya : 5213
Kode Jenis Biaya : 21
Debit Kredit Saldo
Rp 42,700.00 Rp 42,700.00
Rp 42,700.00
Rp 42,700.00
Rp 42,700.00
Rp 42,700.00
Rp 42,700.00
Rp 42,700.00
Rp 42,700.00
Rp 42,700.00
Rp 42,700.00
Rp 42,700.00
Rp 42,700.00
Rp 42,700.00
Rp 42,700.00
Rp 42,700.00
Rp 42,700.00
Rp 42,700.00
Rp 42,700.00

REKENING PEMBANTU :
a Pengobatan dan Perawatan
Halaman : 1
Kode Tempat Biaya : 5213
Kode Jenis Biaya : 23
Debit Kredit Saldo
Rp 15,000.00 Rp 15,000.00
Rp 15,000.00
Rp 15,000.00
Rp 15,000.00
Rp 15,000.00
Rp 15,000.00
Rp 15,000.00
Rp 15,000.00
Rp 15,000.00
Rp 15,000.00
Rp 15,000.00
Rp 15,000.00
Rp 15,000.00
Rp 15,000.00
Rp 15,000.00
Rp 15,000.00
Rp 15,000.00
Rp 15,000.00

REKENING PEMBANTU :
parasi dan Pemeliharaan Gedung
Halaman : 1
Kode Tempat Biaya : 5213
Kode Jenis Biaya : 32
Debit Kredit Saldo
Rp 23,940.00 Rp 23,940.00
Rp 10,000.00 Rp 33,940.00
Rp 33,940.00
Rp 33,940.00
Rp 33,940.00
Rp 33,940.00
Rp 33,940.00
Rp 33,940.00
Rp 33,940.00
Rp 33,940.00
Rp 33,940.00
Rp 33,940.00
Rp 33,940.00
Rp 33,940.00
Rp 33,940.00
Rp 33,940.00
Rp 33,940.00
Rp 33,940.00

REKENING PEMBANTU :
si dan Pemeliharaan Peralatan Pabrik
Halaman : 1
Kode Tempat Biaya : 5213
Kode Jenis Biaya : 34
Debit Kredit Saldo
Rp 115,000.00 Rp 115,000.00
Rp 115,000.00
Rp 115,000.00
Rp 115,000.00
Rp 115,000.00
Rp 115,000.00
Rp 115,000.00
Rp 115,000.00
Rp 115,000.00
Rp 115,000.00
Rp 115,000.00
Rp 115,000.00
Rp 115,000.00
Rp 115,000.00
Rp 115,000.00
Rp 115,000.00
Rp 115,000.00
Rp 115,000.00

REKENING PEMBANTU :
arasi dan Pemeliharaan Kendaraan
Halaman : 1
Kode Tempat Biaya : 5213
Kode Jenis Biaya : 36
Debit Kredit Saldo
Rp 50,000.00 Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00

REKENING PEMBANTU :
Biaya Penyusutan Gedung
Halaman : 1
Kode Tempat Biaya : 5213
Kode Jenis Biaya : 42
Debit Kredit Saldo
Rp 150,000.00 Rp 150,000.00
Rp 150,000.00
Rp 150,000.00
Rp 150,000.00
Rp 150,000.00
Rp 150,000.00
Rp 150,000.00
Rp 150,000.00
Rp 150,000.00
Rp 150,000.00
Rp 150,000.00
Rp 150,000.00
Rp 150,000.00
Rp 150,000.00
Rp 150,000.00
Rp 150,000.00
Rp 150,000.00
Rp 150,000.00

REKENING PEMBANTU :
aya Penyusutan Kendaraan
Halaman : 1
Kode Tempat Biaya : 5213
Kode Jenis Biaya : 46
Debit Kredit Saldo
Rp 100,000.00 Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00

REKENING PEMBANTU :
Biaya Asuransi Persediaan
Halaman : 1
Kode Tempat Biaya : 5213
Kode Jenis Biaya : 52
Debit Kredit Saldo
Rp 100,000.00 Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00

REKENING PEMBANTU :
Biaya Bahan Pelumas
Halaman : 1
Kode Tempat Biaya : 5221
Kode Jenis Biaya : 14
Debit Kredit Saldo
Rp 612,825.00 Rp 612,825.00
Rp 612,825.00
Rp 612,825.00
Rp 612,825.00
Rp 612,825.00
Rp 612,825.00
Rp 612,825.00
Rp 612,825.00
Rp 612,825.00
Rp 612,825.00
Rp 612,825.00
Rp 612,825.00
Rp 612,825.00
Rp 612,825.00
Rp 612,825.00
Rp 612,825.00
Rp 612,825.00
Rp 612,825.00
REKENING PEMBANTU :
rasi dan Pemeliharaan Mesin-mesin
Halaman : 1
Kode Tempat Biaya : 5221
Kode Jenis Biaya : 33
Debit Kredit Saldo
Rp 2,417,500.00 Rp 2,417,500.00
Rp 2,417,500.00
Rp 2,417,500.00
Rp 2,417,500.00
Rp 2,417,500.00
Rp 2,417,500.00
Rp 2,417,500.00
Rp 2,417,500.00
Rp 2,417,500.00
Rp 2,417,500.00
Rp 2,417,500.00
Rp 2,417,500.00
Rp 2,417,500.00
Rp 2,417,500.00
Rp 2,417,500.00
Rp 2,417,500.00
Rp 2,417,500.00
Rp 2,417,500.00

REKENING PEMBANTU :
ya Penyusutan Mesin-mesin
Halaman : 1
Kode Tempat Biaya : 5221
Kode Jenis Biaya : 43
Debit Kredit Saldo
Rp 1,050,000.00 Rp 1,050,000.00
Rp 1,050,000.00
Rp 1,050,000.00
Rp 1,050,000.00
Rp 1,050,000.00
Rp 1,050,000.00
Rp 1,050,000.00
Rp 1,050,000.00
Rp 1,050,000.00
Rp 1,050,000.00
Rp 1,050,000.00
Rp 1,050,000.00
Rp 1,050,000.00
Rp 1,050,000.00
Rp 1,050,000.00
Rp 1,050,000.00
Rp 1,050,000.00
Rp 1,050,000.00

REKENING PEMBANTU :
aya Asuransi Aktiva Tetap
Halaman : 1
Kode Tempat Biaya : 5221
Kode Jenis Biaya : 51
Debit Kredit Saldo
Rp 1,000,000.00 Rp 1,000,000.00
Rp 1,000,000.00
Rp 1,000,000.00
Rp 1,000,000.00
Rp 1,000,000.00
Rp 1,000,000.00
Rp 1,000,000.00
Rp 1,000,000.00
Rp 1,000,000.00
Rp 1,000,000.00
Rp 1,000,000.00
Rp 1,000,000.00
Rp 1,000,000.00
Rp 1,000,000.00
Rp 1,000,000.00
Rp 1,000,000.00
Rp 1,000,000.00
Rp 1,000,000.00

REKENING PEMBANTU :
yang Diterima Dari Seksi Lain
Halaman : 1
Kode Tempat Biaya : 5221
Kode Jenis Biaya : 82
Debit Kredit Saldo
Rp 900,000.00 Rp 900,000.00
Rp 600,000.00 Rp 1,500,000.00
Rp 500,000.00 Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00

REKENING PEMBANTU :
Biaya Bahan Pelumas
Halaman : 1
Kode Tempat Biaya : 5222
Kode Jenis Biaya : 14
Debit Kredit Saldo
Rp 562,500.00 Rp 562,500.00
Rp 562,500.00
Rp 562,500.00
Rp 562,500.00
Rp 562,500.00
Rp 562,500.00
Rp 562,500.00
Rp 562,500.00
Rp 562,500.00
Rp 562,500.00
Rp 562,500.00
Rp 562,500.00
Rp 562,500.00
Rp 562,500.00
Rp 562,500.00
Rp 562,500.00
Rp 562,500.00
Rp 562,500.00

REKENING PEMBANTU :
rasi dan Pemeliharaan Mesin-mesin
Halaman : 1
Kode Tempat Biaya : 5222
Kode Jenis Biaya : 33
Debit Kredit Saldo
Rp 2,319,000.00 Rp 2,319,000.00
Rp 2,319,000.00
Rp 2,319,000.00
Rp 2,319,000.00
Rp 2,319,000.00
Rp 2,319,000.00
Rp 2,319,000.00
Rp 2,319,000.00
Rp 2,319,000.00
Rp 2,319,000.00
Rp 2,319,000.00
Rp 2,319,000.00
Rp 2,319,000.00
Rp 2,319,000.00
Rp 2,319,000.00
Rp 2,319,000.00
Rp 2,319,000.00
Rp 2,319,000.00

REKENING PEMBANTU :
Biaya Penyusutan Gedung
Halaman : 1
Kode Tempat Biaya : 5222
Kode Jenis Biaya : 42
Debit Kredit Saldo
Rp 525,000.00 Rp 525,000.00
Rp 525,000.00
Rp 525,000.00
Rp 525,000.00
Rp 525,000.00
Rp 525,000.00
Rp 525,000.00
Rp 525,000.00
Rp 525,000.00
Rp 525,000.00
Rp 525,000.00
Rp 525,000.00
Rp 525,000.00
Rp 525,000.00
Rp 525,000.00
Rp 525,000.00
Rp 525,000.00
Rp 525,000.00

REKENING PEMBANTU :
Penyusutan Peralatan Pabrik
Halaman : 1
Kode Tempat Biaya : 5222
Kode Jenis Biaya : 44
Debit Kredit Saldo
Rp 40,000.00 Rp 40,000.00
Rp 40,000.00
Rp 40,000.00
Rp 40,000.00
Rp 40,000.00
Rp 40,000.00
Rp 40,000.00
Rp 40,000.00
Rp 40,000.00
Rp 40,000.00
Rp 40,000.00
Rp 40,000.00
Rp 40,000.00
Rp 40,000.00
Rp 40,000.00
Rp 40,000.00
Rp 40,000.00
Rp 40,000.00

REKENING PEMBANTU :
Biaya Asuransi Persediaan
Halaman : 1
Kode Tempat Biaya : 5222
Kode Jenis Biaya : 52
Debit Kredit Saldo
Rp 300,000.00 Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00

REKENING PEMBANTU :
Biaya Bahan Baku
Halaman : 1
Kode Tempat Biaya : 5231
Kode Jenis Biaya : 11
Debit Kredit Saldo

Rp 16,484,000.00 Rp 16,484,000.00
Rp 20,288,000.00 Rp 36,772,000.00
Rp 15,216,000.00 Rp 51,988,000.00
Rp 17,752,000.00 Rp 69,740,000.00
Rp 16,484,000.00 Rp 86,224,000.00
Rp 15,216,000.00 Rp 101,440,000.00
Rp 12,680,000.00 Rp 114,120,000.00
Rp 17,752,000.00 Rp 131,872,000.00
Rp 131,872,000.00
Rp 131,872,000.00
Rp 131,872,000.00
Rp 131,872,000.00
Rp 131,872,000.00
Rp 131,872,000.00
Rp 131,872,000.00
Rp 131,872,000.00
Rp 131,872,000.00

REKENING PEMBANTU :
Biaya Lembur
Halaman : 1
Kode Tempat Biaya : 5232
Kode Jenis Biaya : 22
Debit Kredit Saldo
Rp 400,000.00 Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00

REKENING PEMBANTU :
Biaya Gaji dan Upah
Halaman : 1
Kode Tempat Biaya : 5242
Kode Jenis Biaya : 21
Debit Kredit Saldo

Rp 3,229,000.00 Rp 3,229,000.00
Rp 3,229,000.00
Rp 3,229,000.00
Rp 3,229,000.00
Rp 3,229,000.00
Rp 3,229,000.00
Rp 3,229,000.00
Rp 3,229,000.00
Rp 3,229,000.00
Rp 3,229,000.00
Rp 3,229,000.00
Rp 3,229,000.00
Rp 3,229,000.00
Rp 3,229,000.00
Rp 3,229,000.00
Rp 3,229,000.00
Rp 3,229,000.00

REKENING PEMBANTU :
a Pengobatan dan Perawatan
Halaman : 1
Kode Tempat Biaya : 5242
Kode Jenis Biaya : 23
Debit Kredit Saldo
Rp 261,000.00 Rp 261,000.00
Rp 261,000.00
Rp 261,000.00
Rp 261,000.00
Rp 261,000.00
Rp 261,000.00
Rp 261,000.00
Rp 261,000.00
Rp 261,000.00
Rp 261,000.00
Rp 261,000.00
Rp 261,000.00
Rp 261,000.00
Rp 261,000.00
Rp 261,000.00
Rp 261,000.00
Rp 261,000.00
Rp 261,000.00

REKENING PEMBANTU :
Biaya Lembur
Halaman : 1
Kode Tempat Biaya : 5301
Kode Jenis Biaya : 22
Debit Kredit Saldo
Rp 350,000.00 Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00

REKENING PEMBANTU :
rasi dan Pemeliharaan Emplasemen
Halaman : 1
Kode Tempat Biaya : 5301
Kode Jenis Biaya : 31
Debit Kredit Saldo
Rp 300,000.00 Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00

REKENING PEMBANTU :
Pemeliharaan Mebel dan Peralatan Kantor
Halaman : 1
Kode Tempat Biaya : 5301
Kode Jenis Biaya : 35
Debit Kredit Saldo
Rp 500,000.00 Rp 500,000.00
Rp 700,000.00 Rp 1,200,000.00
Rp 230,000.00 Rp 1,430,000.00
Rp 1,430,000.00
Rp 1,430,000.00
Rp 1,430,000.00
Rp 1,430,000.00
Rp 1,430,000.00
Rp 1,430,000.00
Rp 1,430,000.00
Rp 1,430,000.00
Rp 1,430,000.00
Rp 1,430,000.00
Rp 1,430,000.00
Rp 1,430,000.00
Rp 1,430,000.00
Rp 1,430,000.00
Rp 1,430,000.00

REKENING PEMBANTU :
ya Penyusutan Emplasemen
Halaman : 1
Kode Tempat Biaya : 5301
Kode Jenis Biaya : 41
Debit Kredit Saldo
Rp 100,000.00 Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00

REKENING PEMBANTU :
usutan Mebel dan Peralatan Kantor
Halaman : 1
Kode Tempat Biaya : 5301
Kode Jenis Biaya : 45
Debit Kredit Saldo
Rp 400,000.00 Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00

REKENING PEMBANTU :
si - Biaya Pendirian yang Ditangguhkan
Halaman : 1
Kode Tempat Biaya : 5301
Kode Jenis Biaya : 47
Debit Kredit Saldo
Rp 200,000.00 Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00

REKENING PEMBANTU :
u Tulis, Photocopy, Photo Serta Lightdruk
Halaman : 1
Kode Tempat Biaya : 5301
Kode Jenis Biaya : 61
Debit Kredit Saldo
Rp 150,000.00 Rp 150,000.00
Rp 150,000.00
Rp 150,000.00
Rp 150,000.00
Rp 150,000.00
Rp 150,000.00
Rp 150,000.00
Rp 150,000.00
Rp 150,000.00
Rp 150,000.00
Rp 150,000.00
Rp 150,000.00
Rp 150,000.00
Rp 150,000.00
Rp 150,000.00
Rp 150,000.00
Rp 150,000.00
Rp 150,000.00

REKENING PEMBANTU :
Biaya Perjalanan Dinas
Halaman : 1
Kode Tempat Biaya : 5301
Kode Jenis Biaya : 63
Debit Kredit Saldo
Rp 500,000.00 Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00

REKENING PEMBANTU :
aya Rapat dan Pertemuan
Halaman : 1
Kode Tempat Biaya : 5301
Kode Jenis Biaya : 65
Debit Kredit Saldo
Rp 118,500.00 Rp 118,500.00
Rp 118,500.00
Rp 118,500.00
Rp 118,500.00
Rp 118,500.00
Rp 118,500.00
Rp 118,500.00
Rp 118,500.00
Rp 118,500.00
Rp 118,500.00
Rp 118,500.00
Rp 118,500.00
Rp 118,500.00
Rp 118,500.00
Rp 118,500.00
Rp 118,500.00
Rp 118,500.00
Rp 118,500.00

REKENING PEMBANTU :
dministrasi dan Umum Lain-lain
Halaman : 1
Kode Tempat Biaya : 5301
Kode Jenis Biaya : 67
Debit Kredit Saldo
Rp 75,000.00 Rp 75,000.00
Rp 75,000.00
Rp 75,000.00
Rp 75,000.00
Rp 75,000.00
Rp 75,000.00
Rp 75,000.00
Rp 75,000.00
Rp 75,000.00
Rp 75,000.00
Rp 75,000.00
Rp 75,000.00
Rp 75,000.00
Rp 75,000.00
Rp 75,000.00
Rp 75,000.00
Rp 75,000.00
Rp 75,000.00

REKENING PEMBANTU :
Biaya Gaji dan Upah
Halaman : 1
Kode Tempat Biaya : 5401
Kode Jenis Biaya : 21
Debit Kredit Saldo
Rp 800,000.00 Rp 800,000.00
Rp 800,000.00
Rp 800,000.00
Rp 800,000.00
Rp 800,000.00
Rp 800,000.00
Rp 800,000.00
Rp 800,000.00
Rp 800,000.00
Rp 800,000.00
Rp 800,000.00
Rp 800,000.00
Rp 800,000.00
Rp 800,000.00
Rp 800,000.00
Rp 800,000.00
Rp 800,000.00
Rp 800,000.00
REKENING PEMBANTU :
a Pengobatan dan Perawatan
Halaman : 1
Kode Tempat Biaya : 5401
Kode Jenis Biaya : 23
Debit Kredit Saldo
Rp 110,000.00 Rp 110,000.00
Rp 110,000.00
Rp 110,000.00
Rp 110,000.00
Rp 110,000.00
Rp 110,000.00
Rp 110,000.00
Rp 110,000.00
Rp 110,000.00
Rp 110,000.00
Rp 110,000.00
Rp 110,000.00
Rp 110,000.00
Rp 110,000.00
Rp 110,000.00
Rp 110,000.00
Rp 110,000.00
Rp 110,000.00

REKENING PEMBANTU :
Pemeliharaan Mebel dan Peralatan Kantor
Halaman : 1
Kode Tempat Biaya : 5401
Kode Jenis Biaya : 35
Debit Kredit Saldo
Rp 120,000.00 Rp 120,000.00
Rp 10,000.00 Rp 130,000.00
Rp 108,000.00 Rp 238,000.00
Rp 238,000.00
Rp 238,000.00
Rp 238,000.00
Rp 238,000.00
Rp 238,000.00
Rp 238,000.00
Rp 238,000.00
Rp 238,000.00
Rp 238,000.00
Rp 238,000.00
Rp 238,000.00
Rp 238,000.00
Rp 238,000.00
Rp 238,000.00
Rp 238,000.00

REKENING PEMBANTU :
Biaya Penyusutan Gedung
Halaman : 1
Kode Tempat Biaya : 5401
Kode Jenis Biaya : 42
Debit Kredit Saldo
Rp 50,000.00 Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00

REKENING PEMBANTU :
aya Penyusutan Kendaraan
Halaman : 1
Kode Tempat Biaya : 5401
Kode Jenis Biaya : 46
Debit Kredit Saldo
Rp 400,000.00 Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00

