There are five main UPS system design configurations that distribute power from the utility
source of a building to the critical loads of a data center. The selection of the appropriate
tolerance, types of loads in the data center, budgets, and existing infrastructure. The five
configurations are explained, and advantages and disadvantages of each are discussed.
The impact on availability is addressed for each configuration and guidelines are provided
2005 American Power Conversion. All rights reserved. No part of this publication may be used, reproduced, photocopied, transmitted, or 2
stored in any retrieval system of any nature, without the written permission of the copyright owner. www.apc.com Rev 2005-1
Introduction
Although the public power distribution system is fairly reliable in most developed countries, studies have
shown that even the best utility systems are inadequate to meet the needs of critical, nonstop data
processing operations. Most companies, when faced with the likelihood of downtime, and data processing
errors caused by utility power, choose to implement a UPS (Uninterruptible Power Supply) system between
the public power distribution system and their mission-critical loads. The UPS system design configuration
chosen for the application directly impacts the availability of the IT equipment it supports. There are many
variables that affect a system’s availability, including human error, reliability of components, maintenance
schedules, and recovery time. The impact that each of these variables has on the overall system’s
availability is determined to a large degree, by the configuration chosen.
Over time, many design engineers have tried to create the perfect UPS solution for supporting critical loads,
and these designs often have names that do not necessarily indicate where they fall in the spectrum of
availability. Parallel Redundant, Isolated Redundant, Distributed Redundant, Hot Tie, Hot Synch, Multiple
Parallel Bus, System plus System and Catcher Systems are names that have been given to different UPS
configurations by the engineers who designed them or by the manufacturers who created them. The
problems with these terms are that they can mean different things to different people, and can be interpreted
in many ways. Although UPS configurations found in the market today are many and varied, there are five
that are most commonly applied. These five include: (1) Capacity, (2) Isolated Redundant, (3) Parallel
Redundant, (4) Distributed Redundant and (5) System plus System.
This paper explains these UPS System configurations and discusses the benefits and limitations of each. A
system configuration should be chosen to reflect the criticality of the load. Considering the impact of
downtime and the corporate risk tolerance will help in choosing the appropriate system configuration.
Guidelines are provided for selecting the appropriate configuration for a given application.
2005 American Power Conversion. All rights reserved. No part of this publication may be used, reproduced, photocopied, transmitted, or 3
stored in any retrieval system of any nature, without the written permission of the copyright owner. www.apc.com Rev 2005-1
Tiers
All UPS systems (and electrical distribution equipment) require regular intervals of maintenance. The
availability of a system configuration is dependent on its level of immunity to equipment failure, and the
inherent ability to perform normal maintenance, and routine testing while maintaining the critical load. The
Uptime Institute discusses this topic further in a document titled “Industry Standard Tier Classifications
Define Site Infrastructure Performance”1. The tiers described in the Uptime Institute document encompass
the 5 UPS architectures mentioned in this paper and are also depicted in Table 1.
Cost
As the configuration goes higher on the scale of availability, the cost also increases. Table 1 provides
approximate ranges of costs for each design. These costs represent the cost to build out a new data center
and include not only the UPS architecture cost, but also the complete Network-Critical Physical Infrastructure
(NCPI) of the data center. This consists of generator(s), switchgear, cooling systems, fire suppression,
raised floor, racks, lighting, physical space, and the commissioning of the entire system. These are the up-
front costs only and do not include operating costs such as maintenance contracts. These costs assume an
average of 30 square feet (2.79 square meters) per rack, and are based on a range of power densities from
2.3 kW / rack to 3.8 kW / rack. The cost per rack will decrease as the size of the building increases,
providing a larger footprint over which to spread costs and greater buying power from vendors.
What is “N”?
UPS Design configurations are often described by nomenclatures using the letter “N” in a calculation stream.
For instance, a parallel redundant system may also be called an N+1 design, or a system plus system
design may be referred to as 2N. “N” can simply be defined as the “need” of the critical load. In other
words, it is the power capacity required to feed the protected equipment. IT equipment such as RAID
(Redundant Array of Independent Disks) systems can be used to illustrate the use of “N”. For example, if 4
disks are needed for storage capacity and the RAID system contained 4 disks, this is an “N” design. On the
other hand, if there are 5 disks and only 4 are needed for storage capacity that is an N+1 design.
1
www.upsite.com
2005 American Power Conversion. All rights reserved. No part of this publication may be used, reproduced, photocopied, transmitted, or 4
stored in any retrieval system of any nature, without the written permission of the copyright owner. www.apc.com Rev 2005-1
Historically, the critical load power requirement has had to be projected well into the future in order to allow a
UPS system to support loads for 10 or 15 years. Projecting this load has proven to be a difficult task, and
justifiably so. In the 1990’s the concept of “Watts / Square Area” was developed in order to provide a
framework for the discussion and the ability to compare one facility to the next. Misunderstanding exists with
this measure of power simply by the fact that people can’t agree on what the square area is. More recently,
with the trend of technology compaction, the concept of “Watts / Rack” has been used to drive the system
capacity. This has proven to be more reliable as the quantity of racks in a space is very easy to count.
Regardless of how the load “N” is chosen, it is essential that it be chosen from the onset to allow the design
process to begin on the right track.
Scalable, modular UPS system designs now exist to allow the UPS capacity to grow as the IT “need” grows.
