Preliminary Pavement Design Calculations
Preliminary Pavement Design Calculations
Preliminary Pavement Design Calculations
TRAFFIC ANALYSIS
Annual Volume of Other Goods Vehicle greater than 3 Rigid Axle (OGV2) = 475,567 Vehicles
Assume 30% of OGV2 = Volume of Passenger Vehicles(PSV) + Other Goods Vehicle less than 3 Rigid
Axle(OGV1)
Design Traffic Load in each category type = Design Life(years) x 365 x Total AADF x Wear Factor x
Growth Factor
PSV + OGV1 = 20 x 365 x (0.3x1700) x 1 x 1.089 = 4.06 msa ( msa = Million Single Axle)
FOUNDATION DESIGN
Design Parameters
Assumed enhanced modulus of subgrade reaction due to subgrade type = 0.105 N/mm3
(a) Point Load at mid -slab (i.e > 0.5m from the slab edge)
P = Point load , i.e characteristics axle load x Load factor = 2 x 110 000 = 220 000 N
Project Job Ref.
b = Radius of tyre pressure contact zone = (W/πp)1/2 = (110 000 / 3.142 x 0.7) = 224mm
Therefore:
Point Load at mid -slab (i.e > 0.5m from the slab edge)
σ max = 0.275(1 + 0.15) 110 000 x log ( 0.36 x 20 000 x 200 3 / 0.105 x 224 4) = 1.96 N/mm2
200 2
σ max = 0.529(1 + 0.54 x 0.15)110 000 x log( 0.20 x 20 000 x 200 3/0.105 x 224 4) = 3.27N/mm2
200 2
σ max = 3 x 110 000 {1 -1.41 [12(1 - 0.152)]1/4} 0.105 x 224 4/20 000 x 2003 = - 0.02 N/mm2
2002
Twin wheels that are bolted side by side are assumed to be one wheel transmitting half of the axle
load to the pavement. In certain cases, wheels loads at one end of an axle magnify the stress
beneath wheels at the opposite end of the axle, at a distance S away ( Where S is measured
between patch load centres. To calculate the stress magnification, the characteristics length (i.e
the radius of relative stiffness, l) has to be found from the equation below.
S / l = 2700/600.36 = 4.49
Project Job Ref.
Mt / P = 0.001
Mt = Tangential Moment
Thus,
LONGITUDINAL JOINTS
Longitudinal joints shall be provided per lane but not exceeding 3.75m width of the road.
Y16 Tie bars about 750mm long shall be provided at the middle of the slab and placed at 375mm from
the adjoining transverse joint and at 450mm at subsequent intervals.
TRANSVERSE JOINTS
Depending weather pavement will be reinforced(JRCP) or unreinforced(JPCP), tranverse joints shall be
provided at 12m c/c if reinforced or 4.5m c/c if unreinforced.
Y25 Smooth Steel Dowel bars about 450mm long shall be provided at the mid-slab and parallel to the
centrline of the road. These bars shall be spaced at 300mm c/c.