REKENING PEMBANTU :
Biaya Perjalanan Dinas
Halaman : 1
Kode Tempat Biaya : 5401
Kode Jenis Biaya : 63
Debit Kredit Saldo
Rp 350,000.00 Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00

REKENING PEMBANTU :
Biaya Angkut Kain Grey
Halaman : 1
Kode Tempat Biaya : 5401
Kode Jenis Biaya : 72
Debit Kredit Saldo
Rp 4,250,000.00 Rp 4,250,000.00
Rp 4,250,000.00
Rp 4,250,000.00
Rp 4,250,000.00
Rp 4,250,000.00
Rp 4,250,000.00
Rp 4,250,000.00
Rp 4,250,000.00
Rp 4,250,000.00
Rp 4,250,000.00
Rp 4,250,000.00
Rp 4,250,000.00
Rp 4,250,000.00
Rp 4,250,000.00
Rp 4,250,000.00
Rp 4,250,000.00
Rp 4,250,000.00
Rp 4,250,000.00

REKENING PEMBANTU :
iaya Pemasaran Lain-lain
Halaman : 1
Kode Tempat Biaya : 5401
Kode Jenis Biaya : 74
Debit Kredit Saldo
Rp 80,000.00 Rp 80,000.00
Rp 80,000.00
Rp 80,000.00
Rp 80,000.00
Rp 80,000.00
Rp 80,000.00
Rp 80,000.00
Rp 80,000.00
Rp 80,000.00
Rp 80,000.00
Rp 80,000.00
Rp 80,000.00
Rp 80,000.00
Rp 80,000.00
Rp 80,000.00
Rp 80,000.00
Rp 80,000.00
Rp 80,000.00
REKENING PEMBA
Piutang PT Batik K

Tanggal Keterangan
01/01/1988 Saldo
02/01/1988
02/01/1988
11/01/1988
15/01/1988
29/01/1988

REKENING PEMBA
Piutang PT Gaya B

Tanggal Keterangan
01/01/1988 Saldo
05/01/1988
07/01/1988
17/01/1988
REKENING PEMBA
Piutang CV Batik A

Tanggal Keterangan
01/01/1988 Saldo
10/01/1988
20/01/1988
28/01/1988

REKENING PEMBA
Utang PT Patal Ma

Tanggal Keterangan
01/01/1988 Saldo
13/01/1988
24/01/1988
REKENING PEMBA
Utang Percetakan R

Tanggal Keterangan
01/01/1988 Saldo
16/01/1988
17/01/1998
29/01/1988
30/01/1998

REKENING PEMBA
Utang PT Sumber A

Tanggal Keterangan
01/01/1988 Saldo
21/01/1988
REKENING PEMBA
Biaya Bahan Ba

Tanggal Keterangan
02/01/1988 Produksi - Listrik (Premium & Solar)

REKENING PEMBA
Biaya Gaji dan U

Tanggal Keterangan
31/01/1988 Distribusi
REKENING PEMBA
Biaya Pengobatan dan P

Tanggal Keterangan
31/01/1988 Distribusi

REKENING PEMBA
Biaya Reparasi dan Pemelihar

Tanggal Keterangan
10/01/1988 Reparasi & Pem. Mesin - Listrik (Kabel Listrik & Spare Part
REKENING PEMBA
Biaya Penyusutan Mes

Tanggal Keterangan
31/01/1988 Distribusi

REKENING PEMBA
Biaya yang Dialokasikan K
Tanggal Keterangan
31/01/1988

REKENING PEMBA
Biaya Bahan Pelu

Tanggal Keterangan
27/01/1988 Produksi - Bengkel (Minyak Pelumas)

REKENING PEMBA
Biaya Lembur

Tanggal Keterangan
31/01/1988 Distribusi

REKENING PEMBA
Biaya Reparasi dan Pemelihar

Tanggal Keterangan
14/01/1988 Reparasi & Pem. Mesin - Bengkel (Mesin bubut)
REKENING PEMBA
Biaya Penyusutan mes

Tanggal Keterangan
31/01/1988 Distribusi

REKENING PEMBA
Biaya yang Dialokasian K

Tanggal Keterangan
31/01/1988
REKENING PEMBA
Biaya Lembur

Tanggal Keterangan
31/01/1988 Distribusi

REKENING PEMBA
Biaya Reparasi dan Pemelihar

Tanggal Keterangan
12/01/1988 Reparasi & Pem. Emplasemen - Umum Pabrik (Obat Anti Ha
17/01/1988 Reparasi & Pem. Emplasemen - Umum Pabrik (Aspal & Sem
REKENING PEMBA
Biaya Reparasi dan Pemelihar

Tanggal Keterangan

REKENING PEMBA
Biaya Reparasi dan Pemeliharaan Meb

Tanggal Keterangan
REKENING PEMBA
Biaya Penyusutan Em

Tanggal Keterangan
31/01/1988 Distribusi

REKENING PEMBA
Biaya Penyusutan Mes

Tanggal Keterangan
31/01/1988 Distribusi
REKENING PEMBA
Biaya Asuransi Aktiv

Tanggal Keterangan
31/01/1988 Distribusi

REKENING PEMBA
Biaya yang Dialokasikan K
Tanggal Keterangan
31/01/1988

REKENING PEMBA
Biaya Reparasi dan Pemelih

Tanggal Keterangan
12/01/1988 Reparasi & Pem. Gedung - Persiapan (Kayu Jati & Cat Kayu)
23/01/1988 Reparasi & Pem. Gedung - Persiapan (Seng Asbes & Cat)
REKENING PEMBA
Biaya Penyusutan G

Tanggal Keterangan
31/01/1988 Distribusi

REKENING PEMBA
Biaya Penyusutan Perala

Tanggal Keterangan
31/01/1988 Distribusi
REKENING PEMBA
Biaya Asuransi Pers

Tanggal Keterangan
31/01/1988 Distribusi

REKENING PEMBA
Biaya Bahan Pembu

Tanggal Keterangan
10/01/1988 Produksi - Pertenunan (Kayu Penggulung Kain, Plastik Pemb
13/01/1988 Produksi - Pertenunan (Kayu Penggulung Kain)
20/01/1988 Produksi - Pertenunan (Kayu Penggulung Kain, Plastik Pemb
25/01/1988 Produksi - Pertenunan (Etiket Besar & Peti Kayu)
29/01/1988 Produksi - Pertenunan (Kayu Penggulung Kain)
REKENING PEMBA
Biaya Reparasi dan Pemelih

Tanggal Keterangan
27/01/1988 Reparasi & Pem. Gedung - Pertenunan (Seng Asbes, Cat Tem

REKENING PEMBA
Biaya Reparasi dan Pemeliharaan Meb

Tanggal Keterangan
15/01/1988 Reparasi & Pem. Mebel - Pertenunan (Kayu Jati, Plitur & Cat
REKENING PEMBA
Biaya Penyusutan Mes

Tanggal Keterangan
31/01/1988 Distribusi

REKENING PEMBA
Biaya Asuransi Aktiv

Tanggal Keterangan
31/01/1988 Distribusi
REKENING PEMBA
Biaya yang Diterima Dar

Tanggal Keterangan
31/01/1988
31/01/1988
31/01/1988

REKENING PEMBA
Biaya Gaji dan U
Tanggal Keterangan

31/01/1988 Distribusi

REKENING PEMBA
Biaya Pengobatan dan P

Tanggal Keterangan
31/01/1988 Distribusi

REKENING PEMBA
Biaya Lembur

Tanggal Keterangan
31/01/1988 Distribusi

REKENING PEMBA
Biaya Gaji dan U

Tanggal Keterangan
31/01/1988 Distribusi
REKENING PEMBA
Biaya Pengobatan dan P

Tanggal Keterangan
31/01/1988 Distribusi

REKENING PEMBA
Biaya Reparasi dan Pemelih

Tanggal Keterangan
06/01/1988 Reparasi & Pem. Gedung - Adm. & Umum (Seng)
REKENING PEMBA
Biaya Reparasi dan Pemeliha

Tanggal Keterangan
27/01/1988 Reparasi & Pem. Kendaraan - Adm. & Umum (Accu Mobil, B

REKENING PEMBA
Biaya Penyusutan G

Tanggal Keterangan
31/01/1988 Distribusi
REKENING PEMBA
Biaya Penyusutan Ke

Tanggal Keterangan
31/01/1988 Distribusi

REKENING PEMBA
Biaya Asuransi Aktiv

Tanggal Keterangan
31/01/1988 Distribusi
REKENING PEMBA
Biaya Pos, Telegram, Telepon, Telex

Tanggal Keterangan
17/01/1998 Biaya Pos dan Telepon

REKENING PEMBA
Biaya Langganan Surat Kabar, M

Tanggal Keterangan
17/01/1998 Biaya Langganan Surat Kabar
REKENING PEMBA
Biaya Akuntan, Konsultan,

Tanggal Keterangan
14/01/1998 Pembayaran Biaya Konsultan

REKENING PEMBA
Biaya yang Diterima Dar
Tanggal Keterangan
31/01/1988
31/01/1988

REKENING PEMBA
Biaya Lembur

Tanggal Keterangan
31/01/1988 Distribusi
REKENING PEMBA
Biaya Reparasi dan Pemelih

Tanggal Keterangan
Reparasi & Pem. Gedung - Pemasaran (Kaca, Plywood, Cat &

REKENING PEMBA
Biaya Reparasi dan Pemeliha

Tanggal Keterangan
19/01/1988 Reparasi & Pem. Kendaraan - Pemasaran (Cat Mobil, Ban Mo
REKENING PEMBA
Biaya Penyusutan Mebel dan P

Tanggal Keterangan
31/01/1988 Distribusi

REKENING PEMBA
Biaya Asuransi Aktiv

Tanggal Keterangan
31/01/1988 Distribusi
REKENING PEMBA
Biaya Adverten

Tanggal Keterangan
10/01/1998 Pembayaran Biaya Pemasaran
11/01/1998 Pembayaran Biaya Pemasaran

REKENING PEMBA
Biaya Penghapusan

Tanggal Keterangan
31/01/1988 Kerugian Piutang
REKENING PEMBA
Biaya yang Diterima Dar

Tanggal Keterangan
31/01/1988
31/01/1988
REKENING PEMBANTU :
Piutang PT Batik Kencana

No. Kode Rekening : 1131-2


Ref. Debit Kredit Saldo
Rp 3,102,000.00
JPn-1 Rp 14,520,000.00 Rp 17,622,000.00
JKM-1 Rp 3,102,000.00 Rp 14,520,000.00
JKM-1 Rp 14,520,000.00 Rp -
JPn-1 Rp 36,960,000.00 Rp 36,960,000.00
JKM-1 Rp 36,960,000.00 Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

REKENING PEMBANTU :
Piutang PT Gaya Busana

No. Kode Rekening : 1131-4


Ref. Debit Kredit Saldo
Rp 5,544,000.00
JKM-1 Rp 5,544,000.00 Rp -
JPn-1 Rp 35,640,000.00 Rp 35,640,000.00
JKM-1 Rp 35,640,000.00 Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

REKENING PEMBANTU :
Piutang CV Batik Abadi

No. Kode Rekening : 1131-6


Ref. Debit Kredit Saldo
Rp -
JPn-1 Rp 26,400,000.00 Rp 26,400,000.00
JKM-1 Rp 26,400,000.00 Rp -
JPn-1 Rp 25,080,000.00 Rp 25,080,000.00
Rp 25,080,000.00
Rp 25,080,000.00
Rp 25,080,000.00
Rp 25,080,000.00
Rp 25,080,000.00
Rp 25,080,000.00
Rp 25,080,000.00
Rp 25,080,000.00
Rp 25,080,000.00
Rp 25,080,000.00
Rp 25,080,000.00
Rp 25,080,000.00
Rp 25,080,000.00
Rp 25,080,000.00

REKENING PEMBANTU :
Utang PT Patal Mataram

No. Kode Rekening : 2101-2


Ref. Debit Kredit Saldo
Rp -
JPb-1 Rp 111,584,000.00 Rp 111,584,000.00
JKK-1 Rp 111,584,000.00 Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

REKENING PEMBANTU :
Utang Percetakan Rahayu

No. Kode Rekening : 2101-4


Ref. Debit Kredit Saldo
Rp -
JPb-1 Rp 82,500.00 Rp 82,500.00
JKK-1 Rp 82,500.00 Rp -
JPb-1 Rp 85,250.00 Rp 85,250.00
JKK-1 Rp 85,250.00 Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

REKENING PEMBANTU :
Utang PT Sumber Agung

No. Kode Rekening : 2101-6


Ref. Debit Kredit Saldo
Rp -
JPb-1 Rp 132,000.00 Rp 132,000.00
Rp 132,000.00
Rp 132,000.00
Rp 132,000.00
Rp 132,000.00
Rp 132,000.00
Rp 132,000.00
Rp 132,000.00
Rp 132,000.00
Rp 132,000.00
Rp 132,000.00
Rp 132,000.00
Rp 132,000.00
Rp 132,000.00
Rp 132,000.00
Rp 132,000.00
Rp 132,000.00

REKENING PEMBANTU :
Biaya Bahan Bakar
Halaman : 1
Kode Tempat Biaya : 5211
Kode Jenis Biaya : 13
Ref. Debit Kredit Saldo
JPBhn-1 Rp 1,150,000.00 Rp 1,150,000.00
Rp 1,150,000.00
Rp 1,150,000.00
Rp 1,150,000.00
Rp 1,150,000.00
Rp 1,150,000.00
Rp 1,150,000.00
Rp 1,150,000.00
Rp 1,150,000.00
Rp 1,150,000.00
Rp 1,150,000.00
Rp 1,150,000.00
Rp 1,150,000.00
Rp 1,150,000.00
Rp 1,150,000.00
Rp 1,150,000.00
Rp 1,150,000.00
Rp 1,150,000.00

REKENING PEMBANTU :
Biaya Gaji dan Upah
Halaman : 1
Kode Tempat Biaya : 5211
Kode Jenis Biaya : 21
Ref. Debit Kredit Saldo
JM-1 Rp 183,000.00 Rp 183,000.00
Rp 183,000.00
Rp 183,000.00
Rp 183,000.00
Rp 183,000.00
Rp 183,000.00
Rp 183,000.00
Rp 183,000.00
Rp 183,000.00
Rp 183,000.00
Rp 183,000.00
Rp 183,000.00
Rp 183,000.00
Rp 183,000.00
Rp 183,000.00
Rp 183,000.00
Rp 183,000.00
Rp 183,000.00

REKENING PEMBANTU :
Biaya Pengobatan dan Perawatan
Halaman : 1
Kode Tempat Biaya : 5211
Kode Jenis Biaya : 23
Ref. Debit Kredit Saldo
JM-1 Rp 18,000.00 Rp 18,000.00
Rp 18,000.00
Rp 18,000.00
Rp 18,000.00
Rp 18,000.00
Rp 18,000.00
Rp 18,000.00
Rp 18,000.00
Rp 18,000.00
Rp 18,000.00
Rp 18,000.00
Rp 18,000.00
Rp 18,000.00
Rp 18,000.00
Rp 18,000.00
Rp 18,000.00
Rp 18,000.00
Rp 18,000.00

REKENING PEMBANTU :
aya Reparasi dan Pemeliharaan Mesin-mesin
Halaman : 1
Kode Tempat Biaya : 5211
Kode Jenis Biaya : 33
Ref. Debit Kredit Saldo
JPBhn-1 Rp 103,000.00 Rp 103,000.00
Rp 103,000.00
Rp 103,000.00
Rp 103,000.00
Rp 103,000.00
Rp 103,000.00
Rp 103,000.00
Rp 103,000.00
Rp 103,000.00
Rp 103,000.00
Rp 103,000.00
Rp 103,000.00
Rp 103,000.00
Rp 103,000.00
Rp 103,000.00
Rp 103,000.00
Rp 103,000.00
Rp 103,000.00

REKENING PEMBANTU :
Biaya Penyusutan Mesin-mesin
Halaman : 1
Kode Tempat Biaya : 5211
Kode Jenis Biaya : 43
Ref. Debit Kredit Saldo
JM-1 Rp 400,000.00 Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00

REKENING PEMBANTU :
Biaya yang Dialokasikan Ke Seksi Lain
Halaman : 1
Kode Tempat Biaya : 5211
Kode Jenis Biaya : 81
Ref. Debit Kredit Saldo
JP-2 Rp 3,000,000.00 Rp 3,000,000.00
Rp 3,000,000.00
Rp 3,000,000.00
Rp 3,000,000.00
Rp 3,000,000.00
Rp 3,000,000.00
Rp 3,000,000.00
Rp 3,000,000.00
Rp 3,000,000.00
Rp 3,000,000.00
Rp 3,000,000.00
Rp 3,000,000.00
Rp 3,000,000.00
Rp 3,000,000.00
Rp 3,000,000.00
Rp 3,000,000.00
Rp 3,000,000.00
Rp 3,000,000.00

REKENING PEMBANTU :
Biaya Bahan Pelumas
Halaman : 1
Kode Tempat Biaya : 5212
Kode Jenis Biaya : 14
Ref. Debit Kredit Saldo
JPBhn-1 Rp 165,000.00 Rp 165,000.00
Rp 165,000.00
Rp 165,000.00
Rp 165,000.00
Rp 165,000.00
Rp 165,000.00
Rp 165,000.00
Rp 165,000.00
Rp 165,000.00
Rp 165,000.00
Rp 165,000.00
Rp 165,000.00
Rp 165,000.00
Rp 165,000.00
Rp 165,000.00
Rp 165,000.00
Rp 165,000.00
Rp 165,000.00

REKENING PEMBANTU :
Biaya Lembur
Halaman : 1
Kode Tempat Biaya : 5212
Kode Jenis Biaya : 22
Ref. Debit Kredit Saldo
JM-1 Rp 34,760.00 Rp 34,760.00
Rp 34,760.00
Rp 34,760.00
Rp 34,760.00
Rp 34,760.00
Rp 34,760.00
Rp 34,760.00
Rp 34,760.00
Rp 34,760.00
Rp 34,760.00
Rp 34,760.00
Rp 34,760.00
Rp 34,760.00
Rp 34,760.00
Rp 34,760.00
Rp 34,760.00
Rp 34,760.00
Rp 34,760.00

REKENING PEMBANTU :
aya Reparasi dan Pemeliharaan Mesin-mesin
Halaman : 1
Kode Tempat Biaya : 5212
Kode Jenis Biaya : 33
Ref. Debit Kredit Saldo
JPBhn-1 Rp 335,000.00 Rp 335,000.00
Rp 335,000.00
Rp 335,000.00
Rp 335,000.00
Rp 335,000.00
Rp 335,000.00
Rp 335,000.00
Rp 335,000.00
Rp 335,000.00
Rp 335,000.00
Rp 335,000.00
Rp 335,000.00
Rp 335,000.00
Rp 335,000.00
Rp 335,000.00
Rp 335,000.00
Rp 335,000.00
Rp 335,000.00

REKENING PEMBANTU :
Biaya Penyusutan mesin-mesin
Halaman : 1
Kode Tempat Biaya : 5212
Kode Jenis Biaya : 43
Ref. Debit Kredit Saldo
JM-1 Rp 400,000.00 Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00
Rp 400,000.00

