E&DPlan 0506
E&DPlan 0506
E&DPlan 0506
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018
MV Switchboards
ForApp. ForApp.
By ON
Customer DE E&D S.B.No. Description Start App. Rec. For Prod. Remarks
K.E.S.C. SJA/MR A0356 4800018464 21X4MVAr,11kV Capacitor Banks 12/9/2003 16-01-04 26-02-04 21-01-04 Inspected on 02-08
Sialkot Int'l Airport Ltd. (EC) SMY A0357 5100002643 11kV Switchgear (05 Panels) 12/10/2003 16-01-04 12-02-04 01-03-04 Reinspected on 23-11-04
K.E.S.C. SJA/MR A0363 4800018961 15kV Switchgear (20 Panels) 1/16/2004 29-01-04 26-02-04 20/29-01 ###
PO recd 06-04/App awaited/Qty reduced
IESCO SHA A0367 4800018736 37x200KVA PMTs 12/30/2003 09-04-04 09-04-04
29-07/ Inspection on 17-09
09-04-04
Pakistan Refinery Ltd. KR A0370 4800018945 3.3 kV Switchgear - Simoprime 1/16/2004 24- 04-05-04 24-05-04 Inspected on 29-9 /Dispatch awaited
05-04
20-05-04
21-05-04
Decon Germany MYS A0371 4900000315 24kV Switchgear - 8BK20 1/22/2004 18-03-04 26-04-04 Lot 2.1 Inspection on 21-02
05-11-
04
11kV Switchgear (24xI/C+ CL rel on 13-01/ Inspected on 03/04-
WAPDA ADP27 SJA A0372 4800019094 1/7/2004 17-02-04 04-03-04 13-04-04
50xO/G+20xC) 08/Inspected on 07-09
Pioneer Multipurpose KR A0373 4800019145 02xKESC Outgg + 21xKESC Jr 2/9/2004 08-03-04 06-03-04 App awaited/KESC Jr Panels dispatched
16-03-04
25.03.04
Nishat Chunian Ltd. (Weaving) SJA A0375 4800019386 01xI/C+01xO/G 11kV VCB Panels 3/3/2004 7/1/2004 30- Additional Order on 24-06
13.07.04
01-07-04 06-04
Rahman Cotton Mills SJA A0377 4800019444 01x11KV Wapda O/G Grid Panel 3/5/2004 12-03-04 6/16/2004 11-03-04 App awaited/Inspection on 17-06
Masood Textile Mills KR A0380 4800019596 01x 11kV VCB I/C / O/G Panel 3/25/2004 30-03-04 15-04-04 15-04-04
Crystal Spinning (Pvt.) Ltd. MYS A0383 4800019721 01x Wapda Industrial Panel 3/26/2004 31-03-04 NR 29-03-04
SUPARCO SJA/ KR A0385 510002843 01x11KV 1/C +01x o/g Panels 4/20/2004 5/4/2004 11-05-04 11-05-04 CL rel on 30-04/ App awaited
29.04.04
25x11KV Capacitor Bank Control 26.05.04
NTDC/WAPDA-ADP29 (LOT III) SJA A0389 4800020047 4/19/2004 7/30/2004 7/22/2004 Inspection on 18-10
Switchgear Panels 08.06.04
14.07.04
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018
Chashma Sugar Mills Ltd. SJA A0406 4800020867 02x 6.6 KV VCB Panels 6/17/2004 7/19/2004 7/22/2004 8/10/2004 8/13/2004 Changes to be rel on SB S go-ahead
Roche Pakistan Ltd. MYS A0407 4800020910 01x VCB Phase CO Panel 6/22/2004 7/7/2004 7/16/2004 8/17/2004 7/27/2004 Inspected on 06-10/Changes
FESCO SJA/RA A0408 5100002938 04x I/C+15x O/G VCB Trolleys-WAP 6/22/2004 6/29/2004 8/6/2004 8/6/2004
Fatima Sugar Mills KR A0410 4800020873 01x 11kV VCB I/C Panel 6/24/2004 7/2/2004 7/2/2004 7/20/2004 7/20/2004
Zaffar Enterprises RA A0411 4800020754 03x KESC Jr. +01x I/C / O/G Panels 7/1/2004 7/15/2004 7/15/2004 CL rel on 09-07/App awaited
Ghazi Fabrics International RA A0412 4800021130 01x 11KV VCB I/C / O/G Panel 7/2/2004 7/7/2004 7/19/2004 7/7/2004
Arshad Corporation Pvt. MYS A0413 4800021179 01x WIP + 01 x VCB Owner's Panel 7/7/2004 7/13/2004 9/8/2004 8/19/2004 CL rel on 12-07
Maxcorp Hussain Pakistan KR A0414 4800021244 01x FLBS Panel 7/13/2004 7/15/2004 7/22/2004 7/27/2004 7/26/2004
Krystalite Products (PTD SE) RA A0416 5100002991 01 x WIP 7/22/2004 8/2/2004 7/29/2004 24-08-04 7/29/2004 CL rel on 26-07
Islamabad Club MYS A0418 4800021501 01 x 11kV WAPDA Consumer Panel 8/3/2004 8/6/2004 8/6/2004 8/31/2004 24-08-04
Habib Rafique Pvt. Ltd. KR A0423 4800021842 28x 3-Way + 18x 4-Way RMUs 8/24/2004 8/27/2004 9/29/2004 9/23/2004 ###
01xWIP+02x11kV VCB I/C/O/G
Haleeb Foods KR A0424 4800021812 8/24/2004 9/3/2004 9/2/2004 9/20/2004 9/2/2004
Panels
Indent/S.O. on 26-08 / Add indent for
IESCO SHA A0425 4800021875 (15+3) x 63kVA PMTs 8/6/2004 NR 9/3/2004
03Nos. on 23-02
Indent /S.O.No.on 19-10/Rating plate on
IESCO SJA A0426 4800022602 37 x 4 - Way RMUs 8/26/2004 NR NR 10/29/2004 21-09/Qty enhanced by 07 Nos. on 15-10
/ 30 Nos. dispatched
11-09-04
Reckitt Benckiser (PTD SE) KR A0427 5100003059 01x11kV Simoprime I/C/O/G VCB pan 9/3/2004 9/3/2004 e- 9/3/2004 CL rel on 03-09/App drgs recd 21-09
24-09-04 mail
15-10-
04 03-11-04
28-10-04 18-11-04
Maple Leaf Cement KR A0428 5100003131 6.3 kV Switchgear-14 x 8BD4 8/31/2004 9/21/2004 11/30/2004 Indent/S.O. No. on 13-10
05- 03-12-04
11-04 13-12-04
schematics
01 x 11kV WAPDA 16-09-04 23-09-04
CL rel on 02-11/04-11/Consumer panel
Baber Islam & Company KR A0429 4800022142 Consumer+02x11kV VCB I/C 9/14/2004 9/16/2004 11- 11/29/2004 11-
dispatched
Panels 11-04 11-04
Pakistan Petrolem Ltd. RA A0430 5100003087 01x VCB Trolley with contact arms 9/15/2004 9/16/2004 9/10/2004 9/16/2004 App awaited
Gulshan Weaving Mills Ltd. MYS A0431 4800022111 01x VCB I/C / O/G Panel 9/15/2004 9/17/2004 9/20/2004 12/15/2004 26-11-04
Commodities & Textiles Pvt. Ltd. KR A0432 4800022258 02 x KESC Jr 9/22/2004 10/1/2004 10/7/2004 10/22/2004 10/7/2004 CL rel on 27-09
ENI Pakistan Ltd. (EC) KR A0433 5100003138 02 x LBS+I/C Cable Connection Pan 9/23/2004 10/1/2004 10/4/2004 10/4/2004 Indent /S.O.No. on 14-10
27-09-04
Retrofit for MOCBs/Indent/ S.O.No. on
HESCO (PTD SE) RA A0434 5100003126 05xI/C+15xO/G VCB Trolleys - WAP 9/23/2004 12/8/2004 12/8/2004 13-10/Site Visit on 05-10 / Inspection on
06-10-
03-03
04
Indent/S.O.No. on 13-10 / CL rel on 18-10
20- 08-10-04
Holcim Cement Srilanka (MES) MYS A0435 5100003122 01x 3.3kV,2000A VCB+01xAdapter P 9/28/2004 10/5/2004 10/25/2004 / Rev drgs on 27-10 / Adapter Panel
10-04 28-02-05
dispatched
01 x 6.6 kV VCB Panel with Manual
Indus Sugar Mills (EC) SJA A0436 5100003139 9/28/2004 10/6/2004 10/19/2004 10/21/2004 10/26/2004 Indent /S.O.No. on 15-10
Synchronisation
Shahzor Feeds Pvt. Ltd. RA A0437 4800022424 01x WIP + 01x VCB Owner's Panel 10/7/2004 10/11/2004 10/21/2004 10/11/2004 CL rel on 12-10
23-02-05
02x 24 kV, 25kA, 800A VCB I/C / D01
20-10-04 23-02-05
Barqaab / NTDC (TD) SJA A0438 5100003125 O/G Panels for NTDC -KESC 10/8/2004 10/20/2004 28-04-05 CL rel on 12-10
22-12-04 email
Interconnection D02
10-05-05E01
24-02-05
Clar recd 15-02 / CL for add comps on
07-04-05
25-03 / App comments replied 30-06 /
03-02-05 27-05-05 11-03-05
Meeting with Alstom 08-07 / Rev CL on
Auto changeover scheme in 06- 21-07-05 26-04-05
Alstom Pakistan (Pvt) Ltd. MYS/SJA A0464 3000212008 1/24/2005 NR 21-07 / App comments recd 04-08,
existing MV Panels 04-05 09-08-05 10-06-05
replied on 09-08 with rev drgs /
25-05-05 20-10-05 11-11-05
Comments on 26-08 replied & incorp in
01-11-05
drgs / App with minor changes
16-11-05
Pakistan Air Force KR A0465 3000216361 01x 11kV VCB I/C / O/G Panel 1/27/2005 2/23/2005 3/31/2005 4/1/2005 Fresh indent on 14-02 / CL rel on 23-02
Resham Textile Mills Ltd. RA A0466 3000215233 11kV Switchgear-8BD4 (06 Panels) 2/1/2005 2/11/2005 2/23/2005 2/23/2005 Changes in CT ratios on 25-02
18-03-05
25-03-05 I/C
Nestle Milkpak Ltd. SJA/RFQ A0473 3000221408 01x I/C + 1xO/G 11kV VCB Panels 2/22/2005 3/5/2005 21-03-05 3/31/2005 CL rel on 08-03
Schematics
Loadstar (Pvt.) Ltd. MYS/RFQ A0474 3000224965 01x 7.2kV O/G Panel 2/25/2005 3/4/2005 3/10/2005 3/18/2005 3/22/2005 A1326 Old order/CL rel on 25-02
18-03-05
03x11kV VCB Panel + Loose 30-03-05 28-03-05
DS Textile Ltd. KR A0475 3000215568 2/22/2005 3/9/2005 3/31/2005 Changes in App / Rev CL on 06-04
Component 05-04-05
Schematics
18-03-05
02x 11kV VCB Panel + Loose 24-03-05 28-03-05
DS Industries (Pvt.) Ltd. MYS A0476 3000216345 2/22/2005 3/12/2005 3/28/2005
Component 05-04-05
Schematics
Coca Cola (Pvt.) Ltd. SJA/RFQ A0477 3000222996 01x WCP + 06nos. loose CTs 2/25/2005 3/1/2005 3/1/2005 3/8/2005 App awaited
02-03-05 02-03-05
Arshad Textile Mills Ltd. MYS/RFQ A0478 3000223443 02x 11kV I/C / O/G Panels 2/25/2005 3/2/2005 3/30/2005 Interlocking reqmt on 04-03
11-03-05 11-03-05
Karachi Export Processing Zone KR/RFQ A0479 3000222933 01x 11kV O/G Panel 3/7/2005 3/16/2005 3/16/2005 3/30/2005 4/20/2005 CL rel on 14-03
01x 11kV VCB I/C/O/G (8BD4) + 14-03-05 16-03-05 CL rel on 14-03 /Add indent for WIP - Go
Technical Associates Pakistan MYS A0480 3000225691 3/15/2005 3/15/2005 3/25/2005
01x WIP Panel 24-03-05 25-03-05 ahead on 21-04
Muhammad Mushtaq, Muhammad Naseer & 31-03-2005
MYS/RA A0481 3000228851 02x 11kV VCB I/C/O/G Panels 3/11/2005 3/16/2005 3/17/2005 3/17/2005 CL rel on 14-03/App drgs on 08-04
