BMS 405: PE-I: ADVANCED CASTING AND WELDING (3-1-0): Syllabus
Module-I
Casting processes: Classification, Metal mould casting processes, advanced casting processes,
investment casting, Rheocasting, mould and core making materials and their characteristics.
[04 Lectures]
Technology of Selected casting Processes: Clay bonded, synthetic resin bonded, inorganic material
bonded mould and core making, sand additives, mould coating, continuous casting process,
centrifugal casting process. [06 Lectures]
Module-II
Casting defects, inspection, diagnosis and rectification, mechanization and automation in foundries,
use of robots, casting design, near net shape casting, pollution control, energy and waste
management in foundries. [04 Lectures]
Physics of welding arc, characteristics of arc, modes of metal transfer, welding fluxes, electrode
coating, classification of electrode, characteristics of welding power source, pulsed and inverter
type power source, power source for resistance welding, weldability, weldability tests, Weldability
of cast iron, Plain carbon steel, Determination of preheating temperature, Stainless steel, use of
Scheffler’ s diagram. [10 Lectures]
Module-III
Heat flow in welding, significance, theory of heat flow, cooling rate determination, selection of
welding parameters based on heat flow analysis, residual stress and its measurement, types and
control of distortion. [08 Lectures]
Module-III
Analysis of fatigue of welded joint, fracture and toughness testing and its application on welded
joint, automated welded joint, microprocessor based of control resistance and arc welding, quality
assurance in welding, effects of welding fumes on environment. [08 Lectures]
TEXT BOOK(S):
1. Principle of Metal Casting- Heine, R.W. Loper ,C. Philip and C.R.Rosenthal, McGraw Hill.
2. Principle of Metal Casting- P.L.Jain,TMH
3. Manufacturing Technology- P.N.Rao,TMH
4. Welding Engineering and Technology- R.S. Parmar Khanna publisher
REFERENCE(S):
1. Metallurgy of Welding Technology-D. Seferian, Chapman & Hall
2. Welding and Welding Technology- R.Little, TMH.
1
Module-I
Casting processes: Classification, Metal mould casting processes, advanced casting
processes, investment casting, Rheocasting, mould and core making materials and their
characteristics. Technology of Selected casting Processes: Clay bonded, synthetic resin
bonded, inorganic material bonded mould and core making, sand additives, mould coating,
continuous casting process, centrifugal casting process.
A large number of metal components in designs we use every day are made by casting.
The reasons for this include:
(a) Casting can produce very complex geometry parts with internal cavities and hollow
sections
(b) It can be used to make small (few hundred grams) to very large size parts (thousands of
kilograms)
(c) It is economical, with very little wastage: the extra metal in each casting is re-melted and
re-used
(d) Cast metal is isotropic – it has the same physical/mechanical properties along any
direction
Common examples: door handles, locks, the outer casing or housing for motors, pumps,
etc., wheels of many cars. Casting is also heavily used in the toy industry to make parts,
e.g. toy cars, planes, and so on. Typical metal cast parts are shown in Fig.1
2
Fig.1: Typical metal cast parts
3
1.1 Sand Casting: Sand casting uses natural or synthetic sand (lake sand) which is mostly
refractory material called silica (SiO2). The sand grains must be small enough so that it can
be packed densely; however, the grains must be large enough to allow gasses formed
during the metal pouring to escape through the pores. Larger sized molds use green sand
(mixture of sand, clay and some water). Sand can be re-used, and excess metal poured is
cut-off and re-used also.
• The mold is made of two parts, the top half is called the cope, and bottom part is the
drag.
• The liquid flows into the gap between the two parts, called the mold cavity. The
geometry of the cavity is created by the use of a wooden shape, called the pattern. The
shape of the patterns is (almost) identical to the shape of the part we need to make.
• A funnel shaped cavity; the top of the funnel is the pouring cup; the pipe-shaped neck
of the funnel is the sprue– the liquid metal is poured into the pouring cup, and flows
down the sprue.
• The runners are the horizontal hollow channels that connect the bottom of the sprue
to the mould cavity. The region where any runner joins with the cavity is called the gate.
Some extra cavities are made connecting to the top surface of the mold. Excess metal
poured into the mould flows into these cavities, called risers. They act as reservoirs; as
4
the metal solidifies inside the cavity, it shrinks, and the extra metal from the risers flows
back down to avoid holes in the cast part.
• Vents are narrow holes connecting the cavity to the atmosphere to allow gasses and the
air in the cavity to escape.
• Cores: Many cast parts have interior holes (hollow parts), or other cavities in their shape
that are not directly accessible from either piece of the mold. Such interior surfaces are
generated by inserts called cores. Cores are made by baking sand with some binder so
that they can retain their shape when handled. The mold is assembled by placing the
core into the cavity of the drag, and then placing the cope on top, and locking the mold.
After the casting is done, the sand is shaken off, and the core is pulled away and
usually broken off.
Gating System: Channel through which molten metal flows into cavity from outside of
mold consists of a downsprue, through which metal enters a runner leading to the main
cavity. At top of down-sprue, a pouring cup is often used to minimize splash and
turbulence as the metal flows into down-sprue.
5
Sand
The dry free flowing sand used in the shell mould must be completely free of clay
content. The grain size of the sand used in shell molding is generally in the range of
100150 meshes, as the shell casting process is recommended for castings that require
good surface finish. However, depending on the requirement of surface finish of the final
casting, the grain size of the sand can be ascertained. Also, if the grain size is very fine,
it requires large amount of resins, making it expensive.
Shell-mold casting yields better surface quality and tolerances. The process is
described as follows:
- The 2-piece pattern is made of metal (e.g. aluminum or steel), it is heated to between
175°C-370°C, and coated with a lubricant, e.g. silicone spray.
- Each heated half-pattern is covered with a mixture of sand and a thermoset
resin/epoxy binder. The binder glues a layer of sand to the pattern, forming a shell. The
process may be repeated to get a thicker shell (Fig 3).
- The assembly is baked to cure it. 6
6
- The patterns are removed, and the two half-shells joined together to form the mold;
metal is poured into the mold.
- When the metal solidifies, the shell is broken to get the part.
7
simplified. The process is used to manufacture crank-shafts for engines, aluminum engine
blocks, manifolds etc.
This casting process is advantageous for very complex castings that would regularly
require cores. It is also dimensionally accurate, requires no draft, and has no parting
lines so no flash is formed. As compared to investment casting, it is cheaper because it
is a simpler process and the foam is cheaper than the wax. Risers are not usually
required due to the nature of the process; because the molten metal vaporizes the foam
the first metal into the mold cools more quickly than the rest, which results in natural
directional solidification.
8
The two main disadvantages are that pattern costs can be high for low volume
applications and the patterns are easily damaged or distorted due to their low strength.
If a die is used to create the patterns there is a large initial cost.
1.4 Full Mold Process / Lost Foam Process / Evaporative Pattern Casting Process
The use of foam patterns for metal casting was patented by H.F. Shroyer on April 15,
1958. In Shroyer's patent, a pattern was machined from a block of expanded
polystyrene (EPS) and supported by bonded sand during pouring. This process is
known as the full mold process. With the full mold process, the pattern is usually
machined from an EPS block and is used to make primarily large, one-of-a kind
castings. The full mold process was originally known as the lost foam process.
However, current patents have required that the generic term for the process be full
mold.
In 1964, M.C. Flemmings used unbounded sand with the process. This is known today
as lost foam casting (LFC). With LFC, the foam pattern is molded from polystyrene
beads. LFC is differentiated from full mold by the use of unbounded sand (LFC) as
opposed to bonded sand (full mold process).
Foam casting techniques have been referred to by a variety of generic and proprietary
names. Among these are lost foam, evaporative pattern casting, and cavity less casting,
evaporative foam casting, and full mold casting.
In this method, the pattern, complete with gates and risers, is prepared from expanded
polystyrene. This pattern is embedded in a no bake type of sand. While the pattern is
inside the mold, molten metal is poured through the sprue. The heat of the metal is
sufficient to gasify the pattern and progressive displacement of pattern material by the
molten metal takes place.
9
rigid shapes. The EPC process involves attaching expandable polystyrene patterns to
an expandable polystyrene gating system and applying a refractory coating to the entire
assembly. After the coating has dried, the foam pattern assembly is positioned on loose
dry sand in a vented flask. Additional sand is then added while the flask is vibrated until
the pattern assembly is completely embedded in sand. Molten metal is poured into the
sprue, vaporizing the foam polystyrene, perfectly reproducing the pattern.
10
1.7 Investment casting (lost wax process)
The investment casting process, which is commonly referred to as the “lost wax method”,
originated in and around the fourth millennium B.C. It is evidenced through the architectural
works found in the form of idols, pectorals and jewelry in remains of the ancient Egypt and
Mesopotamia. The investment casting process initiates with the production of wax replicas
or patterns of the required shape of castings. Each and every casting requires a pattern to
be produced. Wax or polystyrene is made used as the injecting material. The assembly of
large number of patterns are made and attached to a wax sprue centrally. Metallic dies are
used to prepare the patterns. The pattern is immersed in refractory slurry which completely
surrounds it and gets set at room temperature forming the mold. The mold is further
heated, so that the pattern melts and flows out, leaving the required cavity behind. After
heating, the mold gets further hardened and molten metal is poured while it is still hot. After
the casting gets solidified, the mold is broken and it is taken out.
The basic steps of the investment casting process are as shown in Fig 5:
1. Preparing the heat-disposable wax, plastic or polystyrene patterns in a die. 2. Assembly
of the prepared patterns onto a gating system 3. “Investing,” (covering) the pattern
assembly with a refractory slurry which builds the shell.
4. Melting the pattern assembly (burning out the wax) by firing, for removing the traces of
the pattern material 5. The metal in molten state is poured into the formed mold. 6. Once
the metal solidifies, the shell is removed (knocked out). 7. Fettling (cutting off) of the
pouring basin and gates followed by finishing operations to get the desired dimensional
tolerances and finish.
11
Fig 5: The Basic Steps of the Investment Casting Process
This is an old process, and has been used since ancient times to make jewellery –
therefore it is of great importance to HK. It is also used to make other small (few grams,
though it can be used for parts up to a few kilograms). The steps of this process are shown
in the Fig 5a.
12
An advantage of this process is that the wax can carry very fine details – so the process not
only gives good dimensional tolerances, but also excellent surface finish; in fact, almost
any surface texture as well as logos etc. can be reproduced with very high level of detail.
13
Fig 7: Draining out metal before solidification yields hollow castings
In the pressure casting process the molten material is forced upward by gas pressure
into a graphite mould or metallic mould Fig 8. The pressure is maintained until the melt
has completely solidified in the mould. The molten material may also be forced upward
by a vacuum, which also removes dissolved gases ahead of the rising melt and
produces a casting with lower porosity.
14
Fig 8: Pressure Casting Process
Variations of this method include Vacuum Riserless Casting (VRC) and Pressure
Riserless Casting (PRC). These techniques are capable of producing a range of
structural and high performance castings exhibiting excellent mechanical attributes and
microstructure refinements in an economical manner. While VRC process uses vacuum
to draw the liquid material up into a mould cavity, PRC uses pressure applied to a
molten bath to force melt into a mould cavity. Yet another approach combines both
techniques to achieve appropriate casting conditions.
Squeeze casting developed in the 1960s, involves solidification of the molten material
under high pressure Fig 9. Thus it is a combination of casting and forging. The
machinery includes a die, punch, and ejector pin.
15
1. Bring a ladle filled with liquid material close to the dies
2. Pour liquid in the bottom die cavity
3. Close dies and applies pressure
4. Open dies and ejects the solidified product
The pressure applied by the punch keeps the entrapped gases in solution, and the high-
pressure contact at the die-product interface promotes rapid heat transfer, resulting in a
fine microstructure with good mechanical properties. Parts can be made to near-net
shape, with complex shapes and fine surface detail, from both nonferrous and ferrous
alloys. Typical products: automotive wheels and mortar bodies (a short-barreled
cannon). The pressures required in squeeze casting are lower than those for hot or cold
forging.
Die casting
Die casting is a very commonly used type of permanent mold casting process. It is used for
producing many components of home appliances (e.g rice cookers, stoves, fans, washing
and drying machines, fridges), motors, toys and hand-tools – since Pearl river delta is a
largest manufacturer of such products in the world, this technology is used by many HK-
based companies. Surface finish and tolerance of die cast parts is so good that there is
almost no post-processing required. Die casting molds are expensive, and require
significant lead time to fabricate; they are commonly called dies. There are two common
types of die casting: hot- and cold-chamber die casting.
• In a hot chamber process (used for Zinc alloys, magnesium) the pressure chamber
connected to the die cavity is filled permanently in the molten metal. The basic cycle of
operation is as follows: (i) die is closed and gooseneck cylinder is filled with molten metal;
(ii) plunger pushes molten metal through gooseneck passage and nozzle and into the die
cavity; metal is held under pressure until it solidifies; (iii) die opens and cores, if any, are
retracted; casting stays in ejector die; plunger returns, pulling molten metal back through
nozzle and gooseneck; (iv) ejector pins push casting out of ejector die. As plunger
uncovers inlet hole, molten metal refills gooseneck cylinder. The hot chamber process is
16
used for metals that (a) have low melting points and (b) do not alloy with the die material,
steel; common examples are tin, zinc, and lead (Fig 10a).
• In a cold chamber process, the molten metal is poured into the cold chamber in each
cycle. The operating cycle is (i) Die is closed and molten metal is ladled into the cold
chamber cylinder; (ii) plunger pushes molten metal into die cavity; the metal is held under
high pressure until it solidifies; (iii) die opens and plunger follows to push the solidified slug
from the cylinder, if there are cores, they are retracted away; (iv) ejector pins push casting
off ejector die and plunger returns to original position. This process is particularly useful for
high melting point metals such as Aluminum, and Copper (and its alloys) (Fig 10b).
Fig. 10: (a) Hot chamber die casting (b) Cold chamber die casting
The Hot-chamber process involves the use of a piston, which traps a certain volume
of melt and forces it into the die cavity through a gooseneck and nozzle Fig 10c.
17
Fig 10c: Hot-chamber process
The pressures range up to 35 MPa. The melt is held under pressure until it solidifies. To
improve die life and to aid in rapid heat transfer, thus reducing the cycle time, dies are
cooled by circulating water or oil through passageways in the die block. Cycle times
usually range up to 900 shots per hour for zinc, (very small components such as zipper
teeth can be cast at 18,000 shots per hour). This process commonly casts low-melting-
point alloys of metals such as zinc, tin, and lead.
In the Cold-chamber process molten metal is poured into the injection cylinder with a
ladle Fig 10d. The shot chamber is not heated. The melt is forced into the die cavity at
pressures ranging from 20 MPa to 70 MPa, (in extremes 150 MPa). The machines may
be horizontal or vertical.
Process capabilities and machine selection: High-melting-point alloys of Al, Mg, and Cu
are cast by this method; ferrous alloys can also be cast in this manner. The dies have a
tendency to part unless clamped together tightly. Die casting machines are rated
according to the clamping force and range from 25 t to 3000 t. A further factor in the
selection of die-casting machines is the piston stroke which delimits the volume of fluid
injected into die cavity.
18
Fig 10d: Cold-chamber process
Dies may be made for single or multiple cavities. Dies wear increases with the
temperature of the fluid. Heat cracking of the die surface from repeated heating and
cooling can be a problem. However dies may last more than half a million shots before
die wear becomes significant.
The entire die-casting and finishing process can be highly automated. Lubricants are
applied, as parting agents on die surfaces. Alloys (except Mg alloys) generally require
lubricants. Die-casting has the capability for high production rates with good strength,
high-quality parts with complex shapes, good dimensional accuracy and surface detail,
thus requiring little or no subsequent machining or finishing operations. Components
such as pins, shafts, and fasteners can be cast integrally. Ejector marks remain, as do
small amounts of flash (thin material squeezed out between the dies) at the die parting
line.
19
1.10 Centrifugal casting
Centrifugal casting uses a permanent mold that is rotated about its axis at a speed between
300 to 3000 rpm as the molten metal is poured. Centrifugal forces cause the metal to be
pushed out towards the mold walls, where it solidifies after cooling. Parts cast in this
method have a fine grain microstructure, which is resistant to atmospheric corrosion; hence
this method has been used to manufacture pipes. Since metal is heavier than impurities,
most of the impurities and inclusions are closer to the inner diameter and can be machined
away. The surface finish along the inner diameter is also much worse than along the outer
surface.
The essential feature of centrifugal casting is the introduction of molten metal into a mold
which is rotated during solidification of the casting. The centrifugal force is relied upon for
shaping and feeding the molten metal with the utmost of detail as the liquid metal is thrown
by the force of gravity into the designed crevices and detail of the mold. (Fig. 11)
The concept of centrifugal casting is by no means a modern process. This technique which
lends clarity to detail was used by Benvenuto Cellini and others in the founding arts during
the 16th century. The mention of actual centrifugal casting machines is first recorded when
a British inventor, A.G. Eckhardt, was issued a patent in the year 1807. His method utilized
the placing of the molds in an upright position on pivots or revolving bases (sometimes
referred to today as a "vertical" centrifugal casting machine). In 1857 a U.S. patent
20
described wheel molds which presumably were used for the centrifugal casting of railroad
car wheels.
The centrifugal casting of railroad car wheels was one of the first applications involving
controlled variations in chemical composition from the outside periphery of the car wheel as
compared to the balance of the casting. As the casting was poured, a quantity of
ferromanganese was introduced with the first metal to enter the mold. This formed a high
manganese wear resistant tread and car wheel flange, as compared to the softer second
portion of the molten metal which became the center portion and the hub of the wheel.
Although this practice is no longer used, similar applications do exist since, in principle, true
solutions will not be separated in the centrifugal casting process.
Centrifugal casting utilizes inertial forces caused by rotation to distribute the molten
material into mould cavities. Variations of this manufacturing method include:
True centrifugal casting,
Semi-centrifugal casting, and
Centrifuging (also called centrifuged or spin casting).
21
Fig 11a: Centrifugal Casting Methods
It is important to remember, however, that materials such as iron or copper that are
immiscible in certain ranges are apt to segregate badly, such as lead in certain bronzes.
Tubing with alloy modifications on the inside diameter which are designed to meet specific
corrosion resistant characteristics have been successfully produced using the centrifugal
casting technique.
Centrifugal casting remained a casting method for large objects until 1907 when Dr.
Taggart, a dentist, introduced it to other dentists who experimented with the method hoping
to perfect cast inlays for teeth that would replace malleting flake gold into prepared cavities.
A Dr. Campbell in Missouri used a Hoosier cowbell as a casting flask. A wire loop such as
an extra-long bucket bail was added to the bell, the clapper was removed, and the model
and its sprues were embedded in the investment plaster.
After the mold had been heated, the prepared molten metal was poured into the sprue and
the bell swung first in pendulum style, then in a circular motion, to force the metal into all
areas of the pattern chamber. This action resembled the old trick of swinging a bucketful of
water over one's head in a circular motion. After 1920, the process began to be used for the
manufacturing of cast iron water pressure pipe, and use of the process has been extended
to a much wider range of shapes and alloys.