REKENING PEMBANTU :
Biaya yang Dialokasian Ke Seksi Lain
Halaman : 1
Kode Tempat Biaya : 5212
Kode Jenis Biaya : 81
Ref. Debit Kredit Saldo
JP-2 Rp 2,000,000.00 Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00

REKENING PEMBANTU :
Biaya Lembur
Halaman : 1
Kode Tempat Biaya : 5213
Kode Jenis Biaya : 22
Ref. Debit Kredit Saldo
JM-1 Rp 33,360.00 Rp 33,360.00
Rp 33,360.00
Rp 33,360.00
Rp 33,360.00
Rp 33,360.00
Rp 33,360.00
Rp 33,360.00
Rp 33,360.00
Rp 33,360.00
Rp 33,360.00
Rp 33,360.00
Rp 33,360.00
Rp 33,360.00
Rp 33,360.00
Rp 33,360.00
Rp 33,360.00
Rp 33,360.00
Rp 33,360.00

REKENING PEMBANTU :
aya Reparasi dan Pemeliharaan Emplasemen
Halaman : 1
Kode Tempat Biaya : 5213
Kode Jenis Biaya : 31
Ref. Debit Kredit Saldo
JPBhn-1 Rp 40,000.00 Rp 40,000.00
JPBhn-1 Rp 135,000.00 Rp 175,000.00
Rp 175,000.00
Rp 175,000.00
Rp 175,000.00
Rp 175,000.00
Rp 175,000.00
Rp 175,000.00
Rp 175,000.00
Rp 175,000.00
Rp 175,000.00
Rp 175,000.00
Rp 175,000.00
Rp 175,000.00
Rp 175,000.00
Rp 175,000.00
Rp 175,000.00
Rp 175,000.00

REKENING PEMBANTU :
aya Reparasi dan Pemeliharaan Mesin-mesin
Halaman : 1
Kode Tempat Biaya : 5213
Kode Jenis Biaya : 33
Ref. Debit Kredit Saldo
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

REKENING PEMBANTU :
arasi dan Pemeliharaan Mebel dan Peralatan Kantor
Halaman : 1
Kode Tempat Biaya : 5213
Kode Jenis Biaya : 35
Ref. Debit Kredit Saldo
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

REKENING PEMBANTU :
Biaya Penyusutan Emplasemen
Halaman : 1
Kode Tempat Biaya : 5213
Kode Jenis Biaya : 41
Ref. Debit Kredit Saldo
JM-1 Rp 300,000.00 Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00

REKENING PEMBANTU :
Biaya Penyusutan Mesin-mesin
Halaman : 1
Kode Tempat Biaya : 5213
Kode Jenis Biaya : 43
Ref. Debit Kredit Saldo
JM-1 Rp 300,000.00 Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00

REKENING PEMBANTU :
Biaya Asuransi Aktiva Tetap
Halaman : 1
Kode Tempat Biaya : 5213
Kode Jenis Biaya : 51
Ref. Debit Kredit Saldo
JM-1 Rp 85,000.00 Rp 85,000.00
Rp 85,000.00
Rp 85,000.00
Rp 85,000.00
Rp 85,000.00
Rp 85,000.00
Rp 85,000.00
Rp 85,000.00
Rp 85,000.00
Rp 85,000.00
Rp 85,000.00
Rp 85,000.00
Rp 85,000.00
Rp 85,000.00
Rp 85,000.00
Rp 85,000.00
Rp 85,000.00
Rp 85,000.00

REKENING PEMBANTU :
Biaya yang Dialokasikan Ke Seksi Lain
Halaman : 1
Kode Tempat Biaya : 5213
Kode Jenis Biaya : 81
Ref. Debit Kredit Saldo
JP-2 Rp 1,500,000.00 Rp 1,500,000.00
Rp 1,500,000.00
Rp 1,500,000.00
Rp 1,500,000.00
Rp 1,500,000.00
Rp 1,500,000.00
Rp 1,500,000.00
Rp 1,500,000.00
Rp 1,500,000.00
Rp 1,500,000.00
Rp 1,500,000.00
Rp 1,500,000.00
Rp 1,500,000.00
Rp 1,500,000.00
Rp 1,500,000.00
Rp 1,500,000.00
Rp 1,500,000.00
Rp 1,500,000.00

REKENING PEMBANTU :
Biaya Reparasi dan Pemeliharaan Gedung
Halaman : 1
Kode Tempat Biaya : 5221
Kode Jenis Biaya : 32
Ref. Debit Kredit Saldo
JPBhn-1 Rp 267,500.00 Rp 267,500.00
JPBhn-1 Rp 261,800.00 Rp 529,300.00
Rp 529,300.00
Rp 529,300.00
Rp 529,300.00
Rp 529,300.00
Rp 529,300.00
Rp 529,300.00
Rp 529,300.00
Rp 529,300.00
Rp 529,300.00
Rp 529,300.00
Rp 529,300.00
Rp 529,300.00
Rp 529,300.00
Rp 529,300.00
Rp 529,300.00
Rp 529,300.00
REKENING PEMBANTU :
Biaya Penyusutan Gedung
Halaman : 1
Kode Tempat Biaya : 5221
Kode Jenis Biaya : 42
Ref. Debit Kredit Saldo
JM-1 Rp 725,000.00 Rp 725,000.00
Rp 725,000.00
Rp 725,000.00
Rp 725,000.00
Rp 725,000.00
Rp 725,000.00
Rp 725,000.00
Rp 725,000.00
Rp 725,000.00
Rp 725,000.00
Rp 725,000.00
Rp 725,000.00
Rp 725,000.00
Rp 725,000.00
Rp 725,000.00
Rp 725,000.00
Rp 725,000.00
Rp 725,000.00

REKENING PEMBANTU :
Biaya Penyusutan Peralatan Pabrik
Halaman : 1
Kode Tempat Biaya : 5221
Kode Jenis Biaya : 44
Ref. Debit Kredit Saldo
JM-1 Rp 160,000.00 Rp 160,000.00
Rp 160,000.00
Rp 160,000.00
Rp 160,000.00
Rp 160,000.00
Rp 160,000.00
Rp 160,000.00
Rp 160,000.00
Rp 160,000.00
Rp 160,000.00
Rp 160,000.00
Rp 160,000.00
Rp 160,000.00
Rp 160,000.00
Rp 160,000.00
Rp 160,000.00
Rp 160,000.00
Rp 160,000.00

REKENING PEMBANTU :
Biaya Asuransi Persediaan
Halaman : 1
Kode Tempat Biaya : 5221
Kode Jenis Biaya : 52
Ref. Debit Kredit Saldo
JM-1 Rp 500,000.00 Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00

REKENING PEMBANTU :
Biaya Bahan Pembungkus
Halaman : 1
Kode Tempat Biaya : 5222
Kode Jenis Biaya : 12
Ref. Debit Kredit Saldo
JPBhn-1 Rp 398,000.00 Rp 398,000.00
JPBhn-1 Rp 300,000.00 Rp 698,000.00
JPBhn-1 Rp 319,000.00 Rp 1,017,000.00
JPBhn-1 Rp 180,200.00 Rp 1,197,200.00
JPBhn-1 Rp 375,000.00 Rp 1,572,200.00
Rp 1,572,200.00
Rp 1,572,200.00
Rp 1,572,200.00
Rp 1,572,200.00
Rp 1,572,200.00
Rp 1,572,200.00
Rp 1,572,200.00
Rp 1,572,200.00
Rp 1,572,200.00
Rp 1,572,200.00
Rp 1,572,200.00
Rp 1,572,200.00
Rp 1,572,200.00

REKENING PEMBANTU :
Biaya Reparasi dan Pemeliharaan Gedung
Halaman : 1
Kode Tempat Biaya : 5222
Kode Jenis Biaya : 32
Ref. Debit Kredit Saldo
JPBhn-1 Rp 1,452,700.00 Rp 1,452,700.00
Rp 1,452,700.00
Rp 1,452,700.00
Rp 1,452,700.00
Rp 1,452,700.00
Rp 1,452,700.00
Rp 1,452,700.00
Rp 1,452,700.00
Rp 1,452,700.00
Rp 1,452,700.00
Rp 1,452,700.00
Rp 1,452,700.00
Rp 1,452,700.00
Rp 1,452,700.00
Rp 1,452,700.00
Rp 1,452,700.00
Rp 1,452,700.00
Rp 1,452,700.00

REKENING PEMBANTU :
arasi dan Pemeliharaan Mebel dan Peralatan Kantor
Halaman : 1
Kode Tempat Biaya : 5222
Kode Jenis Biaya : 35
Ref. Debit Kredit Saldo
JPBhn-1 Rp 508,600.00 Rp 508,600.00
Rp 508,600.00
Rp 508,600.00
Rp 508,600.00
Rp 508,600.00
Rp 508,600.00
Rp 508,600.00
Rp 508,600.00
Rp 508,600.00
Rp 508,600.00
Rp 508,600.00
Rp 508,600.00
Rp 508,600.00
Rp 508,600.00
Rp 508,600.00
Rp 508,600.00
Rp 508,600.00
Rp 508,600.00

REKENING PEMBANTU :
Biaya Penyusutan Mesin-mesin
Halaman : 1
Kode Tempat Biaya : 5222
Kode Jenis Biaya : 43
Ref. Debit Kredit Saldo
JM-1 Rp 850,000.00 Rp 850,000.00
Rp 850,000.00
Rp 850,000.00
Rp 850,000.00
Rp 850,000.00
Rp 850,000.00
Rp 850,000.00
Rp 850,000.00
Rp 850,000.00
Rp 850,000.00
Rp 850,000.00
Rp 850,000.00
Rp 850,000.00
Rp 850,000.00
Rp 850,000.00
Rp 850,000.00
Rp 850,000.00
Rp 850,000.00

REKENING PEMBANTU :
Biaya Asuransi Aktiva Tetap
Halaman : 1
Kode Tempat Biaya : 5222
Kode Jenis Biaya : 51
Ref. Debit Kredit Saldo
JM-1 Rp 600,000.00 Rp 600,000.00
Rp 600,000.00
Rp 600,000.00
Rp 600,000.00
Rp 600,000.00
Rp 600,000.00
Rp 600,000.00
Rp 600,000.00
Rp 600,000.00
Rp 600,000.00
Rp 600,000.00
Rp 600,000.00
Rp 600,000.00
Rp 600,000.00
Rp 600,000.00
Rp 600,000.00
Rp 600,000.00
Rp 600,000.00

REKENING PEMBANTU :
Biaya yang Diterima Dari Seksi Lain
Halaman : 1
Kode Tempat Biaya : 5222
Kode Jenis Biaya : 82
Ref. Debit Kredit Saldo
JP-2 Rp 1,500,000.00 Rp 1,500,000.00
JP-2 Rp 1,000,000.00 Rp 2,500,000.00
JP-2 Rp 1,000,000.00 Rp 3,500,000.00
Rp 3,500,000.00
Rp 3,500,000.00
Rp 3,500,000.00
Rp 3,500,000.00
Rp 3,500,000.00
Rp 3,500,000.00
Rp 3,500,000.00
Rp 3,500,000.00
Rp 3,500,000.00
Rp 3,500,000.00
Rp 3,500,000.00
Rp 3,500,000.00
Rp 3,500,000.00
Rp 3,500,000.00
Rp 3,500,000.00

REKENING PEMBANTU :
Biaya Gaji dan Upah
Halaman : 1
Kode Tempat Biaya : 5232
Kode Jenis Biaya : 21
Ref. Debit Kredit Saldo

JM-1 Rp 2,754,500.00 Rp 2,754,500.00


Rp 2,754,500.00
Rp 2,754,500.00
Rp 2,754,500.00
Rp 2,754,500.00
Rp 2,754,500.00
Rp 2,754,500.00
Rp 2,754,500.00
Rp 2,754,500.00
Rp 2,754,500.00
Rp 2,754,500.00
Rp 2,754,500.00
Rp 2,754,500.00
Rp 2,754,500.00
Rp 2,754,500.00
Rp 2,754,500.00
Rp 2,754,500.00

REKENING PEMBANTU :
Biaya Pengobatan dan Perawatan
Halaman : 1
Kode Tempat Biaya : 5232
Kode Jenis Biaya : 23
Ref. Debit Kredit Saldo
JM-1 Rp 102,750.00 Rp 102,750.00
Rp 102,750.00
Rp 102,750.00
Rp 102,750.00
Rp 102,750.00
Rp 102,750.00
Rp 102,750.00
Rp 102,750.00
Rp 102,750.00
Rp 102,750.00
Rp 102,750.00
Rp 102,750.00
Rp 102,750.00
Rp 102,750.00
Rp 102,750.00
Rp 102,750.00
Rp 102,750.00
Rp 102,750.00

REKENING PEMBANTU :
Biaya Lembur
Halaman : 1
Kode Tempat Biaya : 5242
Kode Jenis Biaya : 22
Ref. Debit Kredit Saldo
JM-1 Rp 650,000.00 Rp 650,000.00
Rp 650,000.00
Rp 650,000.00
Rp 650,000.00
Rp 650,000.00
Rp 650,000.00
Rp 650,000.00
Rp 650,000.00
Rp 650,000.00
Rp 650,000.00
Rp 650,000.00
Rp 650,000.00
Rp 650,000.00
Rp 650,000.00
Rp 650,000.00
Rp 650,000.00
Rp 650,000.00
Rp 650,000.00

REKENING PEMBANTU :
Biaya Gaji dan Upah
Halaman : 1
Kode Tempat Biaya : 5301
Kode Jenis Biaya : 21
Ref. Debit Kredit Saldo
JM-1 Rp 1,700,000.00 Rp 1,700,000.00
Rp 1,700,000.00
Rp 1,700,000.00
Rp 1,700,000.00
Rp 1,700,000.00
Rp 1,700,000.00
Rp 1,700,000.00
Rp 1,700,000.00
Rp 1,700,000.00
Rp 1,700,000.00
Rp 1,700,000.00
Rp 1,700,000.00
Rp 1,700,000.00
Rp 1,700,000.00
Rp 1,700,000.00
Rp 1,700,000.00
Rp 1,700,000.00
Rp 1,700,000.00

REKENING PEMBANTU :
Biaya Pengobatan dan Perawatan
Halaman : 1
Kode Tempat Biaya : 5301
Kode Jenis Biaya : 23
Ref. Debit Kredit Saldo
JM-1 Rp 200,000.00 Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00
Rp 200,000.00

REKENING PEMBANTU :
Biaya Reparasi dan Pemeliharaan Gedung
Halaman : 1
Kode Tempat Biaya : 5301
Kode Jenis Biaya : 32
Ref. Debit Kredit Saldo
JPBhn-1 Rp 187,500.00 Rp 187,500.00
Rp 187,500.00
Rp 187,500.00
Rp 187,500.00
Rp 187,500.00
Rp 187,500.00
Rp 187,500.00
Rp 187,500.00
Rp 187,500.00
Rp 187,500.00
Rp 187,500.00
Rp 187,500.00
Rp 187,500.00
Rp 187,500.00
Rp 187,500.00
Rp 187,500.00
Rp 187,500.00
Rp 187,500.00

REKENING PEMBANTU :
iaya Reparasi dan Pemeliharaan Kendaraan
Halaman : 1
Kode Tempat Biaya : 5301
Kode Jenis Biaya : 36
Ref. Debit Kredit Saldo
JPBhn-1 Rp 425,000.00 Rp 425,000.00
Rp 425,000.00
Rp 425,000.00
Rp 425,000.00
Rp 425,000.00
Rp 425,000.00
Rp 425,000.00
Rp 425,000.00
Rp 425,000.00
Rp 425,000.00
Rp 425,000.00
Rp 425,000.00
Rp 425,000.00
Rp 425,000.00
Rp 425,000.00
Rp 425,000.00
Rp 425,000.00
Rp 425,000.00

REKENING PEMBANTU :
Biaya Penyusutan Gedung
Halaman : 1
Kode Tempat Biaya : 5301
Kode Jenis Biaya : 42
Ref. Debit Kredit Saldo
JM-1 Rp 100,000.00 Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00

REKENING PEMBANTU :
Biaya Penyusutan Kendaraan
Halaman : 1
Kode Tempat Biaya : 5301
Kode Jenis Biaya : 46
Ref. Debit Kredit Saldo
JM-1 Rp 500,000.00 Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00

REKENING PEMBANTU :
Biaya Asuransi Aktiva Tetap
Halaman : 1
Kode Tempat Biaya : 5301
Kode Jenis Biaya : 51
Ref. Debit Kredit Saldo
JM-1 Rp 500,000.00 Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00

REKENING PEMBANTU :
os, Telegram, Telepon, Telex, Fax, dan Biaya Kirim
Halaman : 1
Kode Tempat Biaya : 5301
Kode Jenis Biaya : 62
Ref. Debit Kredit Saldo
JKK-1 Rp 117,500.00 Rp 117,500.00
Rp 117,500.00
Rp 117,500.00
Rp 117,500.00
Rp 117,500.00
Rp 117,500.00
Rp 117,500.00
Rp 117,500.00
Rp 117,500.00
Rp 117,500.00
Rp 117,500.00
Rp 117,500.00
Rp 117,500.00
Rp 117,500.00
Rp 117,500.00
Rp 117,500.00
Rp 117,500.00
Rp 117,500.00

REKENING PEMBANTU :
a Langganan Surat Kabar, Majalah, dan Buletin
Halaman : 1
Kode Tempat Biaya : 5301
Kode Jenis Biaya : 64
Ref. Debit Kredit Saldo
JKK-1 Rp 25,000.00 Rp 25,000.00
Rp 25,000.00
Rp 25,000.00
Rp 25,000.00
Rp 25,000.00
Rp 25,000.00
Rp 25,000.00
Rp 25,000.00
Rp 25,000.00
Rp 25,000.00
Rp 25,000.00
Rp 25,000.00
Rp 25,000.00
Rp 25,000.00
Rp 25,000.00
Rp 25,000.00
Rp 25,000.00
Rp 25,000.00

REKENING PEMBANTU :
Biaya Akuntan, Konsultan, dan Pengacara
Halaman : 1
Kode Tempat Biaya : 5301
Kode Jenis Biaya : 66
Ref. Debit Kredit Saldo
JKK-1 Rp 2,500,000.00 Rp 2,500,000.00
Rp 2,500,000.00
Rp 2,500,000.00
Rp 2,500,000.00
Rp 2,500,000.00
Rp 2,500,000.00
Rp 2,500,000.00
Rp 2,500,000.00
Rp 2,500,000.00
Rp 2,500,000.00
Rp 2,500,000.00
Rp 2,500,000.00
Rp 2,500,000.00
Rp 2,500,000.00
Rp 2,500,000.00
Rp 2,500,000.00
Rp 2,500,000.00
Rp 2,500,000.00

REKENING PEMBANTU :
Biaya yang Diterima Dari Seksi Lain
Halaman : 1
Kode Tempat Biaya : 5301
Kode Jenis Biaya : 82
Ref. Debit Kredit Saldo
JP-2 Rp 450,000.00 Rp 450,000.00
JP-2 Rp 200,000.00 Rp 650,000.00
Rp 650,000.00
Rp 650,000.00
Rp 650,000.00
Rp 650,000.00
Rp 650,000.00
Rp 650,000.00
Rp 650,000.00
Rp 650,000.00
Rp 650,000.00
Rp 650,000.00
Rp 650,000.00
Rp 650,000.00
Rp 650,000.00
Rp 650,000.00
Rp 650,000.00
Rp 650,000.00

