Minimum Wages Calculation For Operation Contract of West Block AC Plant
Minimum Wages Calculation For Operation Contract of West Block AC Plant
Minimum Wages Calculation For Operation Contract of West Block AC Plant
Staff Minimum wages Calculation Manpower Requirement as per contract Monthly Wage
Technesian Technesian (2 Persons Per shift) 7 ₹ 13,246.28
Baisc Pay + DA ₹ 10,732.00 Supervisor (General Shift Only) 1 ₹ 16,000.00
PF ₹ 1,287.84
ESI ₹ 509.77 Wage Cost per month
Sub Total ₹ 12,529.61 Technesian 13246.3 X 7 ₹ 92,723.94
Bonous (7000/12) 583.3 Supervisor ₹ 16,000.00
Holiday Wages (400*4/12) 133.3 Total ₹ 108,723.94
Total ₹ 13,246.28
Total Wage Cost Per Month without Operator Profit ₹ 108,723.94 Amount Quoted by L1
10% Opertor Margin ₹ 10,872.39
Total Per Month ₹ 119,596.33 ₹ 109,791.67
For One Year ₹ 1,435,155.96 ₹ 1,317,500.04
For Two Years ₹ 2,870,311.93 ₹ 2,635,000.08
Minimum Wages Calculation for Operation Contract of west Block AC Plant
Staff Minimum wages Calculation Manpower Requirement as per contract Monthly Wage
Technesian Technesian (2 Persons Per shift) 6 ₹ 13,001.10
Baisc Pay + DA ₹ 10,522.00 Supervisor (General Shift Only) 1 ₹ 15,000.00
PF ₹ 1,262.64
ESI ₹ 499.80 Wage Cost per month
Sub Total ₹ 12,284.44 Technesian 13246.3 X 6 ₹ 78,006.61
Bonous (7000/12) 583.3 Supervisor ₹ 15,000.00
Holiday Wages (400*4/12) 133.3 Total ₹ 93,006.61
Total ₹ 13,001.10