The document appears to be an engineering and design plan printout listing details of various switchboard projects including customer name, order number, planned and actual dates.

The document lists details of various medium voltage and low voltage switchboard projects for different customers.

Medium voltage and low voltage switchboards are mentioned.

SIEMENS Pakistan

BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

MV Switchboards
ForApp. ForApp.
By ON
Customer DE E&D S.B.No. Description Start App. Rec. For Prod. Remarks

03-04-03 03-04-03 Succesfully type tested on 23-09 at


14-01-03
Prototype 100/200kVA SJA/SHA Y5143 5100002190 100/200kVA PMT 23- 11/4/2004 Rewat/WAPDA Inspection on 20-
-
06-04 23-06-04 10/Approved on 27-10
Interloop (Pvt.) Ltd. MYS A0250 4800020535 01 x WIP + 01 VCB Owner's Panel 5/28/2004 6/1/2004 9/8/2004 02-06-04 Modification work
Megabird International KR A0263 4800014835 KESC Jr. Panels 2/4/2003 12-03-03 12-03-03 App awaited
Packages Ltd. SJA/FB A0276 5100002044 01 No. VCB for existing trolley 4/4/2003 Under clar
02x6.6KV INC./OUT.VCB, 01xCOS
WASO - Mianwali ( TD ) SJA A0307 5100002364 6/20/2003 21-08-03 26-04-04 13-10-03 Inspected on 28/29-07
LBS Panels
Highland Traders ( Shamail ) MYS A0308 4800016499 03x KESC Jr. Panels 6/23/2003 04-07-03 21-07-03 10-07-03
Bahria Town - Rawalpindi SJA A0332 4800016903 11 kV Switchgear / PMT 9/29/2003 08-10-03 30-10-03 05-11-03 MV Swgr dispatched

09-03-04 Refer Design Plan / POA &POB


03-12-03 17-05-04
16-01-04 08-12-04 dispatched / P1&P2 inspected on 21&22-
KCI Chashma ( EC ) KR A0342 5100002648 11kV Switchgear - 71 Panels 12/11/2003 22-01-04 04-
20-01-04 17- 03 / P3, P4, VA inspected on 26-28/04
02-08-04 11-04
01-05 and dispatched

K.E.S.C. SJA/MR A0356 4800018464 21X4MVAr,11kV Capacitor Banks 12/9/2003 16-01-04 26-02-04 21-01-04 Inspected on 02-08
Sialkot Int'l Airport Ltd. (EC) SMY A0357 5100002643 11kV Switchgear (05 Panels) 12/10/2003 16-01-04 12-02-04 01-03-04 Reinspected on 23-11-04
K.E.S.C. SJA/MR A0363 4800018961 15kV Switchgear (20 Panels) 1/16/2004 29-01-04 26-02-04 20/29-01 ###
PO recd 06-04/App awaited/Qty reduced
IESCO SHA A0367 4800018736 37x200KVA PMTs 12/30/2003 09-04-04 09-04-04
29-07/ Inspection on 17-09
09-04-04
Pakistan Refinery Ltd. KR A0370 4800018945 3.3 kV Switchgear - Simoprime 1/16/2004 24- 04-05-04 24-05-04 Inspected on 29-9 /Dispatch awaited
05-04
20-05-04
21-05-04
Decon Germany MYS A0371 4900000315 24kV Switchgear - 8BK20 1/22/2004 18-03-04 26-04-04 Lot 2.1 Inspection on 21-02
05-11-
04
11kV Switchgear (24xI/C+ CL rel on 13-01/ Inspected on 03/04-
WAPDA ADP27 SJA A0372 4800019094 1/7/2004 17-02-04 04-03-04 13-04-04
50xO/G+20xC) 08/Inspected on 07-09

Pioneer Multipurpose KR A0373 4800019145 02xKESC Outgg + 21xKESC Jr 2/9/2004 08-03-04 06-03-04 App awaited/KESC Jr Panels dispatched
16-03-04
25.03.04
Nishat Chunian Ltd. (Weaving) SJA A0375 4800019386 01xI/C+01xO/G 11kV VCB Panels 3/3/2004 7/1/2004 30- Additional Order on 24-06
13.07.04
01-07-04 06-04
Rahman Cotton Mills SJA A0377 4800019444 01x11KV Wapda O/G Grid Panel 3/5/2004 12-03-04 6/16/2004 11-03-04 App awaited/Inspection on 17-06
Masood Textile Mills KR A0380 4800019596 01x 11kV VCB I/C / O/G Panel 3/25/2004 30-03-04 15-04-04 15-04-04
Crystal Spinning (Pvt.) Ltd. MYS A0383 4800019721 01x Wapda Industrial Panel 3/26/2004 31-03-04 NR 29-03-04

SUPARCO SJA/ KR A0385 510002843 01x11KV 1/C +01x o/g Panels 4/20/2004 5/4/2004 11-05-04 11-05-04 CL rel on 30-04/ App awaited

01x 11kV VCB O/G Panel + Adaptor


Honda Atlas Cars (Pakistan) Ltd. KR A0386 4800019839 4/7/2004 19-04-04 5/5/2004 30-04-04 20-04-04 Relay changed to P124S
Panel for Simoprime
27-07-04
05.05.04
20-08-
General Tyres & Rubber Company MYS A0387 4800019787 04x 3.3kV Reversible Starter Panels 4/9/2004 19-04-04 15.06.04 8/12/2004 5th Panel to be dispatched
04
schematic
09-09-04
Abdul Razzak Kamani KR A0388 4800020033 01x KESC Jr with Prot w/o Metering 4/19/2004 29-04-04 29-04-04 CL rel on 23-04 /App awaited

29.04.04
25x11KV Capacitor Bank Control 26.05.04
NTDC/WAPDA-ADP29 (LOT III) SJA A0389 4800020047 4/19/2004 7/30/2004 7/22/2004 Inspection on 18-10
Switchgear Panels 08.06.04
14.07.04
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

01x11KV Wapda Industrial


Interloop (Pvt) Ltd. MYS A0390 4800020046 Panel+01x11KV VCB Owner's 4/20/2004 29-04-04 9/8/2004 29-04-04
Panel
CL rel on 27-04/Relay changed to 2TJM
Sitara Chemical Industries KR A0391 4800020056 01x11KV VCB I/C/ O/G Panel 4/20/2004 29-04-04 18-05-04 29-04-04
on 13-07
06 Nos Contact Arm Blade for
PTD Services / Fauji CEMENT Ltd MR A0392 5100000394 4/22/2004 NR NR 23-04-04
3AH1115-2
Berger Paints Pakistan Ltd. KR A0394 4800020138 01x11KV I/C /O/G Panel Simoprime 4/23/2004 29-04-04 14-05-04 29-04-04 CL rel on 27-04
Peoples Steel Mills Ltd. KR A0395 510002827 01xVCB 1250 A, 12KV, 20KA 4/20/2004 27-04-04 7/29/2004 6/3/2004 CL rel on 27-04
01x Wapda Industrial + 01xVCB
Sandal Dyestuff Industries Pvt Ltd. MYS A0396 4800020091 4/26/2004 5/4/2004 5/4/2004 9/8/2004 04-05-04
Owner's Panel
07-05-04
17.05.04
-
Ibrahim Fibers Ltd (ITM) KR A0397 4800020148 11KV Switchgear (03 Panels) 4/27/2004 5/5/2004 01.06.04 10-05-04 Inspected on 26-08
13.07.04
03-06-04
Olympia Chemicals Ltd. MYS A0398 4800020254 6.3KV Switchgear 4/30/2004 5/12/2004 18-05-04 6/23/2004 6/25/2004 Add.indent on 31-08/Inspected on 14-09
26-07-04
11-05-04
PARCO MYS A0399 4800020271 11KV Changeover Panel 5/4/2004 05-07- 18-08-04 Inspection on 18-10
13-
04
08-04
Shaikh Zayed Bin Sultan Al-Nahyan MYS A0400 4800020465 01X WAPDA Industrial Panel 5/24/2004 28-05-04 28-05-04 Under testing
Silver Knits KR A0402 4800020651 01 x KESC Jr with Metering & with P 6/9/2004 6/9/2004 6/29/2004 6/9/2004 CL rel on 07-06
Colony Textile Mills SJA A0403 4800020635 01 x Inc + 03 x Outgoing (8BD4) 6/11/2004 11-06-04 6/25/2004 7/1/2004
Highland Traders (Askari) RA A0404 4800020735 01xKESC grid+02xxKESC Jr+01xIsol 6/9/2004 6/29/2004 7/16/2004 7/5/2004 KESC Jr Panels dispatched
Noorani Spinning Mills Ltd. RA A0405 4800020634 01 x WAPDA Industrial Panel 6/10/2004 6/18/2004 6/21/2004 7/12/2004 7/28/2004

Chashma Sugar Mills Ltd. SJA A0406 4800020867 02x 6.6 KV VCB Panels 6/17/2004 7/19/2004 7/22/2004 8/10/2004 8/13/2004 Changes to be rel on SB S go-ahead

Roche Pakistan Ltd. MYS A0407 4800020910 01x VCB Phase CO Panel 6/22/2004 7/7/2004 7/16/2004 8/17/2004 7/27/2004 Inspected on 06-10/Changes
FESCO SJA/RA A0408 5100002938 04x I/C+15x O/G VCB Trolleys-WAP 6/22/2004 6/29/2004 8/6/2004 8/6/2004

25-06-04 Changes recd on 12-08 - qty revised /


23-06-04
16- Qty revised 07-10 / Changes on 27-12 /
30-03- 04-11-04 05-07-04
Habib Rafique Pvt. Ltd. SHA/SJA A0409 4800019795 215x 100KVA +242x 200 KVA PMTs 08-04 Go-ahead from SB S on 04-02, Rev CLs
05 22-02-05 15-04-05
04-02-05 to PR on 18-05 / Add indent / partially
19-08-05
15-04-05 dispatched / Rev indent for update

Fatima Sugar Mills KR A0410 4800020873 01x 11kV VCB I/C Panel 6/24/2004 7/2/2004 7/2/2004 7/20/2004 7/20/2004
Zaffar Enterprises RA A0411 4800020754 03x KESC Jr. +01x I/C / O/G Panels 7/1/2004 7/15/2004 7/15/2004 CL rel on 09-07/App awaited
Ghazi Fabrics International RA A0412 4800021130 01x 11KV VCB I/C / O/G Panel 7/2/2004 7/7/2004 7/19/2004 7/7/2004
Arshad Corporation Pvt. MYS A0413 4800021179 01x WIP + 01 x VCB Owner's Panel 7/7/2004 7/13/2004 9/8/2004 8/19/2004 CL rel on 12-07
Maxcorp Hussain Pakistan KR A0414 4800021244 01x FLBS Panel 7/13/2004 7/15/2004 7/22/2004 7/27/2004 7/26/2004
Krystalite Products (PTD SE) RA A0416 5100002991 01 x WIP 7/22/2004 8/2/2004 7/29/2004 24-08-04 7/29/2004 CL rel on 26-07

LESCO (PTD SE) RA A0417 5100002993


08x I/C + 15xO/G VCB Trolleys
7/22/2004 8/2/2004 7/28/2004 10/28/2004 10/28/2004 ###
-WAPDA

Islamabad Club MYS A0418 4800021501 01 x 11kV WAPDA Consumer Panel 8/3/2004 8/6/2004 8/6/2004 8/31/2004 24-08-04

Bawany Air Products KR A0419 4800021584


11 kV Switchgear-Simoprime(01x
8/5/2004 8/12/2004 8/11/2004 8/25/2004 8/11/2004 ###
I/C+03x O/G)
Tahir Builders MYS A0420 4800021621 11kV Switchboard 8/5/2004 8/12/2004 8/17/2004 8/30/2004 01-09-04 Voltmeter+SS added in O/G Panel
Colony Textile Mills MYS A0421 4800021612 01 x 11kV VCB O/G Panel 8/6/2004 8/10/2004 8/11/2004 8/23/2004 8/24/2004
13-09-04
01-10-04 CL rel on 10-09/PTs with secondary
Ghazi Fabrics International SJA/RA A0422 4800021793 08 x 11kV VCB Panels 8/23/2004 9/3/2004 9/28/2004 10/8/2004
110/3
Schematics
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

Habib Rafique Pvt. Ltd. KR A0423 4800021842 28x 3-Way + 18x 4-Way RMUs 8/24/2004 8/27/2004 9/29/2004 9/23/2004 ###
01xWIP+02x11kV VCB I/C/O/G
Haleeb Foods KR A0424 4800021812 8/24/2004 9/3/2004 9/2/2004 9/20/2004 9/2/2004
Panels
Indent/S.O. on 26-08 / Add indent for
IESCO SHA A0425 4800021875 (15+3) x 63kVA PMTs 8/6/2004 NR 9/3/2004
03Nos. on 23-02
Indent /S.O.No.on 19-10/Rating plate on
IESCO SJA A0426 4800022602 37 x 4 - Way RMUs 8/26/2004 NR NR 10/29/2004 21-09/Qty enhanced by 07 Nos. on 15-10
/ 30 Nos. dispatched
11-09-04
Reckitt Benckiser (PTD SE) KR A0427 5100003059 01x11kV Simoprime I/C/O/G VCB pan 9/3/2004 9/3/2004 e- 9/3/2004 CL rel on 03-09/App drgs recd 21-09
24-09-04 mail
15-10-
04 03-11-04
28-10-04 18-11-04
Maple Leaf Cement KR A0428 5100003131 6.3 kV Switchgear-14 x 8BD4 8/31/2004 9/21/2004 11/30/2004 Indent/S.O. No. on 13-10
05- 03-12-04
11-04 13-12-04

schematics
01 x 11kV WAPDA 16-09-04 23-09-04
CL rel on 02-11/04-11/Consumer panel
Baber Islam & Company KR A0429 4800022142 Consumer+02x11kV VCB I/C 9/14/2004 9/16/2004 11- 11/29/2004 11-
dispatched
Panels 11-04 11-04
Pakistan Petrolem Ltd. RA A0430 5100003087 01x VCB Trolley with contact arms 9/15/2004 9/16/2004 9/10/2004 9/16/2004 App awaited
Gulshan Weaving Mills Ltd. MYS A0431 4800022111 01x VCB I/C / O/G Panel 9/15/2004 9/17/2004 9/20/2004 12/15/2004 26-11-04
Commodities & Textiles Pvt. Ltd. KR A0432 4800022258 02 x KESC Jr 9/22/2004 10/1/2004 10/7/2004 10/22/2004 10/7/2004 CL rel on 27-09
ENI Pakistan Ltd. (EC) KR A0433 5100003138 02 x LBS+I/C Cable Connection Pan 9/23/2004 10/1/2004 10/4/2004 10/4/2004 Indent /S.O.No. on 14-10
27-09-04
Retrofit for MOCBs/Indent/ S.O.No. on
HESCO (PTD SE) RA A0434 5100003126 05xI/C+15xO/G VCB Trolleys - WAP 9/23/2004 12/8/2004 12/8/2004 13-10/Site Visit on 05-10 / Inspection on
06-10-
03-03
04
Indent/S.O.No. on 13-10 / CL rel on 18-10
20- 08-10-04
Holcim Cement Srilanka (MES) MYS A0435 5100003122 01x 3.3kV,2000A VCB+01xAdapter P 9/28/2004 10/5/2004 10/25/2004 / Rev drgs on 27-10 / Adapter Panel
10-04 28-02-05
dispatched
01 x 6.6 kV VCB Panel with Manual
Indus Sugar Mills (EC) SJA A0436 5100003139 9/28/2004 10/6/2004 10/19/2004 10/21/2004 10/26/2004 Indent /S.O.No. on 15-10
Synchronisation
Shahzor Feeds Pvt. Ltd. RA A0437 4800022424 01x WIP + 01x VCB Owner's Panel 10/7/2004 10/11/2004 10/21/2004 10/11/2004 CL rel on 12-10

23-02-05
02x 24 kV, 25kA, 800A VCB I/C / D01
20-10-04 23-02-05
Barqaab / NTDC (TD) SJA A0438 5100003125 O/G Panels for NTDC -KESC 10/8/2004 10/20/2004 28-04-05 CL rel on 12-10
22-12-04 email
Interconnection D02
10-05-05E01

CL rel on 15-10/App awaited / Inspected


Highland Traders KR A0439 4800022267 01x 15kV KESC Grid O/G Panel 10/13/2004 10/19/2004 10/18/2004 10/18/2004
on 20-04
02-11-04
24-12-04 19-01-05
KW&SB-NEK Pumping Station(KIII Project) 19-01-05 CL rel on 28-10 / 02x O/Gs put on hold
SJA A0440 5100003135 11 kV Switchgear & Capacitor Panel 10/14/2004 10/27/2004 27-12-04 11-03-05
(MES) e-mail by MES - Go-ahead on 07-07
15-07-05
03-01-05
02-11-04
KW&SB-Dhabeji Pumping Station (KIII Project) 27-12- 19-01-05 19-01-05
SJA A0441 5100003136 11 kV Switchgear & Capacitor Panel 10/14/2004 10/27/2004 CL rel on 28-10
(MES) 04 e-mail 28-03-05
03-01-05

01x 3-Way RMU + 01xWIP + 01x Protection CT revised to 50/5A on 31-03


British High Commission-Islamabad MYS A0442 4800022636 10/19/2004 10/27/2004 12/1/2004 12/7/2004
Bus PT + 02xVCB O/G Panels after inspection / Work to be done at site

Voltage relay added / Inspection on 01-


SF Engineering Services-EBM RA A0443 3000192078 01xKESC Jr Panel 10/22/2004 10/28/2004 12/17/2004 10/28/2004
02
04 x 11kV I/C/O/G VCB Panels-
Dewan Farooq Spinning Mills KR A0444 3000192068 10/25/2004 11/2/2004 11/12/2004 12/15/2004 11/12/2004 S.O# recd on 03-11/CL rel on 29-10
simoprime
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

01 x WIP + 01xI/C+02xO/G VCB 13-11-04 22-12-04 23-11-04


Rahman Cotton Mills KR A0445 3000193229 11/2/2004 CL rel on 12-11 / Changes / Resubmittal
Panels 29-12-04 31-01-05 29-12-04
01x WIP + 01 x I/C + 02 x O/G 11kV CL rel on 10-11/WIP CT ratio
Janana De Malucho Textile RFQ/SJA A0446 3000192099 11/4/2004 11/18/2004 11/25/2004 12/14/2004 12/15/2004
VCB Panels changed
26-11-04
MV Switchgear incl. NGRs- 08-11-04
21-11-04 17-
Ittehad Chemicals Ltd. SJA/RA A0447 4800022821 11&13.8kV (09 x 11kV + 12 x 11/5/2004 09-12-04 Inspected on 12-01
22-12-04 12-04
13.8kV) Schematics
29-12-04
12-11-04 19-11-04 CL rel on 10-11/CT revision FCT-15 PM
State Life Building-Islamabad RA A0448 5100003149 01x WIP + 01x VCB Owner's Panel 11/4/2004 12/8/2004
24-11-04 03-12-04 on 22-02
11 kV Switchgear (06 Panels) + 01x 18-11-04 24-12-04
ESS ESS Associats (EC) KR A0449 3000188690 5/25/2005 6/28/2005 6/28/2005 CL rel on 10-12 / Add Indent
11kV Gen I/C Panel 23-05-05 01-06-05
Bahria Town Pvt. Ltd. KR A0450 3000192035 11 x 4-way RMU's 29-11-04 11/29/2004 12/1/2004
QESCO KR A0451 3000197089 05 x WIP 12/7/2004 12/22/2004 12/7/2004 ###
01x WIP + 02x 11kV VCB I/C/O/G 23-12-04 8BD4 instead of SA2 03-01 /Inspection
Bismillah Textile Mills Ltd. KR A0452 3000196666 12/7/2004 1/6/2005 1/11/2005
Panels 03-01-05 21-12-04email on 28-03
16-12-04
20-12-04
01x 11kV VCB I/C Panel + 01x 09-12-04 10-01-05 CL rel on 13-12 / Add indent / CL rel on
Sapphire Power Gen. Ltd. RA A0453 3000199555 03-01- 24-12-04
Adapter Panel + 01x O/G Panel 23-02-05 17-03-05 02-03
05 12-01-
09-03-05 05 15-
01 x WIP+ 01 x11 kV VCB Owner's 03-05 Comments/Changes/Indent recd on 27-
Bahria University MYS A0454 3000204975 12/14/2004 12/14/2004 12/27/2004 12/29/2004
Panel 12/Inspection on 16-02
M. Talib Enterprises KR A0455 3000200218 03x KESC Jr. Panels 12/13/2004 12/21/2004 1/7/2005 App awaited
14-01-05(8BK)
07-02-05 (SA2)
19-01- 01-02-05
6.3 kV Switchgear (09 x 8BK20 + 28 16-12-04 05(SA2) As per Design Plan/ CL rel on 07-01 /
Pioneer Cement MYS/KR A0456 3000200950 email 09-02-05(8BK)
x SA2) 13-04-05 21-04- 20-04-05 Add indent / Changes in App
06-05-05
05 (Add scope)
(Add scope)
18-01-05
28-12-04 11-01-05
KSB (Pak Arab Fertilizer) SJA/RFQ A0457 3000201240 01x 6.3kV VCB I/C/O/G Panel-8BD4 12/22/2004 03-03- Changes 08-02 11kV to 6.3 kV
10-02-05 10-02-05
05e-mail
Chawla Spinning Mills Ltd. SJA/RFQ A0458 3000202527 01x WCP + 01 x WIP 12/22/2004 12/31/2004 12/27/2004 1/11/2005 TCS Relay changed on 06-04

Relay change on 28-01, rel in Prod on


11-01-2005 14-04 / Inspected on 09-06 / Drgs revised
01x WIP + 01x I/C + 02x O/G VCB
Kidney Center Peshawar MYS A0459 3000205185 12/27/2004 1/4/2005 1/5/2005 2/28/2005 12-07- & released based on inspection
Panels
05 points/Re-inspected / Fuji make CTUs
replaced with Elabs make

