Guidelines To Surveyor General: Hull & Machinery Details
Guidelines To Surveyor General: Hull & Machinery Details
Guidelines To Surveyor General: Hull & Machinery Details
Classification:
It should be reported if the Classification Society has been informed about the casualty. If they have
been onboard, or if they are expected onboard. If the Classification has not been informed, the
Surveyor should make the Captain/Owner aware of their obligations with regards to notifying the
Classification. The Surveyor should as far as practicable try to meet/discuss with the attending
Classification Surveyor.
Condemned parts
Condemnation of Engine parts above a certain size/value shall be documented by the
Classification Society.
ISM Certification
It should be determined if the vessels ISM certification is up to date and valid, and whether the
casualty can be linked to any breach of ISM procedure. It should also be checked if the company’s
Designated Person has been informed about the casualty.
STCW regulation
Compliance with STCW regulation shall be considered where applicable.
(Crew’s working routines and rest periods leading up to the casualty, and the manning of the
vessel.)
Previous repairs
It should be determined if the vessel have experienced identical or similar casualties during the last 3
years.
Tendering
The Surveyor to assure that a tender process is already undertaken or if it will be initiated. If not, Gard
to be notified in case they require a tender process to be initiated on their behalf.
Turbochargers
Boilers
Cleaning procedures. Does the appearance of the boiler indicate that the
procedures have been maintained?
Chemical treatment and record for this. Record should be traced at least 6-
12 months prior to the casualty.
Were there any erosion, cavitations or contact marks on the propeller blades and
edges?
Any signs of previous repairs on the propeller which were not recorded
Report from present and last clearance and wear down gauge readings.
Cranes
Gard AS
Marine Claims Department
E-mail: Directly to the claims handler instructing the surveyor
or alternatively marineclaims@gard.no