In centrifugal casting, the mold may spin about a horizontal, inclined or vertical axis. The
outside shape of the casting is determined by the shape of the mold. The inside contour is
22
determined by the free surface of the liquid metal during solidification. The centrifugal force
produced by rotation is large compared with normal hydrostatic forces and is utilized in two
ways.
The first of these is seen in pouring, where the force can be used to distribute liquid metal
over the outer surfaces of a mold. This provides a means of forming hollow cylinders and
other annular shapes. The second is the development of high pressure in the casting
during freezing. This, in conjunction with directional solidification, assists feeding and
accelerates the separation of non-metallic inclusions and precipitated gases. The
advantages of the process are therefore twofold: suitability for casting cylindrical forms and
high metallurgical quality of the product,
The effectiveness of centrifugal force in promoting a high standard of soundness and
metallurgical quality depends above all on achieving a controlled pattern of solidification,
this being governed by the process used and by the shape and dimensions of the casting.
High feeding pressure is no substitute for directional freezing, which remains a primary aim
of casting technique.
Considering first the casting of a plain cylinder, conditions can be seen to be highly
favorable to directional solidification owing to the marked radial temperature gradient
extending from the mold wall. Under these conditions the central mass of liquid metal,
under high pressure, has ready access to the zone of crystallization and fulfills the function
of the feeder head used in static casting. The steepest gradients and the best conditions of
all occur in the outermost zone of the casting, especially when a metal mold is employed.
Another important factor is the length to diameter ratio of the casting, a high ratio
minimizing heat losses from the bore through radiation and convection. Under these
conditions, heat is dissipated almost entirely through the mold wall and freezing is virtually
unidirectional until the casting is completely solid; the wall of the casting is then sound
throughout.
The casting of a plain pipe or tube is accomplished by rotation of a mold about its own
axis—the bore shape being produced by centrifugal force alone, and the wall thickness
determined by the volume of metal introduced. This practice is widely referred to as "true
centrifugal casting." (Fig. 11b)
23
Fig 11b: True Centrifugal Casting
In true centrifugal casting, Fig 11c, hollow cylindrical parts, e.g. pipes and lampposts, are
produced by pouring liquid into a rotating mould. The axis of rotation is usually horizontal
but can also be vertical. Moulds are made of steel, cast iron, or graphite and may be coated
with a refractory lining to increase mould life. Pipes with various outer shapes, (including
polygonal) can be cast. The inner surface of the casting remains cylindrical because the
molten material is uniformly distributed by centrifugal forces. Because of density
differences, lighter particles such as dross and impurities tend to collect on the inner
surface of the casting.
Cylindrical parts ranging from ∅13 mm to 3 m in diameter and 16 m long can be produced
with wall thickness ranging from 6 mm to 125 mm. The acceleration generated by the
centrifugal force is high, as much as 150 g, and is necessary for casting thick-walled parts.
This process enables good dimensional accuracy, and external surface detail. Typical
products are pipes, bushings, engine cylinder liners, and bearing rings with or without
24
flanges. Apart from metallic products some glass and ceramic products (e.g. TV picture
tubes and ceramic membrane tubes) are also manufactured using this technique.
In the case of a component of varying internal diameter or irregular wall thickness, a central
core may be used to form the internal contours, feeder heads then being introduced to
compensate for solidification shrinkage. A further step away from the original concept is the
spacing of separate shaped castings about a central downsprue which forms the axis of
rotation. These variations are referred to respectively as "semi-centrifugal casting and
centrifuging or pressure casting." In both cases, since the castings are shaped entirely by
the mold and cores, centrifugal force is used primarily as a source of pressure for feeding.
Semi-Centrifugal Casting
Such items as wheels and pulleys are occasionally cast in a semi-centrifugal setup as
illustrated in (Fig. 11d). This type of mold need not be rotated as fast as in the case of a
true centrifugal casting for only enough force is needed to cause the metal to first flow to
the outer rim. As the wheel rotates around its hub core, the mold cavity is filled from rim to
hub not from bottom to top as is the case of common gravity pouring. This action promotes
the direction of solidification from rim to hub and provides the required feeding by using
only one central reservoir. Pouring and feeding on the center hub increases the yield
especially when casting high shrinkage alloys. Here, as in other centrifugal setups, the
centrifugal force helps force lightweight nonmetalhc inclusions and trapped gas toward the
center and into the feeder for elimination.
25
In true or open bore casting, circumferential velocity is imparted from mold to metal by
frictional forces at the mold surface and within the liquid. In horizontal axis casting, the
metal entering the mold must rapidly acquire sufficient velocity to prevent instability and
"raining" as it passes over the upper half of its circular path, because of slip, the generation
of the necessary minimum force of 1G in the metal requires a much greater peripheral mold
velocity than would be the case if metal and mold were moving together. (Fig. 11e)
26
Vertical Centrifugal Casting
Vertical castings are produced by pouring a given weight of metal into a mold that rotates
about a vertical axis. The metal is picked up and distributed on the inside surface of the
mold. Dross, slag and other nonmetallics are centrifuged to the inside. Unlike the horizontal
casting, it is not possible to obtain a uniform bore. Depending on the rotational speed of the
mold, the inside will have varying amounts of taper. The inside surface will be that of the
parabola of revolution. The paraboloid "A" in Fig. 11g shows the shape of the cavity formed
by a relatively high rotational speed and paraboloid "B" shows the approximate shape of
the cavity that would be formed at a lower speed. This fact can be utilized advantageously
in the production of certain conically shaped parts.
The vertical axis centrifugal casting method is not suited to the production of pipelike
shapes because of the inherent taper on the inside. Likewise, it is not suited to the
production of very long parts. It finds its greatest application in the production of ringlike
shapes. Because the inside contour can be controlled to some extent, the method is
particularly useful in producing tapered sections. Also, because the rotational speeds can
be lower than in the horizontal axis machine, there is greater latitude in modifying the
outside shape.
Vertical casting machines consist of a rotating table on which a mold is centered and
fastened. The machine must be constructed to withstand static and dynamic loads imposed
on it. The dynamic loading is the most critical. Speed controls are infinitely variable and
speed regulation should be good. For safety's sake the machines are often mounted below
27
floor level. They are provided with adequate shields for protection in case of runout or
machine failure.
28
fraction solids is easy because the product, which is thin, can be cast at low fraction solids.
Fig. 10 shows the two rheocasting processes devised in this discussion.
The molten metal was poured into the lower die half via the cooling slope. The molten
metal became semisolid slurry on the cooling slope. The cooling slope, which is very
compact and simple, is made from mild steel, it is water-cooled and as a package offers
both low equipment costs and low running costs. Thecooling slope can be easily mounted
as part of any conventional casting machine. In conventional semisolid casting process, a
typical fraction solid of about 50% is required, however, the present study aimed at fraction
solids lower than 50%. The primary crystal size in the product becomes smaller as the
fraction solid is reduced. The solidification rate of the semisolid slurry after flowing through
on the cooling slope was about 10%. Casting was done immediately after pouring without
holding the slurry in order not to increase the solidification rate. Therefore, there was no
need of a system that controls the rate of solidification; this simplified the processes
investigated in the present study. Fig. 10(b) shows the rheocasting process that used low
superheat casting. The superheat of the molten metal was 10 0C. The crystal seeds are
generated at the lower die surface, and the upper die is inserted into the lower die before
the metal solidifies. When the superheat of the molten metal is low, the crystal seeds do not
melt and if sufficient crystal seeds remain, they can grow into spheroidal primary crystals.
The low superheat casting is simpler than the cooling slope process.
29
1.12 Continuous Casting
Continuous casting transforms molten metal into solid on a continuous basis and
includes a variety of important commercial processes. These processes are the most
efficient way to solidify large volumes of metal into simple shapes for subsequent
processing. Most basic metals are mass-produced using a continuous casting process,
including over 500 million tons of steel, 20 million tons of aluminum, and 1 million tons
of copper, nickel, and other metals in the world each year. Continuous casting is
distinguished from other solidification processes by its steady state nature, relative to an
outside observer in a laboratory frame of reference. The molten metal solidifies against
the mold walls while it is simultaneously withdrawn from the bottom of the mold at a rate
which maintains the solid / liquid interface at a constant position with time. The process
works best when all of its aspects operate in this steady-state manner. Relative to other
casting processes, continuous casting generally has a higher capital cost, but lower
operating cost. It is the most cost- and energy- efficient method to mass-produce
semifinished metal products with consistent quality in a variety of sizes and shapes.
Cross-sections can be rectangular, for subsequent rolling into plate or sheet, square or
circular for long products, and even “dog-bone” shapes, for rolling into I or H beams.
In the continuous casting, molten steel is poured from the tundish in the water cooled mold
and partially solidified bloom/billet or slab (hereafter called strand) is withdrawn from the
bottom of the mold into water spray so that solidified bloom/billet or slab is produced
constantly and continuously. Continuous casting is widely adopted by steelmakers. The
advantages of continuous casting over ingot casting are
Quality of the cast product is better
No need to have slabbing / blooming or billet mill as required when ingot casting is
used.
Higher extent of automation is possible
Width of the slab can be adjusted with the downstream strip mill.
Continuously cast products show less segregation.
Hot direct charging of the cast product for rolling is possible which leads to energy
saving.
30
The essential components of a continuous casting machine are tundish, water cooled mold,
water spray and torch cutters. Tundish, mold and water spray are arranged such that
molten stream is poured from tundish to mold and solidified strand (billet/bloom/billet) is
produced continuously. The required length of the strand is cut by torch cutter. In Fig. 13,
the arrangement of tundish, mold and water spray is shown. Various continuous casting
processes are shown in Fig 13a.
Fig 13: Arrangement of tundish, mold and water spray in a curved mold machine
31
Tundish
Tundish is a refractory lined vessel. Liquid steel is usually tapped from ladle into tundish.
The stream is shrouded as it enters from ladle to tundish. The functions of the tundish are:
Tundish acts as a reservoir for molten steel. It supplies molten steel in presence of a slag
cover to all continuous casting molds constantly and continuously at constant steel flow
rate. The flow rate is maintained constant by maintaining a constant steel bath height in the
tundish through teeming of molten steel from the ladle. The number of mold is either one or
more than one. Normally bloom and billet casting machines are multi strand i.e. number of
molds are either 4 or 6 or 8. Slab casters usually have either single or two molds. During
sequence casting and ladle change over periods, tundish supplies molten steel to the
molds.
Distributor
Tundish distributes molten steel to different molds of the continuous casting machine at
constant flow rant and superheat which is required for stand similarly with reference to
solidification microstructure. Control of superheat is required in all the moulds to reduce
break out. Location of ladles stream in the tundish is important. It may be located
symmetric or asymmetric to the centre of the tundish depending on the number of mold.
For single strand machines, molten stream enters from one side and exits the other side of
the tundish. In multi strand tundishes, ladle stream is either at the centre of the tundish or
displaced to the width side of the tundish.
32
Fig. 13b: Tundish with flow control device, namely weir and slotted dam
Inclusion removal
Tundish helps to remove inclusions during the process of continuous casting. For this
purpose liquid steel flow in the tundish is modified by inserting dams, weirs, slotted dams
etc. The whole idea is to utilize the residence time available before steel leaves the tundish.
For example, if capacity of tundish is 40 tons and casting speed is 5 tons/min, then the
average residence time of molten steel in the tundish is 8 minutes. During this average
residence time, inclusion removal can be exercised .For this purpose flow of steel melt in
the tundish has to be modified so as to accelerate the inclusion removal. The Inclusion
removal is a two-step step unit operation, namely floatation and absorption by a flux added
on the surface of the tundish. Flux is usually rice husk, or fly ash or some synthetic powder.
Mold:
Mold is the heart of continuous casting. In the water cooled mold, molten stream enters
from the tundish into mold in presence of flux through the submerged nozzle immersed in
the liquid steel. Solidification of steel begins in the mold. The casting powder is added onto
the top of molten steel in the mold. It melts and penetrates between the surface of mold
and the solidifying strand to minimize friction as shown in Fig 13c. Control of height of
molten steel in the mould is crucial for the success of the continuous casting machine. The
33
solidification begins from the meniscus of steel level in the mould. Mold level sensors are
used to control the meniscus level in the mould.
As seen in the figure, flux melts and enters into the gap between mold surface and
solidified strand. Molds are made of copper alloys. Small amounts of alloying elements are
added to increase the strength. Mold is tapered to reduce the air gap formation. Taper is
typically 1% of the mold length. For cross section of mold the taper is about 1mm for 1m
long mold. The cross section of the mold is the cross section of the slab/bloom/billet.
Length of the mold is around 0.7 and is more for large cross sections. Mold cross section
decreases gradually from top to bottom. Mould extracts around 10% of the total heat.
The mold is oscillated up and down to withdraw the partially solidified strand (strand is
either billet or bloom or slab).The oscillated frequency can be varied. At Tata steel slab
caster frequency is varied in between 0 and 250cycles/min and the stroke length from 0 to
12mm.
Steel level in mould is controlled, that is the meniscus for smooth caster operation. Sensors
are used to control the meniscus level.
34
The functions of mold flux are.
For the above functions the flux should have the following properties.
Low viscosity
Low liquidus temperature
Melting rate of flux must match with the speed of the continuous casting.
The hierarchical classification of various casting processes are summarized in Fig. 14.
35
Fig.14 Hierarchical classification of various casting processes
Fig 15: Assembled Mould with Core Inserted Ready for Casting
Sand Preparation: Moulding sand should have good flowability (for better reproduction of
pattern details), adequate green strength (to prevent its collapse during moulding), dry
strength (to prevent its collapse during mould filling), sufficient refractoriness (to withstand
molten metal temperature), enough permeability (to allow entrapped air and gases
generated inside the mould to escape) and collapsibility (for ease of shakeout).
These are achieved by a suitable composition of sand, binders, additives and moisture.
Silica sand is the most widely available and economical. Special sands include zirconsand
(lower thermal expansion, higher refractoriness and higher thermal conductivity, butmore
expensive), olivine sand (with properties in between silica and zircon sand) and
chromite/magnesite sand (high thermal conductivity). The most widely used binder is
bentonite clay (sodium or calcium bentonite), which imparts strength and plasticity tosilica
sand with the addition of water. Additives include coal dust (to improve surfacefinish by gas
evolution at metal-mould interface), iron oxide (for high temperatureresistance), dextrin (for
improved toughness and collapsibility) and molasses (for highstrength and collapsibility).
Modern sand plants automatically carry out mulling, mixing, aeration and testing of the
sand. They also reclaim used sand through magnetic separation(to remove metal
37
particles), crushing of lumps and finally removal of excess fines andbond (usually by
washing in hot water or by mechanical impact).
Core Making: Cores are surrounded by molten metal, and have higher requirement
compared to mould sand in terms of strength (to support their own weight and the
buoyancy force of metal), permeability and collapsibility (especially for curved holes,
otherwise they will be difficult to clean out). The most widely used binder for core sands is
vegetable oil (linseed and corn oil, sometimes mixed with mineral oils), which is
economical, but requires heating in an oven to about 240 C for 2-3 hours to develop
sufficient strength. Another widely used process uses sodium silicate binder mixed in dry
sand free of clay; the sand mixture hardens immediately when CO2 gas is passed through
it. The process is highly productive. The core develops high compressive strength but has
poor collapsibility. Other processes are based on organic binders; mainly thermosetting
resins such as phenol, urea and furan. This includes hot box and cold box processes. The
core sand mixed with binder is filled into a core box either manually or using a sand slinger.
For higher productivity core blowing machines are used, in which core boxes are mounted
in the machine and sand is forced and pressed into the core box under a stream of high
velocity air. This is followed by appropriate heating of the core box to impart the desired
properties to the core.
Moulding: This involves packing the moulding sand uniformly around a pattern placed in a
moulding box (or flask). Most foundries are equipped with jolt-squeeze machines operated
by compressed air. The combination of jolting and squeezing action gives good compaction
of sand near the pattern (by jolting the sand into crevices) as well as the top where the
squeeze plate comes in contact with the mould. Many modern foundries have high
pressure moulding equipment, which use air impulse or gas injection to impact the sand on
the pattern. These machines produce relatively less noise and dust compared to jolt and
squeeze machines and has much higher productivity (several moulds per minute). A
special type of high pressure moulding machine is the flask less moulding machine
pioneered by Disamatic, in which the parting plane is vertical and the mouldcavity is formed
between consecutive blocks of mould.
38
2.2 Heating the Metal
• Heating furnaces are used to heat the metal to molten temperature sufficient for casting
• The heat required is the sum of:
1. Heat to raise temperature to melting point
2. Heat of fusion to convert from solid to liquid
3. Heat to raise molten metal to desired temperature for pouring
39
•Skin thickness increases to form a shell around the molten metal as solidification
progresses
•Rate of freezing depends on heat transfer into mold, as well as thermal properties of the
metal
Most alloys freeze over a temperature range rather than at a single temperature
Figure 17 - (a) Phase diagram for a copper-nickel alloy system and (b) associated
cooling curve for a 50%Ni-50%Cu composition during casting
40
Figure 18 - Characteristic grain structure in an alloy casting, showing segregation of
alloying components in center of casting
Solidification Time
• Solidification takes time
• Total solidification time TST = time required for casting to solidify after pouring
•TST depends on size and shape of casting by relationship known as Chvorinov's Rule
where TST = total solidification time; V = volume of the casting; A = surface area of
casting; n = exponent usually taken to have a value = 2; and Cm is mold constant
Mold Constant in Chvorinov's Rule
•Cm depends on mold material, thermal properties of casting metal, and pouring
temperature relative to melting point
•Value of Cm for a given casting operation can be based on experimental data from
previous operations carried out using same mold material, metal, and pouring
temperature, even though the shape of the part may be quite different
A casting with a higher volume-to-surface area ratio cools and solidifies more slowly
than one with a lower ratio
To feed molten metal to main cavity, TST for riser must greater than TST for
main casting
41
• Since riser and casting mold constants will be equal, design the riser to have a larger
volume-to-area ratio so that the main casting solidifies first
This minimizes the effects of shrinkage
Solidification Shrinkage
•Occurs in nearly all metals because the solid phase has a higher density than the liquid
phase
•Thus, solidification causes a reduction in volume per unit weight of metal
42
•Exception: cast iron with high C content
--Graphitization during final stages of freezing causes expansion that counteracts
volumetric decrease associated with phase change
Shrinkage Allowance
•Patternmakers account for solidification shrinkage and thermal contraction by making
mold cavity oversized
•Amount by which mold is made larger relative to final casting size is called pattern
shrinkage allowance
•Casting dimensions are expressed linearly, so allowances are applied accordingly
Directional Solidification
•To minimize damaging effects of shrinkage, it is desirable for regions of the casting
most distant from the liquid metal supply to freeze first and for solidification to progress
from these remote regions toward the riser(s)
Thus, molten metal is continually available from risers to prevent shrinkage voids
The term directional solidification describes this aspect of freezing and methods by
which it is controlled
43
Figure 21 - (a) External chill to encourage rapid freezing of the molten metal in a thin
section of the casting; and (b) the likely result if the external chill were not used
Riser Design
• Riser is waste metal that is separated from then casting and remelted to make more
castings
• To minimize waste in the unit operation, it is desirable for the volume of metal in the
riser to be a minimum
• Since the geometry of the riser is normally selected to maximize the V/A ratio, this
allows reduction of riser volume as much as possible
Melting: Most widely used melting equipment include cupula, oil/gas fired furnaces
(including crucible and rotary furnaces), direct arc furnace and induction furnace. The
cupola is the simplest and the most economical, and most suited for grey iron. Layers of pig
iron, coke and flux (limestone) are charged into the cupola; air for combustion is blown
through several openings (tuyeres). Use of hot air blast and double row tuyeres improves
cupola efficiency. Oil or gas fired crucible furnaces are suitable for melting small quantities
of metal, usually non-ferrous. The crucible is usually made of graphite and clay. Rotary
furnaces are made of steel shells lined with refractory, turning at a rate of 1-2 rpm. The
charge is placed through a door in the middle; one end of the furnace is heated (by firing oil
or gas) and the melt is taken out through the other end. Electric furnaces include direct arc
and induction furnaces, which are more widely preferred by newer foundries owing to ease
of control over temperature and composition, and high melting rate. In arc furnace, the heat
is generated between the electrodes and transferred to the metal. In induction furnace, the
heat is generated in the metal itself by eddy currents. Induction furnaces can be classified
44
depending on the location of the induction coil (cored and coreless), and frequency of
current (high or medium).