28-01-05 24-02-05email CL rel on 28-01 rev 09-02 / Inspected on


Crescent Bahuman Ltd. KR A0460 3000207654 01x 11kV I/C + 01x Adapter Panel 1/6/2005 1/25/2005 2/25/2005
15-02-05 07-03-05 18-05
CL rel on & 19-01 & 07-02 / Clar Meeting
Civil Works Organisation SJA/RA A0461 3000204995 01x 11kV I/C/O/G + 01xO/G Panels 1/12/2005 1/19/2005 2/18/2005 3/30/2005 4/1/2005
02-02 / Inspected on 20-05
Email SB D
09-
02-05
11kV Switchgear - 25xI/C + 14-02-05 01-04-05 NOA recd on 11-01 / CL rel on 14-01/
WAPDA ADP-43 (Lot-1) SJA A0462 3000209980 1/14/2005 1/14/2005 1/14/2005
172xO/G + 07xB/C Panels 04-05-05 O/G 125xO/G+13xI/C+07xB/C inspected
07-04-05
B/C
11-04-05 I/C
28-01-05e-
Nestle Milkpak Ltd. SJA/RFQ A0463 3000209208 01x WIP 1/14/2005 1/18/2005 1/18/2005 1/31/2005
mail
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

24-02-05
Clar recd 15-02 / CL for add comps on
07-04-05
25-03 / App comments replied 30-06 /
03-02-05 27-05-05 11-03-05
Meeting with Alstom 08-07 / Rev CL on
Auto changeover scheme in 06- 21-07-05 26-04-05
Alstom Pakistan (Pvt) Ltd. MYS/SJA A0464 3000212008 1/24/2005 NR 21-07 / App comments recd 04-08,
existing MV Panels 04-05 09-08-05 10-06-05
replied on 09-08 with rev drgs /
25-05-05 20-10-05 11-11-05
Comments on 26-08 replied & incorp in
01-11-05
drgs / App with minor changes
16-11-05

Pakistan Air Force KR A0465 3000216361 01x 11kV VCB I/C / O/G Panel 1/27/2005 2/23/2005 3/31/2005 4/1/2005 Fresh indent on 14-02 / CL rel on 23-02

Resham Textile Mills Ltd. RA A0466 3000215233 11kV Switchgear-8BD4 (06 Panels) 2/1/2005 2/11/2005 2/23/2005 2/23/2005 Changes in CT ratios on 25-02

CL rel on 15-02 / TCSR changed on 07-


M. K. Sons (Pvt.) Ltd. SJA/RFQ A0467 3000217198 01 x WAPDA Consumer Panel 2/11/2005 2/11/2005 3/10/2005 3/7/2005
04
Hold by SB S on 25-02/Cancelled on 07-
Bahria Town, Islamabad SJA/RFQ A0468 3000218803 60 x 200kVA PMTs 2/11/2005 2/16/2005 2/24/2005
04
Haleeb Foods (Pvt.) Ltd. SJA/RFQ A0469 3000218813 01x WCP 2/11/2005 2/15/2005 3/10/2005 4/11/2005

Changes in specs on 18-02 / CL rel on


11kV Switchgear (07xVCB +
Mughal Steel SJA/RA A0470 3000221388 2/11/2005 2/18/2005 3/3/2005 3/25/2005 4/18/2005 21-02 / SB S go-ahead for SA2 on 14-04 /
01xBPT + 01xNGR)
Bus PT panel revised (600mm)

CL rel on 14-03/CT mtg arrangement


Maple Leaf Cement KR A0471 3000221895 MV Panel + Adaptor Panel 2/16/2005 3/4/2005 3/18/2005 4/6/2005 4/6/2005
revised
6.3kV Switchgear - 8BD4 (03 Nos) +
22-02-05 14-03-05
Thatta Cement Co. Ltd. (MES) KR A0472 3000222460 01x 6.3kV, 450kVAr Capacitor 3/10/2005 4/4/2005 4/11/2005 Add indent / CL on 21-03, rev on 31-03
10-03-05 21-03-05
Panel

18-03-05
25-03-05 I/C
Nestle Milkpak Ltd. SJA/RFQ A0473 3000221408 01x I/C + 1xO/G 11kV VCB Panels 2/22/2005 3/5/2005 21-03-05 3/31/2005 CL rel on 08-03
Schematics
Loadstar (Pvt.) Ltd. MYS/RFQ A0474 3000224965 01x 7.2kV O/G Panel 2/25/2005 3/4/2005 3/10/2005 3/18/2005 3/22/2005 A1326 Old order/CL rel on 25-02
18-03-05
03x11kV VCB Panel + Loose 30-03-05 28-03-05
DS Textile Ltd. KR A0475 3000215568 2/22/2005 3/9/2005 3/31/2005 Changes in App / Rev CL on 06-04
Component 05-04-05
Schematics
18-03-05
02x 11kV VCB Panel + Loose 24-03-05 28-03-05
DS Industries (Pvt.) Ltd. MYS A0476 3000216345 2/22/2005 3/12/2005 3/28/2005
Component 05-04-05
Schematics
Coca Cola (Pvt.) Ltd. SJA/RFQ A0477 3000222996 01x WCP + 06nos. loose CTs 2/25/2005 3/1/2005 3/1/2005 3/8/2005 App awaited
02-03-05 02-03-05
Arshad Textile Mills Ltd. MYS/RFQ A0478 3000223443 02x 11kV I/C / O/G Panels 2/25/2005 3/2/2005 3/30/2005 Interlocking reqmt on 04-03
11-03-05 11-03-05
Karachi Export Processing Zone KR/RFQ A0479 3000222933 01x 11kV O/G Panel 3/7/2005 3/16/2005 3/16/2005 3/30/2005 4/20/2005 CL rel on 14-03
01x 11kV VCB I/C/O/G (8BD4) + 14-03-05 16-03-05 CL rel on 14-03 /Add indent for WIP - Go
Technical Associates Pakistan MYS A0480 3000225691 3/15/2005 3/15/2005 3/25/2005
01x WIP Panel 24-03-05 25-03-05 ahead on 21-04
Muhammad Mushtaq, Muhammad Naseer & 31-03-2005
MYS/RA A0481 3000228851 02x 11kV VCB I/C/O/G Panels 3/11/2005 3/16/2005 3/17/2005 3/17/2005 CL rel on 14-03/App drgs on 08-04
Co. email
21-03-05
12- TCS Relay deleted / CL rel on 21-03 /
11 kV Switchgear (06xSA2 + 18-03-05
Lucky Energy, Karachi SJA/RA A0482 3000230152 3/11/2005 04-05 4/29/2005 5/6/2005 Changes on 20-04 & 29-04 / Trip circuit
01xBPT Panels) 06-04-05
28-04-05 Supervision changes to be done
02-05-05
20-05-05 Clar Meeting with EC on 04-04 / CL rel
DHA Lahore - Phase VI SHA A0483 3000231988 01x 4-way RMU + 04x 100kVA PMTs 3/18/2005 4/7/2005 5/24/2005
19-07-05 on 07-04 / App with changes
15-04-05
11kV Switchgear
22-03-05 30-03-05 06-04-05 20-04-05 CL rel on 01-04 / Add indent / Changes
Nishat Chunian Ltd. - I KR A0484 3000231561 03xI/C+01xB/C+04xO/G+01xBPT
17-06-05 20-06-05 30-06-05 email 30-06-05 on 24-06
Panel + 01x11kV VCB Synch. Panel
12-07-05
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

State Life of Pakistan MYS A0485 3000233483 01x 11KV I/C /O/G Panel 3/24/2005 3/25/2005 3/29/2005 4/4/2005 3/29/2005 CL on 29-03
11kV Switchgear (02xI/C / O/G
Janana De Malucho Textile MYS A0486 3000234193 3/25/2005 3/31/2005 4/1/2005 NR 4/4/2005
Panels)
CL rel on 08-04 rev 28-04 / App with
08-04-05 Changes/ CT ratio changed to 1200/5A
Cherat Cement MYS A0487 3000215827 6.3kV Switchgear-8BK (08 Panels) 3/29/2005 4/6/2005 4/19/2005 5/17/2005
28-04-05 on 07/05/05 / O/G VCBs changed to
1250A by PTSI

18-04-05 26-05-05 CL rel on 18-04 / Meeting with Customer


11kV Switchgear (09xSA2+01xBPT 20-04-05
International Industries Ltd. KR A0488 3000238904 4/6/2005 20-05-05 04-07-05 7/7/2005 & Consultants on 18-05 / Rev CL on 20-
Panels) 20-05-05
08-06-05 12-07-05 05 / Meeting with customer 28-06

15-04-05
RMUs
19-04-05 20-04-05
11kVSwitchgear
WIP+11kV WIP+11kV+
(01xWIP+01xI/C+02xO/G Panels + 08-04-05 19-04-05
Glamour Developers (Pvt.) Ltd. MYS/SHA A0489 3000240107 27-04- 5/10/2005 RMU CL for RMUs on 15-04 / Add indent
11x200kVA & 01x100kVA PMTs + 07-06-05 09-06-05
05 16-05-05
02x4-Way RMUs) +01xWCP
PMT PMTs
10-06-05
WCP

04-05-2005
Chenab Engineering RFQ/SJA A0490 3000240259 01xWIP + 01xWCP 4/8/2005 4/11/2005 4/14/2005 5/5/2005
WCP

CL rel on 13-04 / Changes as per


inspection by KESC on 14-11 /
25x KESC Jr Panels - I/C w/o Successfully type-tested at Rawat on
KESC KR A0491 3000253966 4/12/2005 4/13/2005 4/13/2005 4/13/2005
Metering 12-12 & 13-12 for BIL, PF, SC & at SB
works from 28-30/12 for Temp rise &
Mech endurance

Karachi Golf Club SHA A0492 3000253969 01x 400kVA PMT 4/13/2005 4/25/2005 4/26/2005 6/3/2005
IESCO KR A0493 3000254703 37x 4-Way RMUs 4/14/2005 NR 4/15/2005 NR 4/15/2005
01xI/C+02xO/G 11kV VCB Panels -
Azgard Nine Ltd. KR A0494 3000256591 4/21/2005 4/27/2005 4/26/2005 4/27/2005 4/27/2005 CL rel on 26-04/As-built sent
8BD4

Pakistan Mineral Development Corporation KR A0495 3000257090 01x WIP 4/21/2005 NR 4/21/2005 NR 4/21/2005 CL rel on 21-04

Ashfaq Textile Mills Ltd. KR/RFQ A0496 3000257651 01x WIP + 01x VCB Owner's Panel 4/27/2005 4/29/2005 4/29/2005 5/11/2005 5/23/2005 CL rel on 29-04/CT changed

03-05-05
28-04-05 04-05-05 11-05-05 03-05-05 CL rel on 03-05 / CT ratio for WIP on 11-
Bhanero Textile Mills Ltd. KR A0497 3000257527 11kV Switchgear + 01xWCP 5/10/2005
08-06-05 13-06-05 09-06-05 09-06-05 05 / Add indent / WCP deleted
WCP
Al Noor MDF Board Industries
MYS/RA A0498 3000262987 11kV & 3.3kV Switchgear 5/3/2005 5/10/2005 5/31/2005 6/16/2005 6/20/2005 Meters shall be provided by PTD-SE
(PTD SE)
01x WCP + 01x WIP + 01x VCB
Citropak Ltd. MYS A0499 3000262516 5/5/2005 5/11/2005 5/10/2005 5/18/2005 5/18/2005
Owner's Panel
16-05-05
M/s Rousing Engg Services / 01x I/C + 04xO/G Panels - WAPDA 10-05-05 Formal Indent on 12-05 / Changes as per
RFQ/SJA A0500 3000267773 5/9/2005 5/10/2005 5/16/2005 10-06-05
M/s A. A. Spinning Mills Ltd. P44:96 09-06-05 meeting with Customer
21-06-05
11-05-05
01x 11kV VCB O/G Panel + 01x Add indent / Rev indent - 01xO/G panel
Bismillah Textile Mills Ltd. MYS A0501 3000264770 24-05-05 5/13/2005 6/10/2005 6/22/2005 6/23/2005
VCB Trolley reqd instead of owner's panel
07-06-05
AJK Electricity Dept. RFQ/SJA A0502 3000266732 01x WCP 5/11/2005 5/13/2005 5/13/2005 NR 5/24/2005 Inspected on 08-08
27-05-05
Century Paper & Boards Mills Ltd. KR A0503 3000269891 01x 11kV VCB I/C / O/G Panel 5/20/2005 5/24/2005 6/1/2005 6/7/2005 CL rel on 27-05
07-06-05
01x KESC Jr with Prot w/o
Babar Metal Industries KR A0504 3000272953 5/23/2005 5/24/2005 5/24/2005 5/24/2005
Metering
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

04x 6.6kV, 200kVAr Capacitor 04-07-05


PARCO / PS1 Korangi KR A0505 3000268318 5/23/2005 5/26/2005 5/30/2005 7/1/2005
Banks 29-07-05
02x KESC Jr Panels (with & w/o
Rohaan Enterprises / Kidney Centre Karachi KR A0506 3000273034 5/25/2005 5/26/2005 5/25/2005 NR 5/25/2005
metering)
Lucky Textile Mills Ltd. MYS A0507 3000267718 02x 11kV VCB I/C/O/G Panels 5/25/2005 5/27/2005 6/1/2005 6/7/2005 6/10/2005
CDG-61 instead of 2TJM11 - confirmed
CPC DG Khan MYS A0508 3000276806 02xInc+04xOutgg VCB Panels 6/1/2005 6/8/2005 6/10/2005 7/18/2005 7/27/2005
by PTD ISB

Tayyeb Textile Mills KR A0509 3000276293 01xInc/Outgg + 01xInc + 02xOutgg 6/7/2005 6/7/2005 6/14/2005 6/15/2005

01xKESC Jr. with Prot w/o


Al-Pak Ghee Mills KR A0510 3000278107 6/7/2005 6/8/2005 6/22/2005 6/22/2005 Inputs recd 22-06
Metering

05xI/C+15xO/G VCB trolleys as per 01-07-05 Resubmitted for approval / w-coil+acc


HESCO MYS/RA A0511 3000285529 6/16/2005 6/27/2005 9/26/2005
WAPDA specs P44:96 05-09-05 added on 24-10 in O/G VCBs

Tariq Glass Industry (PTD SE) MYS A0512 3000286314 01xI/C VCB trolley - 8BD4 6/20/2005 6/21/2005 6/24/2005 7/22/2005 7/26/2005

01-07-05
04-07-05 11-07-05 05-08-05
11kV Switchgear - 16x8BD4 + 13-07-05SLD J1,J2&J3
22-06-05 04-07-05 03-08-05JI&J2 CL rel on 04-07 / CL for add indent on
26-07-05J1&J2
12x8BK Additional 05xI/C + 25xO/G 15-08-05J3 27-09-05
M/s Packages Ltd./Bulleh Shah Paper Mill Project KR A0513 3000287128 01-09-05 15-09-05 02-08-05J3 16-09 / Change of CT ratio in 02xO/Gs on
(8BD4) Additional 04xI/C + 16xO/G 22-08-05 15-09-05 02-11-05
21-02-06 28-02-06 J3(PTSI) 18-05
(8BD4) 16-09-05 J3
Add indent 26-09-05 20-03-06
16-03-06

11kV Switchgear - 8BD4


Saif Textile Mills KR A0514 3000288439 6/23/2005 6/30/2005 7/12/2005 08-08-05email 8/9/2005 Clar recd 08-07
03xI/Cs+04xO/Gs+BPT
12-07-05
M/s Honda Atlas Cars (Pakistan) Ltd. MYS/RA A0515 3000288772 11kV Switchgear - 01xI/C+03xO/G 6/24/2005 6/30/2005 6/30/2005 7/13/2005
02-08-05
M/s The Thal Industries Corp. Ltd. / Layyah
RA A0516 3000288538 01x6.6kV I/C / O/G VCB Panel - 8BD 6/27/2005 7/7/2005 7/12/2005 8/2/2005 8/3/2005
Sugar Mills
06-07-05
M/s Victor Pipe Industries - Afghanistan SJA A0517 3000292427 01x2-way 24kV RMU, Scheme 20 6/29/2005 7/4/2005 8/30/2005 8/16/2005 Dim updated
08-07-05
Pioneer Cement KR A0518 3000294434 6.3kV Switchgear - 04xSA2 7/1/2005 7/7/2005 7/4/2005 7/7/2005 7/8/2005

Customer comments recd on 22-08


clarified on 22-08, Go-ahead for release
29-07-05 in prod / 01xO/G to be aligned with 6.3kV
11kV Switchgear - 01xWIP + 12-08-05 switchgear, S. O. No. 3-347560 - A0552
FFC MYS/RA A0519 3000288778 7/4/2005 7/20/2005 9/1/2005 9/1/2005
08xSA2 + Loose Components 02-09-05 with new CT ratio / Relay changed to
Schematics CDG61 from P124 / Informal meeting @
SB with customer dtd 02-11 / Earthing
switches reqd as per email dtd 17-01

Formal indent on 24-10, S. O. # on 21-


05-07-05
PESCO RFQ A0520 3000354645 03x11kV O/G Panels - WAPDA 7/4/2005 12/27/2005 10/21/2005 10 / Customer P.O. recd on 17-10, Qty
21-07-05
changed to 03Nos.
22.07.05
(Item 1)
01xWCP+01xWIP+01xI/C+02xO/G -
Blessed Testile Mills Ltd. - Unit No. 3 MYS A0521 3000289586 7/5/2005 7/8/2005 7/12/2005 7/19/2005
8BD4
19-07-05
(Item 2)
30/08/2005
Formal indent & S. O. # on 10-11 / Drgs
23-09-05
approved during meeting with customer
SP&EW KR A0522 3000348466 6.3kV Switchgear 8/17/2005 8/30/2005 24-11-05
SLD/FV/CLs/ 05-09 to 09-09, resubmitted for formal
SB D
FPs app / CL rel on 12-09
12-09-05
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

SUPARCO MYS A0523 3000296423 01x I/C / O/G VCB Panel 7/12/2005 7/15/2005 7/14/2005 8/2/2005 8/3/2005
PSM KR A0524 3000287792 03x VCBs 7/12/2005 7/13/2005 7/15/2005 7/27/2005 7/27/2005 CL on 15-07-05

11kV Switchgear - 01xKESC Grid


O/G+03xKESC Jr+01xI/C+04xO/G - 18-07-05 Meeting with consultants on 28-07 / CL
Siddiqsons Tin Plate Ltd. KR A0525 3000297394 7/25/2005 8/11/2005 26-08-05Email 8/26/2005
SA2 + 01xAdapter Panel for KESC 24-01-06 rel on 05-08 / Energy Meter changed
Grid S/S

CL rel on 28-07 / Relay changed to CDG


D. S. Industries Ltd. RFQ A0526 3000302535 01xI/C+01xO/G 11kV VCB Panels 7/19/2005 7/26/2005 7/28/2005 8/9/2005 8/9/2005
61 on 22-08 / CC box added on 18-10

HESCO RFQ A0527 3000303957 16xI/C+48xO/G WAPDA P44:96 7/19/2005 7/22/2005 7/21/2005 10/3/2005 9/26/2005 CL rel on 21-07
CL rel on 21-07 / Approved drgs recd on
Bahria Town Rawalpindi KR A0528 3000304924 04x 4-Way RMUs 7/21/2005 7/21/2005 7/26/2005 12-08-05email 8/23/2005
17-08
01x 11kV VCB I/C Panel for
Nagina Cotton Mills - Kotri KR A0529 3000304609 7/21/2005 7/28/2005 8/4/2005 8/16/2005 8/16/2005 Site visit on 01-08 / CL rel on 04-08
Jenbacher Generator
01x I/C + 05xO/G Panels - WAPDA PMT CL rel on 04-08 / EM
02-08-05 13-09-
P44:96 + 01x100kVA PMT Standard 27-07-05 09-08-05 15-09-05 Communciation matter to be considered
M/s Rousing Engg Services / Dost Steel RFQ A0530 3000302543 04-08-05 05email
w/o metering + 01xCapacitor O/G 21-06-06 26-06-06 17-07-06 by SB-LHR / Changes on 09-06 (ES,
29-06-06 13-07-06
Panel meters) / Add indent

DHA Lahor/Electrification Works of DHA Phase V SHA A0531 3000303414 02x 400kVA PMTs 7/27/2005 NR 8/12/2005 8/12/2005 CL rel on 10-08

28-07-05
See (Item1) 02-09-05 CL rel on 28-07(KESC Grid Panel) & 08-
01xKESC Grid O/G + remarks 05-08-05 10-11-05 08-09-05 08 (Bal) / Site visit on 30-08 / All
M/s Abbott Laboratories (EC) SJA/RA A0532 3000304671 7/27/2005
01xI/C+01xB/C KESC Jr Panels 05 -08- (Item 2&3) KESC Grid 21-10-05 equipment except KESC Grid panel
05 26-10-05 Panel dispatched
BC+Adaptor

11-08-05
01xWIP + 02x11kV VCB CT ratio 100/5A reqd for WIP as per
PAEC / NMC-1 RFQ A0533 3000309035 7/28/2005 8/11/2005 06-10-05 9/13/2005 9/14/2005
O/G+01xBPT Panels letter recd 03-10
WIP

01xWIP + 01x11kV VCB 13-09-05


Pakistan Railways Carriage Factory Islamabad RA A0534 3000309089 7/28/2005 8/13/2005 8/10/2005 9/14/2005
I/C+04xFLBS O/G Panels 26-09-05WIP

Revised indent / CLs on 08-09 / PMT


03-08-05 order cancelled / Surge Arr type
Maple Leaf Cement Factory KR A0535 3000298506 02xI/C+06xO/G+2xO/G 8/24/2005 9/8/2005 21-10-05email 10/25/2005
19-08-05 changed to Siemens/ Cu work revision
for Cable mounting

U. S. Embassy RFQ A0536 3000310158 01xWIP 8/3/2005 NR 8/5/2005 8/17/2005 CL rel on 05-08

F. E. S. C. O. SHA A0537 3000310190 21x100+24x200kVA PMTs 8/3/2005 NR 8/8/2005 CL rel on 09-08


S. O. # on 15-08, Formal indent recd on
M/s Muhammad Aslam RFQ A0538 3000317305 01xWIP 8/1/2005 8/5/2005 08-08-05email 8/17/2005
16-08

Formal indent recd on 16-08 / CL rel on


Technical Associates Pakistan / Abu Dhabi
RFQ A0539 3000315161 01xWIP + 01xOwner's Panel 8/15/2005 8/16/2005 9/16/2005 9/20/2005 16-08 / On-Hold since 23-08, go-ahead
Palace Rahimyar Khan
on 13-09 with trafo rating changed

01xWIP + 01x11kV VCB CO Panel + 17-08-05 26-08-05 25-08-05 01-09-05 CL rel on 25-08 / Energy meter reqd in
Gadoon Textile Mills Ltd. RA A0540 3000315535 9/2/2005
01x11kV I/C / O/G Panel 06-09-05 08-09-05 08-09-05 12-09-05 WIP as per App comments / Add indent

Olympia Chemicals Ltd. SJA/KZ A0541 3000316684 01x 6.3kV VCB O/G Panel-8BD4 8/17/2005 8/29/2005 8/25/2005 12-09-05email 9/13/2005 CL rel on 23-08
Formal indent on 10-10 / S.O. # on 07-
17-08-05 30-08-05
IESCO SHA A0542 3000346543 31x 63kVA PMT NR NR 10 / CL rel on 23-08 / Add indent for
16-02-06 01-03-06
06Nos.
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

17-08-05 30-08-05 Formal indent on 11-10 / S. O. # on 07-10


IESCO SHA A0543 3000346560 19x 100kVA PMT NR NR
16-02-06 01-03-06 / CL rel on 19-08 / Add indent for 04Nos.