Co. email
21-03-05
12- TCS Relay deleted / CL rel on 21-03 /
11 kV Switchgear (06xSA2 + 18-03-05
Lucky Energy, Karachi SJA/RA A0482 3000230152 3/11/2005 04-05 4/29/2005 5/6/2005 Changes on 20-04 & 29-04 / Trip circuit
01xBPT Panels) 06-04-05
28-04-05 Supervision changes to be done
02-05-05
20-05-05 Clar Meeting with EC on 04-04 / CL rel
DHA Lahore - Phase VI SHA A0483 3000231988 01x 4-way RMU + 04x 100kVA PMTs 3/18/2005 4/7/2005 5/24/2005
19-07-05 on 07-04 / App with changes
15-04-05
11kV Switchgear
22-03-05 30-03-05 06-04-05 20-04-05 CL rel on 01-04 / Add indent / Changes
Nishat Chunian Ltd. - I KR A0484 3000231561 03xI/C+01xB/C+04xO/G+01xBPT
17-06-05 20-06-05 30-06-05 email 30-06-05 on 24-06
Panel + 01x11kV VCB Synch. Panel
12-07-05
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018
State Life of Pakistan MYS A0485 3000233483 01x 11KV I/C /O/G Panel 3/24/2005 3/25/2005 3/29/2005 4/4/2005 3/29/2005 CL on 29-03
11kV Switchgear (02xI/C / O/G
Janana De Malucho Textile MYS A0486 3000234193 3/25/2005 3/31/2005 4/1/2005 NR 4/4/2005
Panels)
CL rel on 08-04 rev 28-04 / App with
08-04-05 Changes/ CT ratio changed to 1200/5A
Cherat Cement MYS A0487 3000215827 6.3kV Switchgear-8BK (08 Panels) 3/29/2005 4/6/2005 4/19/2005 5/17/2005
28-04-05 on 07/05/05 / O/G VCBs changed to
1250A by PTSI
15-04-05
RMUs
19-04-05 20-04-05
11kVSwitchgear
WIP+11kV WIP+11kV+
(01xWIP+01xI/C+02xO/G Panels + 08-04-05 19-04-05
Glamour Developers (Pvt.) Ltd. MYS/SHA A0489 3000240107 27-04- 5/10/2005 RMU CL for RMUs on 15-04 / Add indent
11x200kVA & 01x100kVA PMTs + 07-06-05 09-06-05
05 16-05-05
02x4-Way RMUs) +01xWCP
PMT PMTs
10-06-05
WCP
04-05-2005
Chenab Engineering RFQ/SJA A0490 3000240259 01xWIP + 01xWCP 4/8/2005 4/11/2005 4/14/2005 5/5/2005
WCP
Karachi Golf Club SHA A0492 3000253969 01x 400kVA PMT 4/13/2005 4/25/2005 4/26/2005 6/3/2005
IESCO KR A0493 3000254703 37x 4-Way RMUs 4/14/2005 NR 4/15/2005 NR 4/15/2005
01xI/C+02xO/G 11kV VCB Panels -
Azgard Nine Ltd. KR A0494 3000256591 4/21/2005 4/27/2005 4/26/2005 4/27/2005 4/27/2005 CL rel on 26-04/As-built sent
8BD4
Pakistan Mineral Development Corporation KR A0495 3000257090 01x WIP 4/21/2005 NR 4/21/2005 NR 4/21/2005 CL rel on 21-04
Ashfaq Textile Mills Ltd. KR/RFQ A0496 3000257651 01x WIP + 01x VCB Owner's Panel 4/27/2005 4/29/2005 4/29/2005 5/11/2005 5/23/2005 CL rel on 29-04/CT changed
03-05-05
28-04-05 04-05-05 11-05-05 03-05-05 CL rel on 03-05 / CT ratio for WIP on 11-
Bhanero Textile Mills Ltd. KR A0497 3000257527 11kV Switchgear + 01xWCP 5/10/2005
08-06-05 13-06-05 09-06-05 09-06-05 05 / Add indent / WCP deleted
WCP
Al Noor MDF Board Industries
MYS/RA A0498 3000262987 11kV & 3.3kV Switchgear 5/3/2005 5/10/2005 5/31/2005 6/16/2005 6/20/2005 Meters shall be provided by PTD-SE
(PTD SE)
01x WCP + 01x WIP + 01x VCB
Citropak Ltd. MYS A0499 3000262516 5/5/2005 5/11/2005 5/10/2005 5/18/2005 5/18/2005
Owner's Panel
16-05-05
M/s Rousing Engg Services / 01x I/C + 04xO/G Panels - WAPDA 10-05-05 Formal Indent on 12-05 / Changes as per
RFQ/SJA A0500 3000267773 5/9/2005 5/10/2005 5/16/2005 10-06-05
M/s A. A. Spinning Mills Ltd. P44:96 09-06-05 meeting with Customer
21-06-05
11-05-05
01x 11kV VCB O/G Panel + 01x Add indent / Rev indent - 01xO/G panel
Bismillah Textile Mills Ltd. MYS A0501 3000264770 24-05-05 5/13/2005 6/10/2005 6/22/2005 6/23/2005
VCB Trolley reqd instead of owner's panel
07-06-05
AJK Electricity Dept. RFQ/SJA A0502 3000266732 01x WCP 5/11/2005 5/13/2005 5/13/2005 NR 5/24/2005 Inspected on 08-08
27-05-05
Century Paper & Boards Mills Ltd. KR A0503 3000269891 01x 11kV VCB I/C / O/G Panel 5/20/2005 5/24/2005 6/1/2005 6/7/2005 CL rel on 27-05
07-06-05
01x KESC Jr with Prot w/o
Babar Metal Industries KR A0504 3000272953 5/23/2005 5/24/2005 5/24/2005 5/24/2005
Metering
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018
Tayyeb Textile Mills KR A0509 3000276293 01xInc/Outgg + 01xInc + 02xOutgg 6/7/2005 6/7/2005 6/14/2005 6/15/2005
Tariq Glass Industry (PTD SE) MYS A0512 3000286314 01xI/C VCB trolley - 8BD4 6/20/2005 6/21/2005 6/24/2005 7/22/2005 7/26/2005
01-07-05
04-07-05 11-07-05 05-08-05
11kV Switchgear - 16x8BD4 + 13-07-05SLD J1,J2&J3
22-06-05 04-07-05 03-08-05JI&J2 CL rel on 04-07 / CL for add indent on
26-07-05J1&J2
12x8BK Additional 05xI/C + 25xO/G 15-08-05J3 27-09-05
M/s Packages Ltd./Bulleh Shah Paper Mill Project KR A0513 3000287128 01-09-05 15-09-05 02-08-05J3 16-09 / Change of CT ratio in 02xO/Gs on
(8BD4) Additional 04xI/C + 16xO/G 22-08-05 15-09-05 02-11-05
21-02-06 28-02-06 J3(PTSI) 18-05
(8BD4) 16-09-05 J3
Add indent 26-09-05 20-03-06
16-03-06
SUPARCO MYS A0523 3000296423 01x I/C / O/G VCB Panel 7/12/2005 7/15/2005 7/14/2005 8/2/2005 8/3/2005
PSM KR A0524 3000287792 03x VCBs 7/12/2005 7/13/2005 7/15/2005 7/27/2005 7/27/2005 CL on 15-07-05
HESCO RFQ A0527 3000303957 16xI/C+48xO/G WAPDA P44:96 7/19/2005 7/22/2005 7/21/2005 10/3/2005 9/26/2005 CL rel on 21-07
CL rel on 21-07 / Approved drgs recd on
Bahria Town Rawalpindi KR A0528 3000304924 04x 4-Way RMUs 7/21/2005 7/21/2005 7/26/2005 12-08-05email 8/23/2005
17-08
01x 11kV VCB I/C Panel for
Nagina Cotton Mills - Kotri KR A0529 3000304609 7/21/2005 7/28/2005 8/4/2005 8/16/2005 8/16/2005 Site visit on 01-08 / CL rel on 04-08
Jenbacher Generator
01x I/C + 05xO/G Panels - WAPDA PMT CL rel on 04-08 / EM
02-08-05 13-09-
P44:96 + 01x100kVA PMT Standard 27-07-05 09-08-05 15-09-05 Communciation matter to be considered
M/s Rousing Engg Services / Dost Steel RFQ A0530 3000302543 04-08-05 05email
w/o metering + 01xCapacitor O/G 21-06-06 26-06-06 17-07-06 by SB-LHR / Changes on 09-06 (ES,
29-06-06 13-07-06
Panel meters) / Add indent
DHA Lahor/Electrification Works of DHA Phase V SHA A0531 3000303414 02x 400kVA PMTs 7/27/2005 NR 8/12/2005 8/12/2005 CL rel on 10-08
28-07-05
See (Item1) 02-09-05 CL rel on 28-07(KESC Grid Panel) & 08-
01xKESC Grid O/G + remarks 05-08-05 10-11-05 08-09-05 08 (Bal) / Site visit on 30-08 / All
M/s Abbott Laboratories (EC) SJA/RA A0532 3000304671 7/27/2005
01xI/C+01xB/C KESC Jr Panels 05 -08- (Item 2&3) KESC Grid 21-10-05 equipment except KESC Grid panel
05 26-10-05 Panel dispatched
BC+Adaptor
11-08-05
01xWIP + 02x11kV VCB CT ratio 100/5A reqd for WIP as per
PAEC / NMC-1 RFQ A0533 3000309035 7/28/2005 8/11/2005 06-10-05 9/13/2005 9/14/2005
O/G+01xBPT Panels letter recd 03-10
WIP
U. S. Embassy RFQ A0536 3000310158 01xWIP 8/3/2005 NR 8/5/2005 8/17/2005 CL rel on 05-08
01xWIP + 01x11kV VCB CO Panel + 17-08-05 26-08-05 25-08-05 01-09-05 CL rel on 25-08 / Energy meter reqd in
Gadoon Textile Mills Ltd. RA A0540 3000315535 9/2/2005
01x11kV I/C / O/G Panel 06-09-05 08-09-05 08-09-05 12-09-05 WIP as per App comments / Add indent
Olympia Chemicals Ltd. SJA/KZ A0541 3000316684 01x 6.3kV VCB O/G Panel-8BD4 8/17/2005 8/29/2005 8/25/2005 12-09-05email 9/13/2005 CL rel on 23-08
Formal indent on 10-10 / S.O. # on 07-
17-08-05 30-08-05
IESCO SHA A0542 3000346543 31x 63kVA PMT NR NR 10 / CL rel on 23-08 / Add indent for
16-02-06 01-03-06
06Nos.
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018
15-09-05email
Gulshan Weaving Mills Ltd. - Unit 2 RA A0549 3000326254 02x11kV VCB Manual CO Panels 8/24/2005 9/6/2005 9/7/2005 29-09-05 9/7/2005 Based on earlier order
08-11-05
05-10-05 21-11-05 S. O. # on 14-11 / CL for Kiosk rel on 11-
HT Panel
HT Panel HT Panel 11 / SB D Details for HT Panel & Kiosk /
01xO/G Panel + 03x25kVA Kiosk 02-01-06
Sialkot Int'l Airport Ltd. (EC) SJA/RFQ A0558 3000345661 9/27/2005 10/5/2005 08-11-05 01-03-06 Kiosk drgs resubmitted / Meeting with
with RMU Scheme 10 Kiosk
28-02-06 Kiosk NESPAK on 03-05-06/Change received
10-05-06
17.08.06 17.08.06 on 21.07.06
21.07.06
10-10-05 14-10-05
01xWIP + 01xI/C+02xO/G 11kV VCB CL rel on 11-10 / Go-ahead for
Al-Rahim Textile Industries KR A0559 3000336850 10/10/2005 10/12/2005 FP, FV FP, FV 10/18/2005
Panels manufacturing on 17-10
11-10-05 19-10-05
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018
24-11-05
29-06-06 Formal indent, S. O. # recd on 28-03 / CL
01-12-05 26-06-06
KESC 2480-02 SJA A0561 3000403028 11kV Switchgear - 113x15kV Panels 10/13/2005 11/1/2005 07-12-06 & drgs for Remote Control Panels
09-01-06 email
RCP pending
05-05-06
??