REKENING PEMBANTU :
Biaya Lembur
Halaman : 1
Kode Tempat Biaya : 5401
Kode Jenis Biaya : 22
Ref. Debit Kredit Saldo
JM-1 Rp 125,000.00 Rp 125,000.00
Rp 125,000.00
Rp 125,000.00
Rp 125,000.00
Rp 125,000.00
Rp 125,000.00
Rp 125,000.00
Rp 125,000.00
Rp 125,000.00
Rp 125,000.00
Rp 125,000.00
Rp 125,000.00
Rp 125,000.00
Rp 125,000.00
Rp 125,000.00
Rp 125,000.00
Rp 125,000.00
Rp 125,000.00
REKENING PEMBANTU :
Biaya Reparasi dan Pemeliharaan Gedung
Halaman : 1
Kode Tempat Biaya : 5401
Kode Jenis Biaya : 32
Ref. Debit Kredit Saldo
JPBhn-1 Rp 72,500.00 Rp 72,500.00
Rp 72,500.00
Rp 72,500.00
Rp 72,500.00
Rp 72,500.00
Rp 72,500.00
Rp 72,500.00
Rp 72,500.00
Rp 72,500.00
Rp 72,500.00
Rp 72,500.00
Rp 72,500.00
Rp 72,500.00
Rp 72,500.00
Rp 72,500.00
Rp 72,500.00
Rp 72,500.00
Rp 72,500.00

REKENING PEMBANTU :
iaya Reparasi dan Pemeliharaan Kendaraan
Halaman : 1
Kode Tempat Biaya : 5401
Kode Jenis Biaya : 36
Ref. Debit Kredit Saldo
JPBhn-1 Rp 815,000.00 Rp 815,000.00
Rp 815,000.00
Rp 815,000.00
Rp 815,000.00
Rp 815,000.00
Rp 815,000.00
Rp 815,000.00
Rp 815,000.00
Rp 815,000.00
Rp 815,000.00
Rp 815,000.00
Rp 815,000.00
Rp 815,000.00
Rp 815,000.00
Rp 815,000.00
Rp 815,000.00
Rp 815,000.00
Rp 815,000.00

REKENING PEMBANTU :
aya Penyusutan Mebel dan Peralatan Kantor
Halaman : 1
Kode Tempat Biaya : 5401
Kode Jenis Biaya : 45
Ref. Debit Kredit Saldo
JM-1 Rp 100,000.00 Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00

REKENING PEMBANTU :
Biaya Asuransi Aktiva Tetap
Halaman : 1
Kode Tempat Biaya : 5401
Kode Jenis Biaya : 51
Ref. Debit Kredit Saldo
JM-1 Rp 50,000.00 Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00
Rp 50,000.00

REKENING PEMBANTU :
Biaya Advertensi
Halaman : 1
Kode Tempat Biaya : 5401
Kode Jenis Biaya : 71
Ref. Debit Kredit Saldo
JKK-1 Rp 400,000.00 Rp 400,000.00
JKK-1 Rp 500,000.00 Rp 900,000.00
Rp 900,000.00
Rp 900,000.00
Rp 900,000.00
Rp 900,000.00
Rp 900,000.00
Rp 900,000.00
Rp 900,000.00
Rp 900,000.00
Rp 900,000.00
Rp 900,000.00
Rp 900,000.00
Rp 900,000.00
Rp 900,000.00
Rp 900,000.00
Rp 900,000.00
Rp 900,000.00

REKENING PEMBANTU :
Biaya Penghapusan Piutang
Halaman : 1
Kode Tempat Biaya : 5401
Kode Jenis Biaya : 73
Ref. Debit Kredit Saldo
JM-1 Rp 700,000.00 Rp 700,000.00
Rp 700,000.00
Rp 700,000.00
Rp 700,000.00
Rp 700,000.00
Rp 700,000.00
Rp 700,000.00
Rp 700,000.00
Rp 700,000.00
Rp 700,000.00
Rp 700,000.00
Rp 700,000.00
Rp 700,000.00
Rp 700,000.00
Rp 700,000.00
Rp 700,000.00
Rp 700,000.00
Rp 700,000.00

REKENING PEMBANTU :
Biaya yang Diterima Dari Seksi Lain
Halaman : 1
Kode Tempat Biaya : 5401
Kode Jenis Biaya : 82
Ref. Debit Kredit Saldo
JP-2 Rp 150,000.00 Rp 150,000.00
JP-2 Rp 200,000.00 Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
Rp 350,000.00
PT TINOMASTEX
YOGYAKARTA

REKENING BUKU BESAR:


Kas

Tanggal Keterangan Ref.


01/01/1988 Saldo
31/01/1988 JKM-1
31/01/1988 JKK-1

REKENING BUKU BESAR:


Investasi Sementara - Saham

Tanggal Keterangan Ref.


01/01/1988 Saldo JKK-1
REKENING BUKU BESAR:
Investasi Sementara - Sertifikat Bank

Tanggal Keterangan Ref.


01/01/1988 Saldo
31/01/1988 JKK-1

REKENING BUKU BESAR:


Piutang Dagang

Tanggal Keterangan Ref.


01/01/1988 Saldo
05/01/1988 JM-1
26/01/1988 JM-1
31/01/1988 JPn-1
31/01/1988
REKENING BUKU BESAR:
Piutang Karyawan

Tanggal Keterangan Ref.


01/01/1988 Saldo

REKENING BUKU BESAR:


Piutang Lain-lain

Tanggal Keterangan Ref.


01/01/1988 Saldo
REKENING BUKU BESAR:
Persediaan Produk Dalam Proses Seksi Persiapan

Tanggal Keterangan Ref.


01/01/1988 Saldo
01/01/1988 JM-1
31/01/1988 JP-2

REKENING BUKU BESAR:


Persediaan Bahan Baku

Tanggal Keterangan Ref.


01/01/1988 Saldo
31/01/1988 JPb-1
31/01/1988 JPBhn-1
REKENING BUKU BESAR:
Persediaan Bahan Baku dan Pelumas

Tanggal Keterangan Ref.


01/01/1988 Saldo
31/01/1988 JPb-1
31/01/1988 JPBhn-1

REKENING BUKU BESAR:


Persediaan Bahan Lain-lain

Tanggal Keterangan Ref.


01/01/1988 Saldo
31/01/1988 JPBhn-1
REKENING BUKU BESAR:
Pajak Penghasilan Badan Dibayar Di Muka

Tanggal Keterangan Ref.


01/01/1988 Saldo
10/01/1998 JKK-1

REKENING BUKU BESAR:


Persekot Biaya Asuransi

Tanggal Keterangan Ref.


01/01/1988 Saldo
31/01/1988 JKK-1
31/01/1988 JM-1
31/01/1988 JM-1
REKENING BUKU BESAR:
Investasi Obligasi

Tanggal Keterangan Ref.


01/01/1988 Saldo (PT Jasa Marga) 1000lb @ Rp10.100
31/01/1988 JKM-1

REKENING BUKU BESAR:


Emplasemen

Tanggal Keterangan Ref.


01/01/1988 Saldo
REKENING BUKU BESAR:
Mesin-mesin

Tanggal Keterangan Ref.


01/01/1988 Saldo

REKENING BUKU BESAR:


Mebel dan Peralatan Kantor

Tanggal Keterangan Ref.


01/01/1988 Saldo
REKENING BUKU BESAR:
Akumulasi Penyusutan Emplasemen

Tanggal Keterangan Ref.


01/01/1988 Saldo
31/01/1988 JM-1

REKENING BUKU BESAR:


Akumulasi Penyusutan Mesin-mesin
Tanggal Keterangan Ref.
01/01/1988 Saldo
31/01/1988 JM-1

REKENING BUKU BESAR:


Akumulasi Penyusutan Mebel dan Peralatan Kantor

Tanggal Keterangan Ref.


01/01/1988 Saldo
31/01/1988 JM-1

REKENING BUKU BESAR:


Merek Dagang
Tanggal Keterangan Ref.
01/01/1988 Saldo

REKENING BUKU BESAR:


Konstruksi Dalam Pelaksanaan

Tanggal Keterangan Ref.


01/01/1988 Saldo
31/01/1988 JKK-1
REKENING BUKU BESAR:
Dividen

Tanggal Keterangan Ref.


01/01/1988 Saldo

REKENING BUKU BESAR:


Utang Pajak Penghasilan Karyawan

Tanggal Keterangan Ref.


01/01/1988 Saldo
31/01/1988 JKK-1
31/01/1988 JKK-1
REKENING BUKU BESAR:
Utang Pajak Penghasilan Badan

Tanggal Keterangan Ref.


01/01/1988 Saldo

REKENING BUKU BESAR:


Utang Biaya

Tanggal Keterangan Ref.


01/01/1988 Saldo
31/01/1988 JM-1
REKENING BUKU BESAR:
Pendapatan Yang Diterima Dimuka

Tanggal Keterangan Ref.


01/01/1988 Saldo

REKENING BUKU BESAR:


Utang Obligasi

Tanggal Keterangan Ref.


01/01/1988 Saldo
REKENING BUKU BESAR:
Diskonto Utang Obligasi

Tanggal Keterangan Ref.


01/01/1988 Saldo

REKENING BUKU BESAR:


Modal Saham Dalam Portepel

Tanggal Keterangan Ref.


01/01/1988 Saldo (5.000lb @ Rp50.000)
REKENING BUKU BESAR:
Modal Sumbangan

Tanggal Keterangan Ref.


01/01/1988 Saldo JM-1

REKENING BUKU BESAR:


Laba Yang Ditahan

Tanggal Keterangan Ref.


01/01/1988 Saldo
31/01/1988 Penutupan
REKENING BUKU BESAR:
Potongan Penjualan

Tanggal Keterangan Ref.


31/01/1988 JKK-1
31/01/1988 Penutupan

REKENING BUKU BESAR:


Harga Pokok Penjualan Kain Grey

Tanggal Keterangan Ref.


31/01/1988 JP-2
31/01/1988 JM-1
31/01/1988 Penutupan
REKENING BUKU BESAR:
Biaya Overhead Pabrik Sesungguhnya Seksi Bengkel

Tanggal Keterangan Ref.


31/01/1988 JPBhn-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 SUB

REKENING BUKU BESAR:


Biaya Overhead Pabrik Sesungguhnya Seksi Persiapan

Tanggal Keterangan Ref.


31/01/1988 JPBhn-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 SUB
31/01/1988 JP-2

REKENING BUKU BESAR:


Barang Dalam Proses - Biaya Bahan Baku Seksi Persiapan

Tanggal Keterangan Ref.


01/01/1988 JM-1
31/01/1988 JPBhn-1
31/01/1988 JP-2
31/01/1988 JP-2

REKENING BUKU BESAR:


Barang Dalam Proses - Biaya Overhead Pabrik Seksi Persiapan

Tanggal Keterangan Ref.


01/01/1988 JM-1
31/01/1988 JP-2
31/01/1988 JP-2
31/01/1988 JP-2

REKENING BUKU BESAR:


Barang Dalam Proses - Biaya Tenaga Kerja Seksi Pertenunan

Tanggal Keterangan Ref.


01/01/1988 JM-1
31/01/1988 JM-1
01/02/1988 JM-1
02/02/1988 JM-1
31/01/1988 JP-2
31/01/1988 JP-2

REKENING BUKU BESAR:


Biaya Administrasi dan Umum

Tanggal Keterangan Ref.


31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JPBhn-1
31/01/1988 JKK-1
31/01/1988 SUB
31/01/1988 Penutupan

REKENING BUKU BESAR:


Pendapatan Bunga

Tanggal Keterangan Ref.


31/01/1988 JM-1
31/01/1988 JKM-1
31/01/1988 Penutupan

REKENING BUKU BESAR:


Pendapatan Dividen
Tanggal Keterangan Ref.

REKENING BUKU BESAR:


Laba Penjualan Surat Berharga

Tanggal Keterangan Ref.


31/01/1988 JKM-1
31/01/1988 Penutupan

REKENING BUKU BESAR:


Pendapatan Lain-lain
Tanggal Keterangan Ref.

REKENING BUKU BESAR:


Rugi Penjualan Aktiva Tetap

Tanggal Keterangan Ref.


REKENING BUKU BESAR:
Rugi Selisih Kurs

Tanggal Keterangan Ref.

REKENING BUKU BESAR:


Rugi Laba

Tanggal Keterangan Ref.


31/01/1988 Penutupan
31/01/1988 Penutupan
PT TINOMASTEX
YOGYAKARTA

KENING BUKU BESAR:


Kas
No. Kode Rekening : 1111

Debit Kredit Saldo


Rp 60,250,500.00
Rp 223,042,500.00 Rp 283,293,000.00
Rp 206,027,860.00 Rp 77,265,140.00
Rp 77,265,140.00
Rp 77,265,140.00
Rp 77,265,140.00
Rp 77,265,140.00
Rp 77,265,140.00
Rp 77,265,140.00
Rp 77,265,140.00
Rp 77,265,140.00
Rp 77,265,140.00
Rp 77,265,140.00
Rp 77,265,140.00
Rp 77,265,140.00
Rp 77,265,140.00
Rp 77,265,140.00
Rp 77,265,140.00

KENING BUKU BESAR:


estasi Sementara - Saham
No. Kode Rekening : 1121

Debit Kredit Saldo


Rp 16,500,000.00 Rp 16,500,000.00
Rp 16,500,000.00
Rp 16,500,000.00
Rp 16,500,000.00
Rp 16,500,000.00
Rp 16,500,000.00
Rp 16,500,000.00
Rp 16,500,000.00
Rp 16,500,000.00
Rp 16,500,000.00
Rp 16,500,000.00
Rp 16,500,000.00
Rp 16,500,000.00
Rp 16,500,000.00
Rp 16,500,000.00
Rp 16,500,000.00
Rp 16,500,000.00
Rp 16,500,000.00

KENING BUKU BESAR:


si Sementara - Sertifikat Bank
No. Kode Rekening : 1123

Debit Kredit Saldo


Rp -
Rp 20,000,000.00 Rp 20,000,000.00
Rp 20,000,000.00
Rp 20,000,000.00
Rp 20,000,000.00
Rp 20,000,000.00
Rp 20,000,000.00
Rp 20,000,000.00
Rp 20,000,000.00
Rp 20,000,000.00
Rp 20,000,000.00
Rp 20,000,000.00
Rp 20,000,000.00
Rp 20,000,000.00
Rp 20,000,000.00
Rp 20,000,000.00
Rp 20,000,000.00
Rp 20,000,000.00

KENING BUKU BESAR:


Piutang Dagang
No. Kode Rekening : 1131

Debit Kredit Saldo


Rp 13,202,000.00
Rp 200,000.00 Rp 13,002,000.00
Rp 3,960,000.00 Rp 9,042,000.00
Rp 234,960,000.00 Rp 244,002,000.00
Rp 205,722,000.00 Rp 38,280,000.00
Rp 38,280,000.00
Rp 38,280,000.00
Rp 38,280,000.00
Rp 38,280,000.00
Rp 38,280,000.00
Rp 38,280,000.00
Rp 38,280,000.00
Rp 38,280,000.00
Rp 38,280,000.00
Rp 38,280,000.00
Rp 38,280,000.00
Rp 38,280,000.00
Rp 38,280,000.00

KENING BUKU BESAR:


Piutang Karyawan
No. Kode Rekening : 1133

Debit Kredit Saldo


Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00
Rp 500,000.00

KENING BUKU BESAR:


Piutang Lain-lain
No. Kode Rekening : 1135

Debit Kredit Saldo


Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

KENING BUKU BESAR:


roduk Dalam Proses Seksi Persiapan
No. Kode Rekening : 1142

Debit Kredit Saldo


Rp 8,528,300.00
Rp 8,528,300.00 Rp -
Rp 11,452,875.00 Rp 11,452,875.00
Rp 11,452,875.00
Rp 11,452,875.00
Rp 11,452,875.00
Rp 11,452,875.00
Rp 11,452,875.00
Rp 11,452,875.00
Rp 11,452,875.00
Rp 11,452,875.00
Rp 11,452,875.00
Rp 11,452,875.00
Rp 11,452,875.00
Rp 11,452,875.00
Rp 11,452,875.00
Rp 11,452,875.00
Rp 11,452,875.00

KENING BUKU BESAR:


Persediaan Bahan Baku
No. Kode Rekening : 1144

Debit Kredit Saldo


Rp 101,440,000.00
Rp 101,440,000.00 Rp 202,880,000.00
Rp 131,872,000.00 Rp 71,008,000.00
Rp 71,008,000.00
Rp 71,008,000.00
Rp 71,008,000.00
Rp 71,008,000.00
Rp 71,008,000.00
Rp 71,008,000.00
Rp 71,008,000.00
Rp 71,008,000.00
Rp 71,008,000.00
Rp 71,008,000.00
Rp 71,008,000.00
Rp 71,008,000.00
Rp 71,008,000.00
Rp 71,008,000.00
Rp 71,008,000.00

KENING BUKU BESAR:


aan Bahan Baku dan Pelumas
No. Kode Rekening : 1146

Debit Kredit Saldo


Rp 3,705,000.00
Rp 2,285,000.00 Rp 5,990,000.00
Rp 3,206,025.00 Rp 2,783,975.00
Rp 2,783,975.00
Rp 2,783,975.00
Rp 2,783,975.00
Rp 2,783,975.00
Rp 2,783,975.00
Rp 2,783,975.00
Rp 2,783,975.00
Rp 2,783,975.00
Rp 2,783,975.00
Rp 2,783,975.00
Rp 2,783,975.00
Rp 2,783,975.00
Rp 2,783,975.00
Rp 2,783,975.00
Rp 2,783,975.00

KENING BUKU BESAR:


rsediaan Bahan Lain-lain
No. Kode Rekening : 1148

Debit Kredit Saldo


Rp 6,200,000.00
Rp 3,009,540.00 Rp 3,190,460.00
Rp 3,190,460.00
Rp 3,190,460.00
Rp 3,190,460.00
Rp 3,190,460.00
Rp 3,190,460.00
Rp 3,190,460.00
Rp 3,190,460.00
Rp 3,190,460.00
Rp 3,190,460.00
Rp 3,190,460.00
Rp 3,190,460.00
Rp 3,190,460.00
Rp 3,190,460.00
Rp 3,190,460.00
Rp 3,190,460.00
Rp 3,190,460.00

KENING BUKU BESAR:


ghasilan Badan Dibayar Di Muka
No. Kode Rekening : 1152

Debit Kredit Saldo


Rp 90,000,000.00
Rp 8,150,000.00 Rp 98,150,000.00
Rp 98,150,000.00
Rp 98,150,000.00
Rp 98,150,000.00
Rp 98,150,000.00
Rp 98,150,000.00
Rp 98,150,000.00
Rp 98,150,000.00
Rp 98,150,000.00
Rp 98,150,000.00
Rp 98,150,000.00
Rp 98,150,000.00
Rp 98,150,000.00
Rp 98,150,000.00
Rp 98,150,000.00
Rp 98,150,000.00
Rp 98,150,000.00

KENING BUKU BESAR:


Persekot Biaya Asuransi
No. Kode Rekening : 1154

Debit Kredit Saldo


Rp 3,935,000.00
Rp 3,500,000.00 Rp 7,435,000.00
Rp 3,035,000.00 Rp 4,400,000.00
Rp 900,000.00 Rp 3,500,000.00
Rp 3,500,000.00
Rp 3,500,000.00
Rp 3,500,000.00
Rp 3,500,000.00
Rp 3,500,000.00
Rp 3,500,000.00
Rp 3,500,000.00
Rp 3,500,000.00
Rp 3,500,000.00
Rp 3,500,000.00
Rp 3,500,000.00
Rp 3,500,000.00
Rp 3,500,000.00
Rp 3,500,000.00

KENING BUKU BESAR:


Investasi Obligasi
No. Kode Rekening : 1202

Debit Kredit Saldo


Rp 10,100,000.00
Rp 10,100,000.00 Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

KENING BUKU BESAR:


Emplasemen
No. Kode Rekening : 1312

Debit Kredit Saldo


Rp 24,000,000.00
Rp 24,000,000.00
Rp 24,000,000.00
Rp 24,000,000.00
Rp 24,000,000.00
Rp 24,000,000.00
Rp 24,000,000.00
Rp 24,000,000.00
Rp 24,000,000.00
Rp 24,000,000.00
Rp 24,000,000.00
Rp 24,000,000.00
Rp 24,000,000.00
Rp 24,000,000.00
Rp 24,000,000.00
Rp 24,000,000.00
Rp 24,000,000.00
Rp 24,000,000.00

KENING BUKU BESAR:


Mesin-mesin
No. Kode Rekening : 1314

Debit Kredit Saldo


Rp 720,000,000.00
Rp 720,000,000.00
Rp 720,000,000.00
Rp 720,000,000.00
Rp 720,000,000.00
Rp 720,000,000.00
Rp 720,000,000.00
Rp 720,000,000.00
Rp 720,000,000.00
Rp 720,000,000.00
Rp 720,000,000.00
Rp 720,000,000.00
Rp 720,000,000.00
Rp 720,000,000.00
Rp 720,000,000.00
Rp 720,000,000.00
Rp 720,000,000.00
Rp 720,000,000.00

KENING BUKU BESAR:


ebel dan Peralatan Kantor
No. Kode Rekening : 1316

Debit Kredit Saldo


Rp 30,000,000.00
Rp 30,000,000.00
Rp 30,000,000.00
Rp 30,000,000.00
Rp 30,000,000.00
Rp 30,000,000.00
Rp 30,000,000.00
Rp 30,000,000.00
Rp 30,000,000.00
Rp 30,000,000.00
Rp 30,000,000.00
Rp 30,000,000.00
Rp 30,000,000.00
Rp 30,000,000.00
Rp 30,000,000.00
Rp 30,000,000.00
Rp 30,000,000.00
Rp 30,000,000.00

KENING BUKU BESAR:


ulasi Penyusutan Emplasemen
No. Kode Rekening : 1322

Debit Kredit Saldo


Rp 5,200,000.00
Rp 400,000.00 Rp 5,600,000.00
Rp 5,600,000.00
Rp 5,600,000.00
Rp 5,600,000.00
Rp 5,600,000.00
Rp 5,600,000.00
Rp 5,600,000.00
Rp 5,600,000.00
Rp 5,600,000.00
Rp 5,600,000.00
Rp 5,600,000.00
Rp 5,600,000.00
Rp 5,600,000.00
Rp 5,600,000.00
Rp 5,600,000.00
Rp 5,600,000.00
Rp 5,600,000.00

KENING BUKU BESAR:


ulasi Penyusutan Mesin-mesin
No. Kode Rekening : 1324
Debit Kredit Saldo
Rp 39,000,000.00
Rp 3,000,000.00 Rp 42,000,000.00
Rp 42,000,000.00
Rp 42,000,000.00
Rp 42,000,000.00
Rp 42,000,000.00
Rp 42,000,000.00
Rp 42,000,000.00
Rp 42,000,000.00
Rp 42,000,000.00
Rp 42,000,000.00
Rp 42,000,000.00
Rp 42,000,000.00
Rp 42,000,000.00
Rp 42,000,000.00
Rp 42,000,000.00
Rp 42,000,000.00
Rp 42,000,000.00

KENING BUKU BESAR:


nyusutan Mebel dan Peralatan Kantor
No. Kode Rekening : 1326

Debit Kredit Saldo


Rp 6,500,000.00
Rp 500,000.00 Rp 7,000,000.00
Rp 7,000,000.00
Rp 7,000,000.00
Rp 7,000,000.00
Rp 7,000,000.00
Rp 7,000,000.00
Rp 7,000,000.00
Rp 7,000,000.00
Rp 7,000,000.00
Rp 7,000,000.00
Rp 7,000,000.00
Rp 7,000,000.00
Rp 7,000,000.00
Rp 7,000,000.00
Rp 7,000,000.00
Rp 7,000,000.00
Rp 7,000,000.00

KENING BUKU BESAR:


Merek Dagang
No. Kode Rekening : 1401

Debit Kredit Saldo


Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

KENING BUKU BESAR:


struksi Dalam Pelaksanaan
No. Kode Rekening : 1502

Debit Kredit Saldo


Rp 800,000.00
Rp 800,000.00 Rp 1,600,000.00
Rp 1,600,000.00
Rp 1,600,000.00
Rp 1,600,000.00
Rp 1,600,000.00
Rp 1,600,000.00
Rp 1,600,000.00
Rp 1,600,000.00
Rp 1,600,000.00
Rp 1,600,000.00
Rp 1,600,000.00
Rp 1,600,000.00
Rp 1,600,000.00
Rp 1,600,000.00
Rp 1,600,000.00
Rp 1,600,000.00
Rp 1,600,000.00
KENING BUKU BESAR:
Dividen
No. Kode Rekening : 1602

Debit Kredit Saldo


Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

KENING BUKU BESAR:


Pajak Penghasilan Karyawan
No. Kode Rekening : 2102

Debit Kredit Saldo


Rp 846,600.00
Rp 846,600.00 Rp -
Rp 835,900.00 Rp 835,900.00
Rp 835,900.00
Rp 835,900.00
Rp 835,900.00
Rp 835,900.00
Rp 835,900.00
Rp 835,900.00
Rp 835,900.00
Rp 835,900.00
Rp 835,900.00
Rp 835,900.00
Rp 835,900.00
Rp 835,900.00
Rp 835,900.00
Rp 835,900.00
Rp 835,900.00
KENING BUKU BESAR:
g Pajak Penghasilan Badan
No. Kode Rekening : 2104

Debit Kredit Saldo


Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

KENING BUKU BESAR:


Utang Biaya
No. Kode Rekening : 2106

Debit Kredit Saldo


Rp -
Rp 6,500,000.00 Rp 6,500,000.00
Rp 6,500,000.00
Rp 6,500,000.00
Rp 6,500,000.00
Rp 6,500,000.00
Rp 6,500,000.00
Rp 6,500,000.00
Rp 6,500,000.00
Rp 6,500,000.00
Rp 6,500,000.00
Rp 6,500,000.00
Rp 6,500,000.00
Rp 6,500,000.00
Rp 6,500,000.00
Rp 6,500,000.00
Rp 6,500,000.00
Rp 6,500,000.00

KENING BUKU BESAR:


patan Yang Diterima Dimuka
No. Kode Rekening : 2108

Debit Kredit Saldo


Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

KENING BUKU BESAR:


Utang Obligasi
No. Kode Rekening : 2202

Debit Kredit Saldo


Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

KENING BUKU BESAR:


Diskonto Utang Obligasi
No. Kode Rekening : 2204

Debit Kredit Saldo


Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

KENING BUKU BESAR:


dal Saham Dalam Portepel
No. Kode Rekening : 3002

Debit Kredit Saldo


Rp 250,000,000.00
Rp 250,000,000.00
Rp 250,000,000.00
Rp 250,000,000.00
Rp 250,000,000.00
Rp 250,000,000.00
Rp 250,000,000.00
Rp 250,000,000.00
Rp 250,000,000.00
Rp 250,000,000.00
Rp 250,000,000.00
Rp 250,000,000.00
Rp 250,000,000.00
Rp 250,000,000.00
Rp 250,000,000.00
Rp 250,000,000.00
Rp 250,000,000.00
Rp 250,000,000.00

KENING BUKU BESAR:


Modal Sumbangan
No. Kode Rekening : 3004

Debit Kredit Saldo


Rp 15,000,000.00 Rp 15,000,000.00
Rp 15,000,000.00
Rp 15,000,000.00
Rp 15,000,000.00
Rp 15,000,000.00
Rp 15,000,000.00
Rp 15,000,000.00
Rp 15,000,000.00
Rp 15,000,000.00
Rp 15,000,000.00
Rp 15,000,000.00
Rp 15,000,000.00
Rp 15,000,000.00
Rp 15,000,000.00
Rp 15,000,000.00
Rp 15,000,000.00
Rp 15,000,000.00
Rp 15,000,000.00

KENING BUKU BESAR:


Laba Yang Ditahan
No. Kode Rekening : 3006

Debit Kredit Saldo


Rp 362,626,100.00
Rp 44,434,000.00 Rp 407,060,100.00
Rp 407,060,100.00
Rp 407,060,100.00
Rp 407,060,100.00
Rp 407,060,100.00
Rp 407,060,100.00
Rp 407,060,100.00
Rp 407,060,100.00
Rp 407,060,100.00
Rp 407,060,100.00
Rp 407,060,100.00
Rp 407,060,100.00
Rp 407,060,100.00
Rp 407,060,100.00
Rp 407,060,100.00
Rp 407,060,100.00
Rp 407,060,100.00

KENING BUKU BESAR:


Potongan Penjualan
No. Kode Rekening : 4201

Debit Kredit Saldo


Rp 2,832,000.00 Rp 2,832,000.00
Rp 2,832,000.00 Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

KENING BUKU BESAR:


Pokok Penjualan Kain Grey
No. Kode Rekening : 5101

Debit Kredit Saldo


Rp 139,196,000.00 Rp 139,196,000.00
Rp 2,346,000.00 Rp 136,850,000.00
Rp 136,850,000.00 Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

KENING BUKU BESAR:


d Pabrik Sesungguhnya Seksi Bengkel
No. Kode Rekening : 5212

Debit Kredit Saldo


Rp 810,000.00 Rp 810,000.00
Rp 200,000.00 Rp 1,010,000.00
Rp 400,000.00 Rp 1,410,000.00
Rp 400,000.00 Rp 1,810,000.00
Rp 143,900.00 Rp 1,953,900.00
Rp 34,760.00 Rp 1,988,660.00
Rp 11,340.00 Rp 2,000,000.00
Rp 2,000,000.00 Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

KENING BUKU BESAR:


Pabrik Sesungguhnya Seksi Persiapan
No. Kode Rekening : 5221

Debit Kredit Saldo


Rp 3,559,625.00 Rp 3,559,625.00
Rp 725,000.00 Rp 4,284,625.00
Rp 1,050,000.00 Rp 5,334,625.00
Rp 160,000.00 Rp 5,494,625.00
Rp 1,000,000.00 Rp 6,494,625.00
Rp 500,000.00 Rp 6,994,625.00
Rp 2,000,000.00 Rp 8,994,625.00
Rp 8,994,625.00 Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

KENING BUKU BESAR:


oses - Biaya Bahan Baku Seksi Persiapan
No. Kode Rekening : 5231

Debit Kredit Saldo


Rp 7,100,800.00 Rp 7,100,800.00
Rp 131,872,000.00 Rp 138,972,800.00
Rp 128,321,600.00 Rp 10,651,200.00
Rp 10,651,200.00 Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

KENING BUKU BESAR:


es - Biaya Overhead Pabrik Seksi Persiapan
No. Kode Rekening : 5233

Debit Kredit Saldo


Rp 1,217,875.00 Rp 1,217,875.00
Rp 8,994,625.00 Rp 10,212,500.00
Rp 9,614,000.00 Rp 598,500.00
Rp 598,500.00 Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

KENING BUKU BESAR:


ses - Biaya Tenaga Kerja Seksi Pertenunan
No. Kode Rekening : 5242

Debit Kredit Saldo


Rp 828,000.00 Rp 828,000.00
Rp 3,229,000.00 Rp 4,057,000.00
Rp 650,000.00 Rp 4,707,000.00
Rp 261,000.00 Rp 4,968,000.00
Rp 4,320,000.00 Rp 648,000.00
Rp 648,000.00 Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

KENING BUKU BESAR:


ya Administrasi dan Umum
No. Kode Rekening : 5301

Debit Kredit Saldo


Rp 100,000.00 Rp 100,000.00
Rp 100,000.00 Rp 200,000.00
Rp 400,000.00 Rp 600,000.00
Rp 500,000.00 Rp 1,100,000.00
Rp 200,000.00 Rp 1,300,000.00
Rp 500,000.00 Rp 1,800,000.00
Rp 1,700,000.00 Rp 3,500,000.00
Rp 350,000.00 Rp 3,850,000.00
Rp 200,000.00 Rp 4,050,000.00
Rp 75,000.00 Rp 4,125,000.00
Rp 612,500.00 Rp 4,737,500.00
Rp 5,141,000.00 Rp 9,878,500.00
Rp 650,000.00 Rp 10,528,500.00
Rp 10,528,500.00 Rp -
Rp -
Rp -
Rp -
Rp -

KENING BUKU BESAR:


Pendapatan Bunga
No. Kode Rekening : 6101

Debit Kredit Saldo


Rp 50,000.00 Rp 50,000.00
Rp 200,000.00 Rp 250,000.00
Rp 250,000.00 Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

KENING BUKU BESAR:


Pendapatan Dividen
No. Kode Rekening : 6103
Debit Kredit Saldo
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

KENING BUKU BESAR:


a Penjualan Surat Berharga
No. Kode Rekening : 6105

Debit Kredit Saldo


Rp 35,000.00 Rp 35,000.00
Rp 35,000.00 Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

KENING BUKU BESAR:


Pendapatan Lain-lain
No. Kode Rekening : 6107

Debit Kredit Saldo

KENING BUKU BESAR:


gi Penjualan Aktiva Tetap
No. Kode Rekening : 6202

Debit Kredit Saldo


Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
KENING BUKU BESAR:
Rugi Selisih Kurs
No. Kode Rekening : 6204

Debit Kredit Saldo


Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

KENING BUKU BESAR:


Rugi Laba
No. Kode Rekening : 6301

Debit Kredit Saldo


Rp 207,953,000.00 Rp 207,953,000.00
Rp 163,519,000.00 Rp 44,434,000.00
Rp 44,434,000.00
Rp 44,434,000.00
Rp 44,434,000.00
Rp 44,434,000.00
Rp 44,434,000.00
Rp 44,434,000.00
Rp 44,434,000.00
Rp 44,434,000.00
Rp 44,434,000.00
Rp 44,434,000.00
Rp 44,434,000.00
Rp 44,434,000.00
Rp 44,434,000.00
Rp 44,434,000.00
Rp 44,434,000.00
Rp 44,434,000.00
REKENING BUKU BESAR:
Kas Kecil

Tanggal Keterangan Ref.


01/01/1988 Saldo
31/01/1988 JKK-1
31/01/1988 JM-1

REKENING BUKU BESAR:


Investasi Sementara - Obligasi

Tanggal Keterangan Ref.


01/01/1988 Saldo
REKENING BUKU BESAR:
Investasi Sementara - Deposito Berjangka

Tanggal Keterangan Ref.


01/01/1988 Saldo

REKENING BUKU BESAR:


Cadangan Kerugian Piutang Dagang

Tanggal Keterangan Ref.


01/01/1988 Saldo
05/01/1988 JM-1
31/01/1988 JM-1
REKENING BUKU BESAR:
Piutang Pendapatan

Tanggal Keterangan Ref.


01/01/1988 Saldo
31/01/1988 JM-1

REKENING BUKU BESAR:


Persediaan Kain Grey

Tanggal Keterangan Ref.


01/01/1988 Saldo
26/01/1988 JM-1
31/01/1988 JP-2
31/01/1988 JP-2
REKENING BUKU BESAR:
Persediaan Produk Dalam Proses Seksi Pertenunan

Tanggal Keterangan Ref.


01/01/1988 Saldo
01/01/1988 JM-1
31/01/1988 JP-2

REKENING BUKU BESAR:


Persediaan Bahan Pembungkus

Tanggal Keterangan Ref.


01/01/1988 Saldo
31/01/1988 JPb-1
31/01/1988 JPBhn-1
REKENING BUKU BESAR:
Persediaan Suku Cadang

Tanggal Keterangan Ref.


01/01/1988 Saldo
31/01/1988 JPb-1
31/01/1988 JPBhn-1

REKENING BUKU BESAR:


Pajak Pertambahan Nilai (PPN) Masukan

Tanggal Keterangan Ref.


01/01/1988 Saldo
31/01/1988 JPb-1
31/01/1988 JKK-1
10/01/1998 JKK-1
REKENING BUKU BESAR:
Persekot Biaya Perjalanan Dinas

Tanggal Keterangan Ref.


01/01/1988 Saldo

REKENING BUKU BESAR:


Investasi Saham

Tanggal Keterangan Ref.


01/01/1988 Saldo (PT Semen Cibinong 450lb @ Rp10.150)
31/01/1988 JKM-1
REKENING BUKU BESAR:
Tanah

Tanggal Keterangan Ref.


01/01/1988 Saldo
05/01/1988 JM-1

REKENING BUKU BESAR:


Gedung

Tanggal Keterangan Ref.


01/01/1988 Saldo
REKENING BUKU BESAR:
Peralatan Pabrik

Tanggal Keterangan Ref.


01/01/1988 Saldo

REKENING BUKU BESAR:


Kendaraan

Tanggal Keterangan Ref.


01/01/1988 Saldo
31/01/1988 JKM-1
31/01/1988 JKK-1

REKENING BUKU BESAR:


Akumulasi Penyusutan Gedung

Tanggal Keterangan Ref.


01/01/1988 Saldo
31/01/1988 JM-1

REKENING BUKU BESAR:


Akumulasi Penyusutan Peralatan Pabrik
Tanggal Keterangan Ref.
01/01/1988 Saldo
31/01/1988 JM-1

REKENING BUKU BESAR:


Akumulasi Penyusutan Kendaraan

Tanggal Keterangan Ref.


01/01/1988 Saldo
31/01/1988 JKM-1
31/01/1988 JM-1

REKENING BUKU BESAR:


Biaya Pendirian Yang Ditangguhkan
Tanggal Keterangan Ref.
01/01/1988 Saldo
31/01/1988 JM-1

REKENING BUKU BESAR:


Gaji dan Upah

Tanggal Keterangan Ref.


01/01/1988 Saldo
31/01/1988 JKK-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JM-1
REKENING BUKU BESAR:
Utang Dagang

Tanggal Keterangan Ref.


01/01/1988 Saldo
31/01/1988 JPb-1
31/01/1988 JKK-1

REKENING BUKU BESAR:


Pajak Pertambahan Nilai (PPN) Keluaran

Tanggal Keterangan Ref.


01/01/1988 Saldo
31/01/1988 JM-1
31/01/1988 JPn-1
31/01/1988 JKK-1
REKENING BUKU BESAR:
Utang Dividen

Tanggal Keterangan Ref.


01/01/1988 Saldo

REKENING BUKU BESAR:


Utang Jangka Pendek Lain-lain

Tanggal Keterangan Ref.