24-10-05 11-11-05 Formal indent & S. O. # on 10-11 / Trafo


IESCO SHA A0544 3000349209 15x 400kVA PMT 8/17/2005 Prototype Prototype drg recd on 07-09 / WAPDA inspection
03-04-06 26-04-06 on 27-28/03
24-10-05 11-11-05 Formal indent & S. O. # on 10-11 / Trafo
IESCO SHA A0545 3000349180 05x 630kVA PMT 8/17/2005 Prototype Prototype drg recd on 07-09 / WAPDA inspection
03-04-06 26-04-06 on 27-28/03

Formal indent recd on 24-08 / CL rel on


01xWIP + 01x11kV VCB I/C / O/G 22-08-05 19-09-05
Wood World Plywood Industries SJA/RFQ A0546 3000320476 6/30/2006 8/31/2005 9/16/2005 26-08 / Rev indent - modif reqd in I/C /
Panel 28-06-06 30-06-06
O/G Panel (SA2 to 8BD4)

MV Switchgear - 03x11kV 23-09-05


Drgs resubmitted to SB S for review &
Peoples Steel Mills Ltd. (Extension) SJA/KZ A0547 3000322766 VCB+02x5kV VC Panels + Cable 8/24/2005 9/24/2005 12-10-05 10/29/2005 11/28/2005
release for App / CL rel on 12-10
Connection Box 28-10-05
15-09-05email
Gulistan Textile Mills Ltd. - Unit 4 RA A0548 3000327455 02x11kV VCB Manual CO Panels 8/24/2005 9/6/2005 9/6/2005 29-09-05 9/7/2005 Based on earlier order

15-09-05email
Gulshan Weaving Mills Ltd. - Unit 2 RA A0549 3000326254 02x11kV VCB Manual CO Panels 8/24/2005 9/6/2005 9/7/2005 29-09-05 9/7/2005 Based on earlier order

Components finalised with S / Meeting


with customer on 22-09 / Site visit on 21-
02xI/C+05xO/G(MT)+3xO/G(TR)
PARCO - Shikarpur Revamp Project KR A0550 3000327376
+01xBC
9/6/2005 9/24/2005 10/6/2005 11/7/2005 11/13/2005 /
11 Differential CT conf recd on 27-02 /
Buchholz+Schematics+TP+WL+LT
comptt+Assembly on 24.04.06

16-09-05 05-01-06 CT ratio changed on 05-01,


Umar Spinning Mills (Pvt.) Ltd. KR A0551 3000332848 01xWIP+01xI/C&O/G SA2 Panel 9/12/2005 9/16/2005 1/6/2006
05-01-06 email Resubmitted, Approved
6.3kV Switchgear - 01xI/C + 03xO/G Earthing Switches reqd as per email dtd
FFC SJA/RA A0552 3000347560 9/16/2005 9/21/2005 9/23/2005 12/20/2005 12/27/2005
Panels 17-01
30-09-05
26-10-05
11kV Switchgear - 07xSA2+BPT 19-09-05 06-10-05 20-10-2005
M/s. Interloop (Pvt.) Ltd. SJA/RA A0553 3000336251 9/28/2005 07-04-06 Changes in App/Additonal Indent
Panels + Additional Indent 06.03.06 Schematics 27.03.06
07-04-06
27.03.06

S. O. # on 14-11 / Qty of RMUs revised


Punjab Industrial Estate (Sunder Industrial 62x4-Way+29x3-Way RMUs +
KR/KZ A0554 3000348705 9/21/2005 9/27/2005 9/23/2005 10/28/2005 11/2/2005 by EC on 24-09/Revisions in CT ratio
State) 01xWIP + 01xWCP
expected
11kV Switchgear - 10xI/C + 20xO/G
WAPDA ADP-43 Variation Order RFQ A0555 T-011 9/21/2005 9/23/2005 NR 9/27/2005
Panels
01xWIP + 01x11kV VCB I/C / O/G
Zulfiqar industries Ltd. KR A0556 3000335402 9/22/2005 9/30/2005 9/27/2005 10/20/2005 10/24/2005 CT, Ammeter ratio recd in App
Panel
01xI/C / O/G + 01xI/C + 02xO/G
Interloop (Pvt.) Ltd. RFQ A0557 3000337622 Panels 9/27/2005 9/30/2005 10/4/2005 10/24/2005 10/25/2005 Minor changes in App
8BD

08-11-05
05-10-05 21-11-05 S. O. # on 14-11 / CL for Kiosk rel on 11-
HT Panel
HT Panel HT Panel 11 / SB D Details for HT Panel & Kiosk /
01xO/G Panel + 03x25kVA Kiosk 02-01-06
Sialkot Int'l Airport Ltd. (EC) SJA/RFQ A0558 3000345661 9/27/2005 10/5/2005 08-11-05 01-03-06 Kiosk drgs resubmitted / Meeting with
with RMU Scheme 10 Kiosk
28-02-06 Kiosk NESPAK on 03-05-06/Change received
10-05-06
17.08.06 17.08.06 on 21.07.06
21.07.06

10-10-05 14-10-05
01xWIP + 01xI/C+02xO/G 11kV VCB CL rel on 11-10 / Go-ahead for
Al-Rahim Textile Industries KR A0559 3000336850 10/10/2005 10/12/2005 FP, FV FP, FV 10/18/2005
Panels manufacturing on 17-10
11-10-05 19-10-05
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

01xI/C+04xO/G+2xB/C WAPDA Grid 19-10-05 SLD/FV/Assembly/FP submitted to TD


Sitara Chemical Industries RA A0560 3000346424 10/12/2005 10/14/2005 21-11-05 01-11-05email 12/12/2005
Panels Schematics/TPs
on 14-10

24-11-05
29-06-06 Formal indent, S. O. # recd on 28-03 / CL
01-12-05 26-06-06
KESC 2480-02 SJA A0561 3000403028 11kV Switchgear - 113x15kV Panels 10/13/2005 11/1/2005 07-12-06 & drgs for Remote Control Panels
09-01-06 email
RCP pending
05-05-06

??
HT Panel 24-04-06
02x11kV O/G VCB Panels (8BD4) + PMT Alternative I reqd as per email from
NTDC-WAPDA / Sahiwal S/S (TD) RFQ/SHA A0562 3000352782 10/19/2005 10/27/2005 22-11-05 25-04-06
02x630kVA PMTs SB S Ex on 22-11 / NESPAK comments
PMTs PMT
20-01-06

03xKESC Jr +
Innovative Engineering / Hilton Pharma Ltd. KZ A0563 3000352299 10/24/2005 10/27/2005 10/31/2005 11/30/2005 11/7/2005 CL rel on 24-10
01x11kV I/C/O/G Panel-8BD4
21-11-05 P124 instead of CDG 61 relay, Fuji
M/s Royal Palm Golf & Country Club RFQ A0564 3000352861 01x11kV I/C/O/G Panel-8BD4 10/24/2005 10/27/2005 10/28/2005 11/23/2005
05-12-05 instead of Elabs CTU reqd in App

2x(1000:2000/5/5A)+
11kV Switchgear - 15xI/C + 68xO/G 01-11-05 13x(1600:800/5/5A) / Formal indent &
WAPDA ADP-61 SJA/RFQ A0565 3000359838 10/25/2005 10/28/2005 11/1/2005 12/7/2005
+ 12xCoupler Panels 29-12-05 S.O. No. on 08-11 / Approval through
letter

08-12-05
03-01-06 Changes in App, Resubmitted / App with
15-11-05
Prefab Systems (Pvt.) Ltd. (Expo Centre) RA A0566 3000356489 01xI/C+02xO/G 11kV VCB Panels 11/2/2005 11/10/2005 16-01-06 26.01.06 comments in Meeting with NESPAK on
18-01-06
17-01-06 17-01
02-02-06

09-12-05 Site visit on 21-11 / CL for KESC Grid I/C


Annoud Power Plant SJA A0567 3000361720 03xKESC Grid I/C Panels 11/7/2005 11/15/2005 12/30/2005 1/20/2006
02-01-06 rel on 09-12/Spares ordered

01x11kV O/G Panel+01x11kV O/G


Black Gold Industries KZ A0568 3000363899 11/14/2005 11/18/2005 11/18/2005 NR 11/21/2005
VCB Trolley - WAPDA
Lucky Cement Ltd. - KHI Project RA A0569 3000354588 02x6.3kV I/C / O/G Panels 11/14/2005 11/23/2005 12/13/2005 12/14/2005 App drgs recd on 16-01

01x11kV I/C & O/G Panel - 8BD4 + 30-11-05


Nestle Pakistan Ltd., Sheikhupura KR A0570 3000370942 11/24/2005 11/30/2005 11/28/2005 11/30/2005 Revised drgs for existing Panel pending
Loose Components email

27-12-05
CL rel on 07-12 / Additional Indent
01xWIP + 01xI/C+02xO/G 11kV 30-11-05 02-12-05 06-01-06
Qaim Automative (Mfg) Pvt. Ltd. KR/MAB A0571 3000373634 12/12/2005 3/15/2006 received on 02-02/FIT Report Received
Panels + 01x I/C Panel 06-02-06 08-02-06 email
19.06.06
13-03-06
01x15kV KESC Grid O/G + 16-12-05
Bolan Casting Ltd. KR/RA A0572 3000377286 03xKESC Jr + 01x 11kV I/C/O/G - 12/1/2005 12/9/2005 12/9/2005 Letter 12/12/2005 CL rel on 02-12
SA2 Panels 03-01-06
11kV Switchgear (14x8BD+01xBPT)
Azgard Nine Ltd. KZ A0573 3000378126 + 12/2/2005 12/12/2005 12/19/2005 1/16/2006 12/26/2005 CL rel on 06-12 rev. 08-12
Loose Components
01x3-Way RMU (WAPDA Specs. Formal indent & S.O. # recd on 27-12 /
M/s Khayaban Enterprises KR A0574 3000388845 12/7/2005 12/9/2005 1/23/2006 12/14/2005
DDS-46:90) CL rel on 09-12
01xWIP + 01x11kV I/C/O/G Panel - 20-12-05
M/s Riffino Rice Mills Pvt. Ltd. KR/MAB A0575 3000380597 12/9/2005 12/13/2005 12/14/2005 12/14/2005 CL rel on 09-12
8BD4 email
01x6.3kV, 1250A, 31.5kA VCB 16-12-05 03-01-06
Fauji Cement Company Ltd. KR/MAB A0576 3000379552 12/8/2005 12/10/2005 2/15/2006 CL rel on 16-12
trolley + Fixed contacts 05-01-06 05-01-06
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

3.3kV Switchgear - 26-12-05


06xI/C+09xO/G+01xCO+01xI/C/O/G 15-12-05 email
+01xBC+05xContactor Panels + 14-12-05 16-12-05 06-01-06 CL rel on 15-12 rev. 16-12 / Changes in
M/s Honda Atlas Cars Extension Project KR/RA A0577 3000380721 12/22/2005 2/3/2006
05x60kVAr Capacitor Bank + 04-01-06 03-01-06 email App / Add indent
Modifications in existing panels of 06-01-06 27-01-06
SS-1 + 01x I/C / O/G Panel email

02x11kV FLBS Panels with CC Box


M/s Coca Cola Beverages Pakistan Ltd. RA A0578 3000381961 12/15/2005 12/23/2005 12/26/2005 1/17/2006 1/20/2006 CL rel on 26-12
& Loose CTs
(20+20)x 11kV WAPDA O/G VCB 03-01-06
M/s Perfect Electromek Pakistan RFQ A0579 3000386861 12/19/2005 12/22/2005 12/23/2005 1/3/2006 Add indent
Trolleys 21-03-06
07x KESC Jr Panels + 01xKESC Jr 26-12-05
M/s Highland Traders KR/MAB A0580 3000388647 12/28/2005 1/18/2006 NR 1/18/2006 CLs rel 0n 21-12, 05-01 & 06-01
+ 01x15kV KESC Grid Panels 29-12-05
07-04-06 CL rel on 27-12, 30-12, revised 02-01/PT
Clariant Pakistan KR/MAB A0581 3000387324 01x11kV Panel-8BD4 12/26/2005 12/29/2005 1/3/2006 Email 20-04- 4/7/2006 mounting arrangement provided by SB-
2006 D
01xWIP + 01x 11kV I/C / O/G Panel- 19-01-06
M/s Super Tech Feeds KR/MAB A0582 3000390122 12/29/2005 1/2/2006 12/30/2005 12/30/2005 CL rel on 28-12, revised 29-12
8BD4 email
11kV Switchgear - 06xSA2+01xBPT 06-01-06 19-01-06 CT ratio changed in App from 400/5/5 to
M/s Suraj Cotton Mills Ltd. KR/MAB A0583 3000391920 1/4/2006 1/6/2006 1/27/2006
Panels 27-01-06 email 300/5/5 in 02xO/Gs

Dewan Cement MR/SJA A0584 3000389045 6.3kV VCB Trolley Contact Arms 12/27/2005 12/30/2005 12/30/2005 Handled by SB-D/Site visit on 15-16/02

04x Mounting of Earthing Switches


British High Commision SJA A0585 3000393131 1/2/2006 1/25/2006 1/25/2006 Site Modification Work
in existing Switchgear

CL rel on 06-01 / Resubmitted / CT


01xI/C / O/G Panel with Outdoor 18-01-06 17-02-06
PARCO RFQ A0586 3000393145 1/3/2006 1/18/2006 3/13/2006 approved with 300/5/5/5A , 5P10/PT re-
Housing ?? 24-03-06
ordered
Platinum Pharmaceuticals (Pvt.) Ltd. KR/MAB A0587 3000394366 03x KESC Jr Panels 1/5/2006 1/17/2006 1/18/2006 1/18/2006 CL rel on 06-01
01x11kV I/C Panel-8BD4 +
Blessed Textile Mills KZ A0588 3000390206 Accessories for mofifications in 1/6/2006 * 1/31/2006 2/22/2006 2/24/2006
existing panels

18-04-06
07x5-Way (Sch. 82)+01x3-Way (MDS)
18-01-2006 24.03.06 Meeting with Consultant on 21-03 / CLs
K.E.P.Z. / Phase II SJA/RFQ A0589 3000394334 (Sch. 32) RMUs + 02x11kV Panels 1/4/2006 * 26-04-06
17-04-06 25-04-06 (Partial) rel on 24-03 / SS6 deleted
(KESC Grid Design) 27-04-06
FLBS, RMUs

01x11kV I/C (8BD4) + 01xBPT


Bhanero Textile Mills MAB A0590 3000390102 Panels + Accessories for 1/6/2006 2/6/2006 2/20/2006 Assembly, LT Comptt, WL to be made
mofifications in existing panels

Rahimbux Group of Cos. - Arain Mills Ltd. (PTD SE) RFQ A0591 3000396628 01x11kV O/G Panel - 8BD4 1/16/2006 1/19/2006 1/27/2006 3/10/2006 3/13/2006

Gadoon Textile Mills RA A0592 3000401019 01x11kV CO Panel - 8BD4 1/20/2006 1/25/2006 1/27/2006 2/15/2006 2/15/2006 CL rel on 27-01

01x24kV, 800A I/C / O/G Panel


07-02-06
Siemens Afghanistan / Gardez Province RFQ A0593 3000394277 (SA4) + 1/20/2006 2/2/2006 2/22/2006 3/13/2006 C/L on 03.02.06
01-03-06
24kV Pole-mounted FLBS (Loose)

M/s Hussain Mills Ltd. RFQ A0594 3000403721 01x11kV I/C / O/G Panel - 8BD4 1/25/2006 1/31/2006 1/27/2006 2/27/2006 3/13/2006 CL rel on 27-01
Highland Traders KR A0595 3000403725 06x KESC Jr. Panels 1/26/2006 1/31/2006 1/30/2006 1/30/2006
Rating Plate approval awaited / Formal
03-02-2006
IESCO SJA A0596 3000418118 50x4-WAY RMUs + 13x4-WAY 2/1/2006 4/6/2006 indent & S.O. # on 21-02 / Additonal
15-08-06
Indent
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

9xI/C+1xBC+1xBPT+1xCab.Con. 23-02-06 20-03-06 CL rel on 21-02 rev 15-03 / Drgs


Colony Textile Mills KR/RA A0597 3000409827 2/10/2006 2/20/2006 3/20/2006
+16xC/O+1xC/OAT+2xAux. Trafo 15-03-06 email resubmitted against rev indent

01-03-2006
Rafique Spinning mills RFQ/KZ A0598 3000412072 1xLBS+2xOG VCB + 1xI/CO/G LBS 2/13/2006 2/17/2006 2/21/2006 3/20/2006
Letter
02 KESC Grid O/G + 27-02-06
Highland Traders-Naval Housing Project KR/MAB A0599 3000412156 2/13/2006 2/17/2006 6/30/2006 Jrs. Dispatched; Grid panels remain
26x8BD4(600mm) SLD, FV
Dewan Salman Fiber Ltd. MAB A0600 3000410001 05xGen I/C+02xO/G+1xBC 2/10/2006 2/21/2006 3/8/2006 3/15/2006 3/23/2006
29-03-06 CT ratios recd on 24-02 / CL rel on 01-
16-02-06 01-03-06
Lucky Energy SJA/RA A0601 3000418226 03xGen I/C+ 03xO/G 2/23/2006 29-05-06 4/10/2006 03 / Add indent / Meeting with customer
13-03-06 20-03-06
09-06-06 on 05-05
Perfect Electromek RFQ A0602 3000418523 01xI/C & O/G VCB Panel 2/20/2006 2/20/2006 2/22/2006
01xWIP + 01x11kV I/C/O/G Panel -
Citropak Ltd. / Unit-II KZ/RA A0603 3000423546 3/1/2006 3/7/2006 3/31/2006 3/7/2006 CL rel on 02-03
8BD4
M/s. Gulshan Spinning Mills Ltd. - 1 KZ/RA A0604 3000423564 01xWIP 3/1/2006 3/5/2006 3/7/2006 3/7/2006 CL rel on 02-03
03xKESC Jr + 01x15kV KESC Grid
Highland Traders-Diamond Metal Industries KR/MAB A0605 3000412158 2/20/2006 2/28/2006 3/9/2006 3/9/2006
Panel
03xKESC Jr + 01x15kV KESC Grid
Highland Traders MAB/KR A0606 3000416975 2/20/2006 2/28/2006 3/9/2006 3/9/2006
Panel

Ordering done by SB S / Resubmitted


100x11kV, 450kVAr Capacitor 28-02-06
KESC MR/SJA A0607 3000419185 2/20/2006 2/27/2006 3/20/2006 3/21/2006 based on fresh inputs from SB S & site
Racks 15-03-06
visit on 08-03

02 KESC Jr With Metering + 08 W/o 21-02-06


KESC KR/MAB A0608 3000420033 2/21/2006 2/24/2006 2/21/2006 CLs rel on 21-02 & 23-02
M 27-02-06
CT ratio changed in App from 50/5/5 to
Paramount Spinning Mills RFQ A0609 3000411852 01xWIP+01x11kV Owner's Panel 2/23/2006 2/27/2006 2/23/2006 2/24/2006 2/27/2006
100/5/5 in Owner's Panel
15-03-06
Hasan Spinning Mills (Pvt.) Ltd. KZ A0610 3000421051 01x11kV Owner's Panel 2/27/2006 2/28/2006 2/28/2006 3/13/2006
email
M/s. Gulistan Spinning Mills Ltd. - 2 RA A0611 3000423607 01xWIP 3/1/2006 3/5/2006 3/7/2006 3/7/2006 CL rel on 02-03
04-05-06
M/s. Sitara Hamza (Pvt.) Ltd. SJA A0612 3000425986 01x3-Way + 01x4-Way RMUs 3/6/2006 3/7/2006 3/10/2006 5/4/2006
Fax

M/s Independent Newspapers Corp. (Pvt.) CL rel on 22-03, 05-04 / Order put on-
RFQ A0613 3000430110 01x KESC Jr+ 01xI/C / O/G Panels 3/8/2006 3/16/2006 4/5/2006
Ltd. / Jang Building, I. I. Chundigar Road (EC) hold on 10-04

M/s J & S Enterprises (Pvt.) Ltd. / Jang Press, CL rel on 22-03 / Order put on-hold on
RFQ A0614 3000430115 01x KESC Jr+ 01xI/C / O/G Panels 3/8/2006 3/16/2006 4/4/2006
Sultanabad (EC) 10-04
05-04-06
20-04-06
Chashma Sugar Mills - D. I. Khan SJA/MAB A0615 3000430049 6.6kV Switchgear - 06xSA2+BPT 3/14/2006 3/22/2006 21-04-06 5/3/2006
10-05-06
Schematics
Perfect Electro Mek / M/s. Khalid Shafique
RFQ A0616 3000436427 01xWCP 3/24/2006 3/20/2006 3/30/2006
Spinning Mills Ltd.