HT Panel 24-04-06
02x11kV O/G VCB Panels (8BD4) + PMT Alternative I reqd as per email from
NTDC-WAPDA / Sahiwal S/S (TD) RFQ/SHA A0562 3000352782 10/19/2005 10/27/2005 22-11-05 25-04-06
02x630kVA PMTs SB S Ex on 22-11 / NESPAK comments
PMTs PMT
20-01-06
03xKESC Jr +
Innovative Engineering / Hilton Pharma Ltd. KZ A0563 3000352299 10/24/2005 10/27/2005 10/31/2005 11/30/2005 11/7/2005 CL rel on 24-10
01x11kV I/C/O/G Panel-8BD4
21-11-05 P124 instead of CDG 61 relay, Fuji
M/s Royal Palm Golf & Country Club RFQ A0564 3000352861 01x11kV I/C/O/G Panel-8BD4 10/24/2005 10/27/2005 10/28/2005 11/23/2005
05-12-05 instead of Elabs CTU reqd in App
2x(1000:2000/5/5A)+
11kV Switchgear - 15xI/C + 68xO/G 01-11-05 13x(1600:800/5/5A) / Formal indent &
WAPDA ADP-61 SJA/RFQ A0565 3000359838 10/25/2005 10/28/2005 11/1/2005 12/7/2005
+ 12xCoupler Panels 29-12-05 S.O. No. on 08-11 / Approval through
letter
08-12-05
03-01-06 Changes in App, Resubmitted / App with
15-11-05
Prefab Systems (Pvt.) Ltd. (Expo Centre) RA A0566 3000356489 01xI/C+02xO/G 11kV VCB Panels 11/2/2005 11/10/2005 16-01-06 26.01.06 comments in Meeting with NESPAK on
18-01-06
17-01-06 17-01
02-02-06
27-12-05
CL rel on 07-12 / Additional Indent
01xWIP + 01xI/C+02xO/G 11kV 30-11-05 02-12-05 06-01-06
Qaim Automative (Mfg) Pvt. Ltd. KR/MAB A0571 3000373634 12/12/2005 3/15/2006 received on 02-02/FIT Report Received
Panels + 01x I/C Panel 06-02-06 08-02-06 email
19.06.06
13-03-06
01x15kV KESC Grid O/G + 16-12-05
Bolan Casting Ltd. KR/RA A0572 3000377286 03xKESC Jr + 01x 11kV I/C/O/G - 12/1/2005 12/9/2005 12/9/2005 Letter 12/12/2005 CL rel on 02-12
SA2 Panels 03-01-06
11kV Switchgear (14x8BD+01xBPT)
Azgard Nine Ltd. KZ A0573 3000378126 + 12/2/2005 12/12/2005 12/19/2005 1/16/2006 12/26/2005 CL rel on 06-12 rev. 08-12
Loose Components
01x3-Way RMU (WAPDA Specs. Formal indent & S.O. # recd on 27-12 /
M/s Khayaban Enterprises KR A0574 3000388845 12/7/2005 12/9/2005 1/23/2006 12/14/2005
DDS-46:90) CL rel on 09-12
01xWIP + 01x11kV I/C/O/G Panel - 20-12-05
M/s Riffino Rice Mills Pvt. Ltd. KR/MAB A0575 3000380597 12/9/2005 12/13/2005 12/14/2005 12/14/2005 CL rel on 09-12
8BD4 email
01x6.3kV, 1250A, 31.5kA VCB 16-12-05 03-01-06
Fauji Cement Company Ltd. KR/MAB A0576 3000379552 12/8/2005 12/10/2005 2/15/2006 CL rel on 16-12
trolley + Fixed contacts 05-01-06 05-01-06
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018
Dewan Cement MR/SJA A0584 3000389045 6.3kV VCB Trolley Contact Arms 12/27/2005 12/30/2005 12/30/2005 Handled by SB-D/Site visit on 15-16/02
18-04-06
07x5-Way (Sch. 82)+01x3-Way (MDS)
18-01-2006 24.03.06 Meeting with Consultant on 21-03 / CLs
K.E.P.Z. / Phase II SJA/RFQ A0589 3000394334 (Sch. 32) RMUs + 02x11kV Panels 1/4/2006 * 26-04-06
17-04-06 25-04-06 (Partial) rel on 24-03 / SS6 deleted
(KESC Grid Design) 27-04-06
FLBS, RMUs
Rahimbux Group of Cos. - Arain Mills Ltd. (PTD SE) RFQ A0591 3000396628 01x11kV O/G Panel - 8BD4 1/16/2006 1/19/2006 1/27/2006 3/10/2006 3/13/2006
Gadoon Textile Mills RA A0592 3000401019 01x11kV CO Panel - 8BD4 1/20/2006 1/25/2006 1/27/2006 2/15/2006 2/15/2006 CL rel on 27-01
M/s Hussain Mills Ltd. RFQ A0594 3000403721 01x11kV I/C / O/G Panel - 8BD4 1/25/2006 1/31/2006 1/27/2006 2/27/2006 3/13/2006 CL rel on 27-01
Highland Traders KR A0595 3000403725 06x KESC Jr. Panels 1/26/2006 1/31/2006 1/30/2006 1/30/2006
Rating Plate approval awaited / Formal
03-02-2006
IESCO SJA A0596 3000418118 50x4-WAY RMUs + 13x4-WAY 2/1/2006 4/6/2006 indent & S.O. # on 21-02 / Additonal
15-08-06
Indent
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018
01-03-2006
Rafique Spinning mills RFQ/KZ A0598 3000412072 1xLBS+2xOG VCB + 1xI/CO/G LBS 2/13/2006 2/17/2006 2/21/2006 3/20/2006
Letter
02 KESC Grid O/G + 27-02-06
Highland Traders-Naval Housing Project KR/MAB A0599 3000412156 2/13/2006 2/17/2006 6/30/2006 Jrs. Dispatched; Grid panels remain
26x8BD4(600mm) SLD, FV
Dewan Salman Fiber Ltd. MAB A0600 3000410001 05xGen I/C+02xO/G+1xBC 2/10/2006 2/21/2006 3/8/2006 3/15/2006 3/23/2006
29-03-06 CT ratios recd on 24-02 / CL rel on 01-
16-02-06 01-03-06
Lucky Energy SJA/RA A0601 3000418226 03xGen I/C+ 03xO/G 2/23/2006 29-05-06 4/10/2006 03 / Add indent / Meeting with customer
13-03-06 20-03-06
09-06-06 on 05-05
Perfect Electromek RFQ A0602 3000418523 01xI/C & O/G VCB Panel 2/20/2006 2/20/2006 2/22/2006
01xWIP + 01x11kV I/C/O/G Panel -
Citropak Ltd. / Unit-II KZ/RA A0603 3000423546 3/1/2006 3/7/2006 3/31/2006 3/7/2006 CL rel on 02-03
8BD4
M/s. Gulshan Spinning Mills Ltd. - 1 KZ/RA A0604 3000423564 01xWIP 3/1/2006 3/5/2006 3/7/2006 3/7/2006 CL rel on 02-03
03xKESC Jr + 01x15kV KESC Grid
Highland Traders-Diamond Metal Industries KR/MAB A0605 3000412158 2/20/2006 2/28/2006 3/9/2006 3/9/2006
Panel
03xKESC Jr + 01x15kV KESC Grid
Highland Traders MAB/KR A0606 3000416975 2/20/2006 2/28/2006 3/9/2006 3/9/2006
Panel
M/s Independent Newspapers Corp. (Pvt.) CL rel on 22-03, 05-04 / Order put on-
RFQ A0613 3000430110 01x KESC Jr+ 01xI/C / O/G Panels 3/8/2006 3/16/2006 4/5/2006
Ltd. / Jang Building, I. I. Chundigar Road (EC) hold on 10-04
M/s J & S Enterprises (Pvt.) Ltd. / Jang Press, CL rel on 22-03 / Order put on-hold on
RFQ A0614 3000430115 01x KESC Jr+ 01xI/C / O/G Panels 3/8/2006 3/16/2006 4/4/2006
Sultanabad (EC) 10-04
05-04-06
20-04-06
Chashma Sugar Mills - D. I. Khan SJA/MAB A0615 3000430049 6.6kV Switchgear - 06xSA2+BPT 3/14/2006 3/22/2006 21-04-06 5/3/2006
10-05-06
Schematics
Perfect Electro Mek / M/s. Khalid Shafique
RFQ A0616 3000436427 01xWCP 3/24/2006 3/20/2006 3/30/2006
Spinning Mills Ltd.
Bahria Town Rawalpindi RFQ A0619 3000436465 03x11kV O/G Panels - WAPDA 3/22/2006 3/31/2006 4/3/2006 4/13/2006 4/17/2006
03-04-06
01x11kV VCB Capacitor O/G
VCB Panels Cap make, ES confirmation recd on 29-
Bahria Town Rawalpindi SJA/MR/RFQ A0620 3000436481 Panel+ 3/22/2006 4/7/2006 6/26/2006 6/29/2006
29-05-06 05 from SB S / CL rel on 02-06
01x11kV, 4800kVAr Capacitor Bank
Cap Bank
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018
04x63+04x100+05x200+34x400+
M/s. Technical Associates Pakistan (Pvt.) Ltd. /
SHA A0621 3000435675 01x630kVA PMTs+03x3-Way+ 3/22/2006 3/29/2006 4/25/2006
Sukh Chayn Gardens
06x4-Way RMUs
Medipharm (Pvt.) Ltd. SJA/MAB A0625 3000437228 01xWIP+01x11kV Owner's Panel 3/30/2006 4/4/2006 4/13/2006 4/7/2006
Kay & Emms (Pvt.) Ltd. RA A0626 300044441 01xWIP+01x11kV Owner's Panel 3/30/2006 4/5/2006 4/13/2006 4/17/2006
Grey Builders KR/RA A0636 3000460706 03xKESC Jr. Panels w/o Metering 5/2/2006 5/3/2006 5/3/2006 5/3/2006
Pakistan Cement (OLM) SJA/MAB A0641 3000469372 02x6.3kV LBS Panels 5/16/2006 5/16/2006 5/19/2006 5/22/2006 6/2/2006 Changes as per App and resubmitted
Babar Islam & Co. RA A0642 3000474344 01x11kV I/C / O/G Panel - 8BD4 5/22/2006 5/31/2006 6/22/2006
11kV Switchgear - 04xI/C + 40xO/G
IESCO RFQ A0643 3000565152 5/23/2006 NR 7/1/2006 7/26/2006 S.O. # awaited
+ 02xCoupler Panels
KESC (PTD SE) KR A0644 3000478610 22xVCB Trolleys (Jr) 5/26/2006 7/5/2006 7/7/2006
Highland Traders KR/MAB A0645 3000473669 07xKESC Jr. Panels 5/30/2006 6/2/2006 6/2/2006 6/2/2006
Prelim Trafo Drgs recd on 09-06 / CL rel
31-05-06 19-06-06 21-06-06
Technical Associates, Abu Dhabi Palace RFQ/SHA/SJA/SMY
A0646 3000485471 15xKiosk Substations 6/27/2006 on 14-06 rev 21-06 / Add indent - Qty inc
15-06-06 20-06-06 04-07-06
from 11 to 15
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018
Sitara Hamza SHA A0651 3000496296 1x100kVA PMT + 1x400kVA PMT 6/12/2006 7/6/2006 7/5/2006 CL rel on 06-07-06
FESCO SHA A0652 3000484330 07x200kVA PMT Alternate III 6/15/2006 6/20/2006
IESCO RFQ A0653 02x200kVA PMT 6/15/2006 NR CL rel on 23-06
Lakson Tobacco Company RFQ A0654 3000493560 01x11kV O/G Panel 6/20/2006 6/23/2006 6/29/2006 7/13/2006 7/14/2006 CL rel on 29-06
6.3kV, 40kA Switchgear - 21-11-06
Maple Leaf Cement KR A0655 3000501466 7/12/2006 7/19/2006 8/3/2006 8/23/2006
01xI/C+02xO/G (8BK20) 27-12-06
Faisal Spinning Mills Ltd. - 2 RFQ A0659 3000499040 01x11kV I/C / O/G Panel 6/30/2006 6/27/2006 6/26/2006 Drgs rel on prior info recd on 26-06
Baluchistan Wheels Ltd. SJA/TAK A0669 3000514729 11kV Switchgear - 01xI/C+01xO/G 7/20/2006 7/25/2006 7/25/2006 8/7/2006 8/7/2006
Advance ordering to be
Bulleh Shah paper Mills Ltd. (Packages Ltd.) KR A0671 3000518196 02xMV Motor Starters 8/1/2006 8/9/2006 8/24/2006 9/4/2006 9/11/2006