For more information on this topic, refer to APC White Paper #37, “Avoiding Costs from Oversizing Data
Center and Network Room Infrastructure”.
Although both examples above are considered N configurations, the UPS module designs are different.
Unlike the small UPS, systems above single-phase capacities (roughly 20 kW) have internal static bypass
switches that allow the load to be transferred safely to the utility source if the UPS module experiences
internal problems. The points at which a UPS transfers to static bypass are carefully selected by the
manufacturer to provide the utmost protection for the critical load, while at the same time safeguarding the
module itself against situations that could damage it. The following example illustrates one of these
protective measures: It is common in three-phase UPS applications for the modules to have overload
ratings. One of these ratings may state that the “module will carry 125% of its rated load for 10 minutes”.
Once a 125% overload is detected, a module will start a timing routine where an internal clock begins a 10-
minute countdown. When the timer expires, if the load has not returned to normal levels, the module will
transfer the load safely to static bypass. There are many scenarios in which the bypass will be activated,
and they are stated clearly in the specifications of a particular UPS module.
A way to augment an N configuration design is to provide the system with “maintenance” or “external”
bypass capability. An external bypass would allow the entire UPS system (modules and static bypass) to be
safely shut down for maintenance if and when that situation arises. The maintenance bypass would
emanate from the same panel that feeds the UPS, and would connect directly to the UPS output panel.
This, of course, is a normally open circuit that can only be closed when the UPS module is in static bypass.
2005 American Power Conversion. All rights reserved. No part of this publication may be used, reproduced, photocopied, transmitted, or 5
stored in any retrieval system of any nature, without the written permission of the copyright owner. www.apc.com Rev 2005-1
Steps need to be taken in the design to prevent the closing of the maintenance bypass circuit when the UPS
is not in static bypass. When properly implemented into a system, the maintenance bypass is an important
component in the system, allowing a UPS module to be worked on safely without requiring the shutdown of
the load.
Most “N” system configurations, especially under 100 kW, are placed in buildings with no particular concern
for the configuration of the overall electrical systems in the building. In general, buildings’ electrical systems
are designed with an “N” configuration, so an “N” UPS configuration requires nothing more than that to feed
it. A common single module UPS system configuration is shown in Figure 1.
Utility Generator
ATS
UPS
300kW
Maintenance
Bypass
PDU
LOAD
300kW
Advantages
• Conceptually simple, and cost effective hardware configuration
• Optimal efficiency of the UPS, because the UPS is used to full capacity
• Expandable if the power requirement grows (It is possible to configure multiple units in the
same installation. Depending on the vendor or manufacturer, you can have up to 8 UPS
modules of the same rating in parallel.)
2005 American Power Conversion. All rights reserved. No part of this publication may be used, reproduced, photocopied, transmitted, or 6
stored in any retrieval system of any nature, without the written permission of the copyright owner. www.apc.com Rev 2005-1
Disadvantages
• Limited availability in the event of a UPS module break down, as the load will be transferred
to bypass operation, exposing it to unprotected power
• Many single points of failure, which means the system is only as reliable as its weakest point
Isolated Redundant
An isolated redundant configuration is sometimes referred to as an “N+1” system, however, it is considerably
different from a parallel redundant configuration which is also referred to as N+1. The isolated redundant
design concept does not require a paralleling bus, nor does it require that the modules have to be the same
capacity, or even from the same manufacturer. In this configuration, there is a main or “primary” UPS
module that normally feeds the load. The “isolation” or “secondary” UPS feeds the static bypass of the main
UPS module(s). This configuration requires that the primary UPS module have a separate input for the
static bypass circuit. This is a way to achieve a level of redundancy for a previously non-redundant
configuration without completely replacing the existing UPS. Figure 2 illustrates an isolated redundant UPS
configuration.
In a normal operating scenario the primary UPS module will be carrying the full critical load, and the isolation
module will be completely unloaded. Upon any event where the primary module(s) load is transferred to
static bypass, the isolation module would accept the full load of the primary module instantaneously. The
isolation module has to be chosen carefully to ensure that it is capable of assuming the load this rapidly. If it
is not, it may, itself, transfer to static bypass and thus defeat the additional protection provided by this
configuration.
Service can be performed on either module by transferring the load to the other module. A maintenance
bypass is still an important design feature, as the output single point of failure still exists. The entire system
needs to be shutdown for 2 – 4 hours per year for system-level preventive maintenance. Reliability gains
from this configuration are often offset by the complexity of the switchgear and associated controls.
MTechnology Inc.2, consultants specializing in high reliability electric power systems, performed a
comparative reliability analysis. Using the techniques of Probabilistic Risk Assessment (PRA), MTech
developed quantitative models for both an isolated redundant UPS system and a non-redundant (capacity)
system. The most basic fault tree analysis, which ignored contributions to failure arising from human error,
component aging, and environmental effects, demonstrate that the isolated redundant system does not
materially affect the probability of failure (unreliability.) Both systems had an unreliability of 1.8% per year of
operation. The isolated redundant model resulted in 30 failure modes (minimal cut sets) vs. 7 for the
2
MTechnology, Inc; 2 Central Street, Saxonville, MA 01701; phone 508-788-6260; fax 508-788-6233
2005 American Power Conversion. All rights reserved. No part of this publication may be used, reproduced, photocopied, transmitted, or 7
stored in any retrieval system of any nature, without the written permission of the copyright owner. www.apc.com Rev 2005-1
capacity system. While the probability of the additional 23 failure modes is generally small, the analysis
illustrates that adding complexity and additional components to the system invariably increases the number
of potential failure modes. Mtech contends that when human errors and the effects of aging are considered,
the case against the isolated redundant system is even stronger. The operation of the isolated redundant
system is much more complex than in a non-isolated system, and the probability of human error very much
higher. The benefits of the preventative maintenance procedures that are enabled by the isolated redundant
designs do not withstand careful scrutiny. The primary beneficiaries of the isolated redundant UPS design
are those who sell the original equipment and those who profit from servicing the additional UPS modules.