01x11kV WAPDA Ring Main Panel


Zaver PC Hotel Gwadar (EC) SJA A0617 3000435737 3/21/2006 3/29/2006 4/4/2006 4/10/2006 4/20/2006
(P44:96)+01x11kV I/C / O/G Panel

S.O. # on 03-04 / App vide NTDC letter


11kV Switchgear - 09xI/C + 33xO/G 22-03-06 06-04-06
NTDC-WAPDA / STG-6-26 (LOT-I) SJA/RFQ A0618 3000446558 NR NR 4/10/2006 dtd 04-04 / CL rel on 13-04 / Rev indent -
+ 03xCoupler Panels 26-06-06 email
Qty of I/C & O/G changed

Bahria Town Rawalpindi RFQ A0619 3000436465 03x11kV O/G Panels - WAPDA 3/22/2006 3/31/2006 4/3/2006 4/13/2006 4/17/2006

03-04-06
01x11kV VCB Capacitor O/G
VCB Panels Cap make, ES confirmation recd on 29-
Bahria Town Rawalpindi SJA/MR/RFQ A0620 3000436481 Panel+ 3/22/2006 4/7/2006 6/26/2006 6/29/2006
29-05-06 05 from SB S / CL rel on 02-06
01x11kV, 4800kVAr Capacitor Bank
Cap Bank
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

04x63+04x100+05x200+34x400+
M/s. Technical Associates Pakistan (Pvt.) Ltd. /
SHA A0621 3000435675 01x630kVA PMTs+03x3-Way+ 3/22/2006 3/29/2006 4/25/2006
Sukh Chayn Gardens
06x4-Way RMUs

29-03-06 04-04-06 07-04-06


11kV Switchgear-
Item 4-6 Item 4-6 Item 4-6 CL for items 1-3 rel on 12-04/SA
Sunlight Wood Industries KR/RA A0622 3000435774 04xI/C+03xO/G+01xBPT+03xI/C / 3/24/2006 4/4/2006
12-04-06 26-05-06 24-05-06 arrangement revised
O/G Panels
Item 1-3 Item 1-3 Item 1-3

Drawings released in production


01xI/C + 01xO/G VCB Trolleys for
BOC (PTD SE) RFQ A0623 3000444016 3/31/2006 4/5/2006 4/28/2006 8/4/2006 considering the production. Delivery
KESC Grid
required as per Indent
Cambridge School-Islamabad MR A0624 3000443999 01x630kVA PMT 3/31/2006 NR 4/27/2006 4/27/2006 As per approved prototype

Medipharm (Pvt.) Ltd. SJA/MAB A0625 3000437228 01xWIP+01x11kV Owner's Panel 3/30/2006 4/4/2006 4/13/2006 4/7/2006

Kay & Emms (Pvt.) Ltd. RA A0626 300044441 01xWIP+01x11kV Owner's Panel 3/30/2006 4/5/2006 4/13/2006 4/17/2006

Brookes Pharmaceutical Laboratories


KR A0627 3000439054 01xKESC Jr with P&M 3/31/2006 4/6/2006 NR NR 4/3/2006
(Pakistan) Ltd.
Contech International (Pvt.) Ltd. RFQ A0628 3000447413 01xWCP + 01x3-Way RMU 4/4/2006 4/7/2006 4/6/2006 5/16/2006 5/17/2006 CL rel on 06-04
M. Ashiq SHA A0629 3000448785 01x400kVA PMT 4/6/2006 NR 4/25/2006
27-04-06
(Consumer)
01xWCP+(11x200+01x100)PMTs+0
Green City RFQ/SHA A0630 3000447858 4/5/2006 4/26/2006 28- NR 6/27/2006 Former order Glamour developers A
2x4Way RMUs
04-2006
(PMTs)
17-04-06
Punjab Industrial Estate/Sunder MR/SHA A0631 3000477583 05x500+45x750+10x1250 kVA PMTs 5/16/2006 5/11/2006 Drgs rel based on Design indent
16-05-06
11kV Switchgear-01xI/C+04xO/G- CL rel on 26-04 / Heater revised to 01no.
M/s Service Industries Ltd. KZ/RA A0632 3000451501 4/17/2006 4/20/2006 4/26/2006 5/10/2006 5/11/2006
8BD4 as per SB-Lhr email
03xI/C+06xO/G VCB Trolleys +
K.E.S.C. (PTD SE) RFQ A0633 3000417800 4/20/2006 4/21/2006 4/21/2006 NR 4/21/2006
Finger Contacts
19-04-06
Bahria Town, Rawalpindi SHA A0634 3000454750 22x4-Way RMUs NR 5/12/2006 Add indent for 08Nos.
18-05-06
15-05-06
Gulshan Weaving Mills Ltd. - 2 RFQ A0635 3000453930 01xWIP 4/26/2006 5/12/2006 5/12/2006 CL rel on 11-05
email

Grey Builders KR/RA A0636 3000460706 03xKESC Jr. Panels w/o Metering 5/2/2006 5/3/2006 5/3/2006 5/3/2006

02xO/G + 01xI/C / O/G 11kV Panels


Umar Spinning Mills RA A0637 3000464309 5/4/2006 5/11/2006 5/22/2006 6/5/2006 6/6/2006 CL rel on 11-05
- 8BD4
30-05-06 CL rel on 10-05 / CT ratio for I/C changed
Pakistan Tobacco Company (MES) SJA/MAB A0638 3000464188 11kV Switchgear - 01xI/C+03xO/G 5/4/2006 5/11/2006 5/15/2006 6/19/2006
email to 300/5/5A in App
22-05-06
M/s Sapphire Power Generation - Unit 1 RA A0639 3000464296 01xI/C + 01xAdapter 11kV Panels 5/5/2006 5/11/2006 5/16/2006 6/13/2006 App with comments
email
Pakistan Navy (PTD SE) KZ/KR A0640 3000464745 01x 11kV I/C / O/G Panel 5/4/2006 5/15/2006 6/8/2006 7/18/2006

Pakistan Cement (OLM) SJA/MAB A0641 3000469372 02x6.3kV LBS Panels 5/16/2006 5/16/2006 5/19/2006 5/22/2006 6/2/2006 Changes as per App and resubmitted

Babar Islam & Co. RA A0642 3000474344 01x11kV I/C / O/G Panel - 8BD4 5/22/2006 5/31/2006 6/22/2006
11kV Switchgear - 04xI/C + 40xO/G
IESCO RFQ A0643 3000565152 5/23/2006 NR 7/1/2006 7/26/2006 S.O. # awaited
+ 02xCoupler Panels
KESC (PTD SE) KR A0644 3000478610 22xVCB Trolleys (Jr) 5/26/2006 7/5/2006 7/7/2006
Highland Traders KR/MAB A0645 3000473669 07xKESC Jr. Panels 5/30/2006 6/2/2006 6/2/2006 6/2/2006
Prelim Trafo Drgs recd on 09-06 / CL rel
31-05-06 19-06-06 21-06-06
Technical Associates, Abu Dhabi Palace RFQ/SHA/SJA/SMY
A0646 3000485471 15xKiosk Substations 6/27/2006 on 14-06 rev 21-06 / Add indent - Qty inc
15-06-06 20-06-06 04-07-06
from 11 to 15
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

11kV Switchgear - 01x VCB Manual


31-05-06 02-06-06 CL rel on 02-06 / Order put on-hold on
M/s Sapphire Textile Mills Ltd. (Weaving Unit) KR/RA A0647 3000480079 CO + 01xCC + 01xLBS CO Panels - 6/2/2006 8/2/2006
06-07-06 13-07-06 29-06 / Rev indent
8BD4
01x11kV I/C (Gen) + 19-06-06
M/s Prosperity Weaving Mills Ltd. KR/RA A0648 3000480258 5/31/2006 6/7/2006 6/8/2006 6/9/2006 Go-ahead for rel in prod on 09-06
01x Adapter Panels email
6.3kV Switchgear + Trafo Changes in App & on 17-07, Site visit
Army Welfare Trust/Nizampur Cement (PWT) KR A0649 3000482465 5/31/2006 6/8/2006 6/16/2006 7/14/2006 7/18/2006
Protection & Metering Panel reqd
11kV (03) & 6.6kV(28) Switchgear -
M/s Etihad Sugar Mills MAB/RFQ A0650 3000481616 6/7/2006 6/8/2006 6/16/2006 6/30/2006 7/24/2006 Prelim indent on 31-05 / CL rel on 16-06
31 Panels

Sitara Hamza SHA A0651 3000496296 1x100kVA PMT + 1x400kVA PMT 6/12/2006 7/6/2006 7/5/2006 CL rel on 06-07-06

FESCO SHA A0652 3000484330 07x200kVA PMT Alternate III 6/15/2006 6/20/2006
IESCO RFQ A0653 02x200kVA PMT 6/15/2006 NR CL rel on 23-06
Lakson Tobacco Company RFQ A0654 3000493560 01x11kV O/G Panel 6/20/2006 6/23/2006 6/29/2006 7/13/2006 7/14/2006 CL rel on 29-06
6.3kV, 40kA Switchgear - 21-11-06
Maple Leaf Cement KR A0655 3000501466 7/12/2006 7/19/2006 8/3/2006 8/23/2006
01xI/C+02xO/G (8BK20) 27-12-06

02xI/C+08xO/G 11kV VCB Trolleys


MEPCO (PTD SE) RFQ A0656 3000494276 6/21/2006 6/26/2006 7/4/2006 7/26/2006
as per WAPDA Specs. P44:96

01x13.8kV I/C Panel - 8BD4


M/s Ittehad Chemicals Ltd. SJA/TAK A0657 3000494486 (WAPDA) w/o VCB Trolley + 6/22/2006 6/28/2006 7/11/2006 7/25/2006 7/11/2006 CL rel on 29-06
01xNGR
Maple Leaf Cement Factory Ltd. (OLM) KR A0658 3000495971 01x5.5kV I/C / O/G Panel 6/22/2006 6/27/2006 7/11/2006 8/2/2006 8/2/2006

Faisal Spinning Mills Ltd. - 2 RFQ A0659 3000499040 01x11kV I/C / O/G Panel 6/30/2006 6/27/2006 6/26/2006 Drgs rel on prior info recd on 26-06

11kV Switchgear - 01xI/C+02xO/G


CPC, DG Khan SJA/TAK A0660 3000276806 6/28/2006 7/3/2006 7/10/2006 8/28/2006
(8BD4)
03-07-2006
Faisal Spinning Mills Ltd. - Nooriabad KR/RFQ A0661 3000499100 01x11kV FLBS Panel 6/29/2006 7/5/2006 7/10/2006 7/5/2006 CDG-31 relay wiring diagram awaited
13-07-06
05-07-06
Indus Motor Co. Ltd. KR A0662 3000506779 02x11kV O/G Panels 7/12/2006 7/12/2006 7/24/2006 7/12/2006 Rev indent - 8BD4 O/G Panels reqd
11-07-06
01xWIP + 01x11kV I/C + 01x11kV
Hoosen Cotton Industries & Oil Mills RFQ A0663 3000500540 7/4/2006 7/12/2006 7/25/2006 8/1/2006 8/1/2006 CDG-31 relay wiring diagram awaited
FLBS Panels - 8BD4
01xWIP+01x11kV Owner's Panel -
M/s Pace Pakistan Ltd. SJA/TAK A0664 3000505905 7/6/2006 7/12/2006 7/13/2006 7/18/2006 7/17/2006 App recd on offer drgs / CL rel on 13-07
8BD4
01xWIP+11kV Switchgear - Indent rel against SB Stores, S.O. #
SB-Stores - Tahir Rafiq SJA/TAK A0665 7/4/2006 7/13/2006 7/18/2006 11/22/2006
01xI/C+02xO/G awaited / CL rel on 17-07
Star Paper Mills TAK A0666 3000505372 01xWIP 7/12/2006 7/25/2006 7/25/2006 8/1/2006 7/25/2006 CT ratio awaited from SB-Sales
11kV Switchgear - 01xI/C+03xO/G
Rafi Group (Defence Shopping Mall) RA A0667 3000509409 7/17/2006 7/21/2006 7/28/2006
(FLBS)
Gelcaps (Pakistan) Ltd. TAK A0668 3000511179 01x11kV I/C / O/G Panel 7/18/2006 7/21/2006 8/2/2006 8/3/2006

Baluchistan Wheels Ltd. SJA/TAK A0669 3000514729 11kV Switchgear - 01xI/C+01xO/G 7/20/2006 7/25/2006 7/25/2006 8/7/2006 8/7/2006

01x11kV I/C O/G Panel + 11kV


Dewan Automobiles Engg. Ltd. KR A0670 3000516051 7/24/2006 8/2/2006 8/2/2006
Switchboard - 01xI/C + 03xO/G
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

Advance ordering to be
Bulleh Shah paper Mills Ltd. (Packages Ltd.) KR A0671 3000518196 02xMV Motor Starters 8/1/2006 8/9/2006 8/24/2006 9/4/2006 9/11/2006
done/Clarifications from S'AG Awaited

PPW RA A0672 3000516016 7.2kV Switchgear 7/27/2006 8/3/2006 8/4/2006 11/27/2006

11kV Switchgear - 11-08-06


Sialkot International Airport RA A0673 30005173487 7/28/2006 8/9/2006 11/16/2006
2xI/C+6xO/G+1xBC+1x315kVA PMT 21-08-06

Power Professionals & Engineers (Bahria 02x Add Panels reqd as per App, indent
RFQ A0674 3000519756 02x11kV I/C & O/G Panel 7/31/2006 8/3/2006 8/3/2006 8/28/2006 8/29/2006
Complex III) requested

Hussain Builders TAK A0675 3000521768 03xKESC Jr. Panels w/o Metering 8/1/2006 8/3/2006 8/4/2006 NR 8/4/2006

04-08-06
EPN/Upgradation of Electrical Network RFQ A0676 3000523164 01x11kV I/C & O/G Panel - 8BD4 8/2/2006 8/4/2006 NR 8/4/2006
24-08-06
Diamond Fabrics Limited RFQ A0677 3000524043 01x11kV I/C & O/G Panel - 8BD4 8/4/2006 8/8/2006 8/11/2006 8/21/2006 8/29/2006
Kidney Foundation TAK A0678 3000526221 01x11kV I/C & O/G Panel - 8BD4 8/8/2006 8/10/2006 8/9/2006 8/18/2006 8/22/2006
01xI/C & O/G, 02xTrafo O/G +
Idrees Textile Mills Ltd. SJA/TAK A0679 3000527956 01xI/C + 01xBus PT / Cable 8/15/2006 8/25/2006 8/23/2006 11/3/2006
Connection Panel
6.36kV Switchgear - 02xI/C +
Maple Leaf Cement (Upgradation Job) KR A0680 3000525337 8/15/2006 01.09.06 Drgs. Received from PTSI
01xO/G
03xKESC Jr. Panels with Metering
Highland Traders RFQ A0681 3000525337 8/23/2006 8/25/2006 8/25/2006 8/25/2006 CT Ratios awaited
+ 06x w/o Metering

Babar Islam & Company TAK A0682 3000536774 02x11kV I/C & O/G Panels -8BD4 8/30/2006

Sarfaraz Textile Mills (Pvt.) Ltd. TAK A0683 3000538341 01XWAPDA


01xI/C + 08xO/G - Finger
K.E.S.C. (PTD SE) FB A0684 3000539527 Contacts+Contact Arms + Fixed 8/30/2006
Contacts
01XWAPDA + 01x11kV I/C & O/G -
Shahtaj Sugar Mills LTd. TAK A0685 3000540136 9/4/2006
8BD4

Bulleh Shah Paper Mill Project-Packages RA/KR A0686 3000541789 02x11kV I/C + 12X11kV O/G 9/4/2006 9/5/2006 9/5/2006 9/8/2006

16x3-Way RMUs (Scheme 32) as


K.E.S.C. TAK A0687 3000562602 8/29/2006 11/28/2006
per KESC Specs. 78
Highland Traders / Naval Housing RA/KR A0688 3000543166 01X15kV KESC Grid O/G Panel 9/6/2006 9/11/2006 10/5/2006 10/9/2006
Maple Leaf Cement Factory ltd. / Upgradation 04X6.3kV , 31.5 kA Switchgear -
SJA A0689 3000540075 9/6/2006
Job NXPLUS C Design
Tritex Cotton Mills RFQ A0690 3000545203 01xWAPDA Consumer Panel 9/13/2006 9/17/2006 9/18/2006 10/2/2006 10/2/2006

International Construction Services/SUPARCO RFQ A0691 3000550675 01x250kVA KIOSK 9/20/2006 10/11/2006 10/13/2006 12/11/2006 App comments to be clarified

66x3-Way RMUs (Scheme 32) as


K.E.S.C. TAK A0692 3000562609 9/27/2006
per KESC Specs. 78
01xKESC Jr. with Protection W/O
Millac Food RJ A0693 3000529373 10/4/2006 NR 10/2/2006
Metering
03x11kV I/C Panels - 8BD +
Din Textile Mills Ltd, Patoki KR A0694 3000567349 10/4/2006 10/15/2006 11/1/2006 11/23/2006
02xDummy Panels
Coca Cola Beverages Pakistan Ltd., 02x11kV LBS + 01X11kV VCB
TAK A0695 3000561709 10/5/2006 10/10/2006 11/1/2006
Gujranwala Panels
01xWIP + 02x11kV O/G + 01xBPT
NMC-1, D.G. Khan TAK A0696 3000564083 10/10/2006 10/15/2006 11/27/2006 11/30/2006
Panel - 8BD4
Sheraton Hotel TAK A0697 11/22/2006
Ittehad Chemicals Ltd. TAK A0698 3000567626 03xVCBs 10/19/2006 10/21/2006
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

01xWIP+01x11kV I/C / O/G Panel -


Punjab Beverages Co. Ltd. RFQ A0699 3000573695 10/18/2006 10/19/2006 10/20/2006 11/8/2006
8BD4
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

M/s Bahria Town, Lahore RJ A0700 3000568400 01x4-Way RMU-WAPDASpecs. 10/19/2006 10/30/2006 11/3/2006 11/14/2006 11/3/2006
01xWIP+
Sitara Per Oxide TAK A0701 3000587675 11kV Switchgear-01xI/C+02xO/G 11/1/2006 11/7/2006 11/16/2006 Formal indent & S.O. # recd on 08-11
01x6.6kV I/C / O/G Panel - 8BD4

11kV Switchgear-WAPDA
GEPCO (TD)/Wazirababad Road, 132/11kV
RFQ A0702 3000584675 02xI/C+16xO/G+01xBC Panels + 11/3/2006 11/20/2006 11/22/2006
Cantt. G/S - Gujranwala
01x200kVA PMT

Zafar & Company/SUPARCO TAK/KR A0703 3000587492 11kV Switchgear-01xI/C+02xO/G 11/7/2006 11/11/2006 11/13/2006 11/22/2006 11/27/2006
18xVCB Trolleys (06xI/C+12xO/G) -
LESCO (PTD SE) RJ A0704 3000589166 11/10/2006 11/14/2006 11/17/2006 1/3/2007 1/5/2007
WAPDA
HESCO (PTD SE) RJ A0705 3000589170 14xO/G VCB Trolleys - WAPDA 11/10/2006 11/14/2006 11/17/2006 12/8/2006

Javedan Cement TAK A0706 3000594854 01No. 11kV Outgoing Panel - SA2 11/20/2006 11/22/2006

DHA Karachi (HSS)/DHA Phase VIII G/S No.1 KR A0707 3000581497 17.5kV Switchgear
Bahria Town RFQ A0708 3000595808 02x200kVA PMT 11/20/2006 11/22/2006 11/29/2006 12/14/2006
FESCO Tender SJA A0709 3000601627 7.2MVAr Capacitor bank 11/27/2006 12/26/2006
Gadoon Textile Mills Ltd. TAK A0710 3000601665 01xChangeover Panels 11/28/2006 12/1/2006
Unicol Ltd. KR/RJ A0711 3000603543 02xI/C / O/G Panel - SA2 11/28/2006 11/30/2006
01xWIP + 01xi/C & O/G Panel - 28-11-06
Fast Feed (Pvt.) Ltd. KR/RJ A0712 300061184 1/4/2007 Formal indent & S.O. # recd on 07-12
8BD4 email
Prime Crete (Pvt.) Ltd. TAK A0713 3000607827 01x11kV I/C / O/G Panel - 8BD4 12/1/2006 12/5/2006 12/5/2006 12/12/2006 12/6/2006
11kV Switchgear - WAPDA Specs.
Prelim Indent based on LOI recd on 01-
MEPCO / 6th STG Project, Tender No. 28 RFQ A0714 3000623538 P44:96 1/8/2007
12

Abdullah Gardens RFQ A0715 3000568170 02x3-Way RMUs 12/5/2006 12/6/2006 NR 12/6/2006

PECT Engineering RJ A0716 3000611667 01xI/C & O/G Panel - 8BD4 12/8/2006 1/18/2007 U/V relay reqd as per App comments

KESC/LPO/FIP/313/06 KR/SJA A0717 3000621821 201 KESC Jr Panels 12/20/2006 1/3/2007


Gulshan Weaving Mills Ltd. RFQ A0718 3000618720 01xI/C / O/G Panel - 8BD4 12/20/2006 12/28/2006 1/12/2007
12x11kV O/G VCB trolleys with
Perfect Electro Mek SJA A0719 3000618315 12/21/2006 12/28/2006
Plug Sockets & Contact Arms
27-12-06
06x1000kVA Kiosks + 04x750kVA
KESC SJA/RFQ A0720 3000624816 12/22/2006 1/24/2007 D01
PMTs
04-01-07
Hussain Mills Ltd. RFQ A0721 3000624407 01xI/C & O/G VCB Panel - SA2 1/4/2007 1/5/2007
PSO-Chukpirana (Schon Engineering) TAK A0722 3000623045 01xWIP 12/26/2006 1/15/2007 1/16/2007
Technical Associates / Sukh Chayn Gardens
RJ A0723 3000634352 01xWIP 12/29/2006 1/4/2007 S.O. # changed on 17-01
Housing Estate
IESCO TAK A0724 3000635336 35x63kVA PMTs 1/19/2007 NR
IESCO TAK A0725 3000635338 18x100kVA PMTs 1/19/2007 NR
IESCO TAK A0726 3000635339 18x200kVA PMTs 1/19/2007 NR
Pakistan Cables Ltd. KR A0727 3000628267 11kV Switchgear + 08xSA2 1/4/2007
01x4-Way RMU+30x3-Way
Punjab Industrial Estate/Sunder industrial
RFQ/RJ A0728 3000628380 RMU+02x11kV Panels (WIPs + 1/4/2007
Estate
Owner's Panels)
Century Paper & Boards Mills Ltd. KR A0729
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