Molten metal is prepared in a variety of furnaces, the choice of which is determined by the
quality, quantity and throughput required.
Electric induction furnaces are the most common type used for batch melting of ferrous,
copper and super alloys. This method involves the use of an electrical current surrounding
a crucible that holds the metal charge. Furnace sizes range from < 100 kg up to 15 tons.
For production of super alloys and titanium, melting may be undertaken in a vacuum
chamber to prevent oxidation.
Cupolas are used solely by iron foundries for continuous production of molten iron. The
cupola consists of a shaft in which a coke bed is established. Metal, coke and limestone
are alternately charged into the furnace from the top. Molten metal trickles through the
coke bed picking up essential carbon, while impurities react with the limestone to form
waste slag. Both metal and slag are continuously tapped out at the bottom. Metal
throughputs of 1 to 45 tons per hour are achieved in the UK.
Electric arc furnaces are still used by a few ferrous foundries in the UK, mainly producing
steel castings, although most have been replaced by induction furnaces. Furnaces of 3 to
100 tons capacity are in use in the UK. The design involves the use of a holding bath into
which electrodes are inserted. The heat generated by creating a charge between the
electrodes causes the metal to melt.
Rotary furnaces are relatively uncommon in the UK but are used in some iron foundries.
The furnace consists of a horizontal cylindrical steel shell mounted on rollers and lined with
refractory material. The furnace is fired using gas or oil from one end and the furnace body
is slowly rotated during melting.
Gas-fired shaft and resistance furnaces are used for melting of aluminium. Shaft furnaces
provide a continuous melting and tapping capability, useful at high production facilities.
Resistance furnaces are employed for melting of small batches.
Gas and oil-fired crucible furnaces are used for small batch melting of copper and
aluminium alloys, although oil-fired units are less common now and tend to be limited to
45
smaller foundries. Unlike the larger furnaces where molten metal is tapped into a ladle for
casting, the crucible is lifted out (or pops out) of the heating chamber and the molten metal
can be poured directly into the mould.
Virtually any metal or alloy that can be melted can be cast. The most common
ferrousmetals include grey iron, ductile iron, malleable iron and steel. Alloys of iron and
steel are used for high performance applications, such as temperature, wear and
corrosion resistance. The most common non-ferrous metals include aluminum, copper,
zinc and magnesium based alloys. The production and application of ductile iron and
46
aluminum castings are steadily increasing. Aluminum has overtaken steel in terms of
production by weight. The consumption of magnesium alloys is rapidly increasing in
automobile and other sectors, owing its high strength to weight ratio. Important and
emerging metal titanium is stronger than steel, but has found limited applications owing
to thedifficulty in casting and machining. Table 3 lists the major metals in use today (by
weight) along with their main characteristics and typical applications.
47
Module-II
Misruns: Casting solidifies before completely fill the mold. Reasons are low pouring
temperature, slow pouring or thin cross section of casting.
Cold shut: Two portions flow together but without fusion between them. Causes are
similar to those of a misrun.
Cold shots: When splattering occurs during pouring, solid globules of metal are
entrapped in the casting. Proper gating system designs could avoid this defect.
Shrinkage cavity: Voids resulting from shrinkage. The problem can often be solved by
proper riser design but may require some changes in the part design as well.
Microporosity: Network of small voids distributed throughout the casting. The defect
occurs more often in alloys, because of the manner they solidify.
Hot tearing: Cracks caused by low mold collapsibility.They occur when the material is
restrained from contraction during solidification. A proper mold design can solve the
problem.
48
3.1 Some defects are typical only for some particular casting processes, for instance,
many defects occur in sand casting as a result of interaction between the sand mold
and the molten metal. Defect found primarily in sand casting are gas cavities, rough
surface areas, shift of the two halves of the mold, or shift of the core, etc.
a) Misruns: A Misruns is a casting that has solidified before completely filling the mold
cavity. Typical causes include
1) Fluidity of the molten metal is insufficient,
2) Pouring Temperature is too low,
3) Pouring is done too slowly and/or
4) Cross section of the mold cavity is too thin.
b) Cold Shut: A cold shut occurs when two portion of the metal flow together, but there
is lack of fusion between them due to premature freezing, Its causes are similar to those
of a Misruns.
49
c) Cold Shots: When splattering occurs during pouring, solid globules of the metal are
formed thatbecome entrapped in the casting. Poring procedures and gating system
designs that avoid splattering can prevent these defects.
d) Shrinkage Cavity: These defects are a depression in the surface or an internal void in
the casting caused by solidification shrinkage that restricts the amount of the molten
metal available in the last region to freeze. It often occurs near the top of the casting in
which case it is referred to as a pipe. The problem can often be solved by proper riser
design.
f) Hot Tearing: This defect, also called hot cracking, occurs when the casting is
restrained or early stages of cooling after solidification. The defect is manifested as a
separation of the metal (hence the terms tearing or cracking) at a point of high tensile
stress caused by metal’s inability to shrink naturally. In sand casting and other
expandable mold processes, compounding the mold to be collapsible prevents it. In
permanent mold processes, removing the part from the mold immediately after freezing
reduces hot tearing.
Some defects are related to the use of sand molds and therefore they occur only in
sand castings. To a lesser degree, other expandable mold processes are also
susceptible to these problems.
Defects found primarily in sand castings are shown in Fig 23 and describe here:
a) Sand Blow: This defect consists of a balloon-shaped gas cavity caused by release of
mold gases during pouring. It occurs at or below the casting surface near the top of the
50
casting. Low permeability, poor venting and high moisture content of the sand mold are
the usual causes.
b) Pinholes: A defect similar to a sand blow involves the formation of many small gas
cavitiesat or slightly below the surface of the casting.
c) Sand Wash: A wash is an irregularity in the surface of the casting that results from
erosion of the sand mold during pouring. The contour of the erosion is imprinted into
surface of the final cast part.
d) Scabs: This is a rough area of the casting due to encrustations of sand and metal. It
is caused by portions of the mold surface flaking off during solidification and becoming
embedded in the casting surface.
e) Penetration: When the fluidity of the liquid metal is high, it may penetrate into the
sand mold or sand core after freezing, the surface of the casting consists of a mixture of
sand grins and metal. Harder packing of the sand molds helps to alleviate this condition.
51
f) Mold Shift: This is manifested as a step in the cast product at the parting line caused
by sidewise displacement of the cope with respect to the drag.
g) Core Shift: A similar movement can happen with the core but the displacement is
usually vertical. Core shift and mold shift are caused by buoyancy of the molten metal.
h) Mold Crack: If mold strength is insufficient a crack may develop in to which liquid
metal can seep to form a fin on the final casting.
Shrinkage
•Can amount to 5-10% by volume
•Gray cast iron expands upon solidification due to phase changes
•Need to design part and mold to take this amount into consideration
Porosity
•Types
–due to gases – smooth bubbles
–due to shrinkage – rough voids
•Not a problem for ingots
–parts that will be deformation processed
52
–as long as it is not exposed to air (corrosion)
–can be healed
Porosity due to Gases
•Smooth bubbles
–result from entrapped gases
–solubility in liquid is high, in solid is low, so gas is rejected during cooling
Sievert’s law
–S = solubility
–k = constant
–pg = partial pressure of gas over melt
53
•Stages
–cooling liquid
–rejects latent heat at melting point
•alloys become slushy - liquid and solid co-exist
–cooling solid
Differential Cooling
•Transition between thicker and thinner sections can lead to porosity
Pipe Defect
•Due to shrinkage giving rise to a funnel-like cavity
•Solutions
–insulate top (glass wool)
–heat top (exothermic mixture - thermit)
Microstructure
•Post-treatment may be necessary to get desired properties - grain structure
–annealing
–tempering
–cold working
54
Design Rules Summary
•Uniform wall thickness
•Flat parting lines
•Gradual thickness transitions
•Draft for removal
–tapers: 0.5 to 2 degrees
•Surface of mold gives surface of part
Cost Equation
Fig 24
55
4. Inspections of Casting
Foundry inspection procedures include;
a. Visual Inspection to detect obvious defects, such as Misruns, cold shut and severe
surface flaws;
b. Dimensional measurements to ensure that tolerances have been met;
c. Metallurgical, chemical, physical and other tests concerned with the inherent quality
of the cast metal. Tests in category 3 include
1) Pressure testing to locate leaks in the casting
2) Radiographic methods, magnetic particle tests, the use of fluorescent penetrants and
supersonic testing to detect either surface or internal defects in the casting;
3) Mechanical testing to determine properties such as tensile strength and hardness. If
defects are discovered but are not too serious, it is often possible to save the casting by
welding, grinding or other salvage methods to which the customer has agreed.
Visual inspection
Visible defects that can be detected provide a means for discovering errors in the
pattern equipment or in the molding and casting process. Visual inspection may prove
inadequate only in the detection of sub surface or internal defects.
Dimensional inspection
Dimensional inspection is one of the important inspections for casting. When precision
casting is required, we make some samples for inspection the tolerance, shape size and
also measure the profile of the cast. This dimensional inspection of casting may be
conducted by various methods:
• Standard measuring instruments to check the size of the cast.
• Contour gauges for the checking of profile, curves and shapes
• Coordinate measuring and Marking Machine
• Special fixtures
56
X-Ray Radiography
In all the foundries the flaw detection test are performed in the casting where the
defects are not visible. This flaw detection test is usually performed for internal defects,
surface defects etc. These tests are valuable not only in detecting but even in locating
the casting defects present in the interior of the casting. Radiography is one of the
important flaw detection test for casting. The radiation used in radiography testing is a
higher energy (shorter wavelength) version of the electromagnetic waves that we see as
visible light. The radiation can come from an X-ray generator or a radioactive source.
Ultrasonic Testing
Ultrasonic testing used for detecting internal voids in casting is based on the principle of
reflection of high frequency sound waves. If the surface under test contains some
defect, the high frequency sound waves when emitted through the section of the
casting, will be reflected from the surface of defect and return in a shorter period of time.
57
The advantage this method of testing over other methods is that the defect, even if in
the interior, is not only detected and located accurately, but its dimension can also be
quickly measured without in any damaging or destroying the casting.
Fracture test
Fracture test is done by examining a fracture surface of the casting. it is possible to
observe coarse graphite or chilled portion and also shrinkage cavity, pin hole etc. The
apparent soundness of the casting can thus be judged by seeing the fracture.
Microscopic Examination
Microscopic examination can enable the study of the microstructure of the metal alloy,
elucidating its composition, the type and nature of any treatment given to it, and its
mechanical properties. In the case of cast metals, particularly steels, cast iron,
malleable iron, and SG iron, microstructure examination is essential for assessing
metallurgical structure and composition. Composition analysis can also be done using
microscopic inspection. Distribution of phase can be observed by metallographic
58
sample preparation of cast product. Grain size and distribution, grain boundary area can
be observed by this procedure. Distribution of nonmetallic inclusion can also be found
from this process of inspection.
Chill Test
Chill test offers a convenient means for an approximate evaluation of the graphitizing
tendency of the iron produced and forms an important and quick shop floor test for
ascertaining whether this iron will be of the class desired. In chill test, accelerated
cooling rate is introduced to induce the formation of a chilled specimen of appropriate
dimension. It is then broken by striking with a hammer in such a manner that the
fracture is straight and midway of its length. The depth of chill obtained on the test piece
is affected by the carbon and silicon present and it can therefore be related to the
carbon equivalent, whose value in turn determines the grade of iron.
Following the automotive trend with the massive shift from iron to aluminium and other
light alloys – for both ecological and economic reasons – foundries are investing heavily
in new machinery. With the aluminium content in vehicles rising by 5.5 % each year,
some 12 million tonnes of aluminium will be cast in 2010. To handle this workload,
around 70 new foundries will have to be built annually. At ABB we are moving right
along with this trend, providing the new businesses with proven robot-based solutions
including progressive production cell technology.
59
production process – all the way from smelter to the finished automotive part. ABB’s
robots are always there to gain efficiency along the entire value chain. This synergised-
system concept based on specific robots designed for the need of each process offers
many advantages like enormous flexibility, high levels of reliability, and consistent
capacity utilisation all along the foundry line.
Even for a robot, a foundry is not a workplace like any other. The exceptionally tough
work environment demands appropriate protection – the more comprehensive the
better. ABB offers an extensive range of foundry-adapted robots with payloads up to
650 kg, by specialized high function controllers and a wide range of software products.
IRC5: the modularised way to success ABB’s innovative IRC5 robot control system sets
new standards with its modularised concept, a human-engineered Flex Pendant
programming unit with special foundry applications interface and fully synchronous,
simultaneous control of up to four robots using Multi Move. The patented True Move
and Quick Move functions assure precise, rapid robot movements throughout the
working range.
Robot Studio: for genuine offline programming Cost-efficient offline programming is the
best way to maximise return on investment in robotics. ABB’s simulation and offline
programming software, Robot Studio, allows robot programming to be carried out in the
office without shutting down production. It also enables robot programs to be prepared
in advance, increasing overall productivity.
Teach Saver: more than a time-saver for a long time, the elaborate programming
required was the biggest impediment to using robots to clean cast components. ABB’s
Teach Saver software package reduces this process by up to 90%. More: using a virtual
offline robot cell also ensures significantly greater accuracy than with classical teaching.
60
can take more than just the heat. These robots are ready to meet the challenges of
spits, sands and lubricants of modern high-performance foundries on a daily basis.
Foundries are a very complex environment to work in. The automation of specialised
tasks such as investment casting, ingot handling or forging requires detailed process
know-how and the right hardware to handle castings and cores with power and
precision. This is where ABB’s robots enter the arena.
Dipping wax trees in water based slurry to continuously build the ceramic shell with
special sand, is a process in investment casting that is often robotised. With a reach of
up to 3.5 m and a handling capacity of 150 kg, ABB’s IRB 7600 is the perfect alternative
to get the job done. Furthermore, robots are frequently used for post processing
applications such as grinding and polishing.
61
Ingot handling is an application found in casting shops where aluminium ingots are
produced. When it comes to handling, the IRB 660 four-axis robot is the perfect tool for
the task: it comes equipped with a special purpose pneumatic gripper for handling the
solidified aluminium ingots and features a payload of up to 250 kg. For even heavier
handling, the IRB 7600 is the perfect choice with a capacity of up to 650 kg.
Tending a zinc die-casting machine requires total reliability and efficiency in a harsh
environment. The IRB 140 Foundry Plus robot featuring full IP67- classification is ready
to take this challenge. Thanks to its compact dimensions, it is even suited for portable
robot cells that can be moved away for tool changes and servicing of the die-casting
machine.
62
After Casting Processing
Machining, heat treating, welding
Evaluation of Cast Product
Experienced pattern makers with the help of fluid flow and heat transfer experts (often
metallurgical engineers) will proceed to lay out the requirements for the molds and the
cores necessary to produce the part. At this point in the process, or even in the design
stage, simulation of the solidification of the proposed part is a desirable activity. Modern
computers are currently being used with powerful software packages to give a preview
of solidification, illustrating in color and in real time the path of solidification in the
casting. This methodology is important in reducing the time between design and
prototype castings, in providing valuable insight to the designer and the person who
does the gating and risering.
63
Fused Deposition Modeling, Laminated Object Manufacturing, Solid Ground Curing, and
Direct Shell Production Casting are someof the methods used to produce patterns very
quickly from the CAD models of the designer.
a). An allowance for the solid state shrinkage that will always accompany the casting as
it cools from the melting temperature to room temperature. This will depend upon the
metal being cast, each of which will have its own unique coefficient of thermal
expansion, α. For 7 example, α for aluminum at 20 oC is 23.9 x 10-6 in/inoC, for iron is
11.7 x 10-6 in/inoC and that for copper is 16.5 x 10-6 in/in oC (see page 50 - 51). Thus
the linear dimensions of the pattern will always be larger than the casting by an amount
determined by the linear expansion coefficient. Of course the expansion coefficients for
each of the above materials will change somewhat with temperature and so the pattern
maker will usually give a generous allowance to cover the temperature dependence of
the expansion coefficient.
b). Inclusion of a draft angle so that the pattern can be removed from the mold (or in the
case of die casting or permanent mold casting, so the casting can be removed from the
metal die) after the molding sand has been rammed around the pattern. These draft
angles can vary from of enough extra stock to allow for variations in casting dimensions
due to mold preparation, pattern wear, etc. This amount will depend greatly upon the
casting process being employed. For example the amount of “extra” stock will be
typically greater for a sand casting than for a die casting. Machining and process
tolerances are typically greater for sand castings than for permanent mold castings.
64
Details on pattern making can be found in several publications form the American
Foundry Society (AFS).
65
66
The above ratio of sprue base area to runner cross sectional area to ingate area is
called the gating ratio, a common way to quantitatively describe gating systems. Filling
67
times for just such a casting has been experimentally measured at Michigan Tech for a
number of years in which the head (Distance from top of pouring basin to the parting
line) and the ingate cross sectional area were independently varied to control flow rates
The number of gates needed to fill a casting cavity in an acceptable time is determined
by the size of the casting as well as the casting complexity, both factors which are dealt
with using experience and a certain amount of common sense.
68
Fig 26 Schematic diagram of Shrinkage
The total amount of shrinkage experienced during solidification may be quite large,
especially for aluminum alloys, which can shrink 6.5% during the change in state. The
number of risers needed to effectively feed a casting depends upon casting geometry
and feeding distance required.
69
70
6.4 Design Recommendations for Casting
1. Compensate the shrinkage of the solidified molten metal by making patterns of
slightly oversize.
2. In sand casting, it is more economical and accurate if the parting line is on a flat
plane [Fig 28(a)]. Contoured parting lines are not economical. Further, some
degree of taper, or draft is recommended to provide to the pattern for its easy
removal [Fig 28(b)]. The recommended draft angles for patters under various
conditions are given elsewhere.
