14 Inspection and Testing
14 Inspection and Testing
14 Inspection and Testing
14.1 General
After welding, the compliance with relevant acceptance criteria shall be checked:
by visual inspection;
by non-destructive testing;
by destructive testing;
form, shape and dimensions of the construction;
results and records of post-weld operations (e.g. post-weld heat treatment, ageing).
The ISO documents to which it is required to conform to fulfil the quality
requirements are specified in
ISO 3834-5:2005, Table 8, for arc welding, electron beam welding, laser beam welding and
gas welding, and in ISO 3834-5:2005, Table 10, for other fusion welding processes.
Measures shall be taken, as appropriate, to indicate, e.g. by marking of the item or a routing
card, the status of inspection and test of the welded construction.