The customer's equipment does not benefit from higher reliability electric power.
ATS
Catcher Static
UPS Switch
300kW Bypass
Primary Static
UPS Switch
300kW Bypass
Maintenance
Bypass
PDU
LOAD LOAD
300kW 300kW
Advantages
• Flexible product choice, products can be mixed with any make or model
• No synchronizing needed
2005 American Power Conversion. All rights reserved. No part of this publication may be used, reproduced, photocopied, transmitted, or 8
stored in any retrieval system of any nature, without the written permission of the copyright owner. www.apc.com Rev 2005-1
Disadvantages
• Reliance on the proper operation of the primary module's static bypass to receive power from
the reserve module
• Requires that both UPS modules’ static bypass must operate properly to supply currents in
excess of the inverter's capability
• The secondary UPS module has to be able to handle a sudden load step when the primary
module transfers to bypass. (This UPS has generally been running with 0% load for a long
period of time. Not all UPS modules can perform this task making the selection of the bypass
module a critical one).
• Higher operating cost due to a 0% load on the secondary UPS, which draws power to keep it
running
• A two module system (one primary, one secondary) requires at least one additional circuit
breaker to permit choosing between the utility and the other UPS as the bypass source. This
is more complex than a system with a common load bus and further increases the risk of
human error.
• Two or more primary modules need a special circuit to enable selection of the reserve
module or the utility as the bypass source (Static Transfer Switch)
A parallel redundant configuration consists of paralleling multiple, same size UPS modules onto a common
output bus. The system is N+1 redundant if the “spare” amount of power is at least equal to the capacity of
one system module; the system would be N+2 redundant if the spare power is equal to two system modules;
and so on. Parallel redundant systems require UPS modules of the same capacity from the same
manufacturer. The UPS module manufacturer also provides the paralleling board for the system. The
paralleling board may contain logic that communicates with the individual UPS modules, and the UPS
modules will communicate with each other to create an output voltage that is completely synchronized. The
parallel bus can have monitoring capability to display the load on the system and the system voltage and
current characteristics at a system level. The parallel bus also needs to be able to display how many
2005 American Power Conversion. All rights reserved. No part of this publication may be used, reproduced, photocopied, transmitted, or 9
stored in any retrieval system of any nature, without the written permission of the copyright owner. www.apc.com Rev 2005-1
modules are on the parallel bus, and how many modules are needed in order to maintain redundancy in the
system. There are logical maximums for the number of UPS modules that can be paralleled onto a common
bus, and this limit is different for different UPS manufacturers. The UPS modules in a parallel redundant
design share the critical load evenly in normal operating situations. When one of the modules is removed
from the parallel bus for service (or if it were to remove itself due to an internal failure), the remaining UPS
modules are required to immediately accept the load of the failed UPS module. This capability allows any
one module to be removed from the bus and be repaired without requiring the critical load to be connected to
straight utility.
The 5,000 square foot (465 square meters) computer room in our N configuration example would require two
400 kW UPS modules, or three 200 kW UPS modules paralleled onto a common output bus to become
redundant. The parallel bus is sized for the non-redundant capacity of the system. So the system
comprised of two 400 kW modules would have a parallel bus with a rated capacity of 400 kW.
In an N+1 system configuration there is an opportunity for the UPS capacity to grow as the load grows.
Capacity triggers need to be set up so that when the percentage of the capacity in place reaches a certain
level, (acknowledging that delivery times for some UPS modules can be many weeks or even months), a
new redundant module should be ordered. The larger the UPS capacity, the more difficult a task this can
become. Large UPS modules weigh thousands of pounds and require special rigging equipment in order to
set them into place. There would typically be a spot reserved in the UPS room for this module. This type of
deployment needs to be well planned as placing a large UPS module into any room comes with some risk.
System efficiency can be an important factor to consider in the design of redundant UPS systems. Lightly -
loaded UPS modules are typically less efficient than a module that is loaded closer to its capacity. Table 2
shows the typical running load for a system using various UPS module sizes, all feeding a 240 kW load. As
can be seen in the table, the module size chosen for a particular application can seriously affect the system
efficiency. The efficiency of any particular UPS at low loads varies from manufacturer to manufacturer, and
should be investigated during a design process.
Table 2 – N + 1 Configurations
UPS Modules Mission Total UPS System % Each UPS
in Parallel Critical Load Capacity Module is Loaded
2 x 240 kW 240 kW 480 kW 50%
3 x 120 kW 240 kW 360 kW 66%
4 x 80 kW 240 kW 320 kW 75%
5 x 60 kW 240 kW 300 kW 80%
Figure 3 depicts a typical two module parallel redundant configuration. This figure shows that even though
these systems provide protection of a single UPS module failure, there still remains a single point of failure in
the paralleling bus. As with the capacity design configuration, a maintenance bypass circuit is an important
consideration in these designs in order to allow the parallel bus to be shutdown for maintenance periodically.