3. In sand casting, it is recommended to attach the raiser near to the heavier section.
The thinnest sections are farthest from the raiser and solidify first and then the
solidification proceeds toward the direction of raiser i.e. towards the heavier
section [Fig 28(c)].
4. Sharp corners in a casting design cause uneven cooling and lead to formation of
hot spots in the final cast structure. Moreover sharp corner in a casting structure
acts as a stress raiser. Rounding the corner decreases the severity of the hot
spot and lessens the stress concentration [Fig 28(d)].
5. Abrupt changes in sections should be avoided. Fillets and tapers are preferable to
sharp steps [Fig 28(e)].
71
6. The interior walls and sections are recommended to be 20% thinner than the
outside members to reduce the thermal and residual stresses, and metallurgical
changes [Fig 28(f)].
7. When a hole is placed in a highly stressed section, add extra material around the
hole as reinforcement [Fig 28(g)].
8. To minimize the residual stresses in the gear, pulley or wheel casting, a balance
between the section size of the rim, spokes and hub is maintained [Fig 28 (h)].
9. An odd number of curved wheel spokes reduce cast-in-residual stresses [Fig
28(i)].
10. Similar to sand casting, permanent mold castings also require draft for the easy
withdrawal of the casting from the mold. The recommended draft angles are
given elsewhere.
11. Due to pattern shrinkage, investment shrinkage and metal shrinkage during
solidification, there is always a tendency for an investment part to “dish” (develop
concave surfaces where flat surfaces are specified). This condition takes place in
areas of thick cross section. Dishing is minimized by designing parts with
uniformly thin walls [Fig 28(j)].
72
73
Figure 28 Recommended designs for casting
74
12. When keys and keyways are required, the recommended ratio of width to depth
is 1.0 or more. The minimum castable key width is 2.3 mm for ferrous metals and
1.5 mm for nonferrous metals [Figure 29].
13. Heavy bosses connecting to the surface can cause “sinks” due to the shrinkage
of the large mass of the metal in the boss during cooling. This shrinkage problem
can be reduced by moving the boss away from the surface and connecting it to
the surface with a short rib [Figure 30].
Figure 29 The recommended casting design for key and key ways for (a) ferrous metal,
(b) Non-ferrous metal
75
environment pollution to minimum. It is especially important to prevent: • excessive
air, water and soil polluting, • spreading bad odors and noise, • substantially
deterioration of living conditions, and • bad influence on environment in the region.
In the testing foundry, formation of waste and environment pollution by
manufacturing processes could be divided into the following groups: • waste gases
emissions, • waste material emissions, • emissions of heat into environmental water,
and • noise
76
8. Introduction to Arc Welding
A welding arc is an electric discharge that develops primarily due to flow of currentfrom
cathode to anode. Flow of current through the gap between electrode and work piece
needs column of charged particles for having reasonably good electrical conductivity.
These charged particles are generated by various mechanisms such as thermal
emission, field emission secondary emission etc. Density of charged particles in gap
governs the electrical conductivity of gaseous column. In an electric arc, electrons
released from cathode (due to electric field or thermo-ionic emission) are accelerated
towards the anode because of potential difference between work piece and electrode.
These high velocity electrons moving from cathode toward anode collide with gaseous
molecules and decompose them into charged particles i.e. electrons and ions. These
charged particles move towards electrode and work piece as per polarity and form a
part of welding current. Ion current becomes only about 1% of electron current as ions
become heavier than the electrons so they move slowly. Eventually electrons merge
into anode. Arc gap between electrode and work piece acts as pure resistance load.
Heat generated in a welding arc depends on arc voltage and welding current.
8.1 Coated Electrodes are specified based on core wire diameter. Commonly used
electrode diameters are 2, 2.5, 3.18, 4, 5 and 6 mm. Length of electrodes may depend
on diameter of core wire ranging from 250 to 450 mm i.e. larger the core diameter larger
the length. However, special electrodes may be of 8-10 mm diameter. Table 5.2 gives
the details of electrode sizes and currents.
The electrodes are also specified based on ratio of diameter of coated portion of
electrode to core wire diameter. If this ratio is lesser than 1.2 then electrodes are thin
coated, if ratio ranges between 1.2 to 1.5 then medium coated and if ratio exceeds 1.5
then electrodes are heavy coated or thick coated. This ratio may vary slightly in different
codes. Thin coated electrodes have very good bridgeability at the joint gap but weld
bead has coarse ripples and penetration is also poor. Medium coated electrodes lead to
reasonably good bridgeability, medium ripples in weld bead and modest penetration.
77
Thick coated electrodes have poor bridgeability, however, bead appearance is excellent
with fine ripples and also excellent penetration.
The ingress of oxygen and nitrogen from the atmosphere to the weld pool and arc
environment would cause embrittlement and porosity in the weld metal and this must be
prevented. The Actual method of arc shielding from atmospheric nitrogen and oxygen
attack varies with different type of electrodes which are in two main categories.
1. Bulk of covering material converts to a gas by the heat of the arc, only a small
amount of slag is produced. Protection depends largely upon a gaseous shield to
prevent atmospheric contamination as in case of cellulosic electrode.
2. Bulk of covering material converts to a slag, only a small volume of shielding gas
produced as in the case of rutile and basic coated electrodes.
Electrode coating performs many functions depending upon coating constituents, during
welding to improve weld metal properties. The important functions are as follows:
1. Improve the electric conductivity in the arc region to improve the arc ignition and
stabilization of the arc.
(b) Protects the droplet during transfer and molten weld pool from atmospheric gases.
5. Alloying with certain elements such as Cr, Ni, Mo to improve weld metal properties.
78
Various constituents of electrode coating are cellulose, calcium fluoride, calcium
carbonate, titanium dioxide, clay, talc, iron oxide, asbestos, potassium / sodium silicate,
iron powder, ferro-maganese, powdered alloys, silica etc. Each constituent performs
either one or more than one functions.
Electrode metallic core wire is the same but the coating constituents give the different
characteristics to the welds. Based on the coating constituents, structural steel
electrodes can be classified in the following classes;
1. Cellulosic Electrodes
Coating consists of high cellulosic content more than 30% and TiO2 up to 20%.
These are all position electrodes and produce deep penetration because of extra
heat generated during burning of cellulosic materials. However, high spatter
losses are associated with these electrodes.
2. Rutile Electrodes
Coating consists of TiO 2 up to 45% and SiO2 around 20%. These electrodes
are widely used for general work and are called general purpose electrodes.
3. Acidic Electrodes
Coating consists of iron oxide more than 20%. Sometimes it may be up to 40%,
other constituents may be TiO2 10% and CaCO3 10%. Such electrodes produce
self detaching slag and smooth weld finish and are used normally in flat position.
4. Basic Electrodes
Coating consist of CaCO3 around 40% and CaF2 15-20%. These electrodes
normally require baking at temperature of approximately 250 ° C for 1-2 hrs or as
per manufacturer's instructions. Such electrodes produce high quality weld
deposits which has high resistance to cracking. This is because hydrogen is
79
removed from weld metal by the action of fluorine i.e. forming HF acid as
CaF2 generates fluorine on dissociation in the heat of arc.
Structural steel electrodes were classified as per IS 814:1974 and this code was
revised and the revised code is IS 814:1991.
IS 815:1974
PXXXXXXS
Suffix (s) are optional and may or may not be given if not applicable.
IS 814:1991
As per IS 814 electrodes are designated with letters and digits as given below:
ELXXXXS
80
In this code E indicates extruded solid electrode, L is a letter to designate type of
coating, first digit indicates UTS and YS of deposited weld metal, second digit
gives percentage elongation and impact values of weld metal deposited, third
digit gives welding positions in which electrode can be used and fourth digit gives
the current conditions for the use of electrode.
Suffix(s) are optional and indicate special characteristics of electrode such as H1,
H2, and H3 indicate hydrogen controlled electrodes with different amount of
diffusible hydrogen J, K, L indicate different amount of metal recovery in weld
pool in case of iron powder electrodes and X means radiographic weld quality.
Thermo-ionic emission
Increase in temperature of metal increases the kinetic energy of free electrons and as it
goes beyond certain limit, electrons are ejected from the metal surface. This mechanism
of emission of electron due to heating of metal is called thermo ionic emission. The
temperature at which thermo-ionic emission takes place, most of the metals melt.
Hence, refractory materials like tungsten and carbon, having high melting point exhibit
thermo ionic electron emission tendency.
81
Field emission:
In this approach, free electrons are pulled out of the metal surface by developing high
strength electro-magnetic field. High potential difference (107 V/cm) between the work
piece and electrode is established for the field emission purpose.
Secondary emission
High velocity electrons moving from cathode to anode in the arc gap collide with other
gaseous molecules. This collision results in decomposition of gaseuousmolecules into
atoms and charged particles (electrons and ions).
Cathode spot
This is a region of cathode wherefrom electrons are emitted. Three types of cathode
spots are generally found namely mobile, pointed, and normal. There can be one or
more than one cathode spots moving at high speed ranging from 5-10 m/sec. Mobile
cathode spot is usually produced at current density 100-1000 A/mm2. Mobile cathode
spot is generally found during the welding of aluminium and magnesium. This type of
cathode spot loosens the oxide layer on reactive metal like aluminium, Mg and stainless
steel. Therefore, mobile cathode spot helps in cleaning action when reverse polarity is
used i.e. work piece is cathode. Pointed cathode spot is formed at a point only mostly in
case of tungsten inert gas welding at about 100A/mm2. Pointed tungsten electrode
forms the pointed cathode-spot. Ball shaped tip of coated steel electrode forms normal
cathode spot.
82
Cathode drop region:
This region is very close to the cathode and a very sharp drop of voltage takes placein
this zone due to cooling effect of cathode. Voltage drop in this region directly affects the
heat generation near the cathode which in turn governs melting rate of the electrode in
case of the consumable arc welding process with straight polarity (electrode is cathode).
Plasma:
Plasma is the region between electrode and work where mostly flow of charged
particles namely free electrons and positive ions takes place. In this region, uniform
voltage drop takes place. Heat generated in this region has minor effect on melting of
the work piece and electrode.
Anode spot:
Anode spot is the region of a anode where electrons get merged and their impact
generates heat for melting. However, no fixed anode spot is generally noticed on the
anode like cathode spot.
83
Fig. 31 Potential drop as function of distance from the cathode to anode
84
8.3 Electrical Fundamentals of Welding Arc
The welding arc acts as impedance for flow of current like an electric conductor. The
impedance of arc is usually found a function of temperature and becomes inversely
proportional to the density of charge particles and their mobility. Therefore, distribution
of charged particles in radial and axial direction in the arc affects the total impedance of
the arc. Three major regions have been noticed in arc gap that accounts for total
potential drop in the arc i.e. cathode drop region, plasma and anode drop region.
Product of potential difference across the arc (V) and current (I) gives the power of the
arc indicating the heat generation per unit time. Arc voltage (V) is taken as sum of
potential drop across the cathode drop region (Vc), potential drop across the plasma
region (Vp), and potential drop across the anode drop region (Va) as shown in Fig. 33.
Potential drop in different zones is expressed in terms of volt (V), welding current in
ampere (A) and power of arc P is in watt (W). This equation suggests that the
distribution of heat in three zones namely cathode, anode and arc plasma can be
changed. Variation of arc length mainly affects plasma heat while shielding gas
influences the heat generation in the cathode and anode drop zones. Addition of low
ionization potential materials (namely potassium and sodium) reduces the arc voltage
because of increased ionization in arc gap so increased electrical conductivity which in
turn reduces the heat generation in plasma region. Heat generation at the anode and
cathode drop zones is primarily governed by type of welding process and polarity
associated with welding arc. In case of direct current (DC) welding, when electrode is
connected to the negative terminal and workpiece is connected with positive terminal of
the power source then it is termed as directcurrent electrode negative polarity (DCEN)
or straight polarity and when electrode is connected to the positive terminal of the power
source and workpiece is connected with negative terminal then it is termed as direct
current electrode positive polarity (DCEP) or reverse polarity. TIG welding with argon as
shielding gas shows 8-10 time higher current carrying capacity (without melting) than
DCEP. The submerged arc welding with DCEP generates larger amount of heat at
85
cathode than anode as indicated by high melting rate of consumable electrode.
Increase in spacing between the electrode and work-piece generally increases the
potential of the arc because of increased losses of the charge carriers by radial
migration to cool boundary of the plasma. Increase in the length of the arc column (by
bulging) exposes more surface area of arc column to the low temperature atmospheric
gas which in turn imposes the requirement of more number of charge carriers to
maintain the flow of current. Therefore, these losses of charged particles must be
accommodated to stabilize the arc by increasing the applied voltage. The most of the
heat generated in consumable arc welding process goes to weld pool which in turn
results in higher thermal efficiencies. This is more evident from the fact that the thermal
efficiency of metal arc welding processes is found in range of 70- 80% whereas that for
non-consumable arc welding processes is found in range of 40-60%.
Arc Initiation
There are two most commonly used methods to initiate an electric arc in welding
processes namely touch start and field start. The touch start method is used in case of
all common welding processes while the later one is preferred in case of automatic
86
welding operations and in the processes where electrode has tendency to form
inclusion in the weld metal like in TIG welding or electrode remains inside the nozzle.
Touch Start
In this method, the electrode is brought in contact with the work piece and thenpulled
apart to create a very small gap. Touching of the electrode to the workpiececauses
short-circuiting resulting in flow of heavy current which in turn leads to heating, partial
melting and even slight evaporation of the metal at the electrode tip. All these events
happen in very short time usually within few seconds (Fig. 34 a, b). Heating of electrode
produces few free electrons due to thermal ionization; additionally dissociation of metal
vapours (owing to lower ionization potential of the metal vapours than the atmospheric
gases) also produces charged particles (electron and positively charged ions). On
pulling up of the electrode apart from the work piece, flow of current starts through these
charged particles and for a moment arc is developed. To use the heat of electric arc for
welding purpose it is necessary that after initiation of arc it must be maintained and
stabilized.
Fig. 34 Schematic diagram showing mechanism of arc initiation by touch start method
a) when circuit closed by touching electrode with work piece b) emission of electrode on
putting them apart
87
Field Start
In this method, high strength electric field (107 V) is applied between electrode and
work piece so that electrons are released from cathode electro-magnetic field emission
(Fig. 35). Development of high strength field leads to ejection of electron from cathode
spots. Once the free electrons are available in arc gap, normal potential difference
between electrode and work piece ensures flow of charged particles to maintain a
welding arc. This method is commonly used in mechanized welding processes such as
plasma arc and GTAW process where direct contact between electrode and work piece
is not preferred.
Maintenance of Arc
Once electric arc is initiated, next step is to maintain it to use the heat generated for
welding purpose. For maintaining of the arc two conditions must be fulfilled (1) heat
dissipation rate from the arc, region should be equal to that of heat generated to
maintain the temperature of the arc and (2) number of electrons produced should be
equal to that of electrons lost to the work piece and surroundings.
An electric arc primarily involves flow of current through the gap between the work piece
and electrode hence there must be sufficient number of charged particles namely
electrons and ions. However, some of the electrons are lost from the arc surface, to the
weld pool and surroundings and few electrons reunite with ions. Loss of these electrons
must be compensated by generation of new free electrons. In case of direct current,
88
magnitude and direction of current does not change with time hence maintaining the
flow of electrons and so the arc becomes easy while in case of alternating current (A.
C.) both magnitude and direction change with time and for a moment flow of current
becomes zero. This makes re-ignition of an electric arc with AC somewhat difficult and
therefore it needs extra precautions and provisions. There are two commonly used
methods for maintaining the arc in A.C. welding: (1) use of low ionization potential
elements in coatings flux and (b) use of low power factor power source.
89
defined as ratio of actual power drawn from the power source to perform the welding
and apparent power drawn into the welding circuit line. Welding transformer operates at
high power factor (>0.9). However, in welding usually low power factor is intentionally
used to improve the arc stability and maintenance of welding arc. In this method, current
and voltage are made out of phase by using proper low power factor (0.3) so that when
current is zero, full open circuit voltage is available between electrode and work piece
(Fig. 37). Full open circuit voltage across the electrode and work helps in release of free
electrons to maintain flow of already existing electrons which is a perquisite for
maintenance of the arc.
Fig. 37 setting proper power factor to have current and voltage out of phase
Arc Characteristic
Welding arc characteristic shows variation in the arc voltage with welding current. There
are three different regions on the arc characteristic curve namely dropping, flat and
rising characteristics zones (Fig. 38). Initially at low current when arc is thin, an increase
in welding current increases the temperature of arc zone which in turn enhances the
number of charged particles in plasma zone of the arc due to thermal ionization and
thermo-ionic emission of electrons. As a result, electrical conductivity of arc zone
increases which in turn decrease arc voltage decreases with initial increase in welding
current in this zone. Arc tends to be stable in this region. This trend continues up to
certain level of current and beyond that increase in current increases the diameter of
cylindrical arc that increases the surface area of the arc. Increase in surface area of the
90
arc in turn increases loss of heat from the arc surface. Therefore, no significant rise in
arc temperature takes place with increase of current hence arc voltage is not affected
appreciably over a range of current in flat zone of the curve. Further, increase in current
bulges the arc, which in turn increases the resistance to flow of current (due to
increased losses of charge carriers and heat from arc) so arc voltage increases with
increase in welding current in rising characteristic zone. These three zones of arc
characteristic curve are called drooping, flat and rising characteristics. Increase in arc
length in general increases arc voltage during welding. However, the extent of increase
in arc voltage with increase in arc length varies with process as shown in Fig. 39. In
general, arc voltage increases almost lineally with increase in arc length (within
reasonable limits) and the same is attributed to increase in resistance to the flow of
current due to reduction in charged particle density in arc zones with increase in arc
length.
Variation in charged particle density in arc zones associated different arc welding
processes such as SMAW, GMAW and GTAW is attributed to appreciable difference in
arc voltage vs. arc length relationship (Fig. 39). For example, GTAW process due to
tungsten electrode (having high electron emitting capability) results in higher charged
particle density in arc region than GMAW and SMAW which in turn leads to lower arc
voltage/arc length ratio for GTAW than LMAW & SMAW process.
91
Fig. 39 Variation in arc voltage as function of arc length for different arc welding processes
92
Fig. 40 Schematic diagram showing typical temperature distribution in the arc
93
Fig. 41 Distribution of heat from the welding arc in DCEN polarity
94
Determination of arc efficiency
Fig. 42 Schematic of heat generation in different zones of the arc of a) non consumable
arc and b) consumable arc welding processes.
95
8.5 Metal Transfer
Metal transfer refers to the transfer of molten metal from the tip of a consumable
electrode to the weld pool and is of great academic and practical importance for
consumable electrode welding processes as it directly affects the control over the
handling of molten metal, slag and spattering. However, metal transfer is considered to
be more of academic importance for GMA and SA welding than practical need.
Shielding gas, composition of the electrode, diameter and extension of the electrodes
are some of the arc welding related parameters, which affect the mode of metal transfer
for a given power setting namely welding current and voltage. Four common modes of
metal transfer are generally observed in case of consumable arc welding processes.
These have been described in the following sections.