done/Clarifications from S'AG Awaited
Power Professionals & Engineers (Bahria 02x Add Panels reqd as per App, indent
RFQ A0674 3000519756 02x11kV I/C & O/G Panel 7/31/2006 8/3/2006 8/3/2006 8/28/2006 8/29/2006
Complex III) requested
Hussain Builders TAK A0675 3000521768 03xKESC Jr. Panels w/o Metering 8/1/2006 8/3/2006 8/4/2006 NR 8/4/2006
04-08-06
EPN/Upgradation of Electrical Network RFQ A0676 3000523164 01x11kV I/C & O/G Panel - 8BD4 8/2/2006 8/4/2006 NR 8/4/2006
24-08-06
Diamond Fabrics Limited RFQ A0677 3000524043 01x11kV I/C & O/G Panel - 8BD4 8/4/2006 8/8/2006 8/11/2006 8/21/2006 8/29/2006
Kidney Foundation TAK A0678 3000526221 01x11kV I/C & O/G Panel - 8BD4 8/8/2006 8/10/2006 8/9/2006 8/18/2006 8/22/2006
01xI/C & O/G, 02xTrafo O/G +
Idrees Textile Mills Ltd. SJA/TAK A0679 3000527956 01xI/C + 01xBus PT / Cable 8/15/2006 8/25/2006 8/23/2006 11/3/2006
Connection Panel
6.36kV Switchgear - 02xI/C +
Maple Leaf Cement (Upgradation Job) KR A0680 3000525337 8/15/2006 01.09.06 Drgs. Received from PTSI
01xO/G
03xKESC Jr. Panels with Metering
Highland Traders RFQ A0681 3000525337 8/23/2006 8/25/2006 8/25/2006 8/25/2006 CT Ratios awaited
+ 06x w/o Metering
Babar Islam & Company TAK A0682 3000536774 02x11kV I/C & O/G Panels -8BD4 8/30/2006
Bulleh Shah Paper Mill Project-Packages RA/KR A0686 3000541789 02x11kV I/C + 12X11kV O/G 9/4/2006 9/5/2006 9/5/2006 9/8/2006
International Construction Services/SUPARCO RFQ A0691 3000550675 01x250kVA KIOSK 9/20/2006 10/11/2006 10/13/2006 12/11/2006 App comments to be clarified
M/s Bahria Town, Lahore RJ A0700 3000568400 01x4-Way RMU-WAPDASpecs. 10/19/2006 10/30/2006 11/3/2006 11/14/2006 11/3/2006
01xWIP+
Sitara Per Oxide TAK A0701 3000587675 11kV Switchgear-01xI/C+02xO/G 11/1/2006 11/7/2006 11/16/2006 Formal indent & S.O. # recd on 08-11
01x6.6kV I/C / O/G Panel - 8BD4
11kV Switchgear-WAPDA
GEPCO (TD)/Wazirababad Road, 132/11kV
RFQ A0702 3000584675 02xI/C+16xO/G+01xBC Panels + 11/3/2006 11/20/2006 11/22/2006
Cantt. G/S - Gujranwala
01x200kVA PMT
Zafar & Company/SUPARCO TAK/KR A0703 3000587492 11kV Switchgear-01xI/C+02xO/G 11/7/2006 11/11/2006 11/13/2006 11/22/2006 11/27/2006
18xVCB Trolleys (06xI/C+12xO/G) -
LESCO (PTD SE) RJ A0704 3000589166 11/10/2006 11/14/2006 11/17/2006 1/3/2007 1/5/2007
WAPDA
HESCO (PTD SE) RJ A0705 3000589170 14xO/G VCB Trolleys - WAPDA 11/10/2006 11/14/2006 11/17/2006 12/8/2006
Javedan Cement TAK A0706 3000594854 01No. 11kV Outgoing Panel - SA2 11/20/2006 11/22/2006
DHA Karachi (HSS)/DHA Phase VIII G/S No.1 KR A0707 3000581497 17.5kV Switchgear
Bahria Town RFQ A0708 3000595808 02x200kVA PMT 11/20/2006 11/22/2006 11/29/2006 12/14/2006
FESCO Tender SJA A0709 3000601627 7.2MVAr Capacitor bank 11/27/2006 12/26/2006
Gadoon Textile Mills Ltd. TAK A0710 3000601665 01xChangeover Panels 11/28/2006 12/1/2006
Unicol Ltd. KR/RJ A0711 3000603543 02xI/C / O/G Panel - SA2 11/28/2006 11/30/2006
01xWIP + 01xi/C & O/G Panel - 28-11-06
Fast Feed (Pvt.) Ltd. KR/RJ A0712 300061184 1/4/2007 Formal indent & S.O. # recd on 07-12
8BD4 email
Prime Crete (Pvt.) Ltd. TAK A0713 3000607827 01x11kV I/C / O/G Panel - 8BD4 12/1/2006 12/5/2006 12/5/2006 12/12/2006 12/6/2006
11kV Switchgear - WAPDA Specs.
Prelim Indent based on LOI recd on 01-
MEPCO / 6th STG Project, Tender No. 28 RFQ A0714 3000623538 P44:96 1/8/2007
12
Abdullah Gardens RFQ A0715 3000568170 02x3-Way RMUs 12/5/2006 12/6/2006 NR 12/6/2006
PECT Engineering RJ A0716 3000611667 01xI/C & O/G Panel - 8BD4 12/8/2006 1/18/2007 U/V relay reqd as per App comments
Ch. Mubarak Ali Contractors RJ A0732 3000639222 01x11kV I/C O/G Panel - 8BD4 1/12/2007 Formal indent & S.O. # recd on 18-01
11kV Switchgear -
Naubahar Bottling Co. Ltd. TAK A0733 3000636438 1xWCP+1xWIP+1xI/C&O/G+1xI/C+2 1/18/2007
xO/G
19xVCB Trolleys (04xI/C+15xO/G) -
FESCO (PTD SE) RJ A0734 3000637480 1/18/2007
WAPDA
12xVCB Trolleys (04xI/C+08xO/G) -
GEPCO (PTD SE) RJ A0735 3000637488 1/18/2007
WAPDA
M/s Riaz-ul-Jannah Housing Scheme, 01x3-Way + 02x4-Way RMUs
A0736 3000636171 1/19/2007
Faisalabad (WAPDA Specs. DDS-46:90)
M/s Gulshan-e-Madina Housing Scheme, 01x3-Way RMU (WAPDA Specs.
A0737 3000636184 1/19/2007
Faisalabad DDS-46:90)
HMA Building & Maintenance Co. A0738 3000640937 01x 11kV I/C / O/G Panel - SA2 1/23/2007
03xVCBs-3AH5214-1MF50-2KF2-Z
Ittehad Chemicals Ltd. A0739 3000567626 1/24/2007 NR
F20
02xRP3+01xRP4+02xCP30+01xCP
Bahria Town - Rawalpindi MA A5448 510002716 2/11/2004 NR NR 30-04-04 Front Plate details 07-06
50 Relay & Control Panels
ICI Soda Ash Business SMY A5456 4800019715 02 x MCCs 3/26/2004 25-03-04 16-04-04 20-04-04
Masood Textile Mills FRQ A5458 4800019596 LT Swithgear with 500kVAr PFIP 3/25/2004 4/1/2004 4/1/2004 15-04-04 19-04-04
30x Relay & Control Panels for
WAPDA ADP32 (TD) SHA A5459 5100002807 3/29/2004 NR NR 06-05-04 Inspected on 04-10
Capacitors
42x Sivacon 8PT Panels in CKD
Scientechnic Dubai TM/FRQ A5460 4900000316 4/6/2004 NR NR 12/13/23-04 Add Indent for 09x ccs2 panels on 28-05
Condition
Decon Germany - Rehabilitation of the 110/15(20 FRQ A5461 4900000306 AC/DC Panels 4/12/2004 25-04-04 17-05-04 15-06-04 15-06-04 Add Indent for 01 x DB on 30-09
Sitara Chemical Industries SMY A5462 4800020056 LT Switchgear with 300kVAr PFIP 4/20/2004 26-04-04 13-05-04 13-05-04
18-05-04 CL rel on 28-04/MLT/PFIPs for prod on
Ibrahim Fibers (AATML) SMY A5464 4800020147 MLT + PFIP + BTD+DBs 4/27/2004 5/4/2004 21-05-04 28-05-04
DBs 19-05/Ist App DBs 13-05
19-05-04
Ibrahim Fibers (ITM) SMY A5465 4800020148 MLT + PFIP + BTD+DBs 4/27/2004 5/4/2004 24-05-04 6/1/2004 Inspected on 26-08
PFIPs
Auto Load Transfer Switch
Seven Star Company FRQ A5466 4800020227 5/4/2004 18-05-04 21-05-04 6/23/2004 7/13/2004
250kVA/400kVA
02x Trafo Control Panel for 16/25
Decon Germany/Afghanistan(TR) RJ A5467 5100002896 4/30/2004 5/10/2004 7/26/2004 NR 8/31/2004 Go ahead on 30-08
MVA Power Trafo
17-05-04 26.05.04 MLT 03-06-04MLT
LT Switchgear (LT Panel, MCCs
Olympia Chemicals Ltd. TAM A5468 4800020254 4/30/2004 5/12/2004 30.06.04MCC 22-07-04MCC MLT/BTDs/PFIP dispatched
F1,600KVArPFIP,3200A BTD etc) 15.07.04 Layout -
28-05-04
DAELIM Ind. for KOC Kuwait(TR) RJ A5469 Not Availabel 14x Temp Control Panels for Trafo 5/11/2004 14-05-04 App awaited
WAPDA / NTDC (TR) RJ A5470 5100002899 01x Control panels for 20/26 MVA Tr 5/13/2004 6/24/2004 7/19/2004 NR 7/19/2004 CL rel on 25-05
22-06-04DBs 22-06-04DBs
Apollo Textile Mills Ltd. TAM A5471 4800020595 LT Switchgear 5/31/2004 6/11/2004 27-07- 01 x DB added 17-08
04MLT 05-08-04 MLT
Enar Petrotech TAM A5472 4800020565 02x 55KW Withdrawable Starter Mod 6/3/2004 6/21/2004 6/30/2004 7/6/2004
POF Wah RJ A5473 5100002919 01x Fan Control Panel for 10/13 MVA 6/16/2004 7/5/2004 8/3/2004 NR 8/31/2004 Go ahead on 30-08
Sanaullah Textile Mills TAM A5474 5100002963 02x 250 KVAr PFIPs 6/30/2004 7/6/2004 7/2/2004 7/21/2004 7/2/2004
Ghazi Fabrics International SMY A5475 4800021130 LT Switchgear with 500kVAr PFIP 7/2/2004 7/13/2004 7/20/2004 7/21/2004
Decon Germany MA A5476 5100002676 Relay & Control Panels 7/2/2004 NR NR 8/5/2004 Add indent on 22-07
Engineering Services SMY A5477 4800021157 COS Panel for Phase Changeover 7/2/2004 7/12/2004 7/13/2004 App. Awaited
PARCO TAM A5478 4800021187 01 X 15kW Withdrawable Starter Mo 9/7/2007 7/19/2004 7/28/2004 7/27/2004 App awaited
07-09-04
04-08-04 const. CL rel on 29-07/Changes in
PressonDescon International TM/SMY A5479 4800021289 02 x MCCs- SIVACON 8PT 15-07-04 8/2/2004 8/30/2004
14-09-04 Drgs. App/Inspection on 19-11
14-09-04
Blessed Textile Mills Ltd. TAM A5480 4800021316 02x DBs + Loose MCCB 7/26/2004 7/29/2004 7/29/2004 App awaited
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018
06-08-04
27.08.04
Changes on 30-09/Add Indent on 11-
Gadoon Textile Mills Ltd. FRQ A5481 4800021476 01x MCC (Fixed, Compartmental) 7/27/2004 8/3/2004 8/20/2004 13-
15- 10/Changes on 18-10
10-04
10-04
Taj Textile Mills Ltd. TAM A5482 4800021455 01 x 400kVAr PFIP 8/2/2004 8/8/2004 8/18/2004 8/24/2004
BP Pakistan TAM A5483 5100003010 01 x PDP , 60Hz 8/5/2004 8/12/2004 8/25/2004 9/14/2004 ###
06-09-04
Colony Textile Mills Ltd. MYS A5484 4800021612 LT Switchgear , 1200kVAr PFIP 8/6/2004 8/20/2004 9/6/2004 CL rel on 20-08
email
01xPanel added 18-08/03x Panels added
Scientechnic Dubai TM/SMY A5485 4900000328 48 x Sivacon 8PT Panels in CKD con 8/6/2004 NR NR 8/16/2004