01/01/1988 Saldo
REKENING BUKU BESAR:
Utang Jangka Panjang dari Bank

Tanggal Keterangan Ref.


01/01/1988 Saldo

REKENING BUKU BESAR:


Premium Utang Obligasi

Tanggal Keterangan Ref.


01/01/1988 Saldo
REKENING BUKU BESAR:
Modal Statutair

Tanggal Keterangan Ref.


01/01/1988 Saldo (20.000lb @ Rp50.000)

REKENING BUKU BESAR:


Agio Saham

Tanggal Keterangan Ref.


01/01/1988 Saldo
REKENING BUKU BESAR:
Cadangan Pelunasan Utang Jangka Panjang

Tanggal Keterangan Ref.


01/01/1988 Saldo

REKENING BUKU BESAR:


Hasil Penjualan Kain Grey

Tanggal Keterangan Ref.


31/01/1988 JPn-1
31/01/1988 Penutupan
REKENING BUKU BESAR:
Retur Penjualan

Tanggal Keterangan Ref.


26/01/1988 JM-1
31/01/1988 Penutupan

REKENING BUKU BESAR:


Biaya Overhead Pabrik Sesungguhnya Seksi Listrik

Tanggal Keterangan Ref.


31/01/1988 JPBhn-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 SUB

REKENING BUKU BESAR:


Biaya Overhead Pabrik Sesungguhnya Seksi Umum Pabrik

Tanggal Keterangan Ref.


31/01/1988 JPBhn-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 SUB

REKENING BUKU BESAR:


Biaya Overhead Pabrik Sesungguhnya Seksi Pertenunan

Tanggal Keterangan Ref.


31/01/1988 JPBhn-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 SUB
31/01/1988 JP-2

REKENING BUKU BESAR:


Barang Dalam Proses - Biaya Tenaga Kerja Seksi Persiapan

Tanggal Keterangan Ref.


01/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JP-2
31/01/1988 JP-2

REKENING BUKU BESAR:


Barang Dalam Proses - Biaya Bahan Baku Seksi Pertenunan

Tanggal Keterangan Ref.


01/01/1988 JM-1
31/01/1988 JP-2
31/01/1988 JP-2
31/01/1988 JP-2

REKENING BUKU BESAR:


Barang Dalam Proses - Biaya Overhead Pabrik Seksi Pertenunan

Tanggal Keterangan Ref.


01/01/1988 JM-1
31/01/1988 JP-2
31/01/1988 JP-2
31/01/1988 JP-2

REKENING BUKU BESAR:


Biaya Pemasaran

Tanggal Keterangan Ref.


31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JM-1
31/01/1988 JPBhn-1
31/01/1988 JKK-1
31/01/1988 SUB
31/01/1988 Penutupan

REKENING BUKU BESAR:


Pendapatan Jasa Giro

Tanggal Keterangan Ref.

REKENING BUKU BESAR:


Laba Penjualan Aktiva Tetap
Tanggal Keterangan Ref.
31/01/1988 JKM-1
31/01/1988 Penutupan

REKENING BUKU BESAR:


Laba Selisih Kurs

Tanggal Keterangan Ref.

REKENING BUKU BESAR:


Biaya Bunga
Tanggal Keterangan Ref.
31/01/1988 JM-1
31/01/1988 Penutupan

REKENING BUKU BESAR:


Rugi Penjualan Penjualan Surat Berharga

Tanggal Keterangan Ref.


31/01/1988 JKM-1
31/01/1988 Penutupan
REKENING BUKU BESAR:
Rugi Lain-lain

Tanggal Keterangan Ref.


ENING BUKU BESAR:
Kas Kecil
No. Kode Rekening : 1112

Debit Kredit Saldo


Rp 230,000.00
Rp 70,000.00 Rp 300,000.00
Rp 75,000.00 Rp 225,000.00
Rp 225,000.00
Rp 225,000.00
Rp 225,000.00
Rp 225,000.00
Rp 225,000.00
Rp 225,000.00
Rp 225,000.00
Rp 225,000.00
Rp 225,000.00
Rp 225,000.00
Rp 225,000.00
Rp 225,000.00
Rp 225,000.00
Rp 225,000.00
Rp 225,000.00

ENING BUKU BESAR:


asi Sementara - Obligasi
No. Kode Rekening : 1122

Debit Kredit Saldo


Rp 5,000,000.00
Rp 5,000,000.00
Rp 5,000,000.00
Rp 5,000,000.00
Rp 5,000,000.00
Rp 5,000,000.00
Rp 5,000,000.00
Rp 5,000,000.00
Rp 5,000,000.00
Rp 5,000,000.00
Rp 5,000,000.00
Rp 5,000,000.00
Rp 5,000,000.00
Rp 5,000,000.00
Rp 5,000,000.00
Rp 5,000,000.00
Rp 5,000,000.00
Rp 5,000,000.00

ENING BUKU BESAR:


mentara - Deposito Berjangka
No. Kode Rekening : 1124

Debit Kredit Saldo


Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00

ENING BUKU BESAR:


n Kerugian Piutang Dagang
No. Kode Rekening : 1132

Debit Kredit Saldo


Rp 250,000.00
Rp 200,000.00 Rp 50,000.00
Rp 700,000.00 Rp 750,000.00
Rp 750,000.00
Rp 750,000.00
Rp 750,000.00
Rp 750,000.00
Rp 750,000.00
Rp 750,000.00
Rp 750,000.00
Rp 750,000.00
Rp 750,000.00
Rp 750,000.00
Rp 750,000.00
Rp 750,000.00
Rp 750,000.00
Rp 750,000.00
Rp 750,000.00

ENING BUKU BESAR:


Piutang Pendapatan
No. Kode Rekening : 1134

Debit Kredit Saldo


Rp 50,000.00
Rp 50,000.00 Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00

ENING BUKU BESAR:


ersediaan Kain Grey
No. Kode Rekening : 1141

Debit Kredit Saldo


Rp 15,640,000.00
Rp 2,346,000.00 Rp 17,986,000.00
Rp 140,760,000.00 Rp 158,746,000.00
Rp 139,196,000.00 Rp 19,550,000.00
Rp 19,550,000.00
Rp 19,550,000.00
Rp 19,550,000.00
Rp 19,550,000.00
Rp 19,550,000.00
Rp 19,550,000.00
Rp 19,550,000.00
Rp 19,550,000.00
Rp 19,550,000.00
Rp 19,550,000.00
Rp 19,550,000.00
Rp 19,550,000.00
Rp 19,550,000.00
Rp 19,550,000.00

ENING BUKU BESAR:


uk Dalam Proses Seksi Pertenunan
No. Kode Rekening : 1143

Debit Kredit Saldo


Rp 16,724,700.00
Rp 16,724,700.00 Rp -
Rp 33,534,000.00 Rp 33,534,000.00
Rp 33,534,000.00
Rp 33,534,000.00
Rp 33,534,000.00
Rp 33,534,000.00
Rp 33,534,000.00
Rp 33,534,000.00
Rp 33,534,000.00
Rp 33,534,000.00
Rp 33,534,000.00
Rp 33,534,000.00
Rp 33,534,000.00
Rp 33,534,000.00
Rp 33,534,000.00
Rp 33,534,000.00
Rp 33,534,000.00

ENING BUKU BESAR:


iaan Bahan Pembungkus
No. Kode Rekening : 1145

Debit Kredit Saldo


Rp 1,978,500.00
Rp 1,112,500.00 Rp 3,091,000.00
Rp 1,572,200.00 Rp 1,518,800.00
Rp 1,518,800.00
Rp 1,518,800.00
Rp 1,518,800.00
Rp 1,518,800.00
Rp 1,518,800.00
Rp 1,518,800.00
Rp 1,518,800.00
Rp 1,518,800.00
Rp 1,518,800.00
Rp 1,518,800.00
Rp 1,518,800.00
Rp 1,518,800.00
Rp 1,518,800.00
Rp 1,518,800.00
Rp 1,518,800.00

ENING BUKU BESAR:


sediaan Suku Cadang
No. Kode Rekening : 1147

Debit Kredit Saldo


Rp 7,100,000.00
Rp 120,000.00 Rp 7,220,000.00
Rp 6,579,500.00 Rp 640,500.00
Rp 640,500.00
Rp 640,500.00
Rp 640,500.00
Rp 640,500.00
Rp 640,500.00
Rp 640,500.00
Rp 640,500.00
Rp 640,500.00
Rp 640,500.00
Rp 640,500.00
Rp 640,500.00
Rp 640,500.00
Rp 640,500.00
Rp 640,500.00
Rp 640,500.00

ENING BUKU BESAR:


mbahan Nilai (PPN) Masukan
No. Kode Rekening : 1151

Debit Kredit Saldo


Rp 18,187,200.00
Rp 10,264,250.00 Rp 28,451,450.00
Rp 1,000,000.00 Rp 29,451,450.00
Rp 18,187,200.00 Rp 11,264,250.00
Rp 11,264,250.00
Rp 11,264,250.00
Rp 11,264,250.00
Rp 11,264,250.00
Rp 11,264,250.00
Rp 11,264,250.00
Rp 11,264,250.00
Rp 11,264,250.00
Rp 11,264,250.00
Rp 11,264,250.00
Rp 11,264,250.00
Rp 11,264,250.00
Rp 11,264,250.00
Rp 11,264,250.00

ENING BUKU BESAR:


ot Biaya Perjalanan Dinas
No. Kode Rekening : 1153

Debit Kredit Saldo


Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

ENING BUKU BESAR:


Investasi Saham
No. Kode Rekening : 1201

Debit Kredit Saldo


Rp 4,567,500.00
Rp 4,567,500.00 Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

ENING BUKU BESAR:


Tanah
No. Kode Rekening : 1311

Debit Kredit Saldo


Rp 28,000,000.00
Rp 15,000,000.00 Rp 43,000,000.00
Rp 43,000,000.00
Rp 43,000,000.00
Rp 43,000,000.00
Rp 43,000,000.00
Rp 43,000,000.00
Rp 43,000,000.00
Rp 43,000,000.00
Rp 43,000,000.00
Rp 43,000,000.00
Rp 43,000,000.00
Rp 43,000,000.00
Rp 43,000,000.00
Rp 43,000,000.00
Rp 43,000,000.00
Rp 43,000,000.00
Rp 43,000,000.00

ENING BUKU BESAR:


Gedung
No. Kode Rekening : 1313

Debit Kredit Saldo


Rp 480,000,000.00
Rp 480,000,000.00
Rp 480,000,000.00
Rp 480,000,000.00
Rp 480,000,000.00
Rp 480,000,000.00
Rp 480,000,000.00
Rp 480,000,000.00
Rp 480,000,000.00
Rp 480,000,000.00
Rp 480,000,000.00
Rp 480,000,000.00
Rp 480,000,000.00
Rp 480,000,000.00
Rp 480,000,000.00
Rp 480,000,000.00
Rp 480,000,000.00
Rp 480,000,000.00

ENING BUKU BESAR:


Peralatan Pabrik
No. Kode Rekening : 1315

Debit Kredit Saldo


Rp 12,000,000.00
Rp 12,000,000.00
Rp 12,000,000.00
Rp 12,000,000.00
Rp 12,000,000.00
Rp 12,000,000.00
Rp 12,000,000.00
Rp 12,000,000.00
Rp 12,000,000.00
Rp 12,000,000.00
Rp 12,000,000.00
Rp 12,000,000.00
Rp 12,000,000.00
Rp 12,000,000.00
Rp 12,000,000.00
Rp 12,000,000.00
Rp 12,000,000.00
Rp 12,000,000.00

ENING BUKU BESAR:


Kendaraan
No. Kode Rekening : 1317

Debit Kredit Saldo


Rp 65,000,000.00
Rp 10,000,000.00 Rp 55,000,000.00
Rp 12,500,000.00 Rp 67,500,000.00
Rp 67,500,000.00
Rp 67,500,000.00
Rp 67,500,000.00
Rp 67,500,000.00
Rp 67,500,000.00
Rp 67,500,000.00
Rp 67,500,000.00
Rp 67,500,000.00
Rp 67,500,000.00
Rp 67,500,000.00
Rp 67,500,000.00
Rp 67,500,000.00
Rp 67,500,000.00
Rp 67,500,000.00
Rp 67,500,000.00

ENING BUKU BESAR:


ulasi Penyusutan Gedung
No. Kode Rekening : 1323

Debit Kredit Saldo


Rp 26,000,000.00
Rp 2,000,000.00 Rp 28,000,000.00
Rp 28,000,000.00
Rp 28,000,000.00
Rp 28,000,000.00
Rp 28,000,000.00
Rp 28,000,000.00
Rp 28,000,000.00
Rp 28,000,000.00
Rp 28,000,000.00
Rp 28,000,000.00
Rp 28,000,000.00
Rp 28,000,000.00
Rp 28,000,000.00
Rp 28,000,000.00
Rp 28,000,000.00
Rp 28,000,000.00
Rp 28,000,000.00

ENING BUKU BESAR:


Penyusutan Peralatan Pabrik
No. Kode Rekening : 1325
Debit Kredit Saldo
Rp 2,600,000.00
Rp 200,000.00 Rp 2,800,000.00
Rp 2,800,000.00
Rp 2,800,000.00
Rp 2,800,000.00
Rp 2,800,000.00
Rp 2,800,000.00
Rp 2,800,000.00
Rp 2,800,000.00
Rp 2,800,000.00
Rp 2,800,000.00
Rp 2,800,000.00
Rp 2,800,000.00
Rp 2,800,000.00
Rp 2,800,000.00
Rp 2,800,000.00
Rp 2,800,000.00
Rp 2,800,000.00

ENING BUKU BESAR:


asi Penyusutan Kendaraan
No. Kode Rekening : 1327

Debit Kredit Saldo


Rp 14,000,000.00
Rp 5,000,000.00 Rp 9,000,000.00
Rp 1,000,000.00 Rp 10,000,000.00
Rp 10,000,000.00
Rp 10,000,000.00
Rp 10,000,000.00
Rp 10,000,000.00
Rp 10,000,000.00
Rp 10,000,000.00
Rp 10,000,000.00
Rp 10,000,000.00
Rp 10,000,000.00
Rp 10,000,000.00
Rp 10,000,000.00
Rp 10,000,000.00
Rp 10,000,000.00
Rp 10,000,000.00
Rp 10,000,000.00

ENING BUKU BESAR:


ndirian Yang Ditangguhkan
No. Kode Rekening : 1501

Debit Kredit Saldo


Rp 4,600,000.00
Rp 200,000.00 Rp 4,400,000.00
Rp 4,400,000.00
Rp 4,400,000.00
Rp 4,400,000.00
Rp 4,400,000.00
Rp 4,400,000.00
Rp 4,400,000.00
Rp 4,400,000.00
Rp 4,400,000.00
Rp 4,400,000.00
Rp 4,400,000.00
Rp 4,400,000.00
Rp 4,400,000.00
Rp 4,400,000.00
Rp 4,400,000.00
Rp 4,400,000.00
Rp 4,400,000.00

ENING BUKU BESAR:


Gaji dan Upah
No. Kode Rekening : 1601

Debit Kredit Saldo


Rp -
Rp 11,204,610.00 Rp 11,204,610.00
Rp 8,853,100.00 Rp 2,351,510.00
Rp 1,633,420.00 Rp 718,090.00
Rp 718,090.00 Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
ENING BUKU BESAR:
Utang Dagang
No. Kode Rekening : 2101

Debit Kredit Saldo


Rp 5,116,000.00
Rp 115,221,750.00 Rp 120,337,750.00
Rp 117,920,750.00 Rp 2,417,000.00
Rp 2,417,000.00
Rp 2,417,000.00
Rp 2,417,000.00
Rp 2,417,000.00
Rp 2,417,000.00
Rp 2,417,000.00
Rp 2,417,000.00
Rp 2,417,000.00
Rp 2,417,000.00
Rp 2,417,000.00
Rp 2,417,000.00
Rp 2,417,000.00
Rp 2,417,000.00
Rp 2,417,000.00
Rp 2,417,000.00

ENING BUKU BESAR:


mbahan Nilai (PPN) Keluaran
No. Kode Rekening : 2103

Debit Kredit Saldo


Rp 21,600,000.00
Rp 360,000.00 Rp 21,240,000.00
Rp 21,360,000.00 Rp 42,600,000.00
Rp 21,600,000.00 Rp 21,000,000.00
Rp 21,000,000.00
Rp 21,000,000.00
Rp 21,000,000.00
Rp 21,000,000.00
Rp 21,000,000.00
Rp 21,000,000.00
Rp 21,000,000.00
Rp 21,000,000.00
Rp 21,000,000.00
Rp 21,000,000.00
Rp 21,000,000.00
Rp 21,000,000.00
Rp 21,000,000.00
Rp 21,000,000.00
ENING BUKU BESAR:
Utang Dividen
No. Kode Rekening : 2105

Debit Kredit Saldo


Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

ENING BUKU BESAR:


Jangka Pendek Lain-lain
No. Kode Rekening : 2107

Debit Kredit Saldo


Rp 100,000,000.00
Rp 100,000,000.00
Rp 100,000,000.00
Rp 100,000,000.00
Rp 100,000,000.00
Rp 100,000,000.00
Rp 100,000,000.00
Rp 100,000,000.00
Rp 100,000,000.00
Rp 100,000,000.00
Rp 100,000,000.00
Rp 100,000,000.00
Rp 100,000,000.00
Rp 100,000,000.00
Rp 100,000,000.00
Rp 100,000,000.00
Rp 100,000,000.00
Rp 100,000,000.00

ENING BUKU BESAR:


Jangka Panjang dari Bank
No. Kode Rekening : 2201

Debit Kredit Saldo


Rp 300,000,000.00
Rp 300,000,000.00
Rp 300,000,000.00
Rp 300,000,000.00
Rp 300,000,000.00
Rp 300,000,000.00
Rp 300,000,000.00
Rp 300,000,000.00
Rp 300,000,000.00
Rp 300,000,000.00
Rp 300,000,000.00
Rp 300,000,000.00
Rp 300,000,000.00
Rp 300,000,000.00
Rp 300,000,000.00
Rp 300,000,000.00
Rp 300,000,000.00
Rp 300,000,000.00

ENING BUKU BESAR:


mium Utang Obligasi
No. Kode Rekening : 2203

Debit Kredit Saldo


Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

ENING BUKU BESAR:


Modal Statutair
No. Kode Rekening : 3001

Debit Kredit Saldo


Rp 1,000,000,000.00
Rp 1,000,000,000.00
Rp 1,000,000,000.00
Rp 1,000,000,000.00
Rp 1,000,000,000.00
Rp 1,000,000,000.00
Rp 1,000,000,000.00
Rp 1,000,000,000.00
Rp 1,000,000,000.00
Rp 1,000,000,000.00
Rp 1,000,000,000.00
Rp 1,000,000,000.00
Rp 1,000,000,000.00
Rp 1,000,000,000.00
Rp 1,000,000,000.00
Rp 1,000,000,000.00
Rp 1,000,000,000.00
Rp 1,000,000,000.00

ENING BUKU BESAR:


Agio Saham
No. Kode Rekening : 3003

Debit Kredit Saldo


Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

ENING BUKU BESAR:


elunasan Utang Jangka Panjang
No. Kode Rekening : 3005

Debit Kredit Saldo


Rp 100,000,000.00
Rp 100,000,000.00
Rp 100,000,000.00
Rp 100,000,000.00
Rp 100,000,000.00
Rp 100,000,000.00
Rp 100,000,000.00
Rp 100,000,000.00
Rp 100,000,000.00
Rp 100,000,000.00
Rp 100,000,000.00
Rp 100,000,000.00
Rp 100,000,000.00
Rp 100,000,000.00
Rp 100,000,000.00
Rp 100,000,000.00
Rp 100,000,000.00
Rp 100,000,000.00

ENING BUKU BESAR:


il Penjualan Kain Grey
No. Kode Rekening : 4101

Debit Kredit Saldo


Rp 213,600,000.00 Rp 213,600,000.00
Rp 213,600,000.00 Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

ENING BUKU BESAR:


Retur Penjualan
No. Kode Rekening : 4202

Debit Kredit Saldo


Rp 3,600,000.00 Rp 3,600,000.00
Rp 3,600,000.00 Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

ENING BUKU BESAR:


Pabrik Sesungguhnya Seksi Listrik
No. Kode Rekening : 5211

Debit Kredit Saldo


Rp 1,708,700.00 Rp 1,708,700.00
Rp 250,000.00 Rp 1,958,700.00
Rp 400,000.00 Rp 2,358,700.00
Rp 400,000.00 Rp 2,758,700.00
Rp 183,000.00 Rp 2,941,700.00
Rp 40,300.00 Rp 2,982,000.00
Rp 18,000.00 Rp 3,000,000.00
Rp 3,000,000.00 Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

ENING BUKU BESAR:


rik Sesungguhnya Seksi Umum Pabrik
No. Kode Rekening : 5213

Debit Kredit Saldo


Rp 373,940.00 Rp 373,940.00
Rp 300,000.00 Rp 673,940.00
Rp 150,000.00 Rp 823,940.00
Rp 300,000.00 Rp 1,123,940.00
Rp 100,000.00 Rp 1,223,940.00
Rp 85,000.00 Rp 1,308,940.00
Rp 100,000.00 Rp 1,408,940.00
Rp 42,700.00 Rp 1,451,640.00
Rp 33,360.00 Rp 1,485,000.00
Rp 15,000.00 Rp 1,500,000.00
Rp 1,500,000.00 Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

ENING BUKU BESAR:


brik Sesungguhnya Seksi Pertenunan
No. Kode Rekening : 5222

Debit Kredit Saldo


Rp 6,415,000.00 Rp 6,415,000.00
Rp 525,000.00 Rp 6,940,000.00
Rp 850,000.00 Rp 7,790,000.00
Rp 40,000.00 Rp 7,830,000.00
Rp 600,000.00 Rp 8,430,000.00
Rp 300,000.00 Rp 8,730,000.00
Rp 3,500,000.00 Rp 12,230,000.00
Rp 12,230,000.00 Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

ENING BUKU BESAR:


s - Biaya Tenaga Kerja Seksi Persiapan
No. Kode Rekening : 5232

Debit Kredit Saldo


Rp 209,625.00 Rp 209,625.00
Rp 2,754,500.00 Rp 2,964,125.00
Rp 400,000.00 Rp 3,364,125.00
Rp 102,750.00 Rp 3,466,875.00
Rp 3,263,700.00 Rp 203,175.00
Rp 203,175.00 Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

ENING BUKU BESAR:


s - Biaya Bahan Baku Seksi Pertenunan
No. Kode Rekening : 5241

Debit Kredit Saldo


Rp 14,050,700.00 Rp 14,050,700.00
Rp 141,199,300.00 Rp 155,250,000.00
Rp 124,200,000.00 Rp 31,050,000.00
Rp 31,050,000.00 Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

ENING BUKU BESAR:


Biaya Overhead Pabrik Seksi Pertenunan
No. Kode Rekening : 5243

Debit Kredit Saldo


Rp 1,846,000.00 Rp 1,846,000.00
Rp 12,230,000.00 Rp 14,076,000.00
Rp 12,240,000.00 Rp 1,836,000.00
Rp 1,836,000.00 Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

ENING BUKU BESAR:


Biaya Pemasaran
No. Kode Rekening : 5401

Debit Kredit Saldo


Rp 50,000.00 Rp 50,000.00
Rp 100,000.00 Rp 150,000.00
Rp 400,000.00 Rp 550,000.00
Rp 50,000.00 Rp 600,000.00
Rp 700,000.00 Rp 1,300,000.00
Rp 800,000.00 Rp 2,100,000.00
Rp 125,000.00 Rp 2,225,000.00
Rp 110,000.00 Rp 2,335,000.00
Rp 887,500.00 Rp 3,222,500.00
Rp 5,818,000.00 Rp 9,040,500.00
Rp 350,000.00 Rp 9,390,500.00
Rp 9,390,500.00 Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

ENING BUKU BESAR:


endapatan Jasa Giro
No. Kode Rekening : 6102

Debit Kredit Saldo


Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

ENING BUKU BESAR:


Penjualan Aktiva Tetap
No. Kode Rekening : 6104
Debit Kredit Saldo
Rp 500,000.00 Rp 500,000.00
Rp 500,000.00 Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

ENING BUKU BESAR:


Laba Selisih Kurs
No. Kode Rekening : 6106

Debit Kredit Saldo


Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

ENING BUKU BESAR:


Biaya Bunga
No. Kode Rekening : 6201

Debit Kredit Saldo


Rp 6,500,000.00 Rp 6,500,000.00
Rp 6,500,000.00 Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

ENING BUKU BESAR:


alan Penjualan Surat Berharga
No. Kode Rekening : 6203

Debit Kredit Saldo


Rp 250,000.00 Rp 250,000.00
Rp 250,000.00 Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
ENING BUKU BESAR:
Rugi Lain-lain
No. Kode Rekening : 6205

Debit Kredit Saldo


Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
PT TINOMASTEX
YOGYAKARTA

Jurnal Penyesuaian
Bulan : Januari 1988

Debit Kredit
Tanggal Keterangan No. BM
No. Rek Jumlah No. Rek
31/01/1988 Penyusutan Emplasemen 6/BM 5213 Rp 300,000.00 1322
5301 Rp 100,000.00

31/01/1988 Penyusutan Gedung 7/BM 5221 Rp 725,000.00 1323


5222 Rp 525,000.00
5211 Rp 250,000.00
5212 Rp 200,000.00
5213 Rp 150,000.00
5301 Rp 100,000.00
5401 Rp 50,000.00

31/01/1988 Penyusutan Mesin 8/BM 5221 Rp 1,050,000.00 1324


5222 Rp 850,000.00
5211 Rp 400,000.00
5212 Rp 400,000.00
5213 Rp 300,000.00

31/01/1988 Penyusutan Peralatan Pabrik 9/BM 5221 Rp 160,000.00 1325


5222 Rp 40,000.00

31/01/1988 Penyusutan Mebel dan Peralatan Kantor 10/BM 5301 Rp 400,000.00 1326
5401 Rp 100,000.00

31/01/1988 Penyusutan Kendaraan 11/BM 5213 Rp 100,000.00 1327


5301 Rp 500,000.00
5401 Rp 400,000.00

31/01/1988 Amortisasi Pendirian 12/BM 5301 Rp 200,000.00 1501

31/01/1988 Asuransi Aktiva Tetap 13/BM 5221 Rp 1,000,000.00 1154


5222 Rp 600,000.00
5211 Rp 400,000.00
5212 Rp 400,000.00
5213 Rp 85,000.00
5301 Rp 500,000.00
5401 Rp 50,000.00
31/01/1988 Asuransi Persediaan 14/BM 5221 Rp 500,000.00 1154
5222 Rp 300,000.00
5213 Rp 100,000.00

31/01/1988 Kerugian Piutang 15/BM 5401 Rp 700,000.00 1131

31/01/1988 Gaji dan Upah 16/BM 5232 Rp 2,754,500.00 1601


5242 Rp 3,229,000.00
5211 Rp 183,000.00
5212 Rp 143,900.00
5213 Rp 42,700.00
5301 Rp 1,700,000.00
5401 Rp 800,000.00

31/01/1988 Upah Lembur 17/BM 5232 Rp 400,000.00 1601


5242 Rp 650,000.00
5211 Rp 40,300.00
5212 Rp 34,760.00
5213 Rp 33,360.00
5301 Rp 350,000.00
5401 Rp 125,000.00

31/01/1988 Biaya Pengobatan dan Perawatan 18/BM 5232 Rp 102,750.00 1601


5242 Rp 261,000.00
5211 Rp 18,000.00
5212 Rp 11,340.00
5213 Rp 15,000.00
5301 Rp 200,000.00
5401 Rp 110,000.00

31/01/1988 Utang Bunga 19/BM 6201 Rp 6,500,000.00 2106


31/01/1988 Pengisian Kas Kecil 20/BM 5301 Rp 75,000.00 1112
31/01/1988 Penyesuaian Bunga 21/BM 1134 Rp 50,000.00 6101

JUMLAH Rp 29,764,610.00
Kredit
Jumlah
Rp 400,000.00

Rp 2,000,000.00

Rp 3,000,000.00

Rp 200,000.00

Rp 500,000.00

Rp 1,000,000.00

Rp 200,000.00

Rp 3,035,000.00
Rp 900,000.00

Rp 700,000.00

Rp 8,853,100.00

Rp 1,633,420.00

Rp 718,090.00

Rp 6,500,000.00
Rp 75,000.00
Rp 50,000.00

Rp 29,764,610.00
REKAPIT
No. Rekening

Biaya

1. Biaya Bahan Baku, Bahan Pembungkus, dan Bahan Lain


1.1 Biaya Bahan Baku
1.2 Biaya Bahan Pembungkus
1.3 Biaya Bahan Bakar
1.4 Biaya Bahan Pelumas
2. Biaya Tenaga Kerja
2.1 Biaya Gaji dan Upah
2.2 Biaya Lembur
2.3 Biaya Pengobatan dan Perawatan
2.4 Biaya Kesejahteraan Lain-lain
3. Biaya Reparasi dan Pemeliharaan
3.1 Biaya Reparasi dan Pemeliharaan - Emplasemen
3.2 Biaya Reparasi dan Pemeliharaan - Gedung
3.3 Biaya Reparasi dan Pemeliharaan - Mesin-mesin
3.4 Biaya Reparasi dan Pemeliharaan - Peralatan Pabrik
3.5 Biaya Reparasi dan Pemeliharaan - Mebel dan Peralatan Kantor
3.6 Biaya Reparasi dan Pemeliharaan - Kendaraan
4. Biaya Penyusutan Aktiva Tetap dan Amortisasi
4.1 Biaya Penyusutan - Emplasemen
4.2 Biaya Penyusutan - Gedung
4.3 Biaya Penyusutan - Mesin-mesin
4.4 Biaya Penyusutan - Peralatan Pabrik
4.5 Biaya Penyusutan - Mebel dan Peralatan Kantor
4.6 Biaya Penyusutan - Kendaraan
4.7 Biaya Amortisasi - Biaya Pendirian Yang Ditangguhkan
5. Biaya Asuransi
5.1 Biaya Asuransi Aktiva Tetap
5.2 Biaya Asuransi Persediaan
6. Biaya Administrasi dan Umum
6.1 Biaya Cetak, Alat Tuli, Photo copy, Foto, serta Lightdruk
6.2 Biaya Pos, Telegraph, Telepon, Telex, Fax, dan Biaya Kirim
6.3 Biaya Perjalanan Dinas
6.4 Biaya Langganan Surat Kabar, Majalah, dan Buletin
6.5 Biaya Rapat dan Pertemuan
6.6 Biaya Akuntan, Konsultan, dan Pengacara
6.7 Biaya Administrasi dan Umum Lain-lain
7. Biaya Pemasaran
7.1 Biaya Iklan / Advertensi
7.2 Biaya Angkutan Kain Grey
7.3 Biaya Penghapusan Piutang
7.4 Biaya Pemasaran Lain-lain
JUMLAH BIAYA SEBELUM ALOKASI BIAYA OVERHEAD PABRIK
Alokasi Biaya
Alokasi Biaya Overhead Pabrik Seksi Listrik
Alokasi Biaya Overhead Pabrik Seksi Bengkel
Alokasi Biaya Overhead Pabrik Seksi Umum Pabrik
JUMLAH BIAYA SETELAH ALOKASI BIAYA OVERHEAD PABRIK
PT TINOMASTEX
YOGYAKARTA

REKAPITULASI BIAYA DAN ALOKASI BIAYA OVERHEAD PABRIK


Bulan : Januari 1988

Biaya Produksi
Jumlah Departemen Pembantu
Seksi Listrik Seksi Bengkel Seksi Umum Pabrik

Rp 131,872,000
Rp 1,572,200
Rp 2,022,500 Rp 1,150,000 Rp 310,000.00
Rp 1,183,525 Rp 405,700 Rp 165,000.00

Rp 8,853,100 Rp 183,000 Rp 143,900.00 Rp 42,700.00


Rp 1,633,420 Rp 40,300 Rp 34,760.00 Rp 33,360.00
Rp 718,090 Rp 18,000 Rp 11,340.00 Rp 15,000.00
Rp -

Rp 475,000 Rp 175,000.00
Rp 2,325,940 Rp 50,000 Rp 33,940.00
Rp 5,174,500 Rp 103,000 Rp 335,000.00 Rp -
Rp 115,000 Rp 115,000.00
Rp 2,176,600 Rp -
Rp 1,290,000 Rp 50,000.00

Rp 400,000 Rp 300,000.00
Rp 2,000,000 Rp 250,000 Rp 200,000.00 Rp 150,000.00
Rp 3,000,000 Rp 400,000 Rp 400,000.00 Rp 300,000.00
Rp 200,000
Rp 500,000
Rp 1,000,000 Rp 100,000.00
Rp 200,000
Rp -
Rp 3,035,000 Rp 400,000 Rp 400,000.00 Rp 85,000.00
Rp 900,000 Rp 100,000.00

Rp 150,000
Rp 117,500
Rp 850,000
Rp 25,000
Rp 118,500
Rp 2,500,000
Rp 75,000
Rp 900,000
Rp 4,250,000
Rp 700,000
Rp 80,000
Rp 180,412,875 Rp 3,000,000 Rp 2,000,000 Rp 1,500,000

Rp 3,000,000
Rp 2,000,000
Rp 1,500,000
Rp 180,412,875 Rp - Rp - Rp -
oduksi
Biaya Administrasi
Departemen Produksi Biaya Pemasaran
dan Umum
Seksi Persiapan Seksi Pertenunan

Rp 131,872,000.00
Rp 1,572,200.00
Rp 562,500.00
Rp 612,825.00

Rp 2,754,500.00 Rp 3,229,000.00 Rp 1,700,000.00 Rp 800,000.00


Rp 400,000.00 Rp 650,000.00 Rp 350,000.00 Rp 125,000.00
Rp 102,750.00 Rp 261,000.00 Rp 200,000.00 Rp 110,000.00

Rp 300,000.00
Rp 529,300.00 Rp 1,452,700.00 Rp 187,500.00 Rp 72,500.00
Rp 2,417,500.00 Rp 2,319,000.00

Rp 508,600.00 Rp 1,430,000.00 Rp 238,000.00


Rp 425,000.00 Rp 815,000.00

Rp 100,000.00
Rp 725,000.00 Rp 525,000.00 Rp 100,000.00 Rp 50,000.00
Rp 1,050,000.00 Rp 850,000.00
Rp 160,000.00 Rp 40,000.00
Rp 400,000.00 Rp 100,000.00
Rp 500,000.00 Rp 400,000.00
Rp 200,000.00

Rp 1,000,000.00 Rp 600,000.00 Rp 500,000.00 Rp 50,000.00


Rp 500,000.00 Rp 300,000.00

Rp 150,000.00
Rp 117,500.00
Rp 500,000.00 Rp 350,000.00
Rp 25,000.00
Rp 118,500.00
Rp 2,500,000.00
Rp 75,000.00
Rp 900,000.00
Rp 4,250,000.00
Rp 700,000.00
Rp 80,000.00
Rp 142,123,875 Rp 12,870,000 Rp 9,878,500 Rp 9,040,500

Rp 900,000.00 Rp 1,500,000.00 Rp 450,000.00 Rp 150,000.00


Rp 600,000.00 Rp 1,000,000.00 Rp 200,000.00 Rp 200,000.00
Rp 500,000.00 Rp 1,000,000.00
Rp 144,123,875 Rp 16,370,000 Rp 10,528,500 Rp 9,390,500
PT TINOMASTEX
YOGYAKARTA

LAPORAN BIAYA PRODUKSI SEKSI PERSIAPA


BULAN Januari 1988

DATA PRODUKSI :

Persediaan produk dalam proses awal


Jumlah produk yang dimasukkan dalam proses

Produk selesai yang ditransfer ke Seksi Pertenunan


Persediaan produk dalam proses akhir, dengan tingkat penyelesaian :
100% Biaya bahan baku, 75% Biaya konversi

BIAYA YANG DIBEBANKAN SEKSI PERSIAPAN

Biaya Produksi yang


Biaya bulan yll yang ditambahkan oleh Sie.
melekat pada persed. Persiapan bulan Januari
Jenis Biaya Produk Dalam Proses awal 1988

Biaya bahan baku Rp 7,100,800.00 Rp 131,872,000.00


Biaya tenaga kerja Rp 209,625.00 Rp 3,257,250.00
Biaya overhead pabrik Rp 1,217,875.00 Rp 8,994,625.00
Jumlah biaya yang dibebankan dalam Seksi Persiapan

PERHITUNGAN BIAYA

Harga pokok produk selesai yang ditransfer ke Seksi Pertenunan


Harga pokok produk dalam proses akhir :
Biaya bahan baku
Biaya tenaga kerja
Biaya overhead pabrik

Jumlah biaya yang dibebankan di Seksi Persiapan


PT TINOMASTEX
YOGYAKARTA

YA PRODUKSI SEKSI PERSIAPAN


BULAN Januari 1988

1,400
26,000
27,400

n 25,300
gkat penyelesaian :
2,100
27,400

Total Biaya Unit Equivalensi Biaya Per Kg

Rp 138,972,800.00 27,400 Rp 5,072.00


Rp 3,466,875.00 26,875 Rp 129.00
Rp 10,212,500.00 26,875 Rp 380.00
Rp 152,652,175.00 Rp 5,581.00

Rp 141,199,300.00

Rp 10,651,200.00
Rp 203,175.00
Rp 598,500.00 Rp 11,452,875.00

Rp 152,652,175.00
PT TINOMASTE
YOGYAKARTA

LAPORAN BIAYA PRODUKSI SE


BULAN Januari 19

DATA PRODUKSI :

Persediaan produk dalam proses awal


Produk yang diterima dari Seksi Persiapan

Produk selesai yang ditransfer ke Gudang


Persediaan produk dalam proses akhir, dengan tingkat penyelesaian :
100% Biaya bahan baku, 60% Biaya konversi

BIAYA YANG DIBEBANKAN SEKSI PERTENUNAN

Harga pokok produk dari Seksi Persiapan


Biaya produksi Seksi Persiapan yang melekat pada persediaan produk
dalam proses awal
Harga pokok produk yang diterima dari Seksi Persiapan bulan Januari
1988