96
Fig. 43 (a) Schematic of short circuiting metal transfer
Globular Transfer
Globular metal transfer takes place when welding current is low (but higher than that for
short circuit transfer) and arc gap is large enough so molten metal droplet can grow
slowly (at the tip of the electrode) with melting of the electrode tip (Fig. 43 b). Drop
continues to grow until gravitational force on drop (due to its own weight) exceeds the
surface tension force other forces if any trying to add the drop at the tip of electrode. As
soon as drop attains large size enough and so gravitational force becomes more than
other drop-holding-forces such as surface tension force, drop detaches from the
electrode tip and is transferred to the weld pool. The transfer of molten metal drop
normally occurs when it attains size larger than the electrode diameter. No short-circuit
takes place in this mode of metal transfer.
97
Fig. 43 (b) Schematic of globular metal transfer
Spray Transfer
This kind of metal transfer takes place when welding current density is higher than that
is required for globular transfer. High welding current density results in high melting rate
and greater pinch force as both melting rate and pinch force are directly related with
welding current and are found proportional to square of welding current. Therefore, at
high welding current density, droplets are formed rapidly and pinched off from the tip of
electrode quickly by high pinch force even when they are of very small in size. Another
reason for detachment of small droplets is that high welding current increases
temperature of arc zone which in turn lowers the surface tension force. Reduction in
surface tension force decreases the resistance to detachment of which in turn facilities
detachment of drops even when they are of small size enough drop from the electrode
tip. The transfer of molten metal from electrode tip appears similar to that of spray in line
of axis of the electrode (Fig. 43 c). This feature helps to direct the molten metal in
proper place where it is required especially in difficult to access areas.
98
Fig. 43 (c) Schematic of spay metal transfer
Dip Transfer
Dip type of metal transfer is observed when welding current is very low and feed rate is
high. Under these welding conditions, electrode is short-circuited with weld pool, which
leads to the melting of electrode and transfer of molten drop (Fig. 43 d). Approach wise
dip transfer is similar to that of short circuit metal transfer and many times two are used
interchangeably. However, these two differ in respect of welding conditions especially
arc gap that lead to these two types of metal transfers. Low welding current and narrow
arc gap (at normal feed rate) results in short circuit mode of metal transfer while the dip
transfer is primarily caused by abnormally high feed rate even when working with
recommended range of welding current and arc gap.
99
8.6 Melting Rate
In consumable arc welding processes, weld metal deposition rate is governed by the
rate at which electrode is melted during welding. Melting of the electrode needs the
sensible and latent heat, which is supplied by arc through the electrical reactions i.e.
heat generated at anode (I.Va), cathode (I.Vc) and plasma zone (I.Vp). In case of DCEN
polarity, heat generated in anode drop region and plasma region do not influence
melting of electrode tip appreciably as electrode (cathode) in case of straight polarity
(DCEN) gets very negligible heat from these two regions (anode and plasma). Hence, in
case of straight polarity (DCEN), melting rate of electrode primarily depends on the heat
generated by a) cathode reaction and b) electrical resistance heating. Accordingly,
melting rate of electrode for consumable arc welding processes is given by following
equation:
considers the melting rate owing to heat generated by electrical resistance heating.
Melting rate is mainly governed by the first factor when welding current is low, electrode
diameter is large and extension is small, whereas second factor significantly determines
the melting rate of electrode when welding current in high, electrode diameter is small,
extension is large and electrical resistivity of electrode metal is high.
100
Factors Limiting the Melting Rate
Difference in values of constant a and b and welding parameters lead to the variation in
melting rate of the electrode in case of different welding processes. To increase the
melting rate, welding current for a specific welding process can be increased up to a
limit. The upper limit of welding current is influenced by two factors a) extent
overheating of electrode caused by electrical resistance heating and so related thermal
degradation of the electrode and b) required mode of metal transfer for smooth
deposition of weld metal with minimum spatter. For example, in semiautomatic welding
process such MIG/SAW, minimum welding current is determined by the current level at
which short circuit metal transfer starts and upper level of current is limited by
appearance of rotational spray transfer. For a given electrode material and diameter,
upper limit of current in case of SMAW is dictated by thermal composition of the
electrode coating and that in case of GTAW is determined by thermal damage to
tungsten electrode. Lower level of current in general determined is by arc stability (the
current at which stable arc is developed) besides other minimum requirement of weld
such as penetration, proper placement of the weld metal and control over the weld pool
especially in vertical and overhead welding positions and those related with poor
accessibility. Depending upon these factors higher and lower limits of welding current
melting rate are decided.
Example
A TIG welding process uses DCEN polarity, arc voltage of 30 V and welding current of
120 A for welding of 2 mm thin plate. Assuming a) the voltage drop in anode, cathode
and plasma regions is 16 V, 10 V, 4 V respectively and b) 20 % of heat generated in
plasma zone is used for melting of base metal and c) all heat generated in anode drop
zone is used for welding. Neglecting the voltage drop on account of work function of
metal during welding, calculate the arc efficiency.
Solution
Arc efficiency: (Heat generated in anode drop zone + heat generated in plasma used
welding ) / all heat produced by welding arc
101
: Va X I + m(Vp XI)/VI ~ (Va + mVp)/V
(16 0.2 X 4)/30~ 16.8/30
Arc efficiency: 0.56~56%
102
Selection of a power source mainly depends on the welding process and welding
consumables to be used for arc welding. The open circuit voltage normally ranges
between 70-90 V in case of welding transformers while that in case of rectifiers varies
from 20-60 V. Moreover, welding arc voltage becomes lower than open circuit voltage
of the power source. Welding power sources can be classified based on different
parameters related with them as under:
Class of Insulation
103
uses tungsten electrode which has good free electron emitting capability by thermal
and field emission mechanism. Abundance of free electron in GTAW under welding
conditions lowers the OCV needed for having stable welding arc. Too high OCV may
cause electric shock. OCV is generally found to be different from arc voltage. Arc
voltage is potential difference between the electrode tip and work piece surface when
there is flow of current. Any fluctuation in arc length affects the resistance to flow of
current through plasma and hence arc voltage is also affected. Increase in arc length or
electrode extension increases the arc voltage. Further, electrical resistance heating of
electrode increases with electrode extension for given welding parameters.
104
of the curves. With a change in arc voltage, the variation in welding current is small
and, therefore, with a consumable electrode welding process, electrode melting rate
remains fairly constant even with a minor change in arc length (Fig. 44). These power
sources are required for processes that use relatively thicker consumable electrodes
which may sometimes get stuck to workpiece or with non-consumable tungsten
electrode where touching of electrode with base metal for starting of arc may lead to
damage of electrode if current is unlimited. Under these conditions, the short circuiting
current shall be limited which would provide safety to power source and the electrode.
In constant current power source, variation in welding current with arc voltage (due to
fluctuations in arc length) is very small therefore welding current remains more or less
constant despite of fluctuations in arc voltage / length. Hence, this type of power source
is also found suitable for all those welding processes where large fluctuation in arc
length is likely to take place e.g., MMA and TIG welding. Constant voltage power
source In CV power sources, a small variation in arc voltage (due to fluctuations in arc
length) causes significant change in welding current. Since arc voltage remains almost
constant during welding despite of fluctuations in arc length therefore this type of power
source is called constant voltage type. Moreover, the constant voltage power sources
do not offer true constant voltage output as current- voltage relationship curve shows
slightly downward or negative slope. This negative slope is attributed to internal
105
electrical resistance and inductance in the welding circuit that causes a minor droop in
the output volt-ampere characteristics of the power source (Fig. 44). This type of power
sources is found more suitable for all those welding processes where fluctuations in arc
length during welding is limited like in semiautomatic welding process MIG, SAW.
106
changing the current) so that feed rate becomes equal to melting rate for maintaining
the arc length. For example, increase in arc length due to any reason shifts the
operating point from 2 to 3 thus increases the arc voltage (Fig. 45). Operating point is
the point of intersection of power source characteristics with arc characteristics. Rise in
arc voltage decreases the welding current significantly. Decrease in welding current
lowers the melting rate (see melting rate equation) of the electrode thus decreases the
arc gap if electrode is fed at constant speed. Reverse phenomenon happens if arc
length decreases (shifting the operating point from 2 to 1).
Rising Characteristics
Power sources with rising characteristics show increase in arc voltage with increase of
welding current (Fig. 45a). In automatic welding processes where strictly constant
voltage is required, power sources with rising characteristics are used.
107
Fig. 45a Static characteristics of rising voltage welding power showing operating points
with different arc length
Dynamic characteristic
Welding arc is subjected to severe and rapid fluctuations in arc voltage (due to
continuous minor changes in arc length) and welding current (Fig. 46). Number from 1
to 4 in figure 5 indicates different stages of welding arc during welding, suggesting that
welding arc is never in a steady state. It causes transients in starting, extinction and re-
ignition after each half cycle in A.C. welding. To cope up with these conditions power
source should have good dynamic characteristics to obtain stable and smooth arc.
Dynamic characteristic of the power source describes the instantaneous variation in arc
voltage with change in welding current over an extremely short period of welding. A
power source with good dynamic characteristic results in an immediate change in arc
voltage and welding current corresponding to the changing welding conditions so as to
give smooth and stable arc.
108
Fig. 46 Dynamic characteristics of a power source showing a) current vs time and b)
voltage vs time relationship.
109
Example
Current rating for a welding power source is 400 A at 60% duty cycle. Determine the
welding current for automatic continuous welding i.e. 100% duty cycle.
Solution:
110
8.9 Class of Insulation
The duty cycle of a power source for a given current setting is primarily governed by the
maximum allowable temperature of various components (primary and secondary coils,
cables, connectors etc.), which in turn depends on the quality and type of insulation and
materials of coils used for manufacturing of power source. The insulation is classified as
A, E, B, F& G in increase order of their maximum allowable temperature 60, 75, 80, 100
&125 0C respectively.
111
compensated by increasing or decreasing the electrode feed rate. The electrode feed
rate is controlled by regulating the speed of feed rollers powered by electric motor (Fig.
47). Input power to the variable speed motor is regulated with help of sensor which
takes inputs from fluctuations in the arc gap. For example, an increase in arc gap
sensed by sensor increases the input power to the variable speed motor to increase the
feed rate of electrode so as to maintain arc gap.
Fig. 47 Schematics diagrams show electrode feed drives for controlling arc length a)
variable speed feed drive and b) constant speed feed drive
112
Capacitor Discharge (CD)
In these power supplies, the energy is stored in capacitor banks and delivered
through a transformer to the weld head. These units work well for applications
requiring short burst of energy such as for conductive materials and projection
welds. However, precise control of the weld pulse shape is difficult.
113
for spray mode is too high for some materials, large heat input to workpiece, wide bead,
and only downhand positional capability are some of its drawbacks.
During the mid-1960s, an alternative transfer technique of GMAW-P was invented. This
mode of metal transfer overcomes the drawbacks of globular mode while achieving the
benefits of spray transfer. This mode is characterized by pulsing of current between low-
level background current and high-level peak current in such a way that mean current is
always below the threshold level of spray transfer. The purpose of background current
is to maintain arc whereas peak currents are long enough to make sure detachment of
the molten droplet. Due to existence of number of metal transfer modes, the knowledge
of the transition current zone between the globular and spray mode has great
importance in the GMAW process, because it determines the working conditions of the
process. This region of operation for pulse is very narrow and is dependent upon
number of changing welding conditions during welding operation. Hence good process
stability and quality of weld fillet can only be obtained by controlling the mode of metal
transfer. With the advent of electronics, significant progress has been made in the
development of high-performance arc welding equipment.
114
Secondary transistor-controlled series regulators
The secondary transistor-controlled series regulators operate in two modes through
secondary transistor: periodic on and off at a switching frequency or by adjusting the
ratio of the make-time to the break-time (pulse width modulation). Higher output is
attained by large switching frequency or by higher ratio of make-time to the break-time.
Benefits from machines of this design is reduced power dissipation, air cooled
comparatively smaller size, smooth output and are well suited for the pulsed GMAW
due to improved response rate and better control. Popular variations like chopper
control power sources are available, yet they are still inefficient, available in restricted
ranges of control and operation, bulky and expensive to manufacture.
115
9.2 Advancement in pulse waveform
Pulse waveforms
Waveforms are response of welding power source to actions of electric arc. The area
under the waveform determines the amount of energy transmitted by a single droplet to
the workpiece. Waveform allows heat transfer to workpiece in a more effective manner
and has the ability to manipulate travel speeds, heat input, fumes, spatter and
appearance of weld.
In order to improve control of metal transfer, waveforms can now be tailor made to suit
different welding conditions as the power sources respond to changes demanded by the
software instantaneously. New way of achieving better penetration is through use of two
distinct series of welding pulses and pulsing wire-feed rate. Two of the pulse waveforms
employing this technique have been shown in Fig. 48.
In Alu-Plus, combinations of hot and cold series of pulses at a fixed frequency are
employed. Set of cold pulses maintains the arc length, preheats both the electrode wire
and the material surface, stabilises weld pool and produces a weld ripple each time it is
fired. Set of hot pulses improves control over weld pool and penetration. Pulsing of wire-
feed rate produces acceleration and deceleration phases resulting in ripples on weld
bead. During acceleration phase, arc energy grows and achieves better weld
penetration. In deceleration phase, arc energy reduces and stabilizes weld pool.
116
Fig. 48 Different pulse waveforms for GMAW-P: (a) Alu-Plus and (b) Double Pulse
117
the pulse parameters. Synergic control is defined as – ‘any system (open or closed
loop) by which a significant pulse parameter (or the corresponding wire-feed speed) is
amended such that an equilibrium condition is maintained over a range of wirefeed
speeds (or average current levels)’. Synergic has been practically implemented into
modern welding machine in two forms: one-knob control and microcomputer control.
One-knob control
One-knob control achieves manipulation of all pulse variables by using a single control
or knob. This type of control eases the jobs of welder, allowing him to manipulate all
welding parameters over wide range of wire-feed rate and current. This system uses
tacho generator reading as input to hardwired electrical unit, which generates
appropriate square waveform based on input. Logic of one-knob control is implemented
in two ways.
118
Synergic control
This mode can also be regarded as wire-feed speed control of mean current [12]. Power
supply and wire-feeder are directly linked in such a way that means current is
determined by wire-feed rate to ensure stable arc. The pulse waveform (see Fig. 48a)
produced by this type of control has constant peak duration and excess current.
Variable pulse parameters are peak current, base current and base current duration.
This control can only be operated in the fixed ranges of mean current as large mean
current might produce multiple droplets detachments per pulse.
Self-regulating control
This mode can also be regarded as voltage control of mean current or error voltage
system. The welding voltage varies according to the arc length in GMAW. This system
always tries to restore arc length to set reference voltage by automatically modifying the
burn off rate.
One-knob control
One-knob control achieves manipulation of all pulse variables by using a single control
or knob. This type of control eases the jobs of welder, allowing him to manipulate all
welding parameters over wide range of wire-feed rate and current. This system uses
tacho generator reading as input to hardwired electrical unit, which generates
appropriate square waveform based on input. Logic of one-knob control is implemented
in two ways.
Synergic control
This mode can also be regarded as wire-feed speed control of mean current. Power
supply and wire-feeder are directly linked in such a way that means current is
determined by wire-feed rate to ensure stable arc. The circuit arrangement for this
system is shown in Fig. 50.
119
Fig. 50 Synergic control
The pulse waveform (see Fig. 48a) produced by this type of control has constant peak
duration and excess current. Variable pulse parameters are peak current, base current
and base current duration. This control can only be operated in the fixed ranges of
mean current as large mean current might produce multiple droplets detachments per
pulse.
Self-regulating control
This mode can also be regarded as voltage control of mean current or error voltage
system. The welding voltage varies according to the arc length in GMAW. This system
always tries to restore arc length to set reference voltage by automatically modifying the
burn off rate. The circuit arrangement for this system is shown in Fig. 51.
120
Fig. 51 Self-regulating control
The pulse waveform produced by this type of control has constant peak duration, peak
current and base current. Only variable pulse parameter is base current duration. This
control logic is poorly defined as base current influences droplet size and requires
constant adjustment to electrical stick out (or arc length).
One-knob control also suffers from need for calibration at the start that requires
considerable operator skills, cannot incorporate other system variables such as
shielding flow gas rate control, seam tracking, etc., and simpler design gives poor
flexibility as it restricts search.
Microcomputer control
Latest generation of advanced electronic power sources are controlled by
microprocessor or microcontroller. They have replaced traditional hard-wired systems
for controlling, sequencing and timing of operations to achieve optimum output. The
microprocessors increase flexibility by quick retrieval of predetermined process
parameters and storing algorithms, which can compute relationship between various
pulsing parameters. Synergic relationships between pulse parameters can be stored in
some form of memory system, e.g., EPROM, EEPROM (electrical erasable
programmable read only memory) or FLASH ROM, etc. Microcomputer control for
synergic systems first takes wire material and diameter as input to compute molten
121
metal droplet volume. Based on droplet volume, pulsing parameters, wire-feed rate and
arc length are automatically selected from memory. The possible disturbances in the
system can be extinguishment of arc and change in wire-feed rate or arc length. Former
is overcome by initiating the arc again by supplying a high level DC current. Latter is
automatically corrected by resetting freshly calculated values of pulsing parameters
from synergic relationships defined in the memory. Various types of controls developed
with help of digital technology by using microprocessor are as follows.
122
weld pool from the atmospheric gases such as developing envelop of inactive (GMAW,
SMAW) or inert gases (TIGW, MIGW) around arc and weld pool, welding in vacuum
(EBW), covering the pool with molten flux and slag (SAW, ESW). The effectiveness of
each method for weld pool protection is different. That is why adverse effect of
atmospheric gases in weld produced by different arc welding processes is different (Fig.
52).
Fig. 52 Schematic diagram showing nitrogen and oxygen content in different welding
processes
Amongst the most commonly used arc welding processes, the cleanest weld (having
minimum nitrogen and oxygen) is produced by gas tungsten arc welding (GTAW)
process due to two important factors associated with GTAW: a) short arc length and b)
very stable arc produced by using non-consumable tungsten electrode. A combination
of short and stable arc with none-consumable tungsten electrode results a firm shielding
of arc and protection of the weld pool by inert gases restricts the entry of atmospheric
gases in the arc zone. Gas metal arc welding (GMAW) also offers clean weld but not as
clean as produced by GTAW because in case of GMAW arc length is somewhat greater
and arc stability is poorer than GTAW. Submerged arc weld (SAW) joints are usually
high in oxygen and less in nitrogen because SAW uses flux containing mostly metallic
oxides. These oxides decompose and release oxygen in arc zone. The self-shielded
fluxed cored metal arc welding processes use electrodes having fluxes in core act as
de-oxidizer and slag formers to protect the weld pool. However, weld produced by the
123
self-shielded fluxed arc welding processes are not as clean as those produced with
GMAW.