23-09/01xPanel added on 18-11
07-09-04
Add Indent for BTD on 01-11/Changes in
Faisal Spinning Mills Ltd. MYS/TAM A5486 4800021762 LTO,Main LT,2No PFIPs,PDBS,LDBS 8/19/2004 8/20/2004 8/20/2004
DBs on 25-10
22-09-04
03-11-04
21-12-
10-09-04 04
17-08-04 04-10-2004 CL rel on 14-10 / Add Indents for
Maple Leaf Cement SMY/HJ A5487 5100003131 LT Switchgear(8PU.011 & 8PU.003) 14-02-05 02-03-05
15-04-05 12-05-05 PFIPs/DB/MCCs / CL rel on 26-04
03-05-05 Item 21
13-05-05
Item 23
CL rel on 30-08/Clar & Layout recd on
Nishat Mills Ltd. TAM A5488 4800021251 01x4000A ACB I/C Panel 8/23/2004 11/19/2004 23-11-04 12/6/2004 23-11-04
04-11/App vide email
CL rel on 09-09/Layout changed/ Schematics
Ghazi Fabrics International MYS A5489 4800021793 01 x MCC 8/23/2004 9/20/2004 9/20/2004 9/28/2004 10/12/2004 pending
Haleeb Foods TAM A5490 4800021812 LT Switchgear 8/24/2004 9/1/2004 10/6/2004 10/15/2004 10/18/2004
13-09-04
13-09-04 Latest WAPDA specs recd 25-05, Al BB
11-02-05 29-09-04 changed to 40x10, Prototype
29-
Service 24-02-05 inspection/testing of SB on 12-07,
10-04
Box 03-08-05SB released for mass production / SLCP rel
LT Connection boxes,Street 02-11-04
Habib Rafique Pvt. Ltd. SMY A5491 4800021842 8/24/2004 9/2/2004 14-07-05 29-08-05 for Prototype on 02-11, Inspected on 28-
Lighting Control Panel 29-
21-07-05 SLCP 29/04, Changes, Drgs rel for Prototype
12-04
SLCP 09-12-05 based on App, resubmitted, inspected
07-04-05
04-10-05 SLCP on 30-11, resubmitted with inspection
02-09-05
14-12-05 points
SLCP proto
01-12-05
Sapphire Textile Mills Ltd. RJ A5492 4800021900 01 x DB + Loose MCCB 8/31/2004 9/2/2004 9/2/2004 9/16/2004 9/17/2004
24-09-04
West Port Malaysia (TR) RJ A5493 02x Trafo Control Panels 9/3/2004 9/20/2004 21- 10/25/2004 22-11-04 Changes
10-04
05-10-04 04.10.04
23-09-04
Paramount Stitching Mills Ltd. RJ A5494 4800021891 LT Switchgear incl. 350 kVAr PFIP 9/6/2004 9/22/2004 07- 15- Items 01-03/DBs/FCDB
30-09-04
10-04 10-04
LT Switchgear incl. 900 kVAr
Naveena Exports Pvt. Ltd. TAM A5495 4800022171 9/15/2004 9/17/2004 9/17/2004 10/4/2004 9/17/2004 Items 04-06 / Bal rel on 22-09
PFIP+Loose Components
BTD rel on 26-11 / Add box for BTD, etc
Gulshan Weaving Mills TAM A5496 4800022111 LT Switchgear incl. 1000 kVAr PFIP 9/15/2004 9/24/2004 10/22/2004 12/15/2004 23-11-04
28-02
29-10-04
11.10.04
11-11-04
Yusuf Textile Mills Ltd. TAM A5497 4800022138 LT Switchgear incl. 2x500 kVAr PFIP 9/16/2004 9/30/2004 11/3/2004 Changes in PDB-8
31-
29-10-04
12-04
07-12-04Item
3
08-12-04 15-12-04
LT Switchgear incl.1x400+1x600
Abbot Laboratories Pakistan Ltd. AM A5498 5100003137 9/17/2004 9/29/2004 9/28/2004 Item 1&2 / Items 01&02 S.O. on 14-10 / Inspected 0n 29-04
kVAr PFIPs
4&5 20-12-04
Item
04&05
Abdul Majeed & Company AM A5499 4800022490 24 x DBs 10/21/2004 10/21/2004 ###
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018
11-11-04DBs
11-11-04
01-11-04 23-11-
01-12-04 MLT/DBs/PFIPs/MCC dispatched / Add
08-11-04 04
Dewan Farooque Spinning Mills Ltd. SMY A5500 3000192068 LT Switchgear incl. 1000 kVAr PFIPs 10/20/2004 16/17- indent for BTD on 04-01 / SB D Details
31- 15-12-04
12-04 for BTDs on 17-02/ Inspection on 16-03
12-04 27-12-
08-02-05
04
31-01-05 12-11-04
10-11-04 30-11-04
22-11-04 16-12-04
17-12- 05-
29-12-04
04 01-05
LT Switchgear & MCCs+400&600 CL rel on 04-11 (Consolidated) / Latest
Matol Distillery (MES) MYS A5501 5100003150 10/25/2004 11/10/2004 Schematics 31-01-05
KVAr PFIPs Schematics changes on 31-01 / Inspected on 28-02
04-02-05
31-01-05
28-01-05
LVDB&MCC-1
10-02-05 09-02-05
MCC-3
03-12-
22-12-04DBs 04SDBs
03-12-04
LT Switchgear incl. 03 x 600 kVAr Layout 03-12-04LT CL rel on 05-11 / Change in MLT / App
Rahman Cotton Mills Ltd. SMY A5502 10/29/2004 11/18/2004 10-01-
PFIPs 10-12-04 Drgs on 12-01
05e-mail
14-12-04 31-01-
05
24-12-04 27-12-04
27-12-04 12-01-05(22) 30-12- S.O.# recd on 03-11/Meeting with
LT Switchgear Fixed / 30-12-04 17-01- 04 Customer 09-14/12 / App drgs of Areas
Dewan Saadi Cement TAM/HJ A5503 5100003155 10/29/2004 11/25/2004
withdrawable 8PU.011 (22) 07-01- 05(32) 25-01-05 22&32 on 17-01/Changes in App / Last
05(32) 17- 26-01-05(42) 04-02-05 dispatch by 17-03
01-05(42) 25-02-05
27-12-04
23-11-04 13-12-04 06-01-05 13-12-04 Details & Go-ahead for MCC on 04-02 /
Blessed Textile Mills Ltd. SMY A5504 4800022822 LT Switchgear & MCCs+Loose ACB 11/2/2004
09-02-05 14-02-05 02-03-05 CL for Loose supply 18-03
schematics
03-01-05
Layouts
08-03-05 CL rel on 28-12 / Clar on Trafo dim drg
ESS ESS Associates (EC) SMY A5505 3000188690 LT Switchgear 18-11-04 12/6/2004 10-01-05 3/3/2005
10-08-05 reqd
26-05-05
WAPDA-NTDC (TR) RJ A5523 3000218389 15x FCPs & ACPs - 20/26 MVA PT 2/8/2005 2/16/2005 2/25/2005 2/28/2005 3/9/2005
16-02-05
15-02-05 15-03-05
10-03-05
14-03-05 14-03-05
15-03-05 PDBs&LDBs
15-02-05 CL rel on 15-02 / Add indent / PFIP CL on
Indus Dyeing KZ/SMY/AM A5525 3000218399 Modification Work + LT Switchgear 3/7/2005 16-03- 04-04-05
22-02-05 PDBs&LDBs 10-03
05MLT-A PFIP<O
27-04-05 31-03-
05-
Layout 05
04-05 LT
11-05-05BTD
15-03-05 06-04-05
08-03-05 Inspected on 25-04,
Bhanero Textile Mills Ltd. AM A5526 3000217322 LT Switchgear 2/17/2005 3/4/2005 12-04-05
22-03-05 Inspection Points
21-04-05 BTD
24-03-05
Const
CL rel on 10-03 / Meeting on 18-03 / ACB
List
Cherat Cement SMY A5527 3000215827 MCC in 8PT (withdrawable) Design 2/18/2005 3/7/2005 3/18/2005 4/1/2005 Changed to 2500A 19-04 / Rev Const
07-04-05
List on 05-05 / Meeting on 17-05, 30-05
PFIP
13-04-05
06-04-05
Pioneer Cement SAH A5528 3000200950 01x Protection & Metering Panel 2/22/2005 NR
31-05-05
06-04-05
Maple Leaf Cement SAH A5529 3000222459 01x Protection & Metering Panel 2/22/2005 NR
31-05-05
Nestle Milkpak Ltd. TAM A5530 3000221409 1600A ACB Panel + BTD 2/22/2005 3/8/2005 3/11/2005 3/28/2005 3/28/2005 Cl rel on 10-03
Loose Supply of 4000A ACB + Aux
DS Textile Ltd. KZ/SHA A5531 3000215568 2/22/2005 3/8/2005 2/28/2005 17-03-05email 5/4/2005 CL rel on 25-02
Comp. & Factory Material
Loose Supply of 2500A ACB + Aux
DS Industries (Pvt.) Ltd. KZ/SHA A5532 3000216345 2/22/2005 3/8/2005 2/28/2005 17-03-05email 4/21/2005 CL rel on 25-02
Comp. & Factory Material
KCI Chashma ( EC ) KR A5533 3000222828 07 x 110VDC Panels 2/23/2005 3/7/2005 3/28/2005 4/14/2005 6/10/2005
Abdul Majeed & Company RJ A5534 3000223632 03 x DBs 2/28/2005 3/7/2005 3/14/2005 4/7/2005 4/8/2005
16-03-05
27-04-05 30-03-05 27-04-05 Site visit on 24-05 / Changes in Panels
Karachi Export Processing Zone TAM A5535 3000222933 LV Switchgear & Loose Supply 3/2/2005 3/16/2005
10-05-05 09-05-05 10-05-05 dim in App / Layout resub for App
31-05-05
14-03-05 17-03-05
Technical Associates Pakistan HJ A5536 3000225691 MLT + DB + 400kVAr PFIP 3/17/2005 3/25/2005 3/25/2005 Cl rel on 17-03/Add indent
24-03-05 25-03-05
21-03-05
29-03- Adv info on 11-03 / CL rel on 14-03 /
Babri cotton Mills Ltd-Kohat TAM A5537 3000231350 LT Switchgear incl. 6300A ACB 3/16/2005 3/18/2005 4/8/2005
05 Inspected on 18/05
13-04-05
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018
05-04-05
Comments by MES on 06-04 / Meeting
Thatta Cement SMY A5538 3000222460 MCC in 8PT Withdrawable Design 3/18/2005 3/30/2005 08-04- 4/12/2005 4/14/2005
on 17-05
05
American Embassy-Islamabad KZ A5540 3000232952 600A MCCB Panel 3/18/2005 3/24/2005 3/29/2005 4/1/2005 Change - I/C from top on 29-03
11-04-
05MCC CL rel on 28-03 rev 07-04 (LT) & 29-03
12-04-05LT rev 07-04 (MCC) / Changes in App / Site
22-03-05 06-04-05 13-05-05LTO
Nishat Chunian Ltd.(Dyeing Power) TAM/HJ A5541 3000231559 LT Switchgear 4/1/2005 4/8/2005 visit 12-05 / Add indent for
29-06-05 30-05-05 07-07-05 01xBTD+01xLTO / Changes in BTDs as
27-07-05BTDs
05-09-05 per email dtd 29-08 app recd 01-09
Rev BTDs
19-04-05
LDBs 21-04-05
26-04-05 20-04-05 LDBs CL for LT/PFIP / LDBs rel on 15-04 rev
Alam Cotton Mills SMY/TAM A5553 3000236665 LT Switchgear 4/14/2005 4/20/2005
LT+PFIP LDBs 06-05-05 28-04 / 19-04
26-04-05 PFIP & LT
DBs
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018
27-04-05 29-04-05
11-05-05
Items 04-13 Items 04-13
Azgard Nine Ltd. HJ A5554 3000256591 LT Switchgear 4/21/2005 4/29/2005 23-05-05 CL (Items 04-13) rel on 27-04
11-05-05 11-05-05
BTDs
Items 01-02 items 01-02
12-05-05 PDBs,
12-05-05
06-05-05 PDBs, Items 06-18, CL LT on 18-05 /