2005 American Power Conversion. All rights reserved. No part of this publication may be used, reproduced, photocopied, transmitted, or 10
stored in any retrieval system of any nature, without the written permission of the copyright owner. www.apc.com Rev 2005-1
Figure 3 – Parallel redundant (N+1) UPS configuration
Utility Generator
ATS
Primary
UPS
300kW
PDU
LOAD
300kW
Advantages
• Higher level of availability than capacity configurations because of the extra capacity that can
be utilized if one of the UPS modules breaks down
• Lower probability of failure compared to isolated redundant because there are less breakers
and because modules are online all the time (no step loads)
• Expandable if the power requirement grows. It is possible to configure multiple units in the
same installation
Disadvantages
• Both modules must be of the same design, same manufacturer, same rating, same
technology and configuration
• Still single points of failure upstream and downstream of the UPS system
• The load is exposed to unprotected power during maintenance of the UPS, batteries or down-
stream equipment, which usually takes place at least once a year with a typical duration of 2-
4 hours
• Most manufacturers need external static switches in order to load-share equally between the
two UPS modules; otherwise they will share within a wide window of 15%. This adds to the
cost of the equipment and makes it more complex
2005 American Power Conversion. All rights reserved. No part of this publication may be used, reproduced, photocopied, transmitted, or 11
stored in any retrieval system of any nature, without the written permission of the copyright owner. www.apc.com Rev 2005-1
• Most manufacturers need a common external service bypass panel. This adds to the cost of
the equipment and makes it more complex
Distributed Redundant
Distributed redundant configurations are commonly used in the market today. This design was developed in
the late 1990s in an effort by an engineering firm to provide the capabilities of complete redundancy without
the cost associated with achieving it. The basis of this design uses three or more UPS modules with
independent input and output feeders. The independent output buses are connected to the critical load via
multiple PDUs and STS. From the utility service entrance to the UPS, a distributed redundant design and a
system plus system design (discussed in the next section) are quite similar. Both provide for concurrent
maintenance, and minimize single points of failure. The major difference is in the quantity of UPS modules
that are required in order to provide redundant power paths to the critical load, and the organization of the
distribution from the UPS to the critical load. As the load requirement, “N”, grows the savings in quantity of
UPS modules also increases.
Figures 4 and 5 illustrate a 300 kW load with two different distributed redundant design concepts. Figure 4
uses three UPS modules in a distributed redundant design that could also be termed a “catcher system”. In
this configuration, module 3 is connected to the secondary input on each STS, and would “catch” the load
upon the failure of either primary UPS module. In this catcher system, module 3 is typically unloaded.
Generator
ATS 1
ATS 2
ATS 3
STS 1 STS 2
PDU 1 PDU 2
2005 American Power Conversion. All rights reserved. No part of this publication may be used, reproduced, photocopied, transmitted, or 12
stored in any retrieval system of any nature, without the written permission of the copyright owner. www.apc.com Rev 2005-1
Figure 5 depicts a distributed redundant design with three STS and the load evenly distributed across the
three modules in normal operation. The failure on any one module would force the STS to transfer the load
to the UPS module feeding its alternate source.
Evident in both of these one lines is the difference between distributing power to dual-corded loads and
single-corded loads. The dual-corded loads can be fed from two STS units while the single-corded loads
can only be fed from a single STS. For the single-corded loads the STS becomes a single point of failure.
As the quantity of single-corded loads in data centers today are becoming fewer and fewer it is becoming
more practical, and less costly to apply multiple, small, point of use transfer switches close to the single-
corded loads. In cases with 100% dual-corded loads this configuration could be designed without STS units.
Generator
ATS 1
ATS 2
ATS 3
Distributed redundant systems are usually chosen for large complex installations where concurrent
maintenance is a requirement and many or most loads are single corded. Savings over 2N also drive this
configuration. Other industry factors that drive distributed redundant configurations are as follows:
2005 American Power Conversion. All rights reserved. No part of this publication may be used, reproduced, photocopied, transmitted, or 13
stored in any retrieval system of any nature, without the written permission of the copyright owner. www.apc.com Rev 2005-1
Concurrent Maintenance – The ability to completely shut down any particular electrical component, or subset
of components, for maintenance or routine testing without requiring that the load be transferred to the utility
source.
Single Point of Failure – An element of the electrical distribution system that at some point will cause
downtime, if a means to bypass it is not developed in the system. An N configuration system is essentially
comprised of a series of single points of failure. Eliminating these from a design is a key component of
redundancy.
Static Transfer Switch (STS) – An STS has two inputs and one output. It typically accepts power from two
different UPS systems, and provides the load with conditioned power from one of them. Upon a failure of its
primary UPS feeders the STS will transfer the load to its secondary UPS feeder in about 4 milliseconds, and
thus keep the load on protected power at all times. This technology was developed in the early 1990’s, and
is commonly used in distributed redundant configurations.