Oxides and nitrides formed by these gases if not removed from the weld, act as site of
weak zone in form of inclusions which in turn lower the mechanical performance of the
weld joint e.g. iron reacts with nitrogen to form hard and brittle needle shape iron nitride
(Fe4N) as shown in Fig. 52. These needle shape micro-constituents offer high stress
concentration at the tip of particle matrix interface which under external tensile stresses
facilitate the easy nucleation and propagation of crack, therefore fracture occurs at
limited elongation (ductility). Similar logic can be given for reduction in mechanical
performance of weld joints having high oxygen/oxide content. However, the presence of
124
N2 in weld metal is known to increase the tensile strength due to the formation of
hardness and brittle iron nitride needles.
Additionally, these inclusions formed by oxygen, nitrogen and hydrogen break the
discontinuity of metal matrix which in turn decreases the effective load resisting cross
section area. Reduction in load resisting cross sectional area lowers the load carrying
capacity of the welds. Nitrogen is also a austenite stabilizer which in case of austenitic
stainless steel (ASS) welding can place crucial role. Chemical composition of ASS is
designed to have about 5-8% ferrite in austenite matrix to control solidification cracking
of weld. Presence of nitrogen in weld metal either from atmosphere or with shielding
gas (Ar) stabilizes the austenite (so increases the austenite content) and reduces ferrite
content in weld which in turn increases the solidification cracking tendency because
ferrite in these steels acts as sink for impurities like P and S which otherwise increase
cracking tendency of weld.
125
and coating and then transfer of the= elements from the electrode across the arc zone
causes the oxidation of some of the highly reactive elements which may be removed in
form of slag. Thus transfer of especially reactive elements to weld pool is reduced which
in turn affects the weld metal composition and so mechanical and other performance
characteristics of weld.
Cold cracking is caused by hydrogen especially when hard and brittle martensitic
structure is formed in the weld and HAZ of hardenable steel. Many theories have been
126
advanced to explain the cold cracking due to hydrogen. Accordingly to one of
hypothesis, hydrogen diffuses towards the vacancies, grain boundary area and other
crystallographic imperfections. At these locations, segregation of the hydrogen results in
first transformation of atomic hydrogen into gaseous molecules and then builds up the
pressure until it is high enough to cause growth of void by propagation of cracks in one
of directions having high stress concentration as shown in Fig. 54. Thereafter, process
of building up of the pressure and growth of crack is repeated until complete fracture of
the weld without any external load occurs. Existence of external or residual tensile
stresses further accelerate the crack growth rate and so lower the time required for
failure to occur by cold cracking. Presence of both of above discontinuities (cracks and
porosity) in the weld decreases mechanical performance of weld joint. Hydrogen in arc
zone can come from variety of sources namely:
Moisture (H2O) in coating of electrode or on the surface of base metal,
Hydrocarbons present on the faying surface of base metal in the form of lubricants
paints etc
Inert gas (Ar) mixed with hydrogen to increase the heat input
Hydrogen in dissolved state in metal (beyond limits) being welded such as
aluminium and steel
It has been reported that proper baking of electrodes directly reduces the cold cracking
tendency and time for failure delayed cracking. Therefore, attempt should be made to
avoid the hydrogen from above sources by taking suitable corrective action.
127
Fig. 55
Fig.56
128
Fig. 57 Influence of calcium fluoride on hydrogen concentration in weld joints
Table 4
129
In general, an increase in basicity of the flux up to 1.5 decreases the S and oxygen
concentration (from about 900 PPM to 250 PPM) in weld joints as shown in Fig. 58 (a,
b). Thereafter, oxygen content remains constant at about 200-250 PPM level despite of
using fluxes of high basicity index. Further, there is no consensus among the
researchers on the mechanism by which an increase in basicity index decreases the
oxygen content.
These oxides get decomposed at high temperature in arc environment. Stability of each
oxide is different. Oxides with decreasing stability are as follows: (i) CaO, (ii) K 2O, (iii)
Na2O and TiO2, (iv) Al2O3, (v) MgO, (vi) SiO2, (vii) MnO and FeO. On decomposition,
these oxides invariably produce oxygen and result-in oxidation of reactive elements in
weld metal.
130
consideration namely melting point, thermal expansion coefficient, thermal and electrical
conductivity, defects inherent in base metal and surface condition. All the factors
adversely affecting the weld quality and increasing the efforts (& skill required) for
producing a satisfactory weld joint will in turn be decreasing the weldability of metal.
In view of above, it can be said that weldability of metal is not an intrinsic property as it
is influenced by a) all steps related with welding procedure, b) purpose of the weld joints
and c) fabrication conditions. Welding of a metal using one process may show poor
weldability (like Al welding with SMA welding process) and good weldability when the
same metal is welded with some other welding process (Al welding with TIG/MIG).
Similarly, a steel weld joint may perform well under normal atmospheric conditions and
the same may exhibit very poor toughness and ductility at very low temperature
condition. Steps of the welding procedure namely preparation of surface and edge,
preheating, welding process, welding parameters, post weld treatment such as relieving
the residual stresses, can influence the weldability of metal appreciably. Therefore,
weldability of a metal is considered as a relative term.
Weldability of steels
To understand the weldability of steel, it important to look into the different phases,
phase mixtures and intermetallic generally found in steel besides the changes in phase
that can occur during welding due to heating and cooling cycles. All these aspects can
be understood by going through following section presenting significance of Fe-C
diagram, time-temperature-transformation diagram and continuous cooling
transformation diagram.
131
Allotropy and critical temperatures
Change in crystal structure of an element with rise in temperature is termed as allotropy.
Iron shows the allotropic behaviour at temperature 910 0C and 1390 0C. Iron changes its
crystal structure first from BCC to FCC at 910 0C and then from FCC to BCC at 1390
0C. Therefore, solubility of carbon in iron varies with temperature especially above 910
0C and 1390 0C.
Proportions of various phases of these transformations can be obtained using lever rule.
Fulcrum of the lever depends upon the alloy composition i.e. carbon content. Since
these transformations take place at constant temperatures therefore it is easy to find the
tie line. Terminal phases (and their compositions) can be obtained using the tie line and
alloy compositions.
132
Fig. 59 Fe-C diagram (source: Materials Science and Metallurgy, 4th ed., Pollack,
Prentice-Hall, 1988)
Ferrite
Ferrite is an interstitial solid solution of carbon in iron having B. C. C. structure.
Solubility of carbon in iron having B. C. C. structure at room temperature is about
0.005% while that at eutectoid temperature (7270C) is 0.025%. Ferrite is a soft, low
strength, tough and ductile (50% elongation) phase.
133
Austenite
Austenite is an interstitial solid solution of carbon in iron having F. C. C. structure. This
is not stable below eutectoid temperature (7270C) in plain Fe-C system as it transforms
into pearlite below this temperature. Solubility of carbon in iron having F. C. C. structure
at temperature 13300C is 2.0% while that at eutectoid temperature (7270C) is 0.8%.
Austenite is a comparatively harder, stronger, tougher but of lower less ductility
(%elongation) than the ferrite.
Cementite
Cementite is an inter-metallic compound of iron and carbon i.e. irons carbide (Fe3C).
Cementite contains 6.67% of carbon and has orthorhombic structure. It is the hardest
amongst all phases appearing in Fe-C diagram. Its hardness is extremely high while
strength is very poor.
Pearlite
Pearliteis a phase mixture of ferrite and cementite and is a result of eutectoid
transformation. The pearlite has alternate layers (lamellas) of cementite and ferrite.
Strength of pearlite is more than any of the individual phases of which it is made.
Mechanical properties i.e. strength, ductility, toughness and hardness of pearlite
depends on the inter-lamellar spacing. Thinner plates (layers) of alpha ferrite, Fe3C
results in better mechanical properties.
Ledeburite
Ledeburite is also a phase mixture of austenite and cementite and is formed as a result
of eutectic transformation but is observed only above the eutectoid temperature in Fe-C
diagram as below this temperature austenite of ledeburitetransforms into pearlite.
134
toughness, hence increase in percentage of pearlite increases strength, hardness and
reduces the ductility and toughness of steel as a whole. Cementite appears as an
individual phase only above eutectoid composition (steel having carbon > 0.8%). It
tends to form a network along the grain boundary of pearlite depending upon carbon
content. Complete isolation of pearlite colonies with the cementite (as a result of
continuous network of cementite) decreases tensile strength and ductility because
mechanical properties of the alloy / steel to a large extent depend upon the properties of
phase which is continuous in alloy. Increase in the carbon content above the eutectoid
compositions (0.8% C) therefore reduces the strength and ductility because in
hypereutectoid steel, network of cementite is formed along the grain boundaries of
pearlite and cementite has very low tensile strength (3.0MPa).
Phase Transformation
Steel having 0.8% carbon is known as eutectoid steel. Steels with carbon lesser than
0.8% are known as hypoeutectoid and those having more than 0.8% and less than 2%
carbon are called hypereutectoid steels. Fe-C systems having carbon more than 2% are
called cast irons. Cast iron having 4.3% carbon is known as eutectic cast iron. Cast
irons with carbon less than 4.3 % are known as hypoeutectic and those having more
than 4.3% are called hypereutectic cast iron.
12.1 Steel
Eutectoid steel
Transformation of eutectoid steel into various phases on cooling from molten state to
the room temperature can be shown by drawing a vertical line through the composition
point on E axis (called composition line). No phase transformation occurs until
temperature of liquid metal goes down from point ‘a’ to ‘b’ on the liquidus. At the point ‘b’
solidification starts and first of all austenite (with 0.3%C) is formed. Further decrease in
temperature results in formation of more and more proportion of austenite whose
composition changes along the solidus whereas composition of liquid changes along
the liquidus. It shows that carbon content in molten metal increases with the reduction in
temperature until it goes down to the point ‘c’. On completion of solidification, steel
135
attains the austenitic state thereafter no phase transformation takes place until it attains
eutectoid temperature (7230C). Reduction in temperature decreases the solubility of
carbon in austenite. Austenite is supersaturated with carbon as temperature goes below
the eutectoid temperature hence austenite rejects the excess carbon leading to the
nucleation of cementite along the grain boundary. As rejection of carbon from austenite
continues, cementite layer grows toward the center of austenite grain and a very small
zone which is depleted of carbon is formed on both the sides of the cementite plate. As
concentration of carbon in carbon depleted zone reduces to such an extent when it is
enough to dissolve in iron having B. C. C. structure at that temperature austenite
transforms into ferrite. Thickness of the cementite or ferrite plates depends on the rate
of diffusion and time available for the transformation to take place. As this
transformation occurs by nucleation and growth mechanism which is based on diffusion
of atoms. Slower the cooling rate, greater is the time available for the transformation
and phases to grow hence thicker cementite and ferrite plates are produced. This
process continues until whole austenite is transformed into pearlite.
Hypoeutectoid Steel
Transformation of 0.18%C steel during the cooling from molten state to the room
temperature is shown by vertical line through the composition point. It is observed that
no phase transformation takes place until temperature of liquid metal goes down from
point ‘d’ to ‘e’ on the liquidus. At the point ‘e’ solidification starts and first of all iron
(with 0.03%C) is formed. Further, decrease in temperature results in formation of more
and more iron whose composition changes along the solidus whereas composition of
liquid changes along the liquidus. Liquidus shows that carbon content in molten metal
increases with the reduction in temperature. At the temperature of 14950C, liquid metal
(with 0.5%C) and solid iron (0.1%C) the transforms into austenite by peritectic
reaction. On completion of solidification, steel attains the complete austenitic state
thereafter no phase transformation takes place until it attains temperature
corresponding to the point ‘g’ (i.e.8500C). At about 8500C, austenite transforms into the
ferrite. Further, transformation of austenite into ferrite continues with reduction in
temperature until eutectoid temperature is attained. During this transformation, the
136
composition of austenite changes continuously with increase in carbon content in
austenite. As eutectoid temperature is attained carbon content in austenite rises to 0.8%
i.e. eutectoid composition. At this temperature, austenite of eutectoid composition
transforms into pearlite as discussed above. Proeutectoid phase i.e. ferrite, is formed
first from austenite in hypoeutectoid steel and subsequently austenite transforms into
pearlite. Hence ferrite is found along the grain boundaries of pearlite. Continuity of
ferrite network depends upon the carbon content in hypoeutectoid steel. Reduction in
carbon content increases the continuity of ferrite network around the pearlite grains.
Increase in carbon content reduces the amount of ferrite and increases the amount of
pearlite.
Hypereutectoid steel:
Transformation of hypereutectoid steel is similar to that of hypoeutectoid steel except
that proeutectoid phase is cementite instead of ferrite. In this case no phase
transformation takes place until temperature of liquid metal goes down from point ‘h’ to
‘I’ on the liquidus. At the point ‘i’ solidification starts and first of all austenite (with
0.8%C) is formed. Further, decrease in temperature results in formation of more and
more amount of austenite whose composition changes along the solidus whereas
composition of liquid metal goes along the liquidus. It shows that carbon content in
molten metal increases with the reduction in temperature until it goes down to the point
‘j’. On completion of solidification, steel attains the austenitic state and thereafter no
phase transformation takes place until it attains temperature corresponding to the point
‘k’ (10000C). At eutectoid temperature, austenite becomes supersaturated with carbon
hence austenite rejects the excess carbon which leads to the nucleation of cementite
along the grain boundary. Further, decrease in temperature results in formation of more
and more cementite from the austenite whose composition changes along the kl. As
eutectoid temperature is attained, carbon content in austenite decreases up to the
eutectoid composition (0.8%C). At this temperature, austenite of eutectoid composition
transforms into pearlite as discussed above. Proeutectoid phase i.e. cementite is
formed first from austenite in hypereutectoid steel subsequently austenite transforms
pearlite. Hence, cementite is found along the grain boundaries of pearlite.
137
12.2 Time Temperature Transformation (TTT) Diagram
This diagram shows the transformation of meta-stable austenite phase at constant
temperature into various phases as a function of time (Fig. 60). Therefore, it is also
known as isothermal transformation diagram. Transformation of austenite into various
phases such as pearlite, bainite and martensite depends on the transformation
temperature. Time needed to start the transformation of austenite into pearlite or bainite
is called incubation period which is initially low at lower transformation temperature and
then increases as transformation temperature increases. TTT Diagram for eutectoid C-
steel has C shape due to variation in time needed to start and end the transformation of
austenite at different transformation temperature This curve has a nose at about 5500C.
Transformation of austenite into pearlite takes place on exposure at any constant
temperature above the nose. It is observed that higher the transformation temperature
more is the time required for starting and completing the transformation. Transformation
of austenite into pearlite or bainite occurs by nucleation and growth process. Hence, at
high temperature high growth rate, low nucleation rate coupled with longer
transformation time results in coarse pearlitic structure whereas at low transformation
temperatures fine pearlitic structure is produced because of low growth rate, high
nucleation rate and short transformation time. High transformation temperature lowers
the strength and hardness of steel owing to the coarse pearliticstructure.
138
Transformation of austenite at a temperature below the nose of the curve results in
bainitic structure. Bainite is a very fine intimate mixture of ferrite and cementite like
pearlite. However, pearlite is a mixture of lamellar ferrite and cementite. That is why
bainite offers much better strength, hardness and toughness than the pearlite. Degree
of fineness of bainite also increases with the reduction in transformation temperature
like pearlitic transformation. Bainite formed at high temperature is called feathery bainite
while that formed at low temperature near the Ms temperatureis called acicular bainite.
Transformation of austenite at a temperature below the Ms temperature results in hard
and brittle phase called martensite structure. Martensite is a supersaturated solid
solution of carbon in iron having body centered tetragonal (B.C.T) structure. This
austenite to martensite transformation is a thermal transformation as it takes place by
diffusionless process. Rapid quenching/cooling from austenitic temperature to a
temperature below the ‘Ms’ prevents any kind of atomic diffusion. Therefore carbon
atoms, which are easily accommodated within FCC unit cell (in austenite) at high
temperature, should be rejected at low temperature because of reduction in solid
solubility. But at such a low temperature (below ‘Ms’) diffusion is prevented and that
leads to formation of supersaturated solid solution of carbon in iron having BCC
structure. This super saturation of carbon in iron (BCC) causes the distortion of the BCC
lattice structure and makes it BCT by increasing the c/a ratio more than 1. Degree of
distortion is measured in terms of c/a ratio. This ratio depends up on the carbon content.
Increase in carbon content up to 0.8%, increases the c/a ratio. The c/a ratio can be
directly related with the increase in hardness, as there is linear relation between the two
up to 0.8% carbon content. Position of transformation lines and nose depends on steel
composition, homogeneity of austenite and grain size. For each composition of steel,
there will be just one TTT diagram. Steel other than eutectoid composition will have one
more line initiating from the nose in TTT diagram corresponding to transformation of
austenite into proeutectoid phase. In case of hypoeutectoid steel, first austenite forms
ferrite as a proeutectoid phase, subsequently it transforms into pearlite whereas the
proeutectoid phase for hypereutectoid steel is cementite. Addition or reduction in carbon
% in steel with respect to eutectoid composition shifts the nose of TTT diagram. For
hypoeutectoid steels nose of the curve is shifted towards the left (reduced incubation
139
time) whereas for hypereutectoid steels nose is shifted to right as compared to that for
eutectoid steel. Temperature corresponding to start (Ms) and end (Mf) of martensite
transformation is found a function of alloy compositions. Addition of alloying elements
lowers these temperatures.
140
Fig. 61 Continuous cooling transformation diagram
Cooling curve ‘QR’ is tangential to 25% transformation line where 25% austenite has
transformed into pearlite and 75% austenite is yet to transform. Thereafter,
transformation of austenite stops and no further transformation takes place until its
temperature goes down to Ms. As austenite crosses the Mstemperature remaining 75%
austenite begins to transform into the martensite. This transformation line is expected to
result in about 75% of martensite and approx. 25 % pearlite. Further, higher cooling rate
line ‘ZO’, which is tangential to the nose of the CCT diagram does not cause any
transformation of austenite into pearlite. Austenite remains stable until Mstemperature is
reached. Further reduction in temperature transforms the austenite into the martensite.
Moreover, complete transformation of austenite into martensite depends on the
quenching temperature. If quenching temperature is below the ‘Mf’ then only whole
austenite is expected to transform into the martensite; otherwise some un-transformed
austenite is left in steel called retained austenite. Retained austenite is comparatively
soft, therefore, its presence reduces the hardness of steel. Amount of retained austenite
depends on the quench temperature between Msand Mf. Lower the transformation
temperature (between Msand Mf), smaller is the amount of retained austenite in steel.
There is non-linear relationship between the amount of austenite transforming into
martensite and quenching temperature in range of Msand Mf. Minimum cooling rate that
ensures complete transformation of austenite into martensite and avoids the formation
141
of soft phases/phase mixtures (like pearlite) is called critical cooling rate (CCR). Critical
cooling rate depends on the position of the nose, which is governed by the alloy
composition, grain size and homogeneity of austenite. To take into account the effect of
all alloying elements on the critical cooling rate, carbon equivalent is used.
High carbon equivalent lowers the critical cooling rate hence less drastic cooling is
required for hardening. In general, presence of all alloying elements (except Co) shifts
the nose of CCT diagram towards right (conversely increase the incubation period to
begin transformation) which in turn reduces the critical cooling rate and increases
hardenability. Reduction in carbon content increases the critical cooling rate and makes
hardening of steel more difficult. Fine grained austenite starts the transformation earlier
so nose of curves is shifted to left (reduces the incubation period for transformation).