Bhanero Textile Mills Ltd. HJ/KZ A5555 3000257527 LT Switchgear, DBs 4/28/2005 5/13/2005 LDBs & MLDB
LDBs & MLDB
25-05-05
31-05-05 Item 01-02 MCC & LCBs put-on-hold
LT, PFIP, MCC on 030605
27-05-05
Gadoon Textile Mills Ltd. KZ A5556 3000257609 01xLDB+02xPDBs 4/28/2005 5/3/2005 31-05-05 5/31/2005
06-05-05
Telenor (A&D) MR A5557 3000264459 25x GT2 Housings for AMF/MOR Pan 5/5/2005 NR Partial Formal Indent recd on 09-05
11-05-05
17-05-05
14-07-05
Loose Supply - ACB & 11-05-05
Bismillah Textile Mills Ltd. KZ A5558 3000264770 5/13/2005 5/13/2005 6/27/2005 BTD1 Rev Indent - 02xBTDs added
Accessories, etc. + 02x BTDs 07-06-05
18-07-05
BTD2
31-05-05
17-05-05 DBs, PFIP
DBs, PFIP 30-05-05 20-06-05 Interlocking & S/S layout details recd on
Ghazi Fabrics International TAM A5560 3000267850 LT Switchgear 5/16/2005 5/20/2005
02-06-05 17-06-05 LT 30-05 / LT CL rel on 31-05
LT 27-06-05
BTD
Cherat Cement SMY A5561 3000272735 01x 3kW + 06x 15kW Starter Module 5/23/2005 5/26/2005 6/27/2005 6/27/2005 7/1/2005
01x 6M W/D module for 200A, 4P
New Progressive Builders (PARCO) TAM A5562 3000276064 6/9/2005 6/10/2005 6/13/2005 6/21/2005 6/9/2005 Refer A1355
MCCB Feeder
03-08-05
112x Service boxes as per WAPDA
Glamour Developers (Pvt.) Ltd. SMY / HJ A5563 3000240107 6/8/2005 6/10/2005 15-08-05 9/15/2005 9/7/2005 Order put On-Hold on 04-10
specs. P92:75
31-08-05
Control scheme same as Gadoon order
Khadim Husain Slatch & Co. TAM A5564 3000284242 250kVA Changeover Panel 6/20/2005 6/21/2005 6/24/2005 4/24/2006 A5545 / Resubmitted as per letter recd
03-04
Major Zuberi COS Panel RJ A5566 3000284356 COS Panel for Phase Changeover 6/14/2005 6/14/2005
45Nos RP-3 & 15Nos RP-4
NTDC-WAPDA(TD-Lahore) ADP 59(LOT III) MA A5567 3000285449 6/16/2005 NR 7/5/2005
protection panels
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018
15-07-05
CHF LV
18-07-05 03-08- Meeting with Consultants & EC on 30-06
CHF DBs 05CHF / CL for CHF on 10-08(DBs) & 11-08(LT) /
10-08-05DBs
01-09-05 11-10-05 Changes in App / Add indent for 01xLV
12-10-05
PB DBs Add indent Panel 8PU.011 Fixed design alignment
21-06-05 Add indent
12-09-05 01-12-05 with existing board / SB D Details /
Glaxo Smith Kline TAM/KZ A5568 3000288055 LT Switchgear 29-09-05 7/8/2005 17-11-05
Item 1 PB PB LT Comments on PB DBs on 14-11 / Major
24-03-06 DBs
20-09-05 13-12-05 changes in PB LT app / Site visit on 22-
27-02-06
Items 04-05PB PB DBs 12 / CL for PB DBs on 21-12, LT on 16-12
SB D LT
04-10-05 25-01-06 & 21-12, Item 51 PDB ?? deleted / Rev
Items 06-09PB LDB/DBs indent
03-10-05
Add indent
Sapphire Fibres Ltd. - No. 3 KZ A5569 3000285015 01xPDB + 02xLDBs 6/22/2005 6/23/2005 6/22/2005 7/13/2005 7/13/2005
20-09-05
06xRelay Panels+02xMarshalling
NTDC-WAPDA Shikarpur & Sibbi Grids (TD) MA A5570 3000288505 6/22/2005 NR 15-11-05
Kiosks
MCs
27-07-05
RP,CP
M/s Rousing Engg Services / 01-07-05
MA A5571 3000286501 01xCP50+01xRP4+01xAC/DC Panels 6/22/2005 23-08-05 TD drgs recd on 22-08 for RP/CP
M/s A. A. Spinning Mills Ltd. AC/DC
26-08-05
AC/DC
Victor Pipe Industries - Afghanistan HJ A5572 3000292427 01xLT Panel 6/29/2005 7/1/2005 7/12/2005 30-08-05email 9/7/2005 Clar recd on 11-07 / CL rel on 12-07
Mr. Rahim Dawood - F&C HJ A5573 3000294427 01xCO DB 6/30/2005 NR 7/1/2005
Honda Atlas Ltd. (TR) RJ A5574 01xFCP for 2/2.5MVA Trafo 6/24/2005 7/1/2005 7/4/2005 Formal indent, S.O. # awaited
13-07-05
19-07-05
DBs/PFIPs 20-07-05
08-07-05 26-07-05DBs
20-07-05 DBs/PFIPs
05-07-05 DBs, LDBs 29-07-05LT CL rel on 07-07 / Add indent for 01xDB /
Blessed Textile Mills Ltd. - Unit No. 3 KZ A5577 3000289586 LT Switchgear DBs resub 02-08-05LT
11-07-05 15-07-05 08-08-05 Changes in App
22-07-05LT 08-08-05
LT, etc. Add indent
03-08-05 BTDs
Layout
11-07-05
15-07-05
MCC 15-07-05 CL rel on 11-07 / meeting with customer
Lucky Textile Mills RJ A5578 3000292953 02xDBs, 01xMCC - 8HKO 7/5/2005 7/8/2005 7/18/2005
20-07-05 DBs 21-07, changes
Schematics
22-07-05
Fazal Textile Mills MHF A5579 3000291548 01x LT Panel 7/13/2005 7/18/2005 7/22/2005 8/16/2005 8/19/2005 CL rel on 20-07
28-07-05 CL rel on 25-07 / SLD, FV&Disp in Ist
Allied Engg Services Ltd./Lucky Cement Ltd. TAM A5580 3000302473 5000A LT Switchgear 7/18/2005 7/29/2005 8/24/2005 8/29/2005
02-08-05 submittal
02-08-05LT 16-08-05DBs
D. S. Industries Ltd. MHF A5581 3000302535 LT Switchgear 7/19/2005 8/1/2005 18-08-05LT CL rel on 28-07(LT) & 08-08(DBs)
08-08-05DBs 22-08-05LT
DHA Lahor/Electrification Works of DHA Phase RJ A5582 3000303414 01xStreet Lighting Control Panel 7/27/2005 NR 7/29/2005
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018
10-08-05
17-11-05
26-09-05 13-09-05
PAEC / NMC-1 MHF A5583 3000309035 LT Switchgear 7/28/2005 8/10/2005 15-12-05 CL rel on 11-08
27-09-05 16-11-05
BTD
Layout
06-10-05
S. O. # on 14-11 / As per Design Plan /
Items 1-4,
Lot 1 & 2 drgs approved during meeting
14-19
with customer 05-09 to 09-09 / CLs of
06-10-05 to
02-09-05 Lot 1 rel on 14-09, Lot 2 CLs on 30-09,
SP&EW SMY/HJ A5584 LT Switchgear, DC DBs 8/17/2005
21-09-05
12-10-05
Lot 3 on 10-10 & 11-10 / Schematics
Part Lists
finalised with customer, formal app
14-10-05
pending / Network study report-SINCAL
to 18-10-05
rel on 25-11
Items 5-12
15-09-05
02-09-05 Item 3, 4 CL rel on 07-09 / Comments in App /
Items 1,3,5 16-09-05 Feeder Pillars Put-on-Hold by SB Lhr
Olympia Chemicals Ltd. SMY A5591 3000316684 LT Switchgear 8/17/2005 9/1/2005 06-09-05 13-09-05email
LT+PFIP+Layout
Items 2, 6 vide email 22-09 / LCBs reqd in local
07-09-05 24-10-05 design vide email dtd 19-10
LCBs
08-09-05
15-09-05email 19-09-05 CL rel for App 30-08, App recd 02-09, rel
Gulistan Textile Mills Ltd. - Unit 4 TAM A5592 3000327455 LT Switchgear 8/24/2005 9/9/2005 14-09-05 29-09-05 21-10-05 for proc 02-09
layout
08-09-05
15-09-05email 19-09-05 CL rel for App 30-08, App recd 02-09, rel
Gulshan Weaving Mills Ltd. - Unit 2 TAM A5593 3000326254 LT Switchgear 8/24/2005 9/8/2005 14-09-05 29-09-05 21-10-05 for proc 02-09
layout
International Knitwear Ltd MHF A5594 3000194869 01x100 + 01x50kVAr PFIP stages 8/26/2005 8/29/2005 NR 9/29/2005 Site visit on 28-09 for clarification
15-09-05email 20-09-05
Gulistan Spinning Mills Ltd. TAM/MHF A5595 3000326183 LT Switchgear & Loose supplies 8/29/2005 9/13/2005 9/12/2005 29-09-05 CL rel on 07-09
24-10-05
15-09-05email 20-09-05
Gulshan Spinning Mills Ltd. - Unit 2 TAM/MHF A5596 3000326152 LT Switchgear & Loose supplies 8/29/2005 9/13/2005 9/12/2005 29-09-05 CL rel on 07-09
24-10-05
CL rel on 14-09 / App comment, UVT
14-09-05 21-09-05 reqd / Changes reqd during inspection
Masood Textile Mills Ltd. MHF A5597 3000326457 LT Switchgear 9/5/2005 9/9/2005 9/26/2005
23-09-05 24-03-06 in item 03 - PDBs (06Nos.), Go-ahead on
08-12
Gharibwal Cement Ltd. MHF A5598 3000328590 01x LT Panel 9/6/2005 9/9/2005 9/19/2005 10/18/2005 10/24/2005 CL rel on 19-09 / Minor changes in App
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018
Dost Steel RJ A5599 3000308554 01xFCP+01xACP for 20/26MVA PT 9/8/2005 9/15/2005 9/14/2005 20-09-05email 9/29/2005 CL rel on 14-09
Lucky Cement Ltd. MHF A5600 3000330522 02x PDBs 9/8/2005 9/14/2005 9/16/2005 10/3/2005 10/5/2005 CL rel on 16-09
05-10-05
PDBs
26-10-05
21-09-05 04-10-05
PFIP/LDBs CLs rel on 21-09 (PDBs), 27-09 (bal) / LT,
PDBs PDBs
27-10-05 PDB 10, Compressor Panel, Layout
04-10-05 24-10-05
08-09-05 LTO/MCC revised & PDB 8 deleted in App /
Naveena Exports (Pvt.) Ltd. - Weaving Unit SMY A5601 3000331514 LT Switchgear 9/19/2005 LT LT
15-11-05 15-11-05 Revised indent, Resubmittal of LT /
15-11-05 29-11-05
LT Layout issue resolved in meeting with
LT LT
17-11-05 consultants on 09-01, Resubmitted
09-01-06 20-01-06
BTDs
16-01-06
SB D
24-10-05
30-09-05
PFIP CL rel on 27-09 / Layout resubmiited on
07-10-05
10-10-05 02-11-05 17-10 as per revised customer layout
Dewan Hattar Cement TAM A5602 3000331543 LT Switchgear - 8PU.011 9/8/2005 9/27/2005 Schematics
24-10-05 GDB, MCC vide email dtd 12-10 in back-back
11-10-05
18-11-05 arrangement, revised 21-10 with BTD
Layout
BTD
25-10-05
PDB/PFIP
24-11-05 CL rel on 27-09 / Upgrade of BTD/BB
12-09-05 23-09-05 29-09-05 24-10-05
Umar Spinning Mills (Pvt.) Ltd. RJ A5603 3000332848 LT Switchgear LT ratings & other changes vide revised
20-02-06 24-02-06 24-02-06 02-03-06
02-12-05 indent
BTD
24-02-06
17-10-05
SL/Clar recd on 17-10 / Entries changed