The primary weakness of this design is the use of static transfer switches. These devices are very complex
and have some unexpected failure modes, the worst of which is that they can fail in a way that causes the
two inputs to short circuit to each other. In this type of event the STS can become a single point of failure
since it can cause two UPS to drop the load simultaneously. The failure of a STS can propagate upstream
and affect the entire system operation. For this reason the system + system design described in the
following section has greater fundamental availability, particularly if the load devices have dual cord
redundant powering capability.
There are many options in an STS configuration and several grades of STS reliability on the market to
consider. In this configuration, the STS is ahead of the PDU (on the 480 volt side). This is a common
application. Many engineers believe, justifiably so, that placing the STS on the 208 volt side of two PDUs is
a more reliable application. This is a much more expensive application than the 480 volt STS, and is
discussed in greater detail in APC White Paper #48, “Comparing Availability of Various Rack Power
Redundancy Configurations”.
Single-Corded Loads - When the environment consists of single-corded equipment, each piece of IT
equipment can only be fed from a single STS or rack mount transfer switch. Bringing the switch closer to the
load is a prerequisite for high availability in redundant architectures as demonstrated in APC White Paper
#48. Placing hundreds of single-corded devices on a single large STS is an elevated risk factor. Deploying
multiple smaller switches feeding smaller percentages of the loads would mitigate this concern. In addition,
distributed rack-mount transfer switches do not exhibit the failure modes that propagate faults upstream to
multiple UPS system as is the case with larger STS. For this reason, the use of rack-based transfer
switches is becoming more common, particularly when only a fraction of the load is single-corded. APC
White Paper #62, “Powering Single-Corded Equipment in a Dual Path Environment” discusses the
differences between STS and rack mount transfer switches in greater detail.
2005 American Power Conversion. All rights reserved. No part of this publication may be used, reproduced, photocopied, transmitted, or 14
stored in any retrieval system of any nature, without the written permission of the copyright owner. www.apc.com Rev 2005-1
Dual-Corded Loads – Dual-corded loads are becoming more the standard as time progresses, therefore the
use of an STS is not necessary. The loads can simply be connected to two separate PDUs which are fed
from separate UPS systems.
Multiple Source Synchronization - When STS units are employed in a data center, it is important for the two
UPS feeds to be in synchronization. Without synchronization control it is possible for UPS modules to be out
of phase, especially when they are running on battery.
A solution to prevent an out of phase transfer is to install a synchronization unit between the two UPS
systems, allowing them to synchronize their AC output. This is especially critical when the UPS modules
have lost input power and are on battery operation. The synchronization unit makes sure that all UPS
systems are in sync at all times, so during a transfer in the STS, the power will be 100% in phase, thus
preventing an out of phase transfer and possible damage to downstream equipment. Of course, adding a
synchronization unit between independent UPS systems allows for the possibility of a common mode failure,
or failure that can simultaneously drop all UPS systems.
Advantages
• Allows for concurrent maintenance of all components if all loads are dual-corded
• Two separate power paths from any given dual-corded load’s perspective provide
redundancy from the service entrance
• UPS modules, switchgear, and other distribution equipment can be maintained without
transferring the load to bypass mode, which would expose the load to unconditioned power.
Many distributed redundant designs do not have a maintenance bypass circuit.
Disadvantages
• Relatively high cost solution due to the extensive use of switchgear compared to previous
configurations
• Design relies on the proper operation of the STS equipment which represents single points of
failure and complex failure modes
• Complex configuration; In large installations that have many UPS modules and many static
transfer switches and PDUs, it can become a management challenge to keep systems evenly
loaded and know which systems are feeding which loads.
• Unexpected operating modes: the system has many operating modes and many possible
transitions between them. It is difficult to test all of these modes under anticipated and fault
conditions to verify the proper operation of the control strategy and of the fault clearing
devices.
• UPS inefficiencies exist due to less than full load normal operation
2005 American Power Conversion. All rights reserved. No part of this publication may be used, reproduced, photocopied, transmitted, or 15
stored in any retrieval system of any nature, without the written permission of the copyright owner. www.apc.com Rev 2005-1
System plus System Redundant
System plus System, Multiple Parallel Bus, Double-Ended, 2(N+1), 2N+2, [(N+1) + (N+1)], and 2N are all
nomenclatures that refer to variations of this configuration. With this design, it now becomes possible to
create UPS systems that may never require the load to be transferred to the utility power source. These
systems can be designed to wring out every conceivable single point of failure. However, the more single
points of failure that are eliminated, the more expensive this design will cost to implement. Most large
system plus system installations are located in standalone, specially designed buildings. It is not uncommon
for the infrastructure support spaces (UPS, battery, cooling, generator, utility, and electrical distribution
rooms) to be equal in size to the data center equipment space.
This is the most reliable, and most expensive, design in the industry. It can be very simple or very complex
depending on the engineer’s vision and the requirements of the owner. Although a name has been given to
this configuration, the details of the design can vary greatly and this, again, is in the vision and knowledge of
the design engineer responsible for the job. The 2(N+1) variation of this configuration, as illustrated in
Figure 6, revolves around the duplication of parallel redundant UPS systems. Optimally these UPS systems
would be fed from separate switchboards, and even from separate utility services and possibly separate
generator systems. The extreme cost of building this type of facility has been justified by the importance of
what is happening within the walls of the data center and the cost of downtime to operations. Many of the
world’s largest organizations have chosen this configuration to protect their critical load.