This increases the critical cooling rate. On the other hand coarse grain structure
reduces the critical cooling rate which in turn increases the hardenability. Similarly
inhomogeneous austenite (due incomplete transformation/austenitizing during heating)
also reduces the transformation time, shifting nose of CCT curve to left and so
increases the critical cooling rate.
142
The most of the carbon equivalent (CE) equations used to evaluate weldability depends
type of steel i.e. alloy steel or carbon steel.
Common CE equation for low alloy steel is as under:
From the Welding Journal, for low carbon, micro-alloyed steels, Ito-Besseyo
carbon equivalent:
Thickness of plate to be welded affects the cooling rate which in turn influences the
hardening and cracking tendency. To take into account the thickness of plate above
criteria is modified to get compensated carbon equivalent (CCE) relation.
CCE= CE + 0.00425t
Where t is the thickness of plate in mm
CCE< 0.4 No preheat required,
0.4<CCE< 0.7 200-5000C of preheat may be used
CCE> 0.7 Cannot be welded
From the weldability point of view, steels can be placed in five categories based on
chemical composition, mechanical properties, heat treatment conditions, and high
temperature properties: a) carbon steel, b) high strength low alloy steel, c) quench and
tempered steel, d) heat treatable steel and e) Cr-Mo steel. These steels need to be
143
welded in different forms such as sheets, plates, pipes, forgings etc. In case of steel
welding, it is important to consider thickness of base metal as it affects the heat input,
cooling rate and restraint conditions during welding.
144
stresses. This combination of high hardness and tensile residual stresses makes the
steel prone to the cracking.
Cold cracking
Another important effect of solid state transformation is the cold cracking. It is also
termed as delayed/hydrogen induced cracking because these two factors (delay and
hydrogen) are basically responsible for cold cracking. It can be observed that increase
in stress decreases the time required for initiation and complete fracture by cold
cracking. Origin of this problem lies in the variation of solubility of hydrogen in the steel
with the temperature. Reduction in temperature decreases solubility of hydrogen in solid
state due to change in crystal structure from F. C. C. to B. C. C. High temperature
transformation (like austenite to pearlite or bainite) allows escape of some of excess
hydrogen (beyond the solubility) by diffusion. But in case of low temperature
transformation (austenite into martensite), when rate of diffusion reduces significantly,
hydrogen cannot escape and is trapped in steel as solid solution. Dissolved hydrogen
has more damaging effect in presence of martensite and the same has been explained
below. Hydrogen dissolved in atomic state at low temperature tends to diffuse out
gradually toward the vacancies and other cavities. At these locations atomic hydrogen
converts into diatomic H2 gas and with time, continued diffusion of hydrogen towards
these discontinuities as this gas starts to build up pressure in the cavities (Fig. 62). If the
pressure exceeds the fracture stress of metal, cavities expands by cracking. Cracking of
metal increases the volume which in turn reduces the pressure. Due to continuous
diffusion of hydrogen toward the cavities after some time again as pressure exceeds the
fracture stress, and crack propagates further. This process of building up on pressure
and propagation of cracks is repeated until compete fracture takes place without
external load. Since this type cracking and fracture takes place after some time of
welding hence it is called delayed cracking. Delay for complete fracture depends on the
following factors:
Hardenability of steel
Amount of hydrogen dissolved in atomic state
Magnitude of residual tensile stress
145
Hardenability of steel affects the critical cooling rate. Steel of high hardenability
promotes the martensitic transformation therefore it has high hardness and brittleness.
High hardness increases the cracking tendency whereas soft and ductile metals reduce
it. Crack tips are blunted in case of ductile metals so they reduce the cracking sensitivity
and increases the stress level for fracture. As a result crack propagation rate is reduced
in case of ductile and low strength metal. Therefore, steels of low hardenability will
therefore minimize the cold/delayed cracking. Larger the amount of dissolved hydrogen
faster will be the delayed/hydrogen induced cracking.
Remedy
Use of low hydrogen electrodes.
Preheating of plates to be welded.
Use of austenitic electrodes.
Use of low hydrogen electrodes will reduce the hydrogen content in weld metal.
Preheating of the plate will reduce the cooing rate, which will allow longer time for gases
to escape during the liquid to solid state and solid-solid transformation. It may also
reduce the cooling rate below the critical cooling rate so that martensitic transformation
can be avoided and austenite can be transformed into softer phases and phase
mixtures like pearlite, bainite etc. These soft phases further reduce the cracking
tendency. Use of austenitic electrode also avoids the martensite formation and provides
mainly austenite matrix in weld zone. Austenite is a soft and tough phase having high
solubility (%) for hydrogen. All these characteristics of austenite reduce the cold/delayed
cracking.
146
Fig. 62 Schematic diagram showing effect of hydrogen concentration on cold cracking
at different stress levels
Corrosion resistance
High temperature resistance
Heat and scale resistance
Low-temperature impact resistance
The combination and interaction of the alloying elements form different structures in
the steel. These structures benefit certain properties of the steel.
Alloying elements fall basically into two groups.
Ferrite formers:
o These limit or inhibit the formation of austenite.
Austenite formers:
o These increase the level of austenite.
Chrome and nickel are among the most important alloying elements here. All ferrite
formers have a chromium equivalent and all austenite formers a nickel equivalent.
147
Our EWM Schaeffler program is a powerful tool to determine the right EWM welding
consumable, depending on which parent metal and expected dilution you select or
enter.
Ferrite is important in avoiding hot cracking in during cooling from welding of austenitic
stainless steels. 'Constitution diagrams' are used to predict ferrite levels from the
composition by comparing the effects of austenite and ferrite stabilising elements. The
Schaeffler and Delong diagrams are the original methods of predicting the phase
balances in austenitic stainless steel welds.
A 'nickel equivalent' is calculated for the austenite stabilising elements and a 'chromium
equivalent' ferrite stabilising elements. These are used as the axes for the diagrams,
which show the compositional equivalent areas where the phases austenite, ferrite,
martensite (and mixtures of these) should be present. Although intended to show the
phase balance of weld fillers, these diagrams can also be used to illustrate the phase
balance of the 'parent' material. There are different diagrams for different alloy systems.
Schaffler Diagram
148
Fig 63
Fig 64
Delong Diagram
This refines the Schaffler diagram by taking account of the strong austenite stabilising
tendency of nitrogen. The chromium equivalent is unaffected but the nickel equivalent is
modified to
The diagram, identifying the phase boundaries is shown below. This shows the ferrite
levels in bands, both as percentages, based on metallographic determinations and as a
ferrite number 'FN', based on magnetic determination methods.
149
Module-III
Heat flow in welding, significance, theory of heat flow, cooling rate determination,
selection of welding parameters based on heat flow analysis, residual stress and its
measurement, types and control of distortion.
Arc welding processes involve the melting of the faying surfaces and the filler metal, if
any, followed by solidification of the molten weld metal. Melting and solidification steps
of welding are associated with the flow of heat and are affected by rate of heat transfer
in and around the weld metal. Metallurgical structure of metal in weld and region close
to the weld metal is mainly determined by the extent of rise in temperature and then
cooling rate experienced by the metal at particular location of HAZ and weld. Further,
differential heating and cooling experienced of different zones of weld joint cause not
only metallurgical heterogeneity but also non-uniform volumetric change which in turn
produces the residual stresses. These residual stresses adversely affect the mechanical
performance of the weld joint besides distortion in the welded components if proper care
is not taken. Since heating, soaking and cooling cycle affect the metallurgical &
mechanical properties, development of residual stresses and distortion of the weld joints
therefore it is pertinent to study various aspects related with heat flow in welding such
as weld thermal cycle, cooling rate and solidification time, peak temperature, width of
heat affected zone. Further, mechanisms of development of residual stresses and
common methods relieving residual stresses apart from the distortion and their remedy
will be discussed on heat flow in welding.
150
Fig. 65 Schematic of weld thermal cycle of two different locations away from the weld centerline
151
– decreases the rate of heating and cooling
– increases time to attain peak temperature
– decreases rate of cooling with increase in time
Thermal properties of metal like thermal conductivity and specific heat also have effect
on weld thermal cycle similar to that of thickness of plates as they increase the rate of
heat transfer from the weld metal and HAZ. Preheating of the plates reduces the rate of
heating and cooling and increases the peak temperature and soaking period above
certain temperature because preheating reduces the rate of heat transfer away from the
weld zone. Peak temperature near the weld fusion boundary decides the width of heat
affected zone (HAZ). Heating and cooling rate affect the microstructure of weld metal
and HAZ therefore weld thermal cycle of each point becomes of great interest especially
in structure sensitive metals like high carbon steels.
152
Fig. 67 Influence of energy density of heat source related with welding process on weld
thermal cycle of HAZ.
153
Fig. 68 Effect of cooling on structure of weld joints shown in form of CCT diagram
Weld thermal cycle indicates both heating and cooling rate. Cooling rate varies as a
function of time, location of point of interest and temperature (at any moment on
commencement of the cooling) during cooling regime of weld thermal cycle. The cooling
rate calculation for HAZ of hardenable steel weld joint is mostly made at 5500C
(corresponding to nose temperature of CCT) as cooling rate at this temperature
predominantly decides the end microstructure and mechanical properties of the HAZ
and weld joint. During welding, two welding parameters dictate the cooling rate a) net
heat input during the welding and b) initial plate temperature besides the thermal and
dimensional properties of material being welded. In general, increases in heat input
decreases the cooling rate while reverse happens with increase of initial plate
temperature during welding of a given metal having specific thickness and thermal
properties. An increase in both heat input and initial plate temperature raises
temperature of base metal around the weld which in turn decreases the rate of transfer
away from the weld zone primarily due to reduction in temperature difference between
the weld zone and surrounding base metal. Reduction in heat transfer rate from the
weld metal to the base metal with increase in heat input and initial plate temperature
means decrease in cooling rate. In view of above, major practical application of cooling
154
rate equation is to determine the preheat requirement for plate to be welded so as to
avoid critical cooling rate in weld and HAZ.
Net heat input (Hnet) during welding is obtained using following relationship:
Hnet = f .VI/S
where V is arc voltage (V), I welding current (A) and S welding speed mm/sec and f is
the fraction of heat generated and transferred to the plate.
Example
Calculate the net heat input used during welding of plates if welding of steel plate is
given below:
– Welding current: 150 A
– Arc voltage: 30 V
– Welding speed: 0.5 mm/sec
– 80 % of heat generated by the arc is used for welding.
Solution
Net heat input: Hnet = f .VI/S
= 0.8 X 30 X150/0.5
= 600 J/mm
= 0.6 kJ/mm
Thereafter, hardness vs. welding speed plot is made to identify the welding speed
above which abrupt increase in hardness of the weld and HAZ takes place. This welding
155
speed is identified as critical welding speed (say 10mm/min in this case) above which
cooling rate of the weld & HAZ becomes greater than critical cooling rate. This abrupt
increase in hardness of the weld and HAZ is attributed to martensitic transformation
during welding as cooling rate becomes greater than critical cooling rate owing to the
reduction in heat input (Hnet) with increase of welding speed. Using welding conditions
corresponding to this critical welding speed for a given steel plate, critical cooling rate
can be calculate using appropriate cooling rate equation.
Corresponding Hnet= f X VI/S = 0.9 X 20 X 200 /10 = 360 J/mm or 0.36 kJ/mm.
Calculate relative plate thickness (RPT) parameter for these conditions: h [(Ti-
T0)C/Hnet]1/2 : 0.31
RPT suggests use of thin plate equation for calculating the cooling rate:
2πkρc(h/Q)(tc-to)3
Cooling Rate (R):
156
157
158
On replacing of values of different factors, in 1/(tp-to) =(4.13ρchY / Hnet) + (1/(tm-to)) the
peak temperature at distance 3 mm, 1.5 mm and 0 mm is obtained as 1184 ºC, 976ºC
and 1510 ºC respectively.
Above equation indicates that solidification time is the function of net heat input, initial
plate temperature and material properties such as latent heat of fusion (L), thermal
conductivity (k), volumetric specific heat ( C) and melting point (tm). Long solidification
time allows each phase to grow to a large extent which in turn results in coarse-grained
structure of weld metal. An increase in net heat input (with increase in welding current /
arc voltage or reduction in welding speed) increases the solidification time. An increase
in solidification time coarsens the grain structure which in turn adversely affects the
mechanical properties. Non-uniformity in solidification rates in different regions of
molten weld pool also brings variation in grain structure and so mechanical properties.
Generally, centerline of the weld joint shows finer grain structure (Fig. 71) and better
mechanical properties than those at fusion boundary primarily because of difference in
solidification times. Micrographs indicate the coarser structure near the fusion boundary
than the weld center.
159
Fig. 71 Variation in microstructure of weld of Al-Si alloys of a) fusion boundary andb)
weld centre owing to difference in cooling rate (200X)
Example
A single pass full penetration weld pass is made using net heat input at the rate of500 J
/mm on steel having ρc=.0044 J/mm3 ºC, t=5mm, to=25ºC, tm=1540ºC, and thermal
conductivity k= 0.025 J/mm.s. ºC and latent heat of fusion 2.4 J/mm3.
Determine the solidification time.
Solution
Solidification time: LQ/2πkρc(tm-to)2in sec
Solidification time: 2.4 X 500/(2π X 0.025 X 0.0044 (1540-25)2 in sec
Solidification time : 1200/1585.54
Solidification time : 0.75 sec
160
heating and cooling like in welding and heat treatment or localized stresses like in
contour rolling, machining and shot peening etc.
161
Mechanisms of residual stress development
The residual stresses in the weld joints develop mainly due to typical nature of welding
process i.e. localized heating and cooling leading to differential volumetric expansion
and contraction of metal around the weld zone. The differential volumetric change
occurs both at macroscopic and microscopic level. Macroscopic volumetric changes
occurring during welding contribute to major part of residual stress development and are
caused by a) varying expansion and contraction and b) different cooling rate
experienced by top and bottom surfaces of weld & HAZ.
Microscopic volumetric changes mainly occur due to metallurgical transformation
(austenite to martensitic transformation) during cooling. Further, it is important to note
that whenever residual stresses develop beyond the yield point limit, the plastic
deformation sets in the component. If the residual stress magnitude is below the elastic
limit then a stress system having both tensile and compressive stresses for equilibrium
is developed.
162
Reduction in temperature causes the shrinkage of hot metal in base metal and HAZ.
Initially at high temperature contraction occurs without much resistance due to low yield
strength of metal but subsequently shrinkage of metal is resisted as metal gains
strength owing to reduction in temperature during cooling regime of weld thermal cycle
(Fig. 73). Therefore, further contraction in shrinking base and weld metal is not allowed
with reduction in temperature. This behavior of contraction leaves the metal in strained
condition which means that metal which should have contracted, is not allowed to do so
and this leads to development of the tensile residual stresses (if the contraction is
prevented). The magnitude of residual stresses can be calculated from the product of
locked-in strain and modulus of elasticity of metal being welded.
The residual stress along the weld is generally tensile in nature while balancing
compressive residual stress is developed adjacent to the weld in heat affected zoneon
cooling to the room temperature as evident from the Fig. 72 (b).
163
Fig. 72 Schematic diagram showing a) plate being welded, b) stress variation across
the weld centerline at different locations and c) temperature of different locations
164
Differential cooling rate in different zone
During welding, higher cooling rate is experienced by the top and bottom surfaces of
weld joint than the core/middle portion of weld and HAZ (Fig. 74). This causes
differential expansion and contraction through the thickness (direction) of the plate
being welded. Contraction of metal near the surface starts even when material in core
portion is still hot. This leads to the development of compressive residual stresses at the
surface and tensile residual stress in the core.
Fig. 74 Schematic showing different cooling rates at surface and core regions ofthe
weld
Metallurgical Transformation
During welding, heat affected zone of steel and weld zone invariably experience
transformation of austenite into other phases phase mixture like pearlite, bainite or
martensite. All these transformations occur with increase in specific volume at
microscopic level. The transformations (from austenite to pearlite and bainite) occurring
at high temperature are easily accommodated with this increase in specific volume
owing to low yield strength and high ductility of these phases and phase mixtures at
high temperature (above 550 0C) therefore such metallurgical transformations don’t
contribute much towards the development of residual stresses.
Transformation of austenite into martensite takes place at very low temperature with
significant increase in specific volume. Hence, this transformation contributes
significantly towards development of residual stresses. Depending upon the location of
the austenite to martensitic transformation, residual stresses may be tensile or
compressive. For example, shallow hardening causes such transformation from
165
austenite to martensite near the surface layers only and develops compressive residual
stresses at the surface and balancing tensile stress in core while through section
hardening develops reverse trend of residual stresses i.e. tensile residual stresses at
the surface and compressive stress in the core.
Presence of residual stresses in the weld joints can encourage or discourage failures
due to external loading as their effect is additive in nature. Conversely, compressive
residual stresses decrease failure tendency under external tensile stresses primarily
due to reduction in net tensile stresses acting on the component (net stress on the
component: external stresses + residual stresses). Residual stress of the same type as
that of external one increases the failure tendency while opposite type of stresses
(residual stress and externally applied stress) decrease the same.
Since more than 90% failure of mechanical component occurs under tensile stresses by
crack nucleation and their propagation under tensile loading conditions therefore
presence of tensile residual stresses in combination with external tensile loading
adversely affect the performance in respect of tensile load carrying capacity while
compressive residual stresses under similar loading conditions reduce the net stresses
and so discourage the failure tendency.
Hence, compressive residual stresses are intentionally induced to enhance tensile and
fatigue performance of mechanical components whereas efforts are made to reduce
166
tensile residual stresses using various approaches such as post weld heat treatment,
shot peening, spot heating etc.
In addition to the cracking of the weld joint under normal ambient conditions, failure of
weld joints exposed in corrosion environment is also accelerated in presence of tensile
residual stresses by a phenomenon called stress corrosion cracking.
Presence of tensile residual stresses in weld joints causes cracking problems which in
turn adversely affect their load carrying capacity. The system residual stress is usually
destabilized during machining and may lead to distortion of the weld joints. Therefore,
residual stresses must be relieved from the weld joint before undertaking any machining
operation.
167
168
15.6 Weld Distortion
Weld distortions due to solidification shrinkage and thermal contraction of the weld
metal during welding.
Angular distortion
Upward angular distortion usually occurs when the weld is made from the top of the
workpiece alone. The weld tends to be wider at the top than the bottom, causing more
solidification shrinkage and thermal contraction.
169
Fig 78: Angular Distortions in fillet joint
Balancing the angular weld distortion on either side of the double V joint
170
Fig 80: Angular Distortions prevention for different grooves
• Double V-joints balance the shrinkage _ almost same amount of contraction on each
side (a).
• Asymetrical double V: The first weld always produces more angular distortion _ the
second side is larger too pull back the distortion when the first weld is made (b).
• A single U joint gives a uniform weld with through the section (c).
171
Fig: 81a Methods for controlling weld distortion
Longitudinal distortion
• Heating and cooling cycles along the joint during welding build up a cumulative effect
of longitudinal bowing.
Remedies
• Welding short lengths on a planned or random distribution are used to controlled this
problem.