U. S. Embassy, Islamabad MHF A5607 3000346832 01xLT Panel 10/10/2005 10/17/2005 10/18/2005 24-10-05 12/8/2005
to top in App
07-12-05
17-10-05
SL/Clar recd on 17-10 / Entries changed
U. S. Embassy, Islamabad MHF A5608 3000346848 01xLT Panel + 01xDB 10/10/2005 10/17/2005 10/18/2005 24-10-05 12/8/2005
to top in App
07-12-05
25-11-05
WAPDA / 220kV Sialkot S/S (TD) MA A5610 3000352797 01xR3 + 01xR4 Protection Panels 10/19/2005 NR
07-12-05
Sitara Chemical Industries (TD) MA A5611 3000354686 01xRP4+01xCP50 + 01xAC/DC Panel 10/24/2005 11/1/2005 11/1/2005
31-10-05 Changes reqd as per ED/A5589 on 14-
Sitara Chemical Industries (TR) RJ A5612 3000354712 01xFCP+01xACP for 20/26MVA PT 10/28/2005 10/31/2005
28-12-05 12, Resubmitted / App awaited
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018
14-11-05 17-11-05
PDBs PDBs
Orient Textile Mills SMY A5614 3000357577 LT Switchgear 10/31/2005 11/11/2005 12/8/2005 CL rel on 01-11
24-11-05 12-12-05
LT LT
08-11-05
LT 08-11-05
15-11-05
10-11-05 LT CL rel on 01-11(LT) / Change in some
Lucky Cotton Mills TAM/MHF A5615 3000358331 LT Switchgear 10/31/2005 11/11/2005 DBs
DBs 10-11-05 DBs, resubmitted & approved
24-11-05
15-11-05 DBs
DBs
Pak Arab Fertilizers (Pvt.) Ltd. MHF A5616 3000350447 LT Panel 11/7/2005 11/11/2005 11/11/2005 11/28/2005 12/1/2005
15-11-05
01-12-05 CL rel on 11-11 / Site visit on 12-12 /
14-12-05 21-11-05
03xGenerator Power (2000A)+ SB D Schematics revised based on customer
Allied Engg Services Ltd./FTC management Co. TAM A5617 3000363990 11/10/2005 11/15/2005 Schematics 03-01-06
02xLTO Panels 09-01-06 drg. recd on 13-12 / CCPs revised to
16-12-05 email
SB D LTOs - thru BTDs (not in scope)
Layout
04xGenerator Power(4000A)+
10-11-05 16-11-05
Al-Karam Textile Mills MHF A5618 3000363970 03xCable Termination(6000A) 11/15/2005 2/16/2006 CL rel on 11-11 / Revised indent
26-12-05 30-12-05
Panels
02xGenerator Power(2000A) CL rel on 21-11, rev 05-12 as per
MHF A5619 3000363976 11/15/2005 11/18/2005 11/22/2005 11/29/2005 12/5/2005
Usman Ltd. LTOs+01xMCC+01xLDB customer comments
NTDC-WAPDA (TD) MA A5620 3000364882 01xDCS Marshalling Kiosk 11/14/2005 TD drgs recd on 18-05 by email
21-11-05 21-12-05
16-11-05
23-11-05 Items 7-8 Items 7&8 21-12-05 CL of items 7-8 on 16-11, bal. on 06-01 /
Philips Electrical Industries of Pakistan Ltd. TAM A5621 3000364875 LT Switchgear 04-01-06
09-01-06 15-12-05 04-01-06 Items 7&8 Revised & Add indents
05-01-06
Items 3-4 Bal.
01xSoft Starter Panel for
BP Pakistan MHF A5622 3000390256 12/26/2005 12/30/2005 1/3/2006 2/10/2006 CL rel on 30-12
75HP/56kW, 480V, 60Hz motor
08-12-05 17-01-06
Novatex Ltd. MHF A5623 3000371920 LT Switchgear 11/23/2005 12/1/2005 1/23/2006 CL rel oh 01-12
15-12-05 Schematics
CL rel on 01-12 / App comment for PES
Punjab Industrial Estate SMY A5624 3000348705 27xSteet Lighting Control Panels 11/24/2005 11/30/2005 12/1/2005 12/15/2005 12/21/2005
clarified on 19-12
24-11-05 02-12-05 02-12-05 15-12-05 06-12-05
Sun Rays Textile Mills Ltd. MHF A5625 3000371221 LT Switchgear CL rel on 02-12
20-01-06 25-01-06 31-01-06 28-02-06 08-03-06
Maple Leaf Cement (OLM) TAM A5626 3000371274 LT Switchgear 11/24/2005 12/9/2005 12/9/2005 12/30/2005 12/28/2005 CL rel on 09-12
14-12-05
Azgard Nine Ltd. SMY A5627 3000378126 LT Switchgear 12/2/2005 12/8/2005 09.12.05 12/19/2005
email
NTDC-WAPDA - 500kV Rawat-Lahore 07xRelay + 02xMetering & Control
MA A5628 3000379723 12/9/2005 NR TD drgs (partial) recd on 26-07
Extension S/S Project Panels
RP14 & CP4 dwgs. Awaited (for Front
NTDC-WAPDA - 500kV & 220kV Sahiwal S/S 15x500kV+05x220kV Relay +
MA A5629 3000379796 12/9/2005 NR Plate), Bottom Cutouts for RP & CPs and
Project 05xMetering & Control Panels
Mimic for CPs
01xMCC - 8PU.011 for alignment
Enar Petrotech Refining Facility (EC) TAM A5630 3000383940 12/15/2005 12/22/2005 12/20/2005 12/30/2005 12/28/2005 CL rel on 20-12
with existing MCC
27-01-06
LT Switchgear - LT Boards-F1 + 05-01-06 email *As per Design Plan dtd. 05-01 /
Honda Atlas Cars Pakistan Ltd. HJ A5631 3000380721 12/20/2005 * 1/30/2006
MCCs & DBs-8HKO Lot 1 15-02-06 Changes in App
email
22-12-05
K.E.S.C. (TR) RJ A5632 3000416783 05x FCP+TCP for 40MVA PT 12/20/2005 2/10/2006 3/24/2006 Formal indent, S. O. # on 16-02
19-01-06
28-12-05 Resubmitted as per changes reqd by SB
Siemens Afghanistan / Gardez Province MHF A5633 3000388920 01x LT Panel 12/26/2005 12/28/2005 2/22/2006 2/22/2006
02-02-06 S dtd 01-02
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018
02-02-06
LTO
23-01-06
LT Switchgear + Loose ACBs & 06-01-06 06-02-06 Revised indent - 4000A ACB reqd in
Bhanero Textile Mills Ltd. TAM A5637 3000390102 1/20/2006 25-01-06 2/20/2006
accessories 25-01-06 MCC Panel
21-02-06
SP
K.E.S.C. (TR-TD/Areva) RJ A5639 3000486629 08x FCP+TCP for 40MVA PT 6/7/2006 7/13/2006 Drgs rel on pre indent / CL rel on 14-07
20-02-06 17-03-06
Siemens Afghanistan / Shindand project TAM A5640 3000394277 LT Switchgear 1/25/2006 2/6/2006 2/15/2006 Revised specs. recd on 07-02
14-03-06 17-04-06
31-01-06 CL rel on 26-01 / Panels position
Sandal Dyestuff Industries Ltd. SMY A5641 3000396759 LT Switchgear 1/20/2006 1/31/2006 1/31/2006 NR
24-02-06 changed on 22-02
27-01-06
NTDC-WAPDA / Sahiwal 500/220/132kV S/S HJ A5642 3000389030 01xDC Auxiliary Services Panel 1/23/2006 2/4/2006 5/30/2006 SB D Details
30-03-06
01x FCP+ACP+TCP for 160MVA
WAPDA / ADP-63 RJ A5643 1/23/2006 1/26/2006
Auto Trafo
06-06-06
S/S P1&P2
Site visit & meeting with Customer on
12-06-06
15-02-06 16-17/03 / CL rel to SB S on 31-03, rev
KCI / Chashma Barrage Colony ( EC ) MHF A5644 3000393133 LT Switchgear 1/24/2006 2/10/2006 4/20/2006 S/S P3&P4,
25-04-06 10-04, rev 25-04 / Meeting with customer
DBs
on 20-04
27-06-06
BTDs
27-02-06 13-03-06
CL rel on 06-02 / MBB rating changed in
M/s Hussain Mills Ltd. MHF A5645 3000403721 LT Switchgear 1/25/2006 2/6/2006 2/6/2006 14-03-06 15-03-06
App
DBs DBs
01 Inner door received, 10 awaited for
NTDC-WAPDA / 500kV Yousuf Wala S/S-Sahiwal MA A5646 3000403443 11x Kiosk Interface Panels 1/25/2006 4/20/2006 front view dwg. Pending from TD,
Bottom Cutouts & Mimic
NTDC-WAPDA / 500kV Rawat S/S Ext. (Lot-1) (T MA A5647 3000403445 03x Kiosk Interface Panels 1/25/2006 SB D Details
23-02-06 20-03-06 BTD layout changed in App drgs recd on
Colony Textile Mills Ltd. TAM A5648 3000409827 LT Switchgear 2/10/2006 2/17/2006 3/20/2006
15-03-06 email 21-03
13-04-06
24-02-06
14-02-06 01-03-06 Item 34 * As per Design Plan / CL for add indent
Zahra Textile Mills SMY A5650 3000412832 LT Switchgear * 14-03-06
07-04-06 Lot II 25-04-06 on 12-04
30-03-06
Items 35-37
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018
15-03-06
01-03-06
email
Hasan Spinning Mills (Pvt.) Ltd. TAM A5656 3000421051 LT Switchgear 2/27/2006 3/6/2006 08-03-06 3/16/2006
24-03-06
Layout
Layout
13-03-06
Al-Karam Textile Mills MHF A5657 3000424575 O/G Feeder Panels 2/28/2006 3/6/2006 3/8/2006 3/17/2006 Alignment with A5618 / CL rel on 06-03
13-04-06
2xLT panels, 7xDBs, 3xMCCs, 06-03-06 10-03-06
CWO / SUPARCO TAM/HJ A5658 3000422017 3/3/2006 4/13/2006 5/17/2006 CL rel on 05-04
6xLockable Mushroom boxes 09-03-06 05-04-06
M/s Independent Newspapers Corp. (Pvt.) Clarifications reqd for some items and
SMY A5659 3000430110 LV Panel, DBs, BTD 3/8/2006 3/24/2006
Ltd. / Jang Building, I. I. Chundigar Road (EC) BTD layout / Order put on-hold on 10-04
K. E. S. C. (TR) RJ A5661 3000499948 01xFCP for 22/30MVA PT 3/2/2006 3/14/2006 3/14/2006 Formal indent & S.O. # recd on 29-06
Gadoon Textile Mills Ltd. SMY A5662 3000430530 01xPDB 3/13/2006 3/20/2006 3/21/2006 3/27/2006 CL rel on 21-03
28-04-06 CL rel on 21-03 / Changes, go-ahead on
BU TR / New Trafo Hall MHF A5663 3000420320 01xLT Panel 3/13/2006 3/20/2006 3/21/2006 5/29/2006
26-05-06 08-05 / Resubmitted
Pakistan Oil Fields Ltd. MHF A5664 3000433261 LT Switchgear 3/14/2006 3/30/2006 4/10/2006 4/19/2006 5/24/2006 CL rel on 10-04
22-03-06 CL rel on 21-03 / Analogue meters reqd
Nishat Dyeing, Finishing & Spinning - Unit 29 HJ A5665 3000433319 01x2000A ACB I/C / O/G Panel 3/15/2006 3/21/2006 3/27/2006
email instead of Digital in App
M/s British Deputy High Commission (OLM) SMY A5666 3000433859 01xLT Panel 3/15/2006 3/22/2006 22.03.06 4/3/2006 3/31/2006 CL rel on 24-03
01x0.25kW DOL Starter module 21-04-06 CL rel on 20-03 , revd 24-04 as per App
