A Brief Overview of Centrifugal Compressor System Process Design
A Brief Overview of Centrifugal Compressor System Process Design
A Brief Overview of Centrifugal Compressor System Process Design
Defines the suction and discharge conditions (P,T, Flowrate) and gas
composition.
Main input to the compressor vendor.
Define all possible options of suction and discharge conditions and gas
compositions, present and future.
The vendor selects the model which fits these conditions the best.
Performance data:
Process Simulation:
System components:
Process Calculations:
Blowdown calculation:
Intent: Reduce the pressure of the equipment to 50% of design pressure within
15 minutes during a fire emergency.
Typically done using Dynamic depressurising Utility in HYSYS
Relief valves are not a depressurisation device.
Ball valve + Orifice combination OR control valve
Hydrate calculations:
Scrubbers:
Vertical Knock out vessels.
Limit liquid carry over to the compressors.
Internals – SMS / SV / SVS
Air Coolers:
Control philosophy:
Capacity control
Antisurge control
Scrubber level control
Safeguarding philosophy:
Process shutdown.
Emergency shutdown.
Other shutdowns.
Process shutdown:
Close the discharge ESD valve. The suction ESD valve shall remain in open
position. The blowdown ESD valve shall remain in closed position. The antisurge
valves and capacity control valve goes to open position. The motor stops and the
compressor settle out to suction pressure. The auxiliaries keep running.
Generally initiated on trips on process parameters.
Enables faster start-up compared to ESD
Emergency shutdown:
PSD1 shall Trip the compressor motor & auxiliaries, and Close the ESD valve on
the suction and discharge header.
The antisurge valves and capacity control valve goes to open position.
The external seal gas supply shall be isolated by the ESD valve on the seal gas
line.
The compressor blowdown valves shall open and depressurise the gas to flare.
Initiated on Fire, Station ESD.
Other shutdowns:
The suction, inter-stage(s) and discharge scrubbers low low level closes liquid
outlet ESD valves.
The inter-stage(s) and After-cooler fan high vibration shall trip the respective fan.
Low Low temperature at the after cooler outlet shall trip the first working fan at 30
deg C and the next at 20 deg C.
External seal gas high high pressure downstream of external seal gas pressure
letdown valve for LP casing shall close the external seal gas supply ESD valve.