M. Talib Enterprises/Container Control 01xKESC Jr with metering with


RFQ A0730 3000632485 1/10/2007 1/24/2007 1/17/2007
Program at Port Qasim protection
Kohinoor Soap & Detergents (Pvt) Ltd. RJ A0731 3000632433 01x11kV I/C O/G Panel - SA2 1/10/2007 1/24/2007

Ch. Mubarak Ali Contractors RJ A0732 3000639222 01x11kV I/C O/G Panel - 8BD4 1/12/2007 Formal indent & S.O. # recd on 18-01
11kV Switchgear -
Naubahar Bottling Co. Ltd. TAK A0733 3000636438 1xWCP+1xWIP+1xI/C&O/G+1xI/C+2 1/18/2007
xO/G
19xVCB Trolleys (04xI/C+15xO/G) -
FESCO (PTD SE) RJ A0734 3000637480 1/18/2007
WAPDA
12xVCB Trolleys (04xI/C+08xO/G) -
GEPCO (PTD SE) RJ A0735 3000637488 1/18/2007
WAPDA
M/s Riaz-ul-Jannah Housing Scheme, 01x3-Way + 02x4-Way RMUs
A0736 3000636171 1/19/2007
Faisalabad (WAPDA Specs. DDS-46:90)
M/s Gulshan-e-Madina Housing Scheme, 01x3-Way RMU (WAPDA Specs.
A0737 3000636184 1/19/2007
Faisalabad DDS-46:90)
HMA Building & Maintenance Co. A0738 3000640937 01x 11kV I/C / O/G Panel - SA2 1/23/2007
03xVCBs-3AH5214-1MF50-2KF2-Z
Ittehad Chemicals Ltd. A0739 3000567626 1/24/2007 NR
F20

TOTAL MV HOURS ###


LV Switchboards
Pak Arab Fertilizer SMY A5239 4800012190 MCC (8PU.011) 7/5/2002 16-09-02 16-05-03 09-07-03 Inspected on 28-06
WASO - Mianwali ( TD ) SJA A5379 5100002364 AC/DC Switchgear 6/20/2003 07-07-03 26-04-04 15-10-03 Inspected on 28/29-07
Trafo Control Panels - 02x10/13
WASO - Mianwali ( TR ) RJ A5386 5100002399 7/15/2003 25-07-03 26-04-04 27-04-04 CL rel on 20-08
MVA, 132/6.6 KV
Trafo Control Panels-
WAPDA ( KF - 541 ) RJ A5389 5100002546 7/21/2003 19-08-03 03-09-03 17-10-03 Indent on 15-10/CL rel on 09-10
15x20/26MVA,132/11.5KV
Add Indent on 07-05/SB D detail on 21-
PAPCO MA A5390 5100002428 Relay and Control Panels 7/24/2003 NR NR 23-12-03
07
K.E.S.C.( TR ) RJ A5403 5100002545 Fan Control Panel-5x31.5/40MVA Tra 9/3/2003 19-09-03 03-11-03 06-11-03
02xProtection Panel, 02xControl
WASO - Mianwali ( TD ) MA A5412 5100002364 10/9/2003 NR NR 12-12-03 Inspected on 28/29-07
Panel, 02xTLCC's
1No.CP20,1No.RP3,1No.AC/DC
WAPDA ADP 25 MA A5415 5150002564 10/7/2003 NR NR 30-10-03
Aux.Panel
220/132kV GIS S/S Islamabad University MA A5416 5100002544 06xCP50+06xRP4 Relay & Control P 10/15/2003 NR NR 30-10-03
Bahria Town - Rawalpindi FRQ A5418 4800016903 AC/DC Auxiliary Supply Panel 10/16/2003 19-11-03 12-01-04 13-01-04
White Oil Pipeline Project RJ A5422 5100002679 Trafo Control Panel - 04x10/13 MVA 10/29/2003 23-12-03 08-01-04 26-01-04 Customer Change rel on 06-04
MDB (1xS1+7xL1+3xC) +
23-01-04 18-
CEMAG - Askari Cement Ltd. FRQ A5424 5100002610 MCC(8xS1) - 8PU.011 + BTD + PLC 11/20/2003 18-12-03 05-01-04 BTD App recd on 31-03
03-04
Panels
WAPDA RJ A5426 5100002594 02xTrafo Fan Control Panel-20/26M 11/11/2003 11-12-03 NR 11-02-04
Sialkot Int'l Airport Ltd. ( EC ) SMY A5435 5100002643 LT Switchgear 12/10/2003 09-01-04 12-02-04 03-03-04 Reinspected on 23-11-04
LT Switchgear for Siemens Power
BU EPN TAM A5436 5100002647 4/2/2004 09-04-04 09-04-04 Add Indent on 14-06/Drgs rel on22/24-06
House
Pakistan PTA Ltd. FRQ/TAM A5439 4800018549 02xMCCs 12/17/2003 24-12-03 10-02-04 12-02-04 Inspection on17-06
01xFan Control Panel For 10/13
WAPDA - Colony Textile Mills (TR) RJ A5444 5100002712 1/8/2004 15-01-04 11-02-04 11-02-04 Indent on 22-01
MVA Power Trafo
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

02xRP3+01xRP4+02xCP30+01xCP
Bahria Town - Rawalpindi MA A5448 510002716 2/11/2004 NR NR 30-04-04 Front Plate details 07-06
50 Relay & Control Panels

KESC (TR) RJ A5449 510002749


01xFan Control Panel For
2/12/2004 03-03-04 08-03-04 08-03-04 ###
30/37.5MVA Power Trafo
Relay & Control Panels dispatched/
WAPDA ADP25 MA A5450 510002564 256x Relay, Control & AC/DC Aux. P 2/17/2004 26-02-04 18-03-04 08-03-04
Inspected on 05-10
Bestway Cement Ltd. FRQ A5451 4800019169 02x Starter Module Withdrawable 2/13/2004 25-03-04 20-04-04 25-03-04
5000A LT Switchgear with BTD/Layout App recd on 16-04/Cu size
Nishat Chunian Ltd.(Weaving) SMY A5453 4800019386 3/3/2004 15-03-04 25-03-04 26-03-04
1400kVAr PFIP changed
MCR - PARCO TAM A5454 4800019400 02x45kW MCC Modules 3/3/2004 NR NR 18-03-04

Indent recd 16-04 / Supporting docs. for


MCBs sent to SB S / Go-ahead to Prod
19-05-04
IESCO FRQ A5455 4800019830 07X AC / DC Panels 3/15/2004 22-04-04 6/23/2004 on 09-03 / Resubmitted for App to
09-08-05
WAPDA as per SB S email dtd 04-08 /
Inspected on 25&26-08

ICI Soda Ash Business SMY A5456 4800019715 02 x MCCs 3/26/2004 25-03-04 16-04-04 20-04-04
Masood Textile Mills FRQ A5458 4800019596 LT Swithgear with 500kVAr PFIP 3/25/2004 4/1/2004 4/1/2004 15-04-04 19-04-04
30x Relay & Control Panels for
WAPDA ADP32 (TD) SHA A5459 5100002807 3/29/2004 NR NR 06-05-04 Inspected on 04-10
Capacitors
42x Sivacon 8PT Panels in CKD
Scientechnic Dubai TM/FRQ A5460 4900000316 4/6/2004 NR NR 12/13/23-04 Add Indent for 09x ccs2 panels on 28-05
Condition
Decon Germany - Rehabilitation of the 110/15(20 FRQ A5461 4900000306 AC/DC Panels 4/12/2004 25-04-04 17-05-04 15-06-04 15-06-04 Add Indent for 01 x DB on 30-09
Sitara Chemical Industries SMY A5462 4800020056 LT Switchgear with 300kVAr PFIP 4/20/2004 26-04-04 13-05-04 13-05-04
18-05-04 CL rel on 28-04/MLT/PFIPs for prod on
Ibrahim Fibers (AATML) SMY A5464 4800020147 MLT + PFIP + BTD+DBs 4/27/2004 5/4/2004 21-05-04 28-05-04
DBs 19-05/Ist App DBs 13-05
19-05-04
Ibrahim Fibers (ITM) SMY A5465 4800020148 MLT + PFIP + BTD+DBs 4/27/2004 5/4/2004 24-05-04 6/1/2004 Inspected on 26-08
PFIPs
Auto Load Transfer Switch
Seven Star Company FRQ A5466 4800020227 5/4/2004 18-05-04 21-05-04 6/23/2004 7/13/2004
250kVA/400kVA
02x Trafo Control Panel for 16/25
Decon Germany/Afghanistan(TR) RJ A5467 5100002896 4/30/2004 5/10/2004 7/26/2004 NR 8/31/2004 Go ahead on 30-08
MVA Power Trafo
17-05-04 26.05.04 MLT 03-06-04MLT
LT Switchgear (LT Panel, MCCs
Olympia Chemicals Ltd. TAM A5468 4800020254 4/30/2004 5/12/2004 30.06.04MCC 22-07-04MCC MLT/BTDs/PFIP dispatched
F1,600KVArPFIP,3200A BTD etc) 15.07.04 Layout -
28-05-04
DAELIM Ind. for KOC Kuwait(TR) RJ A5469 Not Availabel 14x Temp Control Panels for Trafo 5/11/2004 14-05-04 App awaited
WAPDA / NTDC (TR) RJ A5470 5100002899 01x Control panels for 20/26 MVA Tr 5/13/2004 6/24/2004 7/19/2004 NR 7/19/2004 CL rel on 25-05
22-06-04DBs 22-06-04DBs
Apollo Textile Mills Ltd. TAM A5471 4800020595 LT Switchgear 5/31/2004 6/11/2004 27-07- 01 x DB added 17-08
04MLT 05-08-04 MLT
Enar Petrotech TAM A5472 4800020565 02x 55KW Withdrawable Starter Mod 6/3/2004 6/21/2004 6/30/2004 7/6/2004
POF Wah RJ A5473 5100002919 01x Fan Control Panel for 10/13 MVA 6/16/2004 7/5/2004 8/3/2004 NR 8/31/2004 Go ahead on 30-08
Sanaullah Textile Mills TAM A5474 5100002963 02x 250 KVAr PFIPs 6/30/2004 7/6/2004 7/2/2004 7/21/2004 7/2/2004
Ghazi Fabrics International SMY A5475 4800021130 LT Switchgear with 500kVAr PFIP 7/2/2004 7/13/2004 7/20/2004 7/21/2004
Decon Germany MA A5476 5100002676 Relay & Control Panels 7/2/2004 NR NR 8/5/2004 Add indent on 22-07
Engineering Services SMY A5477 4800021157 COS Panel for Phase Changeover 7/2/2004 7/12/2004 7/13/2004 App. Awaited
PARCO TAM A5478 4800021187 01 X 15kW Withdrawable Starter Mo 9/7/2007 7/19/2004 7/28/2004 7/27/2004 App awaited
07-09-04
04-08-04 const. CL rel on 29-07/Changes in
PressonDescon International TM/SMY A5479 4800021289 02 x MCCs- SIVACON 8PT 15-07-04 8/2/2004 8/30/2004
14-09-04 Drgs. App/Inspection on 19-11
14-09-04
Blessed Textile Mills Ltd. TAM A5480 4800021316 02x DBs + Loose MCCB 7/26/2004 7/29/2004 7/29/2004 App awaited
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

06-08-04
27.08.04
Changes on 30-09/Add Indent on 11-
Gadoon Textile Mills Ltd. FRQ A5481 4800021476 01x MCC (Fixed, Compartmental) 7/27/2004 8/3/2004 8/20/2004 13-
15- 10/Changes on 18-10
10-04
10-04
Taj Textile Mills Ltd. TAM A5482 4800021455 01 x 400kVAr PFIP 8/2/2004 8/8/2004 8/18/2004 8/24/2004
BP Pakistan TAM A5483 5100003010 01 x PDP , 60Hz 8/5/2004 8/12/2004 8/25/2004 9/14/2004 ###
06-09-04
Colony Textile Mills Ltd. MYS A5484 4800021612 LT Switchgear , 1200kVAr PFIP 8/6/2004 8/20/2004 9/6/2004 CL rel on 20-08
email
01xPanel added 18-08/03x Panels added
Scientechnic Dubai TM/SMY A5485 4900000328 48 x Sivacon 8PT Panels in CKD con 8/6/2004 NR NR 8/16/2004
23-09/01xPanel added on 18-11
07-09-04
Add Indent for BTD on 01-11/Changes in
Faisal Spinning Mills Ltd. MYS/TAM A5486 4800021762 LTO,Main LT,2No PFIPs,PDBS,LDBS 8/19/2004 8/20/2004 8/20/2004
DBs on 25-10
22-09-04
03-11-04
21-12-
10-09-04 04
17-08-04 04-10-2004 CL rel on 14-10 / Add Indents for
Maple Leaf Cement SMY/HJ A5487 5100003131 LT Switchgear(8PU.011 & 8PU.003) 14-02-05 02-03-05
15-04-05 12-05-05 PFIPs/DB/MCCs / CL rel on 26-04
03-05-05 Item 21
13-05-05
Item 23
CL rel on 30-08/Clar & Layout recd on
Nishat Mills Ltd. TAM A5488 4800021251 01x4000A ACB I/C Panel 8/23/2004 11/19/2004 23-11-04 12/6/2004 23-11-04
04-11/App vide email
CL rel on 09-09/Layout changed/ Schematics
Ghazi Fabrics International MYS A5489 4800021793 01 x MCC 8/23/2004 9/20/2004 9/20/2004 9/28/2004 10/12/2004 pending
Haleeb Foods TAM A5490 4800021812 LT Switchgear 8/24/2004 9/1/2004 10/6/2004 10/15/2004 10/18/2004
13-09-04
13-09-04 Latest WAPDA specs recd 25-05, Al BB
11-02-05 29-09-04 changed to 40x10, Prototype
29-
Service 24-02-05 inspection/testing of SB on 12-07,
10-04
Box 03-08-05SB released for mass production / SLCP rel
LT Connection boxes,Street 02-11-04
Habib Rafique Pvt. Ltd. SMY A5491 4800021842 8/24/2004 9/2/2004 14-07-05 29-08-05 for Prototype on 02-11, Inspected on 28-
Lighting Control Panel 29-
21-07-05 SLCP 29/04, Changes, Drgs rel for Prototype
12-04
SLCP 09-12-05 based on App, resubmitted, inspected
07-04-05
04-10-05 SLCP on 30-11, resubmitted with inspection
02-09-05
14-12-05 points
SLCP proto
01-12-05
Sapphire Textile Mills Ltd. RJ A5492 4800021900 01 x DB + Loose MCCB 8/31/2004 9/2/2004 9/2/2004 9/16/2004 9/17/2004
24-09-04
West Port Malaysia (TR) RJ A5493 02x Trafo Control Panels 9/3/2004 9/20/2004 21- 10/25/2004 22-11-04 Changes
10-04
05-10-04 04.10.04
23-09-04
Paramount Stitching Mills Ltd. RJ A5494 4800021891 LT Switchgear incl. 350 kVAr PFIP 9/6/2004 9/22/2004 07- 15- Items 01-03/DBs/FCDB
30-09-04
10-04 10-04
LT Switchgear incl. 900 kVAr
Naveena Exports Pvt. Ltd. TAM A5495 4800022171 9/15/2004 9/17/2004 9/17/2004 10/4/2004 9/17/2004 Items 04-06 / Bal rel on 22-09
PFIP+Loose Components
BTD rel on 26-11 / Add box for BTD, etc
Gulshan Weaving Mills TAM A5496 4800022111 LT Switchgear incl. 1000 kVAr PFIP 9/15/2004 9/24/2004 10/22/2004 12/15/2004 23-11-04
28-02
29-10-04
11.10.04
11-11-04
Yusuf Textile Mills Ltd. TAM A5497 4800022138 LT Switchgear incl. 2x500 kVAr PFIP 9/16/2004 9/30/2004 11/3/2004 Changes in PDB-8
31-
29-10-04
12-04
07-12-04Item
3
08-12-04 15-12-04
LT Switchgear incl.1x400+1x600
Abbot Laboratories Pakistan Ltd. AM A5498 5100003137 9/17/2004 9/29/2004 9/28/2004 Item 1&2 / Items 01&02 S.O. on 14-10 / Inspected 0n 29-04
kVAr PFIPs
4&5 20-12-04
Item
04&05
Abdul Majeed & Company AM A5499 4800022490 24 x DBs 10/21/2004 10/21/2004 ###
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

11-11-04DBs
11-11-04
01-11-04 23-11-
01-12-04 MLT/DBs/PFIPs/MCC dispatched / Add
08-11-04 04
Dewan Farooque Spinning Mills Ltd. SMY A5500 3000192068 LT Switchgear incl. 1000 kVAr PFIPs 10/20/2004 16/17- indent for BTD on 04-01 / SB D Details
31- 15-12-04
12-04 for BTDs on 17-02/ Inspection on 16-03
12-04 27-12-
08-02-05
04
31-01-05 12-11-04
10-11-04 30-11-04
22-11-04 16-12-04
17-12- 05-
29-12-04
04 01-05
LT Switchgear & MCCs+400&600 CL rel on 04-11 (Consolidated) / Latest
Matol Distillery (MES) MYS A5501 5100003150 10/25/2004 11/10/2004 Schematics 31-01-05
KVAr PFIPs Schematics changes on 31-01 / Inspected on 28-02
04-02-05
31-01-05
28-01-05
LVDB&MCC-1
10-02-05 09-02-05
MCC-3
03-12-
22-12-04DBs 04SDBs
03-12-04
LT Switchgear incl. 03 x 600 kVAr Layout 03-12-04LT CL rel on 05-11 / Change in MLT / App
Rahman Cotton Mills Ltd. SMY A5502 10/29/2004 11/18/2004 10-01-
PFIPs 10-12-04 Drgs on 12-01
05e-mail
14-12-04 31-01-
05
24-12-04 27-12-04
27-12-04 12-01-05(22) 30-12- S.O.# recd on 03-11/Meeting with
LT Switchgear Fixed / 30-12-04 17-01- 04 Customer 09-14/12 / App drgs of Areas
Dewan Saadi Cement TAM/HJ A5503 5100003155 10/29/2004 11/25/2004
withdrawable 8PU.011 (22) 07-01- 05(32) 25-01-05 22&32 on 17-01/Changes in App / Last
05(32) 17- 26-01-05(42) 04-02-05 dispatch by 17-03
01-05(42) 25-02-05
27-12-04
23-11-04 13-12-04 06-01-05 13-12-04 Details & Go-ahead for MCC on 04-02 /
Blessed Textile Mills Ltd. SMY A5504 4800022822 LT Switchgear & MCCs+Loose ACB 11/2/2004
09-02-05 14-02-05 02-03-05 CL for Loose supply 18-03
schematics
03-01-05
Layouts
08-03-05 CL rel on 28-12 / Clar on Trafo dim drg
ESS ESS Associates (EC) SMY A5505 3000188690 LT Switchgear 18-11-04 12/6/2004 10-01-05 3/3/2005
10-08-05 reqd
26-05-05

Sapphire Fiber Ltd. RJ A5506 3000195025 01x PDB 30-11-04 NR 12/1/2004


08-12-04
17-12-04
MCB Tower Project (EC) SMY A5507 3000183765 02 x Feeder Pillar (Indoor type) 30-11-04 20- 12/8/2004
22-12-04
12-04
01 x LV DB + 04 x PLC/Screen + 01 14-02-05
03-12-04
KW&SB-Dhabeji Pumping Station(KIII Project) SMY/AAH/ x Instrument Panels + 13JBs + 01 04-02-05 MCC PLC Panels details on 24-01, 02-02, 23-
A5508 3000187496 15-12-04 12/22/2004 1/14/2005
(MES) MR x LCB + Outdoor Housing for MOM 25-02-05 02 / Add Indent
28-04-05
Screen Panels MCC
28-12-04
CL rel on 17-12/Changes in MCC App /
KW&SB-NEK Pumping Station (KIII Project) SMY/AAH/ 01 x LV DB+02 x PLC + 01 x 03-12-04 04-02-05
A5509 3000187502 12/22/2004 06-01-05 14-02-05 MCC PLC Panels details on 24-01, 02-02, 23-
(MES) MR Instrument Panels + 07JBs 15-12-04 MOM
14- 02 / MCC Inspected on 13-04
02-05
LT Switchgear incl. 02 x 800 kVAr 22-12-04 PFIP CL rel on 13-12/Meters changed /
Bismillah Textile Mills Ltd. SMY/KZ A5510 3000196666 12/7/2004 12/16/2004 12/16/2004 12/23/2004
PFIPs email Inspection on 28-03
Change on 21-12 (25 kVAr stage +
Marmonyx Pvt. Ltd. AAH A5511 3000200884 LT Panel + 150 kVAr PFIP 12/14/2004 12/16/2004 12/17/2004
Exhaast Fan)
08-02- 02-02-
31-01-
05LOT1 05LOT1
05LOT1 As per Design Plan dtd 15-04 / CL Lot 1
20 x MCCs+10xPFIPs 8PU.003 23-02- 01-03-05LOT2
Pioneer Cement HJ A5512 3000200950 12/16/2004 15-02-05LOT2 on 28-01/Change of MCCBs 07-02,
Fixed 05LOT2 15-03-
05PFIP 25- Revised CLs 07-02 / Trip SS on 09-02
25-02-
11-03-
05LOT3 03-05LOT3
05LOT3
Indent recd on 27-12 / BTD Details rel on
Bahria University SMY A5513 3000204975 1600 ACB Panel + BTD 12/21/2004 12/22/2004 1/14/2005 12/29/2004
27-01
27-01-05
KSB (Pak Arab Fertilizer) KZ A5514 3000201240 LT Switchgear + 3200A BTD 12/22/2004 1/5/2005 1/5/2005 1/26/2005
25-02-05 BTD
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