New Progressive Builders (PARCO) TAM A5667 3000433142 3/20/2006 3/20/2006 3/21/2006 3/21/2006
(KS type - 8PU.011) 08-05-06 comments
M/s. Technical Associates Pakistan (Pvt.) Ltd. / Delayed due to late response to Order
SMY A5668 3000435675 429xService Boxes 3/22/2006 3/28/2006 4/4/2006 7/4/2006
Sukh Chayn Gardens review
Medipharm (Pvt.) Ltd. HJ A5670 3000437228 500kVAr PFIP - 1800mm High Panel 3/30/2006 4/3/2006 4/7/2006 5/26/2006 CL rel on 07-04
Pak Arab Fertilizers (Pvt.) Ltd. HJ A5671 3000442087 01x1600A ACB I/C / O/G Panel 3/31/2006 4/4/2006 4/4/2006 5/29/2006 5/30/2006 CL rel on 05-04
British High Commission HJ A5673 3000450144 FLBS units for 8PU.011 S1-Panels 4/13/2006 4/26/2006 4/26/2006 5/8/2006 5/12/2006 CL rel on 26-04 / SB D Details
Hussain Mills Ltd. HJ A5674 3000449951 LT Switchgear, PFIP & DBs 4/19/2006 NR 5/5/2006 CL rel on 28-04 / Changes in inspection
CFO Siemens TAM A5677 IFO-1210 DB for CFO House 4/19/2006 NR 4/21/2006
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018
29-05-06
Item 2
Bolan Castings Ltd. HJ A5678 3000457847 LT Switchgear 4/24/2006 5/8/2006 5/12/2006 5/17/2006 CL rel on 04-05 / Changes in App
30-05-06
Items 3-15
12-05-06
Gulshan Spinning Mills TAM A5679 3000456207 LT Switchgear 4/24/2006 5/5/2006 5/8/2006 CL rel on 08-05
email
06-06-06
Deewan Pakland Cement (MES) SMY/TAM A5680 3000459148 LT Switchgear - 8PU.011+8PU.003 4/28/2006 * As per Design Plan
08-06-06
Umar Spinning Mills (Pvt.) Ltd. MHF A5681 3000464309 LT Switchgear 5/4/2006 5/11/2006 5/16/2006 5/30/2006 5/31/2006 CL rel on 09-05
Attock Cement RJ A5682 3000426789 01x400kVAr PFIP 5/9/2006 5/11/2006 5/11/2006 5/23/2006 5/24/2006 CL rel on 11-05
19-05-06
Rauf & Co. HJ A5683 3000467254 LT Panel 5/9/2006 5/15/2006 5/16/2006 5/22/2006 CL rel on 11-05
email
Pakistan Cement (OLM) HJ A5684 3000469372 LT Switchgear 5/16/2006 5/19/2006 5/22/2006 5/24/2006
05-06-06 Resubmitted based on info recd from
PPL (BU OLM) MHF A5685 3000472842 LT Panel 5/18/2006 5/23/2006 6/8/2006 6/19/2006
15-06-06 customer
26-06-06
Areva / KESC (TR) RJ A5686 3000534493 01xACP for 31.5/40MVA PT 5/23/2006 6/2/2006 8/7/2006 8/24/2006 Formal indent & S.O. # recd on 23-08
14-07-06
02xFCPs+02xACPs for 20/26MVA
WAPDA 20/26MVA PT RJ A5687 3000479443 5/25/2006 6/5/2006
PT
Pakistan Navy (PTD-Isb / TR) RJ A5688 3000516029 1xAVR Panel for 4MVA PT 5/26/2006 6/7/2006 7/3/2006 8/7/2006 8/11/2006
Meaple Leaf Cement Factory Ltd. (OLM) MHF A5689 3000476672 2x15KW DOL starters 5/26/2006 6/1/2006 6/9/2006 CL rel on 09-06
CL (on-hold pending App) rel on 20-06 /
13-06-06
M/s Engro Chemicals Pakistan Ltd. MHF A5690 3000481085 6x30kW MCU 5/29/2006 6/8/2006 6/8/2006 6/20/2006 Qty inc from 01 to 06 on 09-06 / Changes
email
in App
M/s Technical Associates Pakistan (Pvt.) Ltd. / 01x630A MCCB+01x2000A ACB
MHF A5691 3000485471 5/30/2006 6/2/2006 6/2/2006 7/17/2006
Abu Dhabi Palace, RYK Panels - 8PU.003
M/s Sapphire Textile Mills Ltd. (Weaving Unit) HJ A5692 3000480079 LT Switchgear 6/1/2006 6/9/2006 6/9/2006 7/5/2006 7/7/2006 CL rel on 09-06
NTDC-WAPDA / STG-6-26 (LOT-IV) MA A5694 3000483283 07xRP3+27xRP4 Relay Panels 5/31/2006 NR 6/12/2006
DHA CO-GEN (TD) TAM A5695 3000489033 AC & DC Panels 6/12/2006 6/21/2006 6/30/2006 7/21/2006 CL rel on 13-07
Jang Group Lahore (OLM) MHF A5696 3000488405 01x300kVAr PFIP 6/14/2006 6/20/2006 7/5/2006 7/25/2006
56xRTUs + 88xInterfacing +
KESC (TD) / LDC MA A5697 3000488903 6/15/2006 NR 6/20/2006 6/21/2006 CL rel on 20-06
11xEnergy Meter Panels
Pakistan Railway Carriage Factory SMY A5698 3000494509 03x300kVAR PFIPs 6/21/2006 6/30/2006 7/3/2006 CL rel on 04-07
28-06-06
04xLTOs + Loose ACB supply & LTOs
installtion at site + MCC + LDB-1 + 14-07-06 13-07-06
Faisal Spinning Mills Ltd 2, Power House TAM/MHF A5699 3000499040 6/30/2006 7/6/2006 CL rel on 28-06(LTOs), 05-07(bal)
BTD 6000A + Cable termination BTD MCC, LDB
Panel 18-07-06
BTD
02-08-06
Lucky Cement Ltd. SMY A5703 3000503418 01xLT Panel 7/4/2006 * 02days - sub to clarification
28-08-06
Indus Motor Co. Ltd. HJ A5704 3000506779 02xLT Switchgears + 02xBTDs 7/5/2006 7/11/2006 7/24/2006 Changes in App
Green City Housing Scheme SMY A5705 3000447858 148x Service Boxes 7/17/2006 * *01day - sub to clarification
01xFCPs+01xACPs for Fesco,
Fesco, Areva & Nizampur RJ/MAB A5706 3000543142 Areva & Nizampur 20/26 MVA PT 7/18/2006 7/19/2006 7/19/2006 9/10/2006 9/15/2006
respectively.
04xFCPs+04xACPs for 4Nos
Fesco RJ / HJ / MABA5707 3000546366 7/10/2006 7/24/2006 7/24/2006 9/18/2006 9/20/2006
10/13MVA PT
Delta Climate Control Engg. Ltd TAM/HJ A5708 3000517256 01xSML-1+13xLDBs+03xPDBs 7/20/2006 7/25/2006 7/26/2006 8/2/2006 Main Indent with S.O. # recd on 25-07
PPW SJA/RA A5712 3000516016 01xDC+01xAC Distribution Panels 7/26/2006 8/3/2006 11/27/2006
39xRelay+29xControl+
KESC (TD) / Tender 2480-02 MA A5713 3000483204 07xDUPLEX+04xSynch+06xMet+08 7/26/2006
xIF Panels
Pakistan Railways (TS) MA A5726 3000526801 17x Relay Group Housings 8/15/2006 NR Drgs recd from TS released for manuf
Zafar & Company/SUPARCO SMY A5740 3000587492 01x400kVAr PFIP 11/7/2006 11/22/2006 11/24/2006
LT Switchgear-SIVACON 8PT 28-11-06 30-11-06 05-12-06
27-11-06
Sitara Per Oxide HJ/TAM A5741 3000587675 Withdrawable (MCC+PFIP+ATS 11/8/2006 01-12-06 15-12-06 14-12-06
29-11-06
Panel) 08-12-06 23-12-06 19-12-06
DHA Karachi (TR)/DHA Phase VIII G/S No.1 MAB/RA A5742 01xFCP+01xTCP for 31.5/40MVA PT 11/8/2006 Formal Indent & S.O. # awaited
DHA Karachi (HSS)/DHA Phase VIII G/S No.1 A5743 3000541803 01xRemote Control Panel 11/20/2006
AREVA (TR) / Faisalabad Industrial Estate RA A5746 3000602668 01xFCP+01xACP for 20/26MVA PT 11/27/2006 NA NA NA 12/5/2006 App already recd at offer stage
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018
Prime Crete (Pvt.) Ltd MHF A5747 3000607827 02xDBs 12/1/2006 12/6/2006 12/8/2006 12/29/2006
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018
Indus Motor Co. Ltd. HJ A5748 3000612090 02x400kVAr PFIPs 12/8/2006 12/13/2006 12/14/2006 12/14/2006
Gulshan Weaving Mills Ltd. TAM A5749 3000618720 Main LT+BTD+DBs 12/20/2006 12/20/2006 12/20/2006 1/3/2007 12/27/2006 App drgs recd on 15-01
QESCO (TR) RA A5750 3000612278 01xFCP+01xACP for 20/26MVA PT 12/13/2006 12/18/2006 12/21/2006 12/21/2006
Gulistan Textile Mills 4. TAM A5752 3000618711 Main LT+BTD+DBs+PFIP 12/20/2006 12/29/2006 1/11/2007
DHA Karachi (TR)/DHA Phase VIII G/S No.1 RA A5753 3000581497 01xACP for 31.5/40MVA PT 12/21/2006
05xFCPs+05xACPs for 10/13MVA
NTDC-WAPDA(TR)/STG-621 RA A5754 3000626684 1/3/2007
PT
Century Paper Mills HJ A5755 LT Switchgear Indent & S.O. # awaited
BU SS / Siemens Pakistan HO Building, Block
MHF A5756 3000523164 03xDBs 1/9/2007 1/10/2007
'D'
Gadoon Textile Mills Ltd. A5757 3000640923 01xMCC - 8HKO 1/24/2007 1/31/2007
MV Switchgears
1 Umar Spinning Mills (Pvt.) Ltd. KR A0551 3000332848 01xWIP+01xI/C&O/G SA2 Panel 9/12/2005
62x4-Way+29x3-Way RMUs +
4 Punjab Industrial Estate KR A0554 T-010 9/21/2005
01xWIP + 01xWCP
01xI/C+04xO/G+2xB/C WAPDA
5 Sitara Chemical Industries RA A0560 3000346424 10/12/2005
Grid Panels
LV Switchgears
2 Bhanero Textile Mills Ltd. HJ/KZ A5555 3000257527 LT Switchgear, DBs 4/28/2005
4 Khadim Husain Slatch & Co. TAM A5564 3000284242 250kVA Changeover Panel 6/20/2005
5 Pak & Jinnah Park Projects TAM A5565 3000284763/8 LT Power Panel No.1 & No.2 14-06-05-
21-06-05
6 Glaxo Smith Kline TAM/KZ A5568 3000288055 LT Switchgear
29-09-05
SLD/FV/Assembly/FP submitted to TD
10/14/2005 10/19/2005
on 14-10
03-01-05
CL rel on 28-12 / Clar on Trafo dim drg
Layouts
08-03-05 reqd / Meeting with EC on 23-05 / Resub
12/6/2004 10-01-05 3/3/2005
10-08-05 with changes dtd 24-05 / Go-ahead from
26-05-05
SB PL Ex on 08-08
12-05-05 PDBs,
12-05-05
06-05-05 PDBs, Items 06-18, CL LT on 18-05 /
LDBs & MLDB
5/13/2005 LDBs & MLDB
25-05-05
31-05-05 Item 01-02 MCC & LCBs on hold
LT, PFIP, MCC on 030605
03-08-05
6/10/2005 15-08-05 9/15/2005 9/7/2005 Order put On-Hold on 04-10
31-08-05
Control scheme same as Gadoon order
6/21/2005 6/24/2005
A5545 / App awaited
10-08-05
26-09-05 CL rel on 11-08 / Changes in App /
8/10/2005 9/13/2005
27-09-05 Resubmitted, App awaited
Layout
23-08-05 Resubmitted as per comments/changes
8/19/2005 9/7/2005
13-09-05 / App awaited
0
Work in
May Jun Jul Aug Sep Total Balance
Hand Status GP
90 -90
36 33 21 Running
MV