ATS ATS
2005 American Power Conversion. All rights reserved. No part of this publication may be used, reproduced, photocopied, transmitted, or 16
stored in any retrieval system of any nature, without the written permission of the copyright owner. www.apc.com Rev 2005-1
The cost of this configuration is affected by how “deep and wide” the design engineer deems is necessary to
take the system duplication efforts to meet the needs of the client. The fundamental concept behind this
configuration requires that each piece of electrical equipment can fail or be turned off manually without
requiring that the critical load be transferred to utility power. Common in 2(N+1) design are bypass circuits
that will allow sections of the system to be shut down and bypassed to an alternate source that will maintain
the redundant integrity of the installation. An example of this can be seen in Figure 6: the tie circuit between
the UPS input panelboards will allow one of the utility service entrances to be shut down without requiring
one of the UPS systems to be shut down. In a 2(N+1) design, a single UPS module failure will simply result
in that UPS module being removed from the circuit, and its parallel modules assuming additional load.
In this example illustrated in Figure 6, the critical load is 300 kW, therefore the design requires that four 300
kW UPS modules be provided, two each on two separate parallel buses. Each bus feeds the necessary
distribution to feed two separate paths directly to the dual-corded loads. The single-corded load, illustrated
in Figure 6, shows how a transfer switch can bring redundancy close to the load. However, Tier IV power
architectures require that all loads to be dual-corded.
Companies that choose system plus system configurations are generally more concerned about high
availability then the cost of achieving it. These companies also have a large percentage of dual-corded
loads. In addition to the factors discussed in the distributed redundant section, other factors that drive this
design configuration are as follows:
Hardening – Designing a system, and a building, that is immune to the ravages of nature, and is immune to
the types of cascading failures that can occur in electrical systems. The ability to isolate and contain a
failure; for example, the two UPS systems would not reside in the same room, and the batteries would not be
in the same room with the UPS modules. Circuit breaker coordination becomes a critical component of
these designs. Proper Circuit breaker coordination can prevent short circuits from affecting large portions of
the building.
Hardening a building can also mean making it more immune to events such as hurricanes, tornadoes, and
floods, as might be necessary depending on where the building is. For example designing the buildings
away from 100 year flood plains, avoiding flight paths overhead, specifying thick walls and no windows all
help to create this immunity.
Static Transfer Switch (STS) – With the advent of dual-cord capable IT equipment, these devices along with
their undesirable failure modes can be eliminated with a significant increase in system availability.
Single-Corded Loads – To take full advantage of the redundancy benefits of system plus system designs,
single-corded loads should be connected to transfer switches at the rack level. The benefits of doing so are
illustrated in APC White Paper #48, “Comparing Availability of Various Rack Power Redundancy
Configurations”.
2005 American Power Conversion. All rights reserved. No part of this publication may be used, reproduced, photocopied, transmitted, or 17
stored in any retrieval system of any nature, without the written permission of the copyright owner. www.apc.com Rev 2005-1
Advantages
• Two separate power paths allows for no single points of failure; Very fault tolerant
• The configuration offers complete redundancy from the service entrance all the way to the
critical loads
• In 2(N+1) designs, UPS redundancy still exists, even during concurrent maintenance
• UPS modules, switchgear, and other distribution equipment can be maintained without
transferring the load to bypass mode, which would expose the load to unconditioned power
• Easier to keep systems evenly loaded and know which systems are feeding which loads.
Disadvantages
• Highest cost solution due to the amount of redundant components
• UPS inefficiencies exist due to less than full load normal operation
• Typical buildings are not well suited for large highly available system plus system installations
that require compartmentalizing of redundant components
• Cost / Impact of downtime – How much money is flowing through the company every minute,
how long will it take to recover systems after a failure? The answer to this question will help
drive a budget discussion. If the answer is $10,000,000 / minute versus $1,000,000 / hour
the discussion will be different.
• Risk Tolerance – Companies that have not experienced a major failure are typically more risk
tolerant than companies that have not. Smart companies will learn from what companies in
their industry are doing. This is called “Benchmarking” and it can be done in many ways.
The more risk intolerant a company is, the more internal drive their will be to have more
reliable operations, and disaster recovery capabilities.
• Availability requirements – How much downtime can the company withstand in a typical year?
If the answer is none, then a high availability design should be in the budget. However, if the
business can shut down every night after 10 PM, and on most weekends, then the UPS
configuration wouldn’t need to go far beyond a parallel redundant design. Every UPS will, at
some point, need maintenance, and UPS systems do fail periodically, and somewhat
2005 American Power Conversion. All rights reserved. No part of this publication may be used, reproduced, photocopied, transmitted, or 18
stored in any retrieval system of any nature, without the written permission of the copyright owner. www.apc.com Rev 2005-1
unpredictably. The less time that can be found in a yearly schedule to allow for maintenance
the more a system needs the elements of a redundant design.
• Types of loads (single vs. dual-corded) – Dual-corded loads provide a real opportunity for a
design to leverage a redundant capability, but the system plus system design concept was
created before dual-corded equipment existed. The computer manufacturing industry was
definitely listening to their clients when they started making dual-corded loads. The nature of
loads within the data center will help guide a design effort, but are much less a driving force
than the issues stated above.
• Budget – The cost of implementing a 2(N+1) design is significantly more, in every respect,
than a capacity design, a parallel redundant design, or even a distributed redundant. As an
example of the cost difference in a large data center, a 2(N+1) design may require thirty 800
kW modules (five modules per parallel bus; six parallel busses). A distributed redundant
design for this same facility requires only eighteen 800 kW modules, a huge cost savings.