01x Control Panels for 20/26 MVA 28-01-05


Al-Hamd (TR) AAH/RJ A5515 3000204197 12/22/2004 1/5/2005 1/17/2005 1/28/2005 CL rel on 05-01
PT email
01x Control Panels for 10/13 MVA
Maple Leaf Cement AAH/RJ A5516 3000204198 12/22/2004 1/5/2005 1/11/2005 18-02-05email 2/22/2005 CL rel on 05-01
PT
18-03-05email
11-01-05
Kidney Center Peshawar KZ A5517 3000205185 LT Switchgear 12/27/2004 1/7/2005 7/28/2005 CL rel on 06-01
03-08-05 31-03-05
01xControl Panels for 30/36 MVA 01-02-05 08-03-05 CL rel on 01-02 &11-02 / Change from 12
Pioneer Cement AAH/RJ A5518 3000208202 1/7/2005 1/19/2005 3/14/2005
PT 11-02-05 email Fans to 08 on 07-02
Faisal Spinning Mills Ltd. RJ A5519 3000208036 02x PDBs 1/10/2005 1/17/2005 1/19/2005 2/4/2005 2/15/2005 Changes in App
Apollo Textile Mills Ltd. KZ A5520 3000192113 01x DB 1/19/2005 1/25/2005 2/24/2005
Pakistan Air Force KZ A5521 3000216361 MLT + DBs 2/3/2005 2/16/2005 2/18/2005 3/31/2005 4/4/2005 CL rel on 09-02
11-02-05email
Gadoon Textile Mills Ltd. SMY A5522 3000214924 01x PDB 1/31/2005 2/8/2005 2/11/2005 CL rel on 09-02

WAPDA-NTDC (TR) RJ A5523 3000218389 15x FCPs & ACPs - 20/26 MVA PT 2/8/2005 2/16/2005 2/25/2005 2/28/2005 3/9/2005

Modification Works + COS & UPS 01-04-05


MCB Tower (EC) KZ A5524 3000219844 2/11/2005 2/17/2005 3/8/2005 3/11/2005 CL rel on 18-03
DBs Items 3&5

16-02-05
15-02-05 15-03-05
10-03-05
14-03-05 14-03-05
15-03-05 PDBs&LDBs
15-02-05 CL rel on 15-02 / Add indent / PFIP CL on
Indus Dyeing KZ/SMY/AM A5525 3000218399 Modification Work + LT Switchgear 3/7/2005 16-03- 04-04-05
22-02-05 PDBs&LDBs 10-03
05MLT-A PFIP&LTO
27-04-05 31-03-
05-
Layout 05
04-05 LT
11-05-05BTD

15-03-05 06-04-05
08-03-05 Inspected on 25-04,
Bhanero Textile Mills Ltd. AM A5526 3000217322 LT Switchgear 2/17/2005 3/4/2005 12-04-05
22-03-05 Inspection Points
21-04-05 BTD
24-03-05
Const
CL rel on 10-03 / Meeting on 18-03 / ACB
List
Cherat Cement SMY A5527 3000215827 MCC in 8PT (withdrawable) Design 2/18/2005 3/7/2005 3/18/2005 4/1/2005 Changed to 2500A 19-04 / Rev Const
07-04-05
List on 05-05 / Meeting on 17-05, 30-05
PFIP
13-04-05
06-04-05
Pioneer Cement SAH A5528 3000200950 01x Protection & Metering Panel 2/22/2005 NR
31-05-05
06-04-05
Maple Leaf Cement SAH A5529 3000222459 01x Protection & Metering Panel 2/22/2005 NR
31-05-05
Nestle Milkpak Ltd. TAM A5530 3000221409 1600A ACB Panel + BTD 2/22/2005 3/8/2005 3/11/2005 3/28/2005 3/28/2005 Cl rel on 10-03
Loose Supply of 4000A ACB + Aux
DS Textile Ltd. KZ/SHA A5531 3000215568 2/22/2005 3/8/2005 2/28/2005 17-03-05email 5/4/2005 CL rel on 25-02
Comp. & Factory Material
Loose Supply of 2500A ACB + Aux
DS Industries (Pvt.) Ltd. KZ/SHA A5532 3000216345 2/22/2005 3/8/2005 2/28/2005 17-03-05email 4/21/2005 CL rel on 25-02
Comp. & Factory Material
KCI Chashma ( EC ) KR A5533 3000222828 07 x 110VDC Panels 2/23/2005 3/7/2005 3/28/2005 4/14/2005 6/10/2005
Abdul Majeed & Company RJ A5534 3000223632 03 x DBs 2/28/2005 3/7/2005 3/14/2005 4/7/2005 4/8/2005

16-03-05
27-04-05 30-03-05 27-04-05 Site visit on 24-05 / Changes in Panels
Karachi Export Processing Zone TAM A5535 3000222933 LV Switchgear & Loose Supply 3/2/2005 3/16/2005
10-05-05 09-05-05 10-05-05 dim in App / Layout resub for App
31-05-05

14-03-05 17-03-05
Technical Associates Pakistan HJ A5536 3000225691 MLT + DB + 400kVAr PFIP 3/17/2005 3/25/2005 3/25/2005 Cl rel on 17-03/Add indent
24-03-05 25-03-05
21-03-05
29-03- Adv info on 11-03 / CL rel on 14-03 /
Babri cotton Mills Ltd-Kohat TAM A5537 3000231350 LT Switchgear incl. 6300A ACB 3/16/2005 3/18/2005 4/8/2005
05 Inspected on 18/05
13-04-05
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

05-04-05
Comments by MES on 06-04 / Meeting
Thatta Cement SMY A5538 3000222460 MCC in 8PT Withdrawable Design 3/18/2005 3/30/2005 08-04- 4/12/2005 4/14/2005
on 17-05
05

Indent ret to SB S on 04-04 / Clar & go-


25-05-05 ahead recd on 18-05 / CL rel on 24-05 /
DHA Lahore Phase VI SMY A5539 3000231988 08x Street Lighting Control Panels 3/18/2005 5/23/2005 6/15/2005 7/22/2005
22-07-05 Changes in App, Go-ahead recd from SB
S on 22-07 / Rev CL on 22-07

American Embassy-Islamabad KZ A5540 3000232952 600A MCCB Panel 3/18/2005 3/24/2005 3/29/2005 4/1/2005 Change - I/C from top on 29-03

11-04-
05MCC CL rel on 28-03 rev 07-04 (LT) & 29-03
12-04-05LT rev 07-04 (MCC) / Changes in App / Site
22-03-05 06-04-05 13-05-05LTO
Nishat Chunian Ltd.(Dyeing Power) TAM/HJ A5541 3000231559 LT Switchgear 4/1/2005 4/8/2005 visit 12-05 / Add indent for
29-06-05 30-05-05 07-07-05 01xBTD+01xLTO / Changes in BTDs as
27-07-05BTDs
05-09-05 per email dtd 29-08 app recd 01-09
Rev BTDs

CL rel on 29-03 rev 07-04 / Changes in


Nishat Chunian Ltd.-I(Power) HJ A5542 3000231561 MCC in 8PU.003 Fixed Design 3/22/2005 3/29/2005 4/7/2005 4/8/2005 4/11/2005
App
Janana De Malucho Textile TAM A5543 3000234193 LT Switchgear 3/25/2005 3/30/2005 3/31/2005 NR 4/4/2005
Atlas Battery Ltd. KZ A5544 3000235343 LT Switchgear 3/25/2005 4/1/2005 4/11/2005 4/19/2005 4/20/2005 CL rel on 31-03
Gadoon Textile Mills Ltd. TAM A5545 3000235628 CO Panel 3/29/2005 4/4/2005 4/12/2005 4/18/2005 5/19/2005 CL rel on 12-04
Umar Spinning Mills (Pvt.) Ltd. RJ A5546 3000233661 01xPDB + Loose Components 3/30/2005 5/10/2005 4/6/2005
19-04-05
Items 02-
21-04-05 28-04-05
Nishat Mills Ltd. HJ A5547 3000237733 LT Switchgear 4/4/2005 4/20/2005 05 27- CL rel on 14-04/Changes in App
02-05-05 Items 02-05
04-05 Item
01
14x Control Panels (Fan & Aux) for 05-04-05 Formal Indent on 12-04 /
WAPDA/NTDC RJ A5548 3000239181 4/6/2005 5/27/2005 7/6/2005
31.5/40MVA Trafo 07-06-05 Rev indent - qty inc to 14

R&C Panels for NTDC- 12-10-05


RP Const Drgs
NTDC-WAPDA (TD) MA A5549 3000352934 KESC500/220kV Interconnection 4/8/2005 Formal Indent, S.O. No. recd on 19-10
15-11-05
Project CP Const Drgs

Formal Indent / S.O. No.


recd on 21-07 / Drgs resubmitted based
23-08-05 22-11-05
on conceptual SLD vide email dtd 15-09
NTDC-WAPDA (TD) TAM A5550 3000305528 400VAC Switchgear 4/12/2005 8/2/2005 20-10-05 11/2/2005 05-12-05
& meeting on 13-10 / Changes in App /
17-11-05 SB D
Fresh changes on 10-11/ CL rel on 17-
11 / Minor SB D Details

CL rel on 15-04 / Meeting with


Karachi Golf Club KZ A5551 3000253969 02xMCCs-8PU.003 Fixed Design 4/13/2005 4/18/2005 4/18/2005 5/12/2005 5/11/2005
Consultants on 25-04
26-04-05
26-05-05 Indent on 16-06 / Changes in App /
Attock Cement RJ A5552 3000284635 Control Panels for 25MVATrafo 4/13/2005 4/19/2005 29-04-05 6/22/2005
22-06-05 Resubmittal
07-06-05

19-04-05
LDBs 21-04-05
26-04-05 20-04-05 LDBs CL for LT/PFIP / LDBs rel on 15-04 rev
Alam Cotton Mills SMY/TAM A5553 3000236665 LT Switchgear 4/14/2005 4/20/2005
LT+PFIP LDBs 06-05-05 28-04 / 19-04
26-04-05 PFIP & LT
DBs
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

27-04-05 29-04-05
11-05-05
Items 04-13 Items 04-13
Azgard Nine Ltd. HJ A5554 3000256591 LT Switchgear 4/21/2005 4/29/2005 23-05-05 CL (Items 04-13) rel on 27-04
11-05-05 11-05-05
BTDs
Items 01-02 items 01-02

12-05-05 PDBs,
12-05-05
06-05-05 PDBs, Items 06-18, CL LT on 18-05 /
Bhanero Textile Mills Ltd. HJ/KZ A5555 3000257527 LT Switchgear, DBs 4/28/2005 5/13/2005 LDBs & MLDB
LDBs & MLDB
25-05-05
31-05-05 Item 01-02 MCC & LCBs put-on-hold
LT, PFIP, MCC on 030605

27-05-05
Gadoon Textile Mills Ltd. KZ A5556 3000257609 01xLDB+02xPDBs 4/28/2005 5/3/2005 31-05-05 5/31/2005

06-05-05
Telenor (A&D) MR A5557 3000264459 25x GT2 Housings for AMF/MOR Pan 5/5/2005 NR Partial Formal Indent recd on 09-05
11-05-05

17-05-05
14-07-05
Loose Supply - ACB & 11-05-05
Bismillah Textile Mills Ltd. KZ A5558 3000264770 5/13/2005 5/13/2005 6/27/2005 BTD1 Rev Indent - 02xBTDs added
Accessories, etc. + 02x BTDs 07-06-05
18-07-05
BTD2

Site visit on 25-05 / Exhaust fan added in


PARCO / PS1 Korangi MHF A5559 3000268318 02x 400 + 01x 300 kVAr PFIPs 5/13/2005 5/20/2005 5/20/2005 7/1/2005 7/5/2005
App

31-05-05
17-05-05 DBs, PFIP
DBs, PFIP 30-05-05 20-06-05 Interlocking & S/S layout details recd on
Ghazi Fabrics International TAM A5560 3000267850 LT Switchgear 5/16/2005 5/20/2005
02-06-05 17-06-05 LT 30-05 / LT CL rel on 31-05
LT 27-06-05
BTD

Cherat Cement SMY A5561 3000272735 01x 3kW + 06x 15kW Starter Module 5/23/2005 5/26/2005 6/27/2005 6/27/2005 7/1/2005
01x 6M W/D module for 200A, 4P
New Progressive Builders (PARCO) TAM A5562 3000276064 6/9/2005 6/10/2005 6/13/2005 6/21/2005 6/9/2005 Refer A1355
MCCB Feeder
03-08-05
112x Service boxes as per WAPDA
Glamour Developers (Pvt.) Ltd. SMY / HJ A5563 3000240107 6/8/2005 6/10/2005 15-08-05 9/15/2005 9/7/2005 Order put On-Hold on 04-10
specs. P92:75
31-08-05
Control scheme same as Gadoon order
Khadim Husain Slatch & Co. TAM A5564 3000284242 250kVA Changeover Panel 6/20/2005 6/21/2005 6/24/2005 4/24/2006 A5545 / Resubmitted as per letter recd
03-04

CL rel on 20-06 / Resubmitted / App


comments incorporated / Change of
17-06-05 07-10-05
Pak & Jinnah Park Projects TAM A5565 3000284763/8 LT Power Panel No.1 & No.2 14-06-05- 6/17/2005 9/28/2005 Cable entries on 12-10, confirmation
01-09-05 02-12-05
recd on 01-12 for Gen panel / Pak Park
dispatched

Major Zuberi COS Panel RJ A5566 3000284356 COS Panel for Phase Changeover 6/14/2005 6/14/2005
45Nos RP-3 & 15Nos RP-4
NTDC-WAPDA(TD-Lahore) ADP 59(LOT III) MA A5567 3000285449 6/16/2005 NR 7/5/2005
protection panels
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

15-07-05
CHF LV
18-07-05 03-08- Meeting with Consultants & EC on 30-06
CHF DBs 05CHF / CL for CHF on 10-08(DBs) & 11-08(LT) /
10-08-05DBs
01-09-05 11-10-05 Changes in App / Add indent for 01xLV
12-10-05
PB DBs Add indent Panel 8PU.011 Fixed design alignment
21-06-05 Add indent
12-09-05 01-12-05 with existing board / SB D Details /
Glaxo Smith Kline TAM/KZ A5568 3000288055 LT Switchgear 29-09-05 7/8/2005 17-11-05
Item 1 PB PB LT Comments on PB DBs on 14-11 / Major
24-03-06 DBs
20-09-05 13-12-05 changes in PB LT app / Site visit on 22-
27-02-06
Items 04-05PB PB DBs 12 / CL for PB DBs on 21-12, LT on 16-12
SB D LT
04-10-05 25-01-06 & 21-12, Item 51 PDB ?? deleted / Rev
Items 06-09PB LDB/DBs indent
03-10-05
Add indent

Sapphire Fibres Ltd. - No. 3 KZ A5569 3000285015 01xPDB + 02xLDBs 6/22/2005 6/23/2005 6/22/2005 7/13/2005 7/13/2005
20-09-05
06xRelay Panels+02xMarshalling
NTDC-WAPDA Shikarpur & Sibbi Grids (TD) MA A5570 3000288505 6/22/2005 NR 15-11-05
Kiosks
MCs

27-07-05
RP,CP
M/s Rousing Engg Services / 01-07-05
MA A5571 3000286501 01xCP50+01xRP4+01xAC/DC Panels 6/22/2005 23-08-05 TD drgs recd on 22-08 for RP/CP
M/s A. A. Spinning Mills Ltd. AC/DC
26-08-05
AC/DC

Victor Pipe Industries - Afghanistan HJ A5572 3000292427 01xLT Panel 6/29/2005 7/1/2005 7/12/2005 30-08-05email 9/7/2005 Clar recd on 11-07 / CL rel on 12-07
Mr. Rahim Dawood - F&C HJ A5573 3000294427 01xCO DB 6/30/2005 NR 7/1/2005
Honda Atlas Ltd. (TR) RJ A5574 01xFCP for 2/2.5MVA Trafo 6/24/2005 7/1/2005 7/4/2005 Formal indent, S.O. # awaited

16-08-05 13-09-05 22-09-05


220VDC 220V 220V
NTDC-WAPDA HJ A5575 3000293276 220V & 48VDC DBs 6/29/2005 7/7/2005 Clarified on 02-08 / CL rel on 22-09
25-08-05 29-09-05 04-10-05
48VDC 48V 48V
18-07-05 CL rel on 08-07, rev 22-07 / Changes in
M/s FFC Ltd. MHF A5576 3000288778 LT Switchgear 7/4/2005 7/8/2005 8/9/2005 8/24/2005
22-07-05 app

13-07-05
19-07-05
DBs/PFIPs 20-07-05
08-07-05 26-07-05DBs
20-07-05 DBs/PFIPs
05-07-05 DBs, LDBs 29-07-05LT CL rel on 07-07 / Add indent for 01xDB /
Blessed Textile Mills Ltd. - Unit No. 3 KZ A5577 3000289586 LT Switchgear DBs resub 02-08-05LT
11-07-05 15-07-05 08-08-05 Changes in App
22-07-05LT 08-08-05
LT, etc. Add indent
03-08-05 BTDs
Layout

11-07-05
15-07-05
MCC 15-07-05 CL rel on 11-07 / meeting with customer
Lucky Textile Mills RJ A5578 3000292953 02xDBs, 01xMCC - 8HKO 7/5/2005 7/8/2005 7/18/2005
20-07-05 DBs 21-07, changes
Schematics
22-07-05

Fazal Textile Mills MHF A5579 3000291548 01x LT Panel 7/13/2005 7/18/2005 7/22/2005 8/16/2005 8/19/2005 CL rel on 20-07
28-07-05 CL rel on 25-07 / SLD, FV&Disp in Ist
Allied Engg Services Ltd./Lucky Cement Ltd. TAM A5580 3000302473 5000A LT Switchgear 7/18/2005 7/29/2005 8/24/2005 8/29/2005
02-08-05 submittal

02-08-05LT 16-08-05DBs
D. S. Industries Ltd. MHF A5581 3000302535 LT Switchgear 7/19/2005 8/1/2005 18-08-05LT CL rel on 28-07(LT) & 08-08(DBs)
08-08-05DBs 22-08-05LT

DHA Lahor/Electrification Works of DHA Phase RJ A5582 3000303414 01xStreet Lighting Control Panel 7/27/2005 NR 7/29/2005
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

10-08-05
17-11-05
26-09-05 13-09-05
PAEC / NMC-1 MHF A5583 3000309035 LT Switchgear 7/28/2005 8/10/2005 15-12-05 CL rel on 11-08
27-09-05 16-11-05
BTD
Layout

06-10-05
S. O. # on 14-11 / As per Design Plan /
Items 1-4,
Lot 1 & 2 drgs approved during meeting
14-19
with customer 05-09 to 09-09 / CLs of
06-10-05 to
02-09-05 Lot 1 rel on 14-09, Lot 2 CLs on 30-09,
SP&EW SMY/HJ A5584 LT Switchgear, DC DBs 8/17/2005
21-09-05
12-10-05
Lot 3 on 10-10 & 11-10 / Schematics
Part Lists
finalised with customer, formal app
14-10-05
pending / Network study report-SINCAL
to 18-10-05
rel on 25-11
Items 5-12

02-09-05 15-09-05 21-09-05


07-09-05 LTO+DB LTO/LDB CL rel on 02-09, 06-09 / Resubmitted
Hussain Mills Ltd. MHF A5585 3000311980 LT Switchgear incl. 02x1000kVAr PF 8/17/2005 9/6/2005
MCC 22-09-05 04-10-05 based on App comments
04-10-05 MCC+LDB Items 1-5
Technical Associates Pakistan / Abu Dhabi 26-08-05 12-09-05 03-10-05 CL rel on 12-08 / Changes in App
TAM A5586 3000315161 LT Switchgear 8/16/2005 8/24/2005
Palace Rahimyar Khan 06-10-05 17-10-05 17-10-05 clarified on 03-10

CL rel on 25-08, rev 12-10, rev 28-10


25-08-05 based on SB S inputs on 25-10 /
08-11-05 28-10-05
Siddiqsons Tin Plate Ltd. MHF A5587 3000297394 6000A & 3200A LT Switchgear 8/16/2005 8/24/2005 28-10-05 Meeting with Consultants on 08-11, App
08-12-05 15-11-05
24-11-05 with comments, Go-ahead for changes
on 18-11, Resubmitted

S. O. # on 15-08, Formal indent on 16-


M/s Muhammad Aslam MHF A5588 3000317305 LT Switchgear 8/1/2005 8/19/2005 8/19/2005 19-08-05email 8/24/2005
08 / CL rel on 17-08
23-08-05
Maple Leaf Cement RJ A5589 3000318704 01xFCP+01xACP for 20/26MVA PT 8/17/2005 8/19/2005 12/6/2005 Resubmitted as per comments/changes
13-09-05
18-11-05
NTDC-WAPDA (TD) MA A5590 3000319145 02x Marshalling Kiosks 8/17/2005 NR 13-12-05
TD Drgs

15-09-05
02-09-05 Item 3, 4 CL rel on 07-09 / Comments in App /
Items 1,3,5 16-09-05 Feeder Pillars Put-on-Hold by SB Lhr
Olympia Chemicals Ltd. SMY A5591 3000316684 LT Switchgear 8/17/2005 9/1/2005 06-09-05 13-09-05email
LT+PFIP+Layout
Items 2, 6 vide email 22-09 / LCBs reqd in local
07-09-05 24-10-05 design vide email dtd 19-10
LCBs