• Mechanical methods: straightening press, jacks, clamps
• Thermal methods: local heating to relieve stresses (using torches) but cannot be used
for highly conductive metal such as Al and Cu.
172
Sequences for welding short lengths of a joint to reduce longitudinal bowing
• Angular distortion and longitudinal bowing can also be observed in joints made with
fillet welds such as fillet-welded T joint
Remedies
• Back-step technique is also used. Each small increment will have its own shrinkage
pattern which then becomes insignificant to the whole pattern of weldment. (But time
consuming)
• Using the smallest possible weld size.
173
Module-IV
Analysis of fatigue of welded joint, fracture and toughness testing and its application on
welded joint, automated welded joint, microprocessor based of control resistance and
arc welding, quality assurance in welding, effects of welding fumes on environment.
174
Notch stress and notch intensity approach, using the elastic notch stress range or an
equivalent parameter such as the stress intensity to take the notch effect of the weld toe
or root into account.
* Notch strain approach, using the local elastic–plastic strain range and/or other
parameters describing the relevant damage process in the material.
* Crack propagation approach, using special parameters such as the J-integral or the
range of the stress intensity to describe the increase of the crack length per cycle, i.e.
the crack propagation rate.
Selection of optimal method and parameters of each of above steps and their execution
meticulously in different stages of production of a weld joint determine the quality of the
weld joint. Inspection is mainly carried out to assess ground realties in respect of
progress of the work or how meticulously things are being implemented. Testing helps
to: a) assess the suitability of the weld joint for a particular application and b) to take
decision on whether to go ahead (with further processing or accept/reject the same) at
any stage of welding and c) quantify the performance parameters related with
soundness and performance of weld joints.
175
Testing methods of the weld joint are broadly classified as destructive testing and non-
destructive testing. Destructive testing methods damage the test piece to more or less
extent. The extent of damage on (destructive) tested specimens sometime can be up to
complete fracture (like in tensile or fatigue testing) thus making it un-useable for the
intended purpose while in case of non-destructive tested specimen the extent of
damage on tested specimen is either none or negligible which does not adversely affect
their usability for the intended purpose in anyways.
Weld joints are generally subjected to destructive tests such as hardness, toughness,
bend and tensile test for developing the welding procedure specification and assessing
the suitability of weld joint for a particular application.
Visual inspection reflects the quality of external features of a weld joint such as weld
bead profile indicating weld width and reinforcement, bead angle and external defects
such as craters, cracks, distortion etc. only.
176
Fig. 82 Schematic of tensile specimens from a) transverse section of weld joints and b)
all weld specimen
Tensile test results must be supported by respective engineering stress and strain
diagram indicating modulus of elasticity, elongation at fracture, yield and ultimate
strength (Fig. 83). Tests results must include information on following point about test
conditions
Type of sample (transverse weld, all weld specimen)
Strain rate (mm/min)
Temperature or any other environment in which test was conducted if any
Topography, morphology, texture of the fracture surface indicating the mode of
fracture and respective stress state
Fig. 83 Typical stress stain diagram for AA 7039 in as received (BM) and friction
stir prcoessed (PM) condition
177
Bend test
Bend test is one of the most important and commonly used destructive tests to
determine the ductility and soundness (for the presence porosity, inclusion, penetration
and other macro-size internal weld discontinuities) of the weld joint produced using
under one set of welding conditions. Bending of the weld joint can be done from face or
root side depending upon the purpose i.e. whether face or root side of the weld is to be
assessed. The root side bending shows the lack of penetration and fusion if any at the
root. Further, bending can be performed using simple compressive/bending load and
die of standard size for free and guided bending respectively (Fig. 84, 85). Moreover,
free bending can be face or root bending while guided bending is performed by placing
the weld joint over the die as needs for bending is better and controlled condition as
shown in Fig. 84.
Fig. 85 Schematics of guided bend tests a) face bend and b) root bend
178
For bend test, the load increased until cracks start to appear on face or root ofthe weld
for face and root bend test respectively and angle of bend at this stageis used as a
measured of ductility of weld joints. Higher is bend angle (needed forcrack initiation)
greater is ductility of the weld. Fracture surface of the joint fromthe face/root side due to
bending reveals the presence of internal welddiscontinuities if any.
Hardness test
Hardness is defined as resistance to indentation and is commonly used as a measure
of resistance to abrasion or scratching. For the formation of a scratch or causing
abrasion, a relative movement is required between two bodies and out of two one body
must penetrate/indent into other body. Indentation is the penetration of a pointed object
(harder) into other object (softer) under the external load. Resistance to the penetration
of pointed object (indenter) into the softer one depends on the hardness of the sample
on which load is applied through the indenter.
All methods of hardness testing are based on the principle of applying the standard
load through the indenter (a pointed object) and measuring the penetration in terms of
diameter/diagonal/depth of indentation (Fig. 86). High penetration of an indenter at a
given standard load suggests low hardness. Various methods of hardness testing can
be compared on the basis of following three criteria 1) type of indenter, 2) magnitude of
load and 3) measurement of indentation.
179
Fig. 86 Schematic diagram showing indentation using different indenters corresponding
to different hardness test methods
Penetration due to applied normal load is affected by unevenness on the surface and
presence of hard surface films such as oxides, lubricants, dust and dirt etc. if any.
Therefore, surface should be cleaned and polished before hardness test. In case of
Brinell hardness test, full load is applied directly for causing indentation for measuring
hardness while in case of Rockwell hardness test, minor load (10 kN) is applied first
before applying major load. Minor load is applied to ensure the firm metallic contact
between the indenter and sample surface by breaking surface films and impurities if any
present on the surface. Minor load does not cause indentation. Indentation is caused by
major load only. Therefore, cleaning and polishing of the surface films becomes
mandatory for accuracy in hardness test results in case of Brinell test method as major
load is applied directly. Steel ball of different diameters (D) is used as an indenter in
Brinell hardness test. Diameter of indentation (d) is measured to calculate the projected
area and determine the hardness. Brinell hardness test results are expressed in terms
of pressure generated due to load (P). It is calculated by the ratio of load applied and
projected contact area. Load in the range of 500 to 3000 kg can be applied depending
upon the type of material to be tested. Higher load is applied for hardness testing of
hard materials as compared to soft materials.
180
In case of Rockwell hardness test first minor load of 10 kg is applied and then major
load of 50-150kg is applied on the surface of the work-piece through the indenter and
the same is decided by scale (A, B, C and D) to be used as per type of material to be
tested. Minor load is not changed. Out of mainly scales, B and C scales are commonly
used. Different indenter and major load are required for each scale. Steel ball and
diamond cone are two types of indenters used in Rockwell testing. B scale uses
hardened steel ball and major load of 90kg whereas C scale uses diamond cone and
major load of 140kg accordingly hardness is written in terms of HRB and HRC
respectively.
Vickers hardness test uses square pyramid shape indenter of diamond and load ranging
from 1 to 120 kg. Average length (L) of two diagonals of square indentation is used as a
measure of hardness. Longer is average diagonal length lower is hardness. Vickers
hardness number (VHN) or diamond pyramid hardness (DPH) is the ratio of load (P)
and apparent area of indentation given bythe relation:
W=2B, a=B, W-a=B and radius of hole r = 0.25B where B is plate thickness
Fig. 93 Schematic of fracture toughness specimens using a) compact tension and b)
three point bending approaches
Although different standards have historically been published for determining K, CTOD
and J-integral, the tests are very similar, and generally all three values can be
established from one type of test. In general, stress intensity factor (K) decreases with
increase in specimen thickness. This trend continues up to a limit of thickness thereafter
187
K becomesindependent of the plate thickness. The corresponding value of K is called
criticalstress intensity factor (Kc) and occurs in plane strain condition. KIC is used forthe
estimation of the critical stress need to apply to a specimen with a givencrack length for
catastrophic fracture to take place.
σC ≤KIC /(Y(π a)½)
Where KIC is the stress-intensity factor, measured in MPa*m½, σCis the critical stress
applied to the specimen, a is the crack length for edge crack or half crack length for
internal crack and Y is a geometry factor.
188
189
17. Microprocessor-Based Electrode Movement Controller
In normal practice, the welding current, pressure applied to the workpiece, and weld
time are all preset for a particular application depending upon the material properties of
the workpiece to be welded, and upon the electrode tip geometry. Satisfactory machine
settings will guarantee a good weld quality of the workpiece. However, even when the
machine variables are held constant, there is considerable variation in the weld quality
190
from part to part. This is due to variation in the welding current which is caused by
changes in the surface condition of the workpiece, changes in the electrode tip
diameter fit-up, and changes in the impedance of the welding circuit. The shunting
effect which may be a consequence of the presence of other spot welds is another
source of quality variation. This necessitates the development of in-process control
techniques that can produce a uniform weld quality regardless of the welding
environment changes. Many variables associated with the welding process have been
examined for the quality monitoring. More frequently referred variables seem to be the
dynamic resistance and the electrode movement. Several attempts have been made to
correct weld quality utilizing these variables. One such method is to utilize the dynamic
resistance as a quality control variable but essentially an ON-OFF feedback system.
Recently a resistance tracking method has been attempted to explore the possibility of
using the instantaneous resistance value as an on-line feedback signal. The
performance of this tracking control showed that more uniform weld strength can be
obtained with this controller. But the control performance appeared to be very sensitive
to the choice of controller gain parameters due to the complex shape of the resistance
curve. Besides these methods, welding voltage and welding current have been used as
a control variable, but these techniques are essentially regulating the control variables
to the specified input values and do not use the process state variables for on-line
feedback control.
In this approach a new digital control technique is developed to obtain uniform weld
quality regardless of the changing welding environments. The control system utilizes a
proportional (P) control algorithm, incorporating with the electrode movement as an
output feedback variable. In this controller the welding current is generated so as to
track a desired trace of the electrode movement (reference electrode movement curve)
throughout welding time. The electrode movement trace was measured by a non
contacting displacement sensor and sampled via an A/D converter to compute the
command control current. A series of experiments was performed to evaluate the
performance of this tracking controller. The results show that, as a result of the
191
electrode movement tracking, the weld strengths of all the weldments approach to a
desired strength level.
18. Quality
The word quality comes from Latin and means state or nature. Quality is a word that
describes the characteristics of a product or service. The meaning of the word quality
differs depending on who you ask and which product or service that is being referred to.
The right quality is when the demands put on a product or service is fulfilled.
Substandard quality is only when the demands put on a product or service are not
fulfilled. Above standard quality is when a product or service fulfills more than what is
demanded.
As an example, the demands put on a car used for short trips between your home and
your place of work is, for most people, that is reliable and cheap to run. A Rolls Royce
fulfils the demand on reliability by a long way and is also very comfortable. In this
particular case, the quality of a Rolls Royce is above standard. However, it does not
fulfil the requirement of being cheap in mileage costs as the initial purchase price, fuel
consumption and insurance together will give a high mileage cost. On the other hand a
car that is 15 - 20 years old and has gone more than 200.000 km can be very charming
but could not be called reliable and will therefore represent substandard quality. A car
buyer's choice, that is to say the one with the right quality in this case, would probably
be a small car, perhaps just a few years old but reliable and inexpensive in fuel
consumption.
A standardized definition of quality is: "All the combined characteristics and properties of
a given product that gives it the ability to satisfy expressed or implied needs"
Another definition could be: "The quality has two dimensions: "must-be quality"
"Conformance to specifications" or "fitness for use" (defined by the customer) or and
"attractive quality". The latter is what the customer would love, but has not yet thought
about. "
192
Quality policy
A quality policy describes the company's aims and intentions with regard to quality. The
executive management of a company establishes and signs the company's quality
policy. This is a requirement specified in the ISO 9000 quality system. A company's
quality policy is often briefly described using one or more phrases.
Quality control
A system for verifying and maintaining a desired level of quality in a product or process
by careful planning, use of proper equipment, continued inspection, and corrective
action as required.
The operations of a company are controlled to give products the right level of quality.
This means that the daily activities follow the company's quality system, applying the
directions contained in the quality manual and the instructions that are to be available at
each workplace.
Quality assurance
A standard definition is that quality assurance is " all planned and systematic activities
to give sufficient confidence that a product will fulfil given demands on quality"
Quality Assurance covers all activities from design, development, production,
installation, servicing and documentation, this introduced the rules: "fit for purpose" and
"do it right the first time". It includes the regulation of the quality of raw materials,
assemblies, products and components; services related to production; and
management, production, and inspection processes.
193
inspection. In-Process Quality Assurance is complimentary to these other technologies
and provides valuable process information not available through other means.
Applications to real-time closed loop control are also possible. In this modality of
operation, In-Process Quality Assurance is used to preclude the occurrence of defects
altogether.
Quality system
A company's quality system gives guidelines to how the business should be organized,
managed and controlled as well as how responsibility is to be distributed. The objective
of a company's business is to provide products or services with the right level of quality.
A quality system describes the procedures, methods and processes that are to be
applied.
Quality manual
All the documents describing the quality system in a company must be entered into a
quality manual. The contents and appearance of the quality manual usually varies from
company to company. The quality manual describes everything from the company's
quality policy to the procedures and processes used to attain the quality objectives.
Certification
In order to prove they have a working quality system, a company can apply to be
certified. A certification involves an inspection to ensure that the requirements applying
to the quality concerned are fulfilled. Such an inspection is called quality audit.
Certifications may be perpetual, may need to be renewed periodically, or may be valid
for a specific period of time (e.g. the life-time of the product upon which the individual is
certified). Certifications are offered through a certification body. This is usually a
business organization. Sometimes, the organization's business is directly related to the
certification, In other cases, an organization (often a not-for-profit organization) exists
wholly, or in large part, to offer a particular certification. Whatever its nature, the
certifying body determines the policies of the certification program. Potential consumers
of a certification wish to understand the nature of the certifying body and the certification
process.
194
Personnel
The ability to follow verbal or written instructions and testing of the skill are important
factors in ensuring the quality of a welded product. Testing of the skill will be done
according the relevant standard or guideline. Such a test will then lead to a certificate or
a diploma. Although it is common in regards to certificates and diplomas, sometimes as
part or whole of the renewal of an individual's certification, the individual must show
evidence of continual learning — often termed continuing education or life-long-learning.
Accredited certification
Certification carried out according an accredited certification body. An accredited
certification body has received an accreditation from the National accreditation body.
Inspection
To ensure that a product has the right level of quality, some form of inspection is often
required. This can involve such things as measuring the dimensions of a welded part,
destructive or none-destructive testing and so forth.
A standard definition of Inspection is: " Measurement, investigation, testing or other
classification of one or more characteristics or properties of a product and the
comparison of the results with the set requirements to determine whether they are
fulfilled."
Welding coordination
ISO 14731 "Welding Coordination - Tasks and Responsibilities" is the standard that
covers supervision of welding processes and thereby the role and competence of the
welding coordinator.
Welding is a special process which requires the coordination of welding operation in
order to establish confidence in welding fabrication and reliable performance in service.
The tasks and responsibilities of personnel involved in welding and related activities,
e.g. planning, executing, supervising and inspection should be clearly defined.
For all tasks assigned, welding coordination personnel shall be able to demonstrate
adequate technical knowledge to enable such tasks to be performed satisfactorily. The
following factors should be considered:
195
-general technical knowledge
-special technical knowledge relevant to the assigned tasks. This may be attained by a
combination of theoretical knowledge, training and/or experience.
The extent of required manufacturing experience, education and technical knowledge
should be decided by the manufacturing organization and will depend on the assigned
tasks and responsibilities.
Authorized welding coordination personnel should normally be allocated from one of the
following groups. This will depend on the nature and/or complexity of the production.
Adequate manufacturing experience need not necessarily be longer than three years.
ISO 3834
For welded constructions to be effective and free from serious problems in production
and in service, it is necessary to provide controls, from the design phase, through
material selection, into fabrication and subsequent inspection.
For example, poor design for welding may create serious and costly difficulties in the
workshop, on site, or in service. Incorrect material selection may result in welding
problems, such as cracking. Welding procedures have to be correctly formulated and
approved to avoid imperfections. Supervision needs to be implemented to ensure that
the specified quality will be achieved.
For the manufacturing industries a set standards, ISO 3834, with appropriate guidelines
have been developed. These guidelines are intended to be used for the following
purposes:
a)providing interpretation of the requirements in the EN ISO 9000 series of standards,
as a guideline for specification and establishment of the part of the quality system
related to control of welding as a "Special Process".
b) providing guidelines to establish specifications and welding quality requirements
where a quality system according to EN ISO 9001 and EN ISO 9003 is not involved
c)assessment of the welding quality requirements mentioned in a) and b) above.
The applicable party of ISO 3834 (2, 3 or 4) for stand alone assessment and
certification of welded operations and activities will depend on the nature of the welding
activities required to meet the agreed specifications and influenced by how critical the
welding operations are to the quality and fitness of the final product.
196
Common to all three levels of ISO 3834;
•All welders must take a welding test in compliance with EN 287 or EN ISO 9606 series
of standards.
•All welding operators must take a welding test in compliance with EN 1418.
•Welding Inspectors for NDT must be qualified in compliance with EN 473
•Demands on description (not ISO 3834-4) and maintenance of equipment such as
welding power sources and heating chambers
•A WPS ( Welding Procedure Specification) or a WI (Welding Instruction) is used to
control the welding process( Not ISO 3834-4)
•Filler material must be handled in accordance to the manufacturer's instruction.
As can be seen above, even quality control of welding process in compliance with the
simplest and least comprehensive standard, ISO 3834-4, demands the application of
the most important parts of the new European standards.
197
Gases, vapours and fumes enter the body through the air we breathe. Different gases
and fumes affect us in various ways. A healthy body can rid itself of some gases and
fumes without lasting effects. Gases such as carbon dioxide and argon, for example,
are relatively non-toxic unless inhaled in large quantities. However, gases such as
carbon monoxide, nitrogen oxides and ozone are extremely toxic.
The health effects of inhaling fumes depend on the type of fume inhaled. Iron oxides,
which are produced during most manual welding processes, are relatively non-toxic.
The effects, as currently known, are not permanent unless tobacco smoke or other
substances, such as silica and asbestos, have already affected your lungs. Effects such
as breathing problems tend to disappear over time — once exposure is reduced or
stopped. Fumes such as those produced during the welding of stainless steel may
produce serious and long-lasting problems. These can include chronic breathing
difficulty and cancer, in the case of exposure to chromium.
References:
rd
1. John A Schey, Introduction to Manufacturing Processes, Mcgraw Hill, 3 Edition,
2000.
2. A. Ghosh and A. K. Mallik, Manufacturing Science, Affiliated East-West Press
Private Limited, New Delhi, 2001.
3. J. Campbell, Casting, Butterworth-Heinemann, 2003.
4. M F Ashby, Material Selection in Mechanical Design, Butterworth-Heinemann,
1999.
5. G E Dieter, Mechanical Metallurgy, McGraw-Hill, 1961.
6. J. B. Bralla, “Design for manufacturability handbook”, McGraw hill handbooks, 2nd
edition, New york.
7. http://www.substech.com/dokuwiki/
8. Deter G. E., Engineering Design, Mc Graw-Hill,1999
198