Harga pokok produk dari Seksi Persiapan

Biaya yang ditambahkan dalam Seksi Pertenunan :

Biaya bulan yll yang melekat


pada persed. Produk Dalam
Jenis Biaya Proses awal
Biaya tenaga kerja Rp 828,000.00
Biaya overhead pabrik Rp 1,846,000.00
Jumlah biaya yang ditambahkan dalam Seksi Pertenunan
Biaya produksi kumulatif dalam Seksi Pertenunan

PERHITUNGAN BIAYA
Harga pokok produk selesai yang ditransfer ke Gudang
Harga pokok persediaan produk dalam proses akhir :
Harga Pokok dari Seksi Persiapan
Harga Pokok yang dibebankan oleh Seksi Pertenunan :
Biaya tenaga kerja
Biaya overhead pabrik
Jumlah biaya yang dibebankan di Seksi Pertenunan
PT TINOMASTEX
YOGYAKARTA

LAPORAN BIAYA PRODUKSI SEKSI PERTENUNAN


BULAN Januari 1988

oses awal
eksi Persiapan

er ke Gudang
oses akhir, dengan tingkat penyelesaian :
% Biaya konversi

pan yang melekat pada persediaan produk

terima dari Seksi Persiapan bulan Januari

ksi Persiapan

Biaya produksi yang


ditambahkan oleh Sie.
Pertenunan bulan Januari 1988
Rp 4,140,000.00
Rp 12,230,000.00

an oleh Seksi Pertenunan :


AN

22,600
202,400
225,000

180,000

45,000
225,000

Total biaya Biaya per m UNIT EKUIVALENSI

Rp 14,050,700.00

Rp 141,199,300.00

Rp 155,250,000.00 Rp 690.00 225,000

Rp 4,968,000.00 Rp 24.00 207,000


Rp 14,076,000.00 Rp 68.00 207,000
Rp 19,044,000.00 Rp 92.00
Rp 174,294,000.00 Rp 782.00

Rp 140,760,000.00

Rp 31,050,000.00

Rp 648,000.00
Rp 1,836,000.00 Rp 33,534,000.00
Rp 174,294,000.00
PT TINOMASTEX
YOGYAKARTA

Jurnal Penyesuaian
Bulan : Januari 1988

Debit
Tanggal Keterangan No.
No. Rek
31/01/1988 BOPss Seksi Persiapan 22/BM 5221
a. BOPss Seksi Pertenunan 5222
Biaya Administrasi dan Umum 5301
Biaya Pemasaran 5401
BOPss Seksi Listrik

31/01/1988 BOPss Seksi Persiapan 23/BM 5221


BOPss Seksi Pertenunan 5222
Biaya Administrasi dan Umum 5301
Biaya Pemasaran 5401
BOPss Seksi Bengkel

31/01/1988 BOPss Seksi Persiapan 24/BM 5221


BOPss Seksi Pertenunan 5222
BOPss Seksi Umum Pabrik

31/01/1988 BDP BOP Seksi Persiapan 25/BM 5233


b. BOPdb Seksi Persiapan

31/01/1988 BDP BOP Seksi Pertenunan 26/BM 5243


BOPdb Seksi Persiapan

31/01/1988 Persediaan Produk Dalam Proses Seksi Pertenunan 27/BM 5241


c. BDP BB Seksi Persiapan
BDP TK Seksi Persiapan
BDP BOP Seksi Persiapan

31/01/1988 Persediaan Kain Grey 28/BM 1141


d. BDP BB Seksi Pertenunan
BDP TK Seksi Pertenunan
BDP BOP Seksi Pertenunan

31/01/1988 Persediaan Produk Dalam Proses Seksi Persiapan 29/BM 1142


e. BDP BB Seksi Persiapan
BDP TK Seksi Persiapan
BDP BOP Seksi Persiapan

31/01/1988 Persediaan Produk Dalam Proses Seksi Pertenunan 30/BM 1143


BDP BB Seksi Pertenunan
BDP TK Seksi Pertenunan
BDP BOP Seksi Pertenunan

31/01/1988 Harga Pokok Produksi 31/BM 5101


f. Persediaan Kain Grey

Perhitungan Persediaan m Harga/m


Persediaan awal 20000 Rp 782.00
Plus : Retur Penjualan 23000 Rp 782.00
Produksi Selesai 203000 Rp 782.00
EX
TA

ian
988

Debit Kredit
Jumlah No. Rek Jumlah
Rp 900,000.00
Rp 1,500,000.00
Rp 450,000.00
Rp 150,000.00
5211 Rp 3,000,000.00

Rp 600,000.00
Rp 1,000,000.00
Rp 200,000.00
Rp 200,000.00
5212 Rp 2,000,000.00

Rp 500,000.00
Rp 1,000,000.00
5213 Rp 1,500,000.00

Rp 8,994,625.00
5221 Rp 8,994,625.00

Rp 12,230,000.00
5222 Rp 12,230,000.00

Rp 141,199,300.00
5231 Rp 128,321,600.00
5232 Rp 3,263,700.00
5233 Rp 9,614,000.00

Rp 140,760,000.00
5241 Rp 124,200,000.00
5242 Rp 4,320,000.00
5243 Rp 12,240,000.00

Rp 11,452,875.00
5231 Rp 10,651,200.00
5232 Rp 203,175.00
5233 Rp 598,500.00

Rp 33,534,000.00
5241 Rp 31,050,000.00
5242 Rp 648,000.00
5243 Rp 1,836,000.00

Rp 139,196,000.00
1141 Rp 139,196,000.00

Rp 493,866,800.00 Rp 493,866,800.00

Total Persediaan
Rp 15,640,000.00
Rp 17,986,000.00
Rp 158,746,000.00
PT
YO

NE
BULA

Neraca Saldo Setelah Diselesaikan


No. Rek Nama Rekening
Debit
1111 Kas Rp 77,265,140.00
1112 Kas Kecil Rp 225,000.00
1121 Inv. Sementara - Saham Rp 16,500,000.00
1122 Inv. Sementara - Obligasi Rp 5,000,000.00
1123 Inv. Sementara - Sertifikat Bank Rp 20,000,000.00
1124 Inv. Sementara - Deposito Berjangka Rp 2,000,000.00
1131 Piutang Dagang Rp 38,280,000.00
1132 Cadangan Kerugian Piutang
1133 Piutang Karyawan Rp 500,000.00
1134 Piutang Pendapatan Rp 100,000.00
1141 Persediaan Kain Grey Rp 19,550,000.00
1142 Persediaan Produk Dalam Proses - Sie. Persiapan Rp 11,452,875.00
1143 Persediaan Produk Dalam Proses - Sie. Pertenunan Rp 33,534,000.00
1144 Persediaan Bahan Baku Rp 71,008,000.00
1145 Persediaan Bahan Pembungkus Rp 1,518,800.00
1146 Persediaan Bahan Bakar dan Pelumas Rp 2,783,975.00
1147 Persediaan Suku Cadang Rp 640,500.00
1148 Persediaan Bahan Lain-lain Rp 3,190,460.00
1151 PPN Masukan Rp 11,264,250.00
1152 PPNh Dibayar Dimuka Rp 98,150,000.00
1154 Persekot Biaya Asuransi Rp 3,500,000.00
1311 Tanah Rp 43,000,000.00
1312 Emplasemen Rp 24,000,000.00
1313 Gedung Rp 480,000,000.00
1314 Mesin - mesin Rp 720,000,000.00
1315 Perlengkapan Pabrik Rp 12,000,000.00
1316 Mebel dan Peralatan Kantor Rp 30,000,000.00
1317 Kendaraan Rp 67,500,000.00
1322 Akumulasi Penyusutan Emplasemen
1323 Akumulasi Penyusutan Gedung
1324 Akumulasi Penyusutan Mesin - mesin
1325 Akumulasi Penyusutan Perlengkapan Pabrik
1326 Akumulasi Penyusutan Mebel dan Peralatan Kantor
1327 Akumulasi Penyusutan Kendaraan
1501 Biaya Pendirian Yang Ditangguhkan Rp 4,400,000.00
1502 Konstruksi Dalam Pelaksanaan Rp 1,600,000.00
2101 Utang Dagang
2102 Utang PPh Karyawan
2103 PPN Keluaran
2106 Utang Biaya
2107 Utang Jangka Pendek Lain - lain
2201 Utang Jangka Panjang Dari Bank
3001 Modal Statutair
3002 Modal Saham Dalam Portepel Rp 250,000,000.00
3004 Modal Sumbangan
3005 Cadangan Pelunasan Utang Jangka Panjang
3202 Laba Yang Ditahan
4101 Hasil Penjualan Kain Grey
4201 Potongan Penjualan Rp 2,832,000.00
4202 Retur Penjualan Rp 3,600,000.00
5101 Harga Pokok Penjualan Rp 136,850,000.00
5301 Biaya Adminsitrasi dan Umum Rp 10,528,500.00
5401 Biaya Pemasaran Rp 9,390,500.00
6101 Pendapatan Bunga
6104 Laba Penjualan Aktiva Tetap
6105 Laba Penjualan Surat Berharga
6201 Biaya Bunga Rp 6,500,000.00
6203 Rugi Penjualan Surat Berharga Rp 250,000.00
Rp 2,218,914,000.00
###
PT TINOMASTEX
YOGYAKARTA

NERACA LAJUR
BULAN JANUARI 1988

Saldo Setelah Diselesaikan Rugi - Laba


Kredit Debit Kredit

Rp 750,000.00

Rp 5,600,000.00
Rp 28,000,000.00
Rp 42,000,000.00
Rp 2,800,000.00
Rp 7,000,000.00
Rp 10,000,000.00

Rp 2,417,000.00
Rp 835,900.00
Rp 21,000,000.00
Rp 6,500,000.00
Rp 100,000,000.00
Rp 300,000,000.00
Rp 1,000,000,000.00

Rp 15,000,000.00
Rp 100,000,000.00
Rp 362,626,100.00
Rp 213,600,000.00 Rp 213,600,000.00
Rp 2,832,000.00
Rp 3,600,000.00
Rp 136,850,000.00
Rp 10,528,500.00
Rp 9,390,500.00
Rp 250,000.00 Rp 250,000.00
Rp 500,000.00 Rp 500,000.00
Rp 35,000.00 Rp 35,000.00
Rp 6,500,000.00
Rp 250,000.00
Rp 2,218,914,000.00
### Rp 169,951,000.00
### Rp 214,385,000.00
###
Rp 44,434,000.00

Rp 214,385,000.00 Rp 214,385,000.00
Neraca
Debit Kredit
Rp 77,265,140.00
Rp 225,000.00
Rp 16,500,000.00
Rp 5,000,000.00
Rp 20,000,000.00
Rp 2,000,000.00
Rp 38,280,000.00
Rp 750,000.00
Rp 500,000.00
Rp 100,000.00
Rp 19,550,000.00
Rp 11,452,875.00
Rp 33,534,000.00
Rp 71,008,000.00
Rp 1,518,800.00
Rp 2,783,975.00
Rp 640,500.00
Rp 3,190,460.00
Rp 11,264,250.00
Rp 98,150,000.00
Rp 3,500,000.00
Rp 43,000,000.00
Rp 24,000,000.00
Rp 480,000,000.00
Rp 720,000,000.00
Rp 12,000,000.00
Rp 30,000,000.00
Rp 67,500,000.00
Rp 5,600,000.00
Rp 28,000,000.00
Rp 42,000,000.00
Rp 2,800,000.00
Rp 7,000,000.00
Rp 10,000,000.00
Rp 4,400,000.00
Rp 1,600,000.00
Rp 2,417,000.00
Rp 835,900.00
Rp 21,000,000.00
Rp 6,500,000.00
Rp 100,000,000.00
Rp 300,000,000.00
Rp 1,000,000,000.00
Rp 250,000,000.00
Rp 15,000,000.00
Rp 100,000,000.00
Rp 362,626,100.00

Rp 2,048,963,000.00
### Rp 2,004,529,000.00
Rp 44,434,000.00

Rp 2,048,963,000.00 Rp 2,048,963,000.00
PT TINOMASTEX
YOGYAKARTA

LAPORAN LABA RUGI


BULAN JANUARI 1988

HASIL PENJUALAN
Potongan Penjualan
Retur Penjualan

Hasil Penjualan Bersih

HARGA POKOK PENJUALAN


Persediaan Kain Grey Awal
Persediaan Produk Dalam Proses Awal
Biaya Produksi Bulan Januari :
Biaya Bahan Baku Rp 141,199,300.00
Biaya Tenaga Kerja Rp 4,140,000.00
Biaya Overhead Pabrik Rp 12,230,000.00

Persediaan Produk Dalam Proses Akhir


Harga Pokok Kain Grey Yang Dibuat

Persediaan Kain Grey Akhir


Harga Pokok Penjualan
Laba Kotor

BIAYA USAHA
Biaya Administrasi dan Umum
Biaya Pemasaran

Laba Usaha

PENDAPATAN DAN BIAYA DI LUAR USAHA


Pendapatan Di Luar Usaha
Biaya Di Luar Usaha

Laba Bersih Sebelum Pajak


PT TINOMASTEX
YOGYAKARTA

LAPORAN LABA RUGI


BULAN JANUARI 1988

Rp 213,600,000.00
Rp (2,832,000.00)
Rp (3,600,000.00)
Rp (6,432,000.00)
Rp 207,168,000.00

Rp 15,640,000.00
Rp 16,724,700.00

Rp 157,569,300.00
Rp 174,294,000.00
Rp 33,534,000.00
Rp 140,760,000.00

Rp (19,550,000.00)
Rp 136,850,000.00
Rp 70,318,000.00

Rp 10,528,500.00
Rp 9,390,500.00
Rp 19,919,000.00
Rp 50,399,000.00

Rp 785,000.00
Rp (6,750,000.00)
Rp (5,965,000.00)
Rp 44,434,000.00
Aktiva
AKTIVA LANCAR
Kas Kecil
Kas
Investasi Sementara - Saham
Investasi Sementara - Obligasi
Investasi Sementara - Sertifikat Bank
Investasi Sementara - Deposito Berjangka
Piutang Dagang
Cadangan Kerugian Piutang Dagang
Piutang Karyawan
Piutang Pendapatan
Persediaan Kain Grey
Persediaan Produk Dalam Proses - Seksi Persiapan
Persediaan Produk Dalam Proses - Seksi Pertenunan
Persediaan Bahan Baku
Persediaan Bahan Pembungkus
Persediaan Bahan Bakar dan Pelumas
Persediaan Suku Cadang
Persediaan Bahan Lain-lain
PPN Masukan
PPh Dibayar Di Muka
Persekot Biaya Asuransi
Jumlah Aktiva Lancar
AKTIVA TETAP
Tanah
Emplasemen
Akumulasi Penyusutan Emplasemen
Gedung
Akumulasi Penyusutan Gedung
Mesin-mesin
Akumulasi Penyusutan Mesin-mesin
Perlengkapan Pabrik
Akumulasi Penyusutan Perlengkapan Pabrik
Mebel dan Peralatan Kantor
Akumulasi Penyusutan Mebel dan Peralatan Kantor
Kendaraan
Akumulasi Penyusutan Kendaraan
Jumlah Aktiva Tetap
AKTIVA LAIN-LAIN
Biaya Pendirian Yang Ditangguhkan
Konstruksi Dalam Pelaksanaan
Jumlah Aktiva Lain-lain
JUMLAH AKTIVA
PT TINOMASTEX
YOGYAKARTA

NERACA
Bulan Januari 1988

UTANG LANCAR
Rp 77,265,140.00 Utang Dagang
Rp 225,000.00 Utang PPh Karyawan
Rp 16,500,000.00 PPN Keluaran
Rp 5,000,000.00 Utang PPh Badan
Rp 20,000,000.00 Utang Dividen
Rp 2,000,000.00 Utang Biaya
Rp 38,280,000.00 Utang Jangka Pendek Lain-lai
Rp (750,000.00) Pendapatan Yang Diterima Di
Rp 500,000.00 Jumlah Utang Lancar
Rp 100,000.00
Rp 19,550,000.00
Rp 11,452,875.00 UTANG JANGKA PANJANG
Rp 33,534,000.00
Rp 71,008,000.00 Utang Jangka Panjang Dari Ba
Rp 1,518,800.00
Rp 2,783,975.00
Rp 640,500.00
Rp 3,190,460.00
Rp 11,264,250.00
Rp 98,150,000.00
Rp 3,500,000.00
Rp 415,713,000.00
MODAL
Rp 43,000,000.00 Modal Statutair - 20.000 lb. Sa
Rp 24,000,000.00
Rp (5,600,000.00) Modal Dalam Portepel - 5.000
Rp 480,000,000.00 Modal Yang Ditempatkan dan
Rp (28,000,000.00) Modal Sumbangan
Rp 720,000,000.00 Cadangan Pelunasan Utang Ja
Rp (42,000,000.00) Laba Yang Ditahan
Rp 12,000,000.00
Rp (2,800,000.00)
Rp 30,000,000.00
Rp (7,000,000.00) Jumlah Modal
Rp 67,500,000.00
Rp (10,000,000.00)
Rp 1,281,100,000.00

Rp 4,400,000.00
Rp 1,600,000.00
Rp 6,000,000.00
Rp 1,702,813,000.00 JUMLAH PASIVA
Rp 2,417,000.00
g PPh Karyawan Rp 835,900.00
Rp 21,000,000.00
g PPh Badan Rp -
Rp -
Rp 6,500,000.00
g Jangka Pendek Lain-lain Rp 100,000,000.00
apatan Yang Diterima Di Muka Rp -
Jumlah Utang Lancar

ANGKA PANJANG

g Jangka Panjang Dari Bank

al Statutair - 20.000 lb. Saham, Nominal @ Rp5.000,00/lb Rp 1,000,000,000.00

al Dalam Portepel - 5.000 lb Rp (250,000,000.00)


al Yang Ditempatkan dan Disetor Rp -
al Sumbangan Rp 15,000,000.00
ngan Pelunasan Utang Jangka Panjang Rp 100,000,000.00
Yang Ditahan Rp 407,060,100.00

Jumlah Modal
JUMLAH PASIVA
Pasiva

Rp 130,752,900.00

Rp 300,000,000.00

Rp 1,272,060,100.00
Rp 1,702,813,000.00
PT TINOMASTEX
YOGYAKARTA

JURNAL PENUTUP
Bulan Januari 1988

Debit Kredit
Tanggal Keterangan No. BM
No. Rek Jumlah No. Rek
31/01/1988 32/BM 4101 Rp 213,600,000.00 4201
Penutupan Rekening Hasil 6101 Rp 250,000.00 4202
Penjualan Kain Grey 6104 Rp 500,000.00 6301
6105 Rp 35,000.00

31/01/1988 33/BM 6301 Rp 163,519,000.00 5101


5301
Penutupan Rekening -
5401
Rekening Biaya
6201
6203

31/01/1988 Penutupan Rekening Rugi Laba 34/BM 6301 Rp 44,434,000.00 3006

TOTAL Rp 422,338,000.00
Kredit
Jumlah
Rp 2,832,000.00
Rp 3,600,000.00
Rp 207,953,000.00

Rp 136,850,000.00
Rp 10,528,500.00
Rp 9,390,500.00
Rp 6,500,000.00
Rp 250,000.00

Rp 44,434,000.00

Rp 422,338,000.00

You might also like