08-09-05
15-09-05email 19-09-05 CL rel for App 30-08, App recd 02-09, rel
Gulistan Textile Mills Ltd. - Unit 4 TAM A5592 3000327455 LT Switchgear 8/24/2005 9/9/2005 14-09-05 29-09-05 21-10-05 for proc 02-09
layout
08-09-05
15-09-05email 19-09-05 CL rel for App 30-08, App recd 02-09, rel
Gulshan Weaving Mills Ltd. - Unit 2 TAM A5593 3000326254 LT Switchgear 8/24/2005 9/8/2005 14-09-05 29-09-05 21-10-05 for proc 02-09
layout
International Knitwear Ltd MHF A5594 3000194869 01x100 + 01x50kVAr PFIP stages 8/26/2005 8/29/2005 NR 9/29/2005 Site visit on 28-09 for clarification
15-09-05email 20-09-05
Gulistan Spinning Mills Ltd. TAM/MHF A5595 3000326183 LT Switchgear & Loose supplies 8/29/2005 9/13/2005 9/12/2005 29-09-05 CL rel on 07-09
24-10-05
15-09-05email 20-09-05
Gulshan Spinning Mills Ltd. - Unit 2 TAM/MHF A5596 3000326152 LT Switchgear & Loose supplies 8/29/2005 9/13/2005 9/12/2005 29-09-05 CL rel on 07-09
24-10-05
CL rel on 14-09 / App comment, UVT
14-09-05 21-09-05 reqd / Changes reqd during inspection
Masood Textile Mills Ltd. MHF A5597 3000326457 LT Switchgear 9/5/2005 9/9/2005 9/26/2005
23-09-05 24-03-06 in item 03 - PDBs (06Nos.), Go-ahead on
08-12

Gharibwal Cement Ltd. MHF A5598 3000328590 01x LT Panel 9/6/2005 9/9/2005 9/19/2005 10/18/2005 10/24/2005 CL rel on 19-09 / Minor changes in App
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

Dost Steel RJ A5599 3000308554 01xFCP+01xACP for 20/26MVA PT 9/8/2005 9/15/2005 9/14/2005 20-09-05email 9/29/2005 CL rel on 14-09
Lucky Cement Ltd. MHF A5600 3000330522 02x PDBs 9/8/2005 9/14/2005 9/16/2005 10/3/2005 10/5/2005 CL rel on 16-09

05-10-05
PDBs
26-10-05
21-09-05 04-10-05
PFIP/LDBs CLs rel on 21-09 (PDBs), 27-09 (bal) / LT,
PDBs PDBs
27-10-05 PDB 10, Compressor Panel, Layout
04-10-05 24-10-05
08-09-05 LTO/MCC revised & PDB 8 deleted in App /
Naveena Exports (Pvt.) Ltd. - Weaving Unit SMY A5601 3000331514 LT Switchgear 9/19/2005 LT LT
15-11-05 15-11-05 Revised indent, Resubmittal of LT /
15-11-05 29-11-05
LT Layout issue resolved in meeting with
LT LT
17-11-05 consultants on 09-01, Resubmitted
09-01-06 20-01-06
BTDs
16-01-06
SB D

24-10-05
30-09-05
PFIP CL rel on 27-09 / Layout resubmiited on
07-10-05
10-10-05 02-11-05 17-10 as per revised customer layout
Dewan Hattar Cement TAM A5602 3000331543 LT Switchgear - 8PU.011 9/8/2005 9/27/2005 Schematics
24-10-05 GDB, MCC vide email dtd 12-10 in back-back
11-10-05
18-11-05 arrangement, revised 21-10 with BTD
Layout
BTD

25-10-05
PDB/PFIP
24-11-05 CL rel on 27-09 / Upgrade of BTD/BB
12-09-05 23-09-05 29-09-05 24-10-05
Umar Spinning Mills (Pvt.) Ltd. RJ A5603 3000332848 LT Switchgear LT ratings & other changes vide revised
20-02-06 24-02-06 24-02-06 02-03-06
02-12-05 indent
BTD
24-02-06

Meeting with customer on 22-09 /


20-10-05 07-11-05
PARCO SMY A5604 3000327376 01xMCC - 8PU.011 + 01xBTD 1250A 9/21/2005 10/21/2005 12/8/2005 Changes in App / Rev CL on 07-12 /
17-11-05 05-12-05
Revd layout recd on 21-12

TD drgs for RP, CP recd on 21-11 /


Maple Leaf Cement MA A5605 3000339739 02xRP4+02xCP50 + 02xAC/DC Panel 9/23/2005 10/5/2005 10/11/2005 12/14/2005 Comments on AC/DC recd, replied by
SB S Ex, Drgs released as per Go-ahead

Formal indent recd on 10-10, Revised


12-10-05 SLD on 11-10 / DBs resent from site,
30-09-05 17-10-05
11-10-05 09-01-06 11-10-05 Revised indent - qty changed from
General Syed Absar Hussain MHF A5606 3000347671 08xDBs 05-01-06 18-01-06
09-01-06 18-01-06 23-01-06 03Nos. to 02Nos. / CL of items 1&2 rel
24-01-06 23-01-06
27-01-06 on 30-01 / Revised indent - qty/scope
change

17-10-05
SL/Clar recd on 17-10 / Entries changed
U. S. Embassy, Islamabad MHF A5607 3000346832 01xLT Panel 10/10/2005 10/17/2005 10/18/2005 24-10-05 12/8/2005
to top in App
07-12-05
17-10-05
SL/Clar recd on 17-10 / Entries changed
U. S. Embassy, Islamabad MHF A5608 3000346848 01xLT Panel + 01xDB 10/10/2005 10/17/2005 10/18/2005 24-10-05 12/8/2005
to top in App
07-12-05

19-10-05 Formal indent, S. O. # recd on 18-10 /


Carriage Factory Pakistan Railway RJ A5609 3000351055 04x LT Panels 10/17/2005 10/19/2005 11/2/2005
02-11-05 Resubmitted with changes reqd by S'Isb

25-11-05
WAPDA / 220kV Sialkot S/S (TD) MA A5610 3000352797 01xR3 + 01xR4 Protection Panels 10/19/2005 NR
07-12-05
Sitara Chemical Industries (TD) MA A5611 3000354686 01xRP4+01xCP50 + 01xAC/DC Panel 10/24/2005 11/1/2005 11/1/2005
31-10-05 Changes reqd as per ED/A5589 on 14-
Sitara Chemical Industries (TR) RJ A5612 3000354712 01xFCP+01xACP for 20/26MVA PT 10/28/2005 10/31/2005
28-12-05 12, Resubmitted / App awaited
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

M/s Rousing Engg Services /


MA A5613 3000354680 01xRP4+01xCP50 + 01xAC/DC Panel 10/28/2005 11/8/2005 11/14/2005 TD drgs for RP, CP recd on 22-11
M/s Dost Steel (Pvt.) Ltd.

14-11-05 17-11-05
PDBs PDBs
Orient Textile Mills SMY A5614 3000357577 LT Switchgear 10/31/2005 11/11/2005 12/8/2005 CL rel on 01-11
24-11-05 12-12-05
LT LT

08-11-05
LT 08-11-05
15-11-05
10-11-05 LT CL rel on 01-11(LT) / Change in some
Lucky Cotton Mills TAM/MHF A5615 3000358331 LT Switchgear 10/31/2005 11/11/2005 DBs
DBs 10-11-05 DBs, resubmitted & approved
24-11-05
15-11-05 DBs
DBs

Pak Arab Fertilizers (Pvt.) Ltd. MHF A5616 3000350447 LT Panel 11/7/2005 11/11/2005 11/11/2005 11/28/2005 12/1/2005

15-11-05
01-12-05 CL rel on 11-11 / Site visit on 12-12 /
14-12-05 21-11-05
03xGenerator Power (2000A)+ SB D Schematics revised based on customer
Allied Engg Services Ltd./FTC management Co. TAM A5617 3000363990 11/10/2005 11/15/2005 Schematics 03-01-06
02xLTO Panels 09-01-06 drg. recd on 13-12 / CCPs revised to
16-12-05 email
SB D LTOs - thru BTDs (not in scope)
Layout

04xGenerator Power(4000A)+
10-11-05 16-11-05
Al-Karam Textile Mills MHF A5618 3000363970 03xCable Termination(6000A) 11/15/2005 2/16/2006 CL rel on 11-11 / Revised indent
26-12-05 30-12-05
Panels
02xGenerator Power(2000A) CL rel on 21-11, rev 05-12 as per
MHF A5619 3000363976 11/15/2005 11/18/2005 11/22/2005 11/29/2005 12/5/2005
Usman Ltd. LTOs+01xMCC+01xLDB customer comments
NTDC-WAPDA (TD) MA A5620 3000364882 01xDCS Marshalling Kiosk 11/14/2005 TD drgs recd on 18-05 by email

21-11-05 21-12-05
16-11-05
23-11-05 Items 7-8 Items 7&8 21-12-05 CL of items 7-8 on 16-11, bal. on 06-01 /
Philips Electrical Industries of Pakistan Ltd. TAM A5621 3000364875 LT Switchgear 04-01-06
09-01-06 15-12-05 04-01-06 Items 7&8 Revised & Add indents
05-01-06
Items 3-4 Bal.
01xSoft Starter Panel for
BP Pakistan MHF A5622 3000390256 12/26/2005 12/30/2005 1/3/2006 2/10/2006 CL rel on 30-12
75HP/56kW, 480V, 60Hz motor
08-12-05 17-01-06
Novatex Ltd. MHF A5623 3000371920 LT Switchgear 11/23/2005 12/1/2005 1/23/2006 CL rel oh 01-12
15-12-05 Schematics
CL rel on 01-12 / App comment for PES
Punjab Industrial Estate SMY A5624 3000348705 27xSteet Lighting Control Panels 11/24/2005 11/30/2005 12/1/2005 12/15/2005 12/21/2005
clarified on 19-12
24-11-05 02-12-05 02-12-05 15-12-05 06-12-05
Sun Rays Textile Mills Ltd. MHF A5625 3000371221 LT Switchgear CL rel on 02-12
20-01-06 25-01-06 31-01-06 28-02-06 08-03-06
Maple Leaf Cement (OLM) TAM A5626 3000371274 LT Switchgear 11/24/2005 12/9/2005 12/9/2005 12/30/2005 12/28/2005 CL rel on 09-12
14-12-05
Azgard Nine Ltd. SMY A5627 3000378126 LT Switchgear 12/2/2005 12/8/2005 09.12.05 12/19/2005
email
NTDC-WAPDA - 500kV Rawat-Lahore 07xRelay + 02xMetering & Control
MA A5628 3000379723 12/9/2005 NR TD drgs (partial) recd on 26-07
Extension S/S Project Panels
RP14 & CP4 dwgs. Awaited (for Front
NTDC-WAPDA - 500kV & 220kV Sahiwal S/S 15x500kV+05x220kV Relay +
MA A5629 3000379796 12/9/2005 NR Plate), Bottom Cutouts for RP & CPs and
Project 05xMetering & Control Panels
Mimic for CPs
01xMCC - 8PU.011 for alignment
Enar Petrotech Refining Facility (EC) TAM A5630 3000383940 12/15/2005 12/22/2005 12/20/2005 12/30/2005 12/28/2005 CL rel on 20-12
with existing MCC

27-01-06
LT Switchgear - LT Boards-F1 + 05-01-06 email *As per Design Plan dtd. 05-01 /
Honda Atlas Cars Pakistan Ltd. HJ A5631 3000380721 12/20/2005 * 1/30/2006
MCCs & DBs-8HKO Lot 1 15-02-06 Changes in App
email
22-12-05
K.E.S.C. (TR) RJ A5632 3000416783 05x FCP+TCP for 40MVA PT 12/20/2005 2/10/2006 3/24/2006 Formal indent, S. O. # on 16-02
19-01-06
28-12-05 Resubmitted as per changes reqd by SB
Siemens Afghanistan / Gardez Province MHF A5633 3000388920 01x LT Panel 12/26/2005 12/28/2005 2/22/2006 2/22/2006
02-02-06 S dtd 01-02
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

01xLT Panel + 01xMCC (8HKO) + 06-01-06


29-12-05 04-01-06 20-01-06
Lucky Tex TAM A5634 3000391409 200kVAr detuned PFIP stage 23-01-06 1/23/2006 Rev indent, CL rel on 14-06
30-05-06 05-06-06 02-08-06
connected with existing PFIP 14-06-06
19-01-06
M/s Suraj Cotton Mills Ltd. MHF A5635 3000391920 01xMCC (8PU.003) + 01xDB 12/30/2005 1/5/2006 1/9/2006 1/23/2006 CL rel on 09-01
email
31-01-06
LDBs
K.E.P.Z. / Phase II SMY A5636 3000394334 LT Switchgear 1/5/2006 27-01-06* 4/25/2006 * Design inputs recd on 20-01
28-02-06
Layout

02-02-06
LTO
23-01-06
LT Switchgear + Loose ACBs & 06-01-06 06-02-06 Revised indent - 4000A ACB reqd in
Bhanero Textile Mills Ltd. TAM A5637 3000390102 1/20/2006 25-01-06 2/20/2006
accessories 25-01-06 MCC Panel
21-02-06
SP

Rahimbux Group of Cos. - Arain Mills Ltd.


TAM A5638 3000396628 LT Switchgear 1/16/2006 1/24/2006 1/27/2006 3/10/2006 3/14/2006
(PTD SE)

K.E.S.C. (TR-TD/Areva) RJ A5639 3000486629 08x FCP+TCP for 40MVA PT 6/7/2006 7/13/2006 Drgs rel on pre indent / CL rel on 14-07

20-02-06 17-03-06
Siemens Afghanistan / Shindand project TAM A5640 3000394277 LT Switchgear 1/25/2006 2/6/2006 2/15/2006 Revised specs. recd on 07-02
14-03-06 17-04-06
31-01-06 CL rel on 26-01 / Panels position
Sandal Dyestuff Industries Ltd. SMY A5641 3000396759 LT Switchgear 1/20/2006 1/31/2006 1/31/2006 NR
24-02-06 changed on 22-02
27-01-06
NTDC-WAPDA / Sahiwal 500/220/132kV S/S HJ A5642 3000389030 01xDC Auxiliary Services Panel 1/23/2006 2/4/2006 5/30/2006 SB D Details
30-03-06
01x FCP+ACP+TCP for 160MVA
WAPDA / ADP-63 RJ A5643 1/23/2006 1/26/2006
Auto Trafo

06-06-06
S/S P1&P2
Site visit & meeting with Customer on
12-06-06
15-02-06 16-17/03 / CL rel to SB S on 31-03, rev
KCI / Chashma Barrage Colony ( EC ) MHF A5644 3000393133 LT Switchgear 1/24/2006 2/10/2006 4/20/2006 S/S P3&P4,
25-04-06 10-04, rev 25-04 / Meeting with customer
DBs
on 20-04
27-06-06
BTDs

27-02-06 13-03-06
CL rel on 06-02 / MBB rating changed in
M/s Hussain Mills Ltd. MHF A5645 3000403721 LT Switchgear 1/25/2006 2/6/2006 2/6/2006 14-03-06 15-03-06
App
DBs DBs
01 Inner door received, 10 awaited for
NTDC-WAPDA / 500kV Yousuf Wala S/S-Sahiwal MA A5646 3000403443 11x Kiosk Interface Panels 1/25/2006 4/20/2006 front view dwg. Pending from TD,
Bottom Cutouts & Mimic
NTDC-WAPDA / 500kV Rawat S/S Ext. (Lot-1) (T MA A5647 3000403445 03x Kiosk Interface Panels 1/25/2006 SB D Details
23-02-06 20-03-06 BTD layout changed in App drgs recd on
Colony Textile Mills Ltd. TAM A5648 3000409827 LT Switchgear 2/10/2006 2/17/2006 3/20/2006
15-03-06 email 21-03

* Order on-hold due to pending design


04-04-06 24-04-06 inputs, resolved on 27-03 / CL rel after
OGDC / Chanda Gas Field (EC) TAM A5649 3000412163 LT Switchgear 2/13/2006 27-02-06* 5/26/2006
26-04-06 10-05-06 app on 26-05 / Resubmitted as per App
comments / Ammeters added in App

13-04-06
24-02-06
14-02-06 01-03-06 Item 34 * As per Design Plan / CL for add indent
Zahra Textile Mills SMY A5650 3000412832 LT Switchgear * 14-03-06
07-04-06 Lot II 25-04-06 on 12-04
30-03-06
Items 35-37
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

Lot I-68 Panels (bottom cutouts), Lot II-


02-08-06 67 Panels / TD drgs for 54xR&C Panels
NTDC-WAPDA / WOR-11 Lot III (TD) MHF/MA A5651 3000403485 143x Relay & Control + AC + DC Pan 2/13/2006
AC-DC recd on 24-02 / CLs for AC, DC rel on 18-
05 after App, rev CL on 19-07
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

SOP of FPB 2/2.1 missing / CL rel on 09-


Highland Traders (Naval Housing Scheme) MHF A5652 3000412156 LT Switchgear 2/20/2006 3/1/2006 3/2/2006
03 as per SB S go-ahead
MD Siemens Pakistan A5653 Phase CO DB 2/17/2006 NR 2/20/2006
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

NTDC-WAPDA / 500/220/132kV S/S-Sahiwal


MA A5654 3000420275 02x Kiosk Interface Panels 2/22/2006 NR 3/10/2006 Bottom Plate Cutout
(TD)
Maple Leaf Cement MA A5655 3000422849 02x Marshalling Kiosks 2/27/2006 NR Order cancelled on 26-05

15-03-06
01-03-06
email
Hasan Spinning Mills (Pvt.) Ltd. TAM A5656 3000421051 LT Switchgear 2/27/2006 3/6/2006 08-03-06 3/16/2006
24-03-06
Layout
Layout

13-03-06
Al-Karam Textile Mills MHF A5657 3000424575 O/G Feeder Panels 2/28/2006 3/6/2006 3/8/2006 3/17/2006 Alignment with A5618 / CL rel on 06-03
13-04-06
2xLT panels, 7xDBs, 3xMCCs, 06-03-06 10-03-06
CWO / SUPARCO TAM/HJ A5658 3000422017 3/3/2006 4/13/2006 5/17/2006 CL rel on 05-04
6xLockable Mushroom boxes 09-03-06 05-04-06

M/s Independent Newspapers Corp. (Pvt.) Clarifications reqd for some items and
SMY A5659 3000430110 LV Panel, DBs, BTD 3/8/2006 3/24/2006
Ltd. / Jang Building, I. I. Chundigar Road (EC) BTD layout / Order put on-hold on 10-04

Clarifications reqd for LVP and BTD


M/s J & S Enterprises (Pvt.) Ltd. / Jang Press,
SMY A5660 3000430115 LV Panel, 2Nos BTDs 3/8/2006 3/31/2006 layouts L248 / Order put on-hold on 10-
Sultanabad (EC)
04

K. E. S. C. (TR) RJ A5661 3000499948 01xFCP for 22/30MVA PT 3/2/2006 3/14/2006 3/14/2006 Formal indent & S.O. # recd on 29-06

Gadoon Textile Mills Ltd. SMY A5662 3000430530 01xPDB 3/13/2006 3/20/2006 3/21/2006 3/27/2006 CL rel on 21-03
28-04-06 CL rel on 21-03 / Changes, go-ahead on
BU TR / New Trafo Hall MHF A5663 3000420320 01xLT Panel 3/13/2006 3/20/2006 3/21/2006 5/29/2006
26-05-06 08-05 / Resubmitted
Pakistan Oil Fields Ltd. MHF A5664 3000433261 LT Switchgear 3/14/2006 3/30/2006 4/10/2006 4/19/2006 5/24/2006 CL rel on 10-04
22-03-06 CL rel on 21-03 / Analogue meters reqd
Nishat Dyeing, Finishing & Spinning - Unit 29 HJ A5665 3000433319 01x2000A ACB I/C / O/G Panel 3/15/2006 3/21/2006 3/27/2006
email instead of Digital in App

M/s British Deputy High Commission (OLM) SMY A5666 3000433859 01xLT Panel 3/15/2006 3/22/2006 22.03.06 4/3/2006 3/31/2006 CL rel on 24-03

01x0.25kW DOL Starter module 21-04-06 CL rel on 20-03 , revd 24-04 as per App
New Progressive Builders (PARCO) TAM A5667 3000433142 3/20/2006 3/20/2006 3/21/2006 3/21/2006
(KS type - 8PU.011) 08-05-06 comments
M/s. Technical Associates Pakistan (Pvt.) Ltd. / Delayed due to late response to Order
SMY A5668 3000435675 429xService Boxes 3/22/2006 3/28/2006 4/4/2006 7/4/2006
Sukh Chayn Gardens review

Complete scope dispatched, only SS3


24-03-06
Sunlight Wood Industries MHF A5669 3000435774 LT Switchgear 3/29/2006 3/29/2006 5/8/2006 5/15/2006 BTD to be designed after reciept of SS 3
22-05-06
layout from customer

Medipharm (Pvt.) Ltd. HJ A5670 3000437228 500kVAr PFIP - 1800mm High Panel 3/30/2006 4/3/2006 4/7/2006 5/26/2006 CL rel on 07-04

Pak Arab Fertilizers (Pvt.) Ltd. HJ A5671 3000442087 01x1600A ACB I/C / O/G Panel 3/31/2006 4/4/2006 4/4/2006 5/29/2006 5/30/2006 CL rel on 05-04

24-04-06 Scope changed in App, Instead of


AGE (Navy) Mehran MHF A5672 3000446498 09xPFIPs (4x50,1x125,4x175kVAr) 4/7/2006 4/13/2006 5/8/2006 5/19/2006
16-05-06 25kVAr, additional 50kVAr unit reqd

British High Commission HJ A5673 3000450144 FLBS units for 8PU.011 S1-Panels 4/13/2006 4/26/2006 4/26/2006 5/8/2006 5/12/2006 CL rel on 26-04 / SB D Details

Hussain Mills Ltd. HJ A5674 3000449951 LT Switchgear, PFIP & DBs 4/19/2006 NR 5/5/2006 CL rel on 28-04 / Changes in inspection

19xFCPs+19xACPs for 20/26MVA


NTDC-WAPDA RA A5675 3000612276 4/19/2006 4/26/2006 4/28/2006 13.12.06 15.12.06 Formal indent & S.O. # recd on 13-12
PT

Drgs rel based on preliminary info / CLs


26-04-06
Zaver PC Hotel Gwadar (EC) SMY A5676 3000435737 LT Switchgear 4/28/2006 4/21/2006 for bal items rel on 17-05. Additional
26-07-06
indent for 03x DBs received on 26/07/06.