The flowchart illustrated in Figure 7 is a useful starting point for selecting the right UPS system design
configuration for a particular application. For designs with no or little redundancy of components, periods of
downtime for maintenance should be expected. If this downtime is unacceptable, then a design that allows
for concurrent maintenance should be selected. By following the questions in the flowchart, the appropriate
system can be identified.
2005 American Power Conversion. All rights reserved. No part of this publication may be used, reproduced, photocopied, transmitted, or 19
stored in any retrieval system of any nature, without the written permission of the copyright owner. www.apc.com Rev 2005-1
Figure 7 – Design configuration selection decision tree
NO
Capacity or "N" System
NO
2005 American Power Conversion. All rights reserved. No part of this publication may be used, reproduced, photocopied, transmitted, or 20
stored in any retrieval system of any nature, without the written permission of the copyright owner. www.apc.com Rev 2005-1
Conclusions
The power infrastructure is critical to the successful operation of a data center’s equipment. There are
various UPS configurations that can be implemented, with advantages and limitations of each. By
understanding the business’s availability requirements, risk tolerance, and budget capability, an appropriate
design can be selected. As demonstrated in the analysis of this paper, 2(N+1) architectures fed directly to
dual-corded loads provide the highest availability by offering complete redundancy and eliminating single
points of failure.
2005 American Power Conversion. All rights reserved. No part of this publication may be used, reproduced, photocopied, transmitted, or 21
stored in any retrieval system of any nature, without the written permission of the copyright owner. www.apc.com Rev 2005-1
Appendix – Availability Analysis
An availability analysis is done in order to quantify the availability difference between the five configurations
presented in this paper. The details of the analysis are provided below.
The PDU is broken down into three basic subcomponents: Circuit Breakers, Step-down Transformer and
Terminations. The subpanel is evaluated based on one main breaker, one branch circuit breaker and
terminations all in series.
2005 American Power Conversion. All rights reserved. No part of this publication may be used, reproduced, photocopied, transmitted, or 22
stored in any retrieval system of any nature, without the written permission of the copyright owner. www.apc.com Rev 2005-1
Table A1 – Assumptions of analysis
Assumption Description
Failure Rates of Components All components in the analysis exhibit a constant failure rate. This is the best assumption,
given that the equipment will be used only for its designed useful life period. If products
were used beyond their useful life, then non-linearity would need to be built into the failure
rate.
Repair Teams For “n” components in series it is assumed that “n” repair persons are available.
System Components Remain All components within the system are assumed to remain operating while failed components
Operating are repaired.
Independence of Failures These models assume construction of the described architectures in accordance with
Industry Best Practices. These result in a very low likelihood of common cause failures and
propagation because of physical and electrical isolation. This assumption does not entirely
apply to the distributed redundant architectures, because the Static Transfer Switch can
cause two of the three UPS to fail thereby causing the failure of the entire architecture. This
common cause failure was modeled for the two distributed redundant architectures.
Failure Rate of Wiring Wiring between the components within the architectures has not been included in the
calculations because wiring has a failure rate too low to predict with certainty and statistical
relevance. Also previous work has shown that such a low failure rate minimally affects the
overall availability. Major terminations have still been accounted for.
Human Error Downtime due to human error has not been accounted for in this analysis. Although this is a
significant cause of data center downtime, the focus of these models is to compare power
infrastructure architectures, and to identify physical weaknesses within those architectures.
In addition, there exists a lack of data relating to how human error affects the availability.
Power Availability is the key This analysis provides information related to power availability. The availability of the
measure business process will typically be lower because the return of power does not immediately
result in the return of business availability. The IT systems typically have a restart time
which adds unavailability that is not counted in this analysis.
Definition of failure per Any trouble with a power system component that causes any of the following to
IEEE Std 493-1997 (Gold occur:
Book) — Partial or complete plant shutdown, or below-standard plant operation
IEEE Recommended Practice — Unacceptable performance of user’s equipment
for the Design of Reliable — Operation of the electrical protective relaying or emergency operation of the plant
Industrial and commercial electrical system
Power Systems — De-energization of any electric circuit or equipment
2005 American Power Conversion. All rights reserved. No part of this publication may be used, reproduced, photocopied, transmitted, or 23
stored in any retrieval system of any nature, without the written permission of the copyright owner. www.apc.com Rev 2005-1
Component Failure Recovery Source of Data Comments
Rate Rate
Raw Utility 3.887E-003 30.487 EPRI - Data for utility power was This data is highly dependent on
collected and a weighted average geographic location.
of all distributed power events was
calculated.
Failure Rate is based on
Diesel Engine IEEE Gold Book Std 493-1997, operating hours. 0.01350 failures
1.0274E-04 0.25641
Generator Page 406 per start attempt per Table 3-4 pg
44.
Used to transfer electrical source
Automatic Survey of Reliability / Availability -
9.7949E-06 0.17422 from utility to generator and visa
Transfer Switch ASHRAE paper # 4489
versa.
Termination, 0- IEEE Gold Book Std 493-1997,
1.4498E-08 0.26316 Used to connect two conductors.
600V Page 41
Upstream of the transformer, one
6 x IEEE value termination exists per conductor.