CFO Siemens TAM A5677 IFO-1210 DB for CFO House 4/19/2006 NR 4/21/2006
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

29-05-06
Item 2
Bolan Castings Ltd. HJ A5678 3000457847 LT Switchgear 4/24/2006 5/8/2006 5/12/2006 5/17/2006 CL rel on 04-05 / Changes in App
30-05-06
Items 3-15
12-05-06
Gulshan Spinning Mills TAM A5679 3000456207 LT Switchgear 4/24/2006 5/5/2006 5/8/2006 CL rel on 08-05
email
06-06-06
Deewan Pakland Cement (MES) SMY/TAM A5680 3000459148 LT Switchgear - 8PU.011+8PU.003 4/28/2006 * As per Design Plan
08-06-06
Umar Spinning Mills (Pvt.) Ltd. MHF A5681 3000464309 LT Switchgear 5/4/2006 5/11/2006 5/16/2006 5/30/2006 5/31/2006 CL rel on 09-05
Attock Cement RJ A5682 3000426789 01x400kVAr PFIP 5/9/2006 5/11/2006 5/11/2006 5/23/2006 5/24/2006 CL rel on 11-05
19-05-06
Rauf & Co. HJ A5683 3000467254 LT Panel 5/9/2006 5/15/2006 5/16/2006 5/22/2006 CL rel on 11-05
email
Pakistan Cement (OLM) HJ A5684 3000469372 LT Switchgear 5/16/2006 5/19/2006 5/22/2006 5/24/2006
05-06-06 Resubmitted based on info recd from
PPL (BU OLM) MHF A5685 3000472842 LT Panel 5/18/2006 5/23/2006 6/8/2006 6/19/2006
15-06-06 customer
26-06-06
Areva / KESC (TR) RJ A5686 3000534493 01xACP for 31.5/40MVA PT 5/23/2006 6/2/2006 8/7/2006 8/24/2006 Formal indent & S.O. # recd on 23-08
14-07-06
02xFCPs+02xACPs for 20/26MVA
WAPDA 20/26MVA PT RJ A5687 3000479443 5/25/2006 6/5/2006
PT
Pakistan Navy (PTD-Isb / TR) RJ A5688 3000516029 1xAVR Panel for 4MVA PT 5/26/2006 6/7/2006 7/3/2006 8/7/2006 8/11/2006
Meaple Leaf Cement Factory Ltd. (OLM) MHF A5689 3000476672 2x15KW DOL starters 5/26/2006 6/1/2006 6/9/2006 CL rel on 09-06
CL (on-hold pending App) rel on 20-06 /
13-06-06
M/s Engro Chemicals Pakistan Ltd. MHF A5690 3000481085 6x30kW MCU 5/29/2006 6/8/2006 6/8/2006 6/20/2006 Qty inc from 01 to 06 on 09-06 / Changes
email
in App
M/s Technical Associates Pakistan (Pvt.) Ltd. / 01x630A MCCB+01x2000A ACB
MHF A5691 3000485471 5/30/2006 6/2/2006 6/2/2006 7/17/2006
Abu Dhabi Palace, RYK Panels - 8PU.003

M/s Sapphire Textile Mills Ltd. (Weaving Unit) HJ A5692 3000480079 LT Switchgear 6/1/2006 6/9/2006 6/9/2006 7/5/2006 7/7/2006 CL rel on 09-06

Main indent Main


01xMCC (F1 Design) + ACB trolley Indent:
BHP Billiton / Zamzama Phase-2 Development + spares + Remote Switching 16-06-06 16-06-06 25-08-06
SMY/ MHF A5693 3000483225 6/2/2006
(EC) Panel Add. 20-06-06 Item 01
Add indent: Indent:
03xLT Panels (F1 Design) 19-06-06

NTDC-WAPDA / STG-6-26 (LOT-IV) MA A5694 3000483283 07xRP3+27xRP4 Relay Panels 5/31/2006 NR 6/12/2006
DHA CO-GEN (TD) TAM A5695 3000489033 AC & DC Panels 6/12/2006 6/21/2006 6/30/2006 7/21/2006 CL rel on 13-07
Jang Group Lahore (OLM) MHF A5696 3000488405 01x300kVAr PFIP 6/14/2006 6/20/2006 7/5/2006 7/25/2006
56xRTUs + 88xInterfacing +
KESC (TD) / LDC MA A5697 3000488903 6/15/2006 NR 6/20/2006 6/21/2006 CL rel on 20-06
11xEnergy Meter Panels
Pakistan Railway Carriage Factory SMY A5698 3000494509 03x300kVAR PFIPs 6/21/2006 6/30/2006 7/3/2006 CL rel on 04-07

28-06-06
04xLTOs + Loose ACB supply & LTOs
installtion at site + MCC + LDB-1 + 14-07-06 13-07-06
Faisal Spinning Mills Ltd 2, Power House TAM/MHF A5699 3000499040 6/30/2006 7/6/2006 CL rel on 28-06(LTOs), 05-07(bal)
BTD 6000A + Cable termination BTD MCC, LDB
Panel 18-07-06
BTD

01x2500A ACB Panel to be aligned


Faisal Spinning Mills Ltd, Nooriabad MHF A5700 3000499100 6/29/2006 7/3/2006 7/11/2006 CL rel on 05-07
with existing Siemens Panel

DHA Karachi (TR) / 132kV Creek City Grid


RJ A5701 3000505379 01xFCP + 01xTCP for 40MVA PT 7/5/2006 7/6/2006 7/6/2006
Station
M/s Khalid & Brothers MHF A5702 3000502316 LV DBs 7/4/2006 7/7/2006 7/7/2006 7/12/2006 7/17/2006 CL rel on 17-07
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

02-08-06
Lucky Cement Ltd. SMY A5703 3000503418 01xLT Panel 7/4/2006 * 02days - sub to clarification
28-08-06
Indus Motor Co. Ltd. HJ A5704 3000506779 02xLT Switchgears + 02xBTDs 7/5/2006 7/11/2006 7/24/2006 Changes in App
Green City Housing Scheme SMY A5705 3000447858 148x Service Boxes 7/17/2006 * *01day - sub to clarification
01xFCPs+01xACPs for Fesco,
Fesco, Areva & Nizampur RJ/MAB A5706 3000543142 Areva & Nizampur 20/26 MVA PT 7/18/2006 7/19/2006 7/19/2006 9/10/2006 9/15/2006
respectively.
04xFCPs+04xACPs for 4Nos
Fesco RJ / HJ / MABA5707 3000546366 7/10/2006 7/24/2006 7/24/2006 9/18/2006 9/20/2006
10/13MVA PT

Delta Climate Control Engg. Ltd TAM/HJ A5708 3000517256 01xSML-1+13xLDBs+03xPDBs 7/20/2006 7/25/2006 7/26/2006 8/2/2006 Main Indent with S.O. # recd on 25-07

01xMLT Panel+02x400kVAr CL rel on 28-07 / Drgs to be rel for prod


Dewan Automotive Engg. Ltd HJ A5709 3000516051 7/25/2006 8/1/2006 8/4/2006 8/10/2006
PFIPs+02xBTDs on SB S go-ahead
TR / PT Hall Extension HJ A5710 3000511934 02xGT3 DBs 7/25/2006 8/9/2006 8/8/2006 8/23/2006 24-0/8-06 Specs recd on 07-08
KESC (TD) / KESC-02 TAM A5711 3000517233 03xLVDC + 03xLVAC Panels 7/25/2006 11/13/2006 11/2/2006

PPW SJA/RA A5712 3000516016 01xDC+01xAC Distribution Panels 7/26/2006 8/3/2006 11/27/2006

39xRelay+29xControl+
KESC (TD) / Tender 2480-02 MA A5713 3000483204 07xDUPLEX+04xSynch+06xMet+08 7/26/2006
xIF Panels

01xCOP + Upgradation of the MBB


Indent with clarifications awaited from
BU-EPN TAM A5714 3000523164 from 3200A to 5000A of 3Nos LT 8/2/2006 8/9/2006
SB-Exec
panels.
6xLT boards (MDP-D,L,1,3,4,5), 25-08-06 MDP-D have 70KA MCCBs to be
Baluchistan Wheels Ltd. SMY / TAM A5715 3000514726 8/3/2006 8/8/2006
2xLDBs(1 &2), 4000A BTD Item 02 ordered by 04/08/06
1x LV Board,1x PFIP 400 KVAR, 1x
CL rel on 08-08 / Formal indent duly
Diamond Fabrics Limited. HJ A5716 3000524043 BTD 3200A (7 meters), 2x PDB, 1x 8/2/2006 8/11/2006 8/16/2006 8/22/2006 8/24/2006
signed recd on 07-08
LDB.
NTDC - WAPDA (TD) 220/132kV GIS MA A5717 3000524805 01x Metrosil Box 8/4/2006 NR 8/25/2006
13-11-06
SIAL / NESPAK (EC) /SIAL Package III A-4 TAM A5718 3000517348 LT Switchgear 8/4/2006 11/15/2006 App comments to be clarified
PFIP
18x FCPs + 18x TCPs for
KESC (TR) / Capacity Enhancement RJ / MAB A5719 3000525381 8/7/2006 8/9/2006 8/9/2006 8/25/2006 8/25/2006
31.5/40MVA Power Trafos
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

DB & Components for PT Hall 09-08-06 23-08-06


BU TR HJ A5720 3000525387 8/8/2006 8/9/2006 9/6/2006 Change in App
Extension 24-08-06 05-09-06
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

01xProtection & Metering Panel for


Army Welfare Trust (PWT) / Nizampur Cement SHA A5721 3000482465 5/31/2006
PT
KESC (TR) / Capacity Enhancement MAB A5722 3000565712 01xFCP for 30/37.5 MVA PT 7/25/2006 8/17/2006 10/12/2006 10/12/2006
Pakistan Railways MAB A5723 3000545583 01x TCP for 7.5MVA PT 7/27/2006 8/21/2006 9/14/2006 9/15/2006
DHA CO-GEN (TD) MA A5724 3000528782 03xLCC Panels 8/15/2006 NR
03xLCPs+02xLPPs+01xTCP+
DHA CO-GEN (TD) MA A5725 3000528724 8/15/2006 NR
01xTPP+01xMP+01xBBPP

Pakistan Railways (TS) MA A5726 3000526801 17x Relay Group Housings 8/15/2006 NR Drgs recd from TS released for manuf

2x Independent (standalone) S- 28-08-06 05-09-06


PTD SE - for PARCO HJ A5727 3000529527 8/16/2006 8/24/2006 9/20/2006 CL rel on 28-08
Panels _ 8PU.011 06-09-06 19-09-06
M/s Treet Corporation Ltd. Lahore MHF A5728 3000533274 LT Switchgear 8/23/2006 8/30/2006
Dow University of health and Sciences SMY A5729 3000535559 LT Switchgear 8/23/2006 8/29/2006
KESC (TD) / KESC-02 HJ A5730 3000555449 04x250V DC Panels 8/23/2006 9/29/2006 11/1/2006 11/23/2006 11/23/2006 Cable Glands / Cutouts
Sample Relay Panel-132kV BB
International Media Zone, U.A.E. MR A5731 IFO 1213
Protection, SIVACON 8PT
MEPCO (TD) / Tender No. 20 MA A5732 3000562509 08xRP3 + 07xRP4 Relay Panel 10/4/2006 NR Drgs recd from TD
01xRP + 01xCP + 01xLCC For
Dewan Cement (TD) MA A5733 3000562529 10/13/2006 NR Drgs recd from TD
Trafo.
M. Talib Enterprises / Container Control
MHF A5734 3000574438 01xLT Panel+DBs 10/30/2006 11/10/2006 12/7/2006 App with comments
Program at Port Qasim
Attock Cement Ltd. HJ A5735 3000565413 01x400kVAr PFIP 10/11/2006 11/20/2006 11/21/2006 Same as A5682
DHA (TD)/132kV G/S No. 1, DHA Phase VIII,
MHF A5736 3000581497 01xAC+01xDC Distribution Panel 10/31/2006
Karachi
Impact Design Studio, Islamabad HJ A5737 3000584183 01xLT Panel 11/2/2006 11/3/2006 11/14/2006 11/8/2006
M/s Maple leaf Cement MHF A5738 3000581410 10xDBs 11/3/2006 11/15/2006 11/14/2006

GEPCO (TD)/Wazirababad Road, 132/11kV 01xCP20+01xCP30+02xCP50+02xR


MA A5739 3000584675 11/3/2006 CP/RP Drgs not recd from TD
Cantt. G/S - Gujranwala P3+02xRP4+01xAC/DC Panels

Zafar & Company/SUPARCO SMY A5740 3000587492 01x400kVAr PFIP 11/7/2006 11/22/2006 11/24/2006
LT Switchgear-SIVACON 8PT 28-11-06 30-11-06 05-12-06
27-11-06
Sitara Per Oxide HJ/TAM A5741 3000587675 Withdrawable (MCC+PFIP+ATS 11/8/2006 01-12-06 15-12-06 14-12-06
29-11-06
Panel) 08-12-06 23-12-06 19-12-06

DHA Karachi (TR)/DHA Phase VIII G/S No.1 MAB/RA A5742 01xFCP+01xTCP for 31.5/40MVA PT 11/8/2006 Formal Indent & S.O. # awaited

DHA Karachi (HSS)/DHA Phase VIII G/S No.1 A5743 3000541803 01xRemote Control Panel 11/20/2006

05xRelay Panels + 03xMarshalling


NTDC-WAPDA / WOR-11 Lot III (TD) MR A5744 3000601763 11/27/2006
Kiosks
DEWA PROJECT SMY/MHF A5745 IFO-1213 02xSample 8PT Panels 12/1/2006 NR 12/11/2006

AREVA (TR) / Faisalabad Industrial Estate RA A5746 3000602668 01xFCP+01xACP for 20/26MVA PT 11/27/2006 NA NA NA 12/5/2006 App already recd at offer stage
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

Prime Crete (Pvt.) Ltd MHF A5747 3000607827 02xDBs 12/1/2006 12/6/2006 12/8/2006 12/29/2006
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

Indus Motor Co. Ltd. HJ A5748 3000612090 02x400kVAr PFIPs 12/8/2006 12/13/2006 12/14/2006 12/14/2006
Gulshan Weaving Mills Ltd. TAM A5749 3000618720 Main LT+BTD+DBs 12/20/2006 12/20/2006 12/20/2006 1/3/2007 12/27/2006 App drgs recd on 15-01

QESCO (TR) RA A5750 3000612278 01xFCP+01xACP for 20/26MVA PT 12/13/2006 12/18/2006 12/21/2006 12/21/2006

GEPCO(TR) RA A5751 3000612279 01xFCP+01xACP for 20/26MVA PT 12/13/2006 12/18/2006

Gulistan Textile Mills 4. TAM A5752 3000618711 Main LT+BTD+DBs+PFIP 12/20/2006 12/29/2006 1/11/2007
DHA Karachi (TR)/DHA Phase VIII G/S No.1 RA A5753 3000581497 01xACP for 31.5/40MVA PT 12/21/2006
05xFCPs+05xACPs for 10/13MVA
NTDC-WAPDA(TR)/STG-621 RA A5754 3000626684 1/3/2007
PT
Century Paper Mills HJ A5755 LT Switchgear Indent & S.O. # awaited
BU SS / Siemens Pakistan HO Building, Block
MHF A5756 3000523164 03xDBs 1/9/2007 1/10/2007
'D'
Gadoon Textile Mills Ltd. A5757 3000640923 01xMCC - 8HKO 1/24/2007 1/31/2007

TOTAL LV HOURS ###


S. Customer DE E&D S.B.No. Description Start

MV Switchgears
1 Umar Spinning Mills (Pvt.) Ltd. KR A0551 3000332848 01xWIP+01xI/C&O/G SA2 Panel 9/12/2005

11kV Switchgear - 01xWIP +


2 FFC MYS/RA A0519 3000288778 7/4/2005
08xSA2 + Loose Components

3 FFC SJA/RA A0552 3000347560 01xI/C+03xO/G 9/16/2005

62x4-Way+29x3-Way RMUs +
4 Punjab Industrial Estate KR A0554 T-010 9/21/2005
01xWIP + 01xWCP

01xI/C+04xO/G+2xB/C WAPDA
5 Sitara Chemical Industries RA A0560 3000346424 10/12/2005
Grid Panels

LV Switchgears

1 ESS ESS Associates (EC) SMY A5505 3000188690 LT Switchgear 18-11-04

2 Bhanero Textile Mills Ltd. HJ/KZ A5555 3000257527 LT Switchgear, DBs 4/28/2005

112x Service boxes as per


3 Glamour Developers (Pvt.) Ltd. SMY / HJ A5563 3000240107 6/8/2005
WAPDA specs. P92:75

4 Khadim Husain Slatch & Co. TAM A5564 3000284242 250kVA Changeover Panel 6/20/2005

5 Pak & Jinnah Park Projects TAM A5565 3000284763/8 LT Power Panel No.1 & No.2 14-06-05-
21-06-05
6 Glaxo Smith Kline TAM/KZ A5568 3000288055 LT Switchgear
29-09-05

7 PAEC / NMC-1 MHF A5583 3000309035 LT Switchgear 7/28/2005

8 Maple Leaf Cement RJ A5589 3000318704 01xFCP+01xACP for 20/26MVA PT 8/17/2005

9 Olympia Chemicals Ltd. SMY A5591 3000316684 LT Switchgear 8/17/2005

10 Naveena Exports (Pvt.) Ltd. - W SMY A5601 3000331514 LT Switchgear 9/8/2005

11 Maple Leaf Cement MA A5605 3000339739 02xRP4+02xCP50 + 02xAC/DC Pan 9/23/2005

12 U. S. Embassy, Islamabad MHF A5607 3000346832 01xLT Panel 10/10/2005

13 U. S. Embassy, Islamabad MHF A5608 3000346848 01xLT Panel + 01xDB 10/10/2005


ForApp. ForApp.
By ON Projected
App. Rec. For Prod. Remarks Hours
Planned

9/16/2005 9/16/2005 App awaited

Customer comments recd on 22-08


clarified on 22-08, Go-ahead for release
in prod / Schematics for changes in
29-07-05
existing panel reqd / 01xO/G to be
12-08-05
7/20/2005 9/1/2005 9/1/2005 aligned with 6.3kV switchgear, S. O. No.
02-09-05
3-347560 - A0552 with new CT ratio /
Schematics
Relay changed to CDG61 from P124 yet
to be confirmed/Informal Meeting @ SB
with customer dt. 2.11.05

9/21/2005 9/23/2005 App awaited

Qty of RMUs revised by EC on 24-09 /


23-09-05 App comments to be clarified for
9/27/2005 10/28/2005
02-11-05 RMUs / WCP to be clarified/Reamining
scope released on 2.11.05

SLD/FV/Assembly/FP submitted to TD
10/14/2005 10/19/2005
on 14-10

03-01-05
CL rel on 28-12 / Clar on Trafo dim drg
Layouts
08-03-05 reqd / Meeting with EC on 23-05 / Resub
12/6/2004 10-01-05 3/3/2005
10-08-05 with changes dtd 24-05 / Go-ahead from
26-05-05
SB PL Ex on 08-08

12-05-05 PDBs,
12-05-05
06-05-05 PDBs, Items 06-18, CL LT on 18-05 /
LDBs & MLDB
5/13/2005 LDBs & MLDB
25-05-05
31-05-05 Item 01-02 MCC & LCBs on hold
LT, PFIP, MCC on 030605

03-08-05
6/10/2005 15-08-05 9/15/2005 9/7/2005 Order put On-Hold on 04-10
31-08-05
Control scheme same as Gadoon order
6/21/2005 6/24/2005
A5545 / App awaited

CL rel on 20-06 / Resubmitted / App


17-06-05 comments incorporated / Change of
6/17/2005 9/28/2005 10/7/2005
01-09-05 Cable entries on 12-10, confirmation
reqd for Gen panel / SB D Details
15-07-05
CHF LV
18-07-05
CHF DBs
01-09-05 Meeting with Consultants & EC on 30-06
PB DBs 03-08- 10-08-
/ CL for CHF on 10-08(DBs) & 11-08(LT) /
12-09-05 05CHF 05DBs
7/8/2005 Changes in App / Add indent for 01xLV
Item 1 PB 11-10-05 12-10-05
Panel 8PU.011 Fixed design alignment
20-09-05 Add indent Add indent
with existing board / SB D Details
Items 04-05PB
04-10-05
Items 06-09PB
03-10-05
Add indent

10-08-05
26-09-05 CL rel on 11-08 / Changes in App /
8/10/2005 9/13/2005
27-09-05 Resubmitted, App awaited
Layout
23-08-05 Resubmitted as per comments/changes
8/19/2005 9/7/2005
13-09-05 / App awaited

15-09-05 CL rel on 07-09 / Comments in App /


02-09-05 Item 3, 4 Partial mtg plates pending / SB D
Items 1,3,5 16-09-05 Details for O/D Feeder Pillars & BTD /
9/1/2005 06-09-05 13-09-05email
LT+PFIP+Layout
Items 2, 6 Feeder Pillars Put-on-Hold by SB Lhr
07-09-05 24-10-05 vide email 22-09 / LCBs reqd in local
LCBs design vide email dtd 19-10

05-10-05 CLs rel on 21-09 (PDBs), 27-09 (bal) /


21-09-05 04-10-05 PDBs PDB 10 put On-Hold 04-10 / PDBs 7&8
PDBs PDBs 26-10-05 also put On-Hold 06-10 / LT, PDB 10,
9/19/2005
04-10-05 24-10-05 PFIP/LDBs Compressor Panel, Layout revised &
LT LT 27-10-05 PDB 8 deleted in App /
LTO/MCC SB D Details

10/5/2005 10/11/2005 App awaited

10/17/2005 10/18/2005 SL/Clar recd on 17-10 / App awaited

10/17/2005 10/18/2005 SL/Clar recd on 17-10 / App awaited


Changes/
Total 10/04 Oct. Nov Dec Jan Feb Mar Apr
Additions

0
Work in
May Jun Jul Aug Sep Total Balance
Hand Status GP

90 -90

36 33 21 Running

MV

You might also like