Since there are 2 sets of
6 Terminations 8.6988E-08 0.26316 Computed from value by IEEE Gold terminations between
Book Std 493-1997, Page 41 components a total of six
terminations are used.
Downstream of the transformer,
8 x IEEE value one termination exists per
conductor plus the neutral. Since
8 Terminations 1.1598E-07 0.26316 Computed from value by IEEE Gold there are 2 sets of terminations
Book Std 493-1997, Page 41 between components a total of
eight terminations are used.
Used to isolate components from
electrical power for maintenance
IEEE Gold Book Std 493-1997, or fault containment.
Circuit Breaker 3.9954E-07 0.45455
Page 40
Fixed (including Molded case), 0-
600A
PDU MTBF is from IEEE Gold Book Std
Used to step down the 480 VAC
Transformer, 493-1997, Page 40, MTTR is
7.0776E-07 0.00641 input to 208 VAC outputs, which
Stepdown average given by Marcus
is required for 120 VAC loads.
>100kVA Transformer Data and Square D.
Failure Rate includes Controls;
Recovery Rate was not given by
Static Transfer
4.1600E-06 0.16667 Gordon Associates, Raleigh, NC ASHRAE for this size STS, so the
Switch
value used is from the 600-1000A
STS
Failure Rate is from Power Quality
Magazine, Feb 2001 issue, UPS without bypass. MTBF is
UPS no Bypass Recovery Rate data is based on 27,440 hrs without bypass per
3.64E-05 0.125
150kW assumption of 4 hours for service MGE "Power Systems
person to arrive, and 4 hours to Applications Guide"
repair system
2005 American Power Conversion. All rights reserved. No part of this publication may be used, reproduced, photocopied, transmitted, or 24
stored in any retrieval system of any nature, without the written permission of the copyright owner. www.apc.com Rev 2005-1
State Space Models
State space models were used to represent the various states in which each of the six architectures can
exist. In addition to the reliability data, other variables were defined for use within the state space models
(Table A3).
Figure A1 describes the series relationship between the upstream and downstream portions of the “capacity
configuration”. The “Upstream” block represents everything between the utility and the UPS inclusive. The
“Downstream” block represents everything after the UPS including all components up to and including the
transformer output breaker.
Upstream Downstream
Inside the “Power Input” block resides the Markov diagram used to calculate the availability of upstream
components that feed the downstream components. The blocks at the top of Figure A2 represent the
individual components of the Bypass, UPS System, Generator, Automatic Transfer Switch (ATS) and Utility
respectively. The failure and recovery rates from these blocks feed the Markov diagram which results in an
overall availability for the entire “Upstream” block.
2005 American Power Conversion. All rights reserved. No part of this publication may be used, reproduced, photocopied, transmitted, or 25
stored in any retrieval system of any nature, without the written permission of the copyright owner. www.apc.com Rev 2005-1
Figure A2 – Upstream Markov diagram
Bypass Path UPS System Gen Path ATS Path Utility Path
ëBypass ëUPS ëGen ëUpstream ëPower
ìBypass ìUPS ìGen ìUpstream ìPower
gen_failed
ìPower 0
ëGen
On_Gen
1 ìGen
ìPower*(1-Patsfail_Switch)
((1-Patsfail_Switch)*(1-Pgenfail_start)*(1/Tgenstart))*(1-R)
On_Batt
ëPower*(1-Pbatfailed) 1 ((1-Patsfail_Switch)*(1-Pgenfail_start)*(1/Tgenstart))*(1-R)
ìPower*R Failed_NoPower
Normal (Pgenfail_start*(1/Tbat)+Patsfail_Switch*(1/Tbat)-(Pgenfail_start*Patsfail_Switch)*(1/Tbat))*(1-R) 0
1
ëPower*Pbatfailed
ìPower
ëUpstream*(1-Pbatfailed)
ëUpstream*Pbatfailed
Fail_Upstream
ìUpstream 0
OnBatt_Upstream_Failure
1 1/Tbat
ëUPS*(1-PbypassFailSwitch)
1/((1/ìPower)*ëPower/(ëPower+ëBypass+ëUpstream)+(1/ìBypass)*ëBypass/(ëPower+ëBypass+ëUpstream)+(1/ìUpstream)*ëUpstream/(ëPower+ëBypass+ëUpstream))
ëUPS*PbypassFailSwitch UPS_and_Bypass_Failed
0
ìUPS
Figure A3 represents the components that make up the “Downstream” block in Figure A1. For the
distributed redundant configurations (Figures 4 and 5), the STS would be added at the beginning of this
component string.
2005 American Power Conversion. All rights reserved. No part of this publication may be used, reproduced, photocopied, transmitted, or 26
stored in any retrieval system of any nature, without the written permission of the copyright owner. www.apc.com Rev 2005-1
Figure A3 – Downstream Diagram
ë=8.6988e-008 ë=3.9954e-007 ë=8.6988e-008
ì=0.263158 ì=0.45455 ì=0.263158
TERMS 6 TERMS 6
CB UNDER
UNDER UNDER
600A
600V 600V
Results
Table A4 illustrates the results of the analysis for all 5 UPS configurations.
2005 American Power Conversion. All rights reserved. No part of this publication may be used, reproduced, photocopied, transmitted, or 27
stored in any retrieval system of any nature, without the written permission of the copyright owner. www.apc.com Rev 2005-1