Marketing Plan VCSHVW
Marketing Plan VCSHVW
Marketing Plan VCSHVW
Introduction
Thirst Aid water refilling station is a licensed and standard water refill station selling for
profit either wholesale or retail of water placed in refillable water containers or in customer’s
containers. The company plans to establish a standard water refill station in Balingoan and in the
nearby municipalities throughout Misamis Oriental that will become the number one choice for
households and offices.
Thirst Aid aims to build a standard and excellent water refill station that in our own
capacity will favourably compete in the market. We want to build a water refill station business
that will be listed amongst the top water refill station brands in Misamis Oriental.
The Company
Thirst Aid is located in front Balingoan Integrated Bus Terminal. It is going to supply
treated water to household and offices.
The company intends to hire 2 full time water refilling attendants to handle customer
service and day to day operations.
Sales
10%
15%
Households
50%
Offices
25% Stores
Other
2. Observation Results
Competitor Analysis
D. Sales Projection
2. Price
3. Place
4. Promotion
MONTH Marketing Strategies Description
JUNE Bottoms up (free Drinks) The company will provide free drinks for
the first week of operation. Only 1 drinks
per purchase. No refill. Promo runs three
days.
JULY Nutri Week Treat The company will have a mascot named as
“Veggie Mon” , and have a chance to take a
photo with the company’s standee (mini
man size vegetable figure)
AUGUST Tongue Twister Roulette The company will celebrate in the “Buwan
ng Wika”. A willing customer can
participate in the roulette game and recite
the tongue twister correctly, 1 trial only.
Winner will receive the company’s
customized ballpen.
SEPTEMBER Loyalty Card The company will give stamp cards, that 10
stamps are needed to be completed by the
customer. Stamp is given every purchase,
only 1 stamp per day is allowed, and valid
until 12 days only.
OCTOBER Suggestion Box This will help the company to address our
customer’s concern.
NOVEMBER Halloween design for the In the Halloween, the company will
mobile decorate, and give a scary feeling in our
mobile.
DECEMBER Christmas design for the The company will put Christmas decors in
mobile. the mobile in accordance to the season.
FEBRUARY Guess the Missing Word The company will provide an exciting treat
Activity activity by guessing the missing word in a
famous love quotes or lines. The customer
will pick the word in the fish bowl lottery.
(ex. I LOVE ________. Ans. YOU. The
winner will receive a delicious chocolate.
PRODUCTION PLAN
A. Operation Process
1. The water first passes Plastics Cups Big Blue Filter Front 45
through the 1st stage Floucon (Coarse Sediment Liner minutes
which makes up a Cups Seal Filtration)
course gravel that traps Cups Triple-O Delivery
slid particles of about Nipple Ozonation System Man
Dishwashing (Disinfection &
100 micron
soap Filtration)
2. Consist of sand filters Brush 20” Big Blue
that removes sediment Containers Series ( Sediment
of 50 micron ratings Caustic Soda Filtration)
3. A water softener is used Multi-Pure System
4. Demineralisation – SCB
removes unwanted Technology
minerals (through Ozonation
reverse osmosis or Taste and Odor
distillation). Polish Filter
5. Water received in Ultraviolet
storage tanks is Disinfecting Unit
monitored on a daily
basis.
6. Selected minerals are
added to cater to
consumer taste
preferences.
7. Pharmaceutical grade
micro-filtration
removes particles as
small as 0.2 microns. It
is also capable of
removing potential
microbiological
contaminants. This is
monitored on an hourly
basis.
8. Ultra-violet filtration
provides additional
product disinfection.
This is monitored on an
hourly basis.
9. Ozone disinfection is
the third disinfection
step (steps 7-9), using a
highly reactive form of
oxygen. This is
monitored on an hourly
basis.
10. The filling room is
highly sanitary to
ensure bottling is
conducted in a
microbiologically
controlled environment.
It is continuously
monitored and
controlled.
11. Packaging quality
assurance is conducted
by human inspection
and the latest in modern
equipment designed to
ensure the removal of
any packaging defects.
12. Line sanitation includes
automated cleaning
equipment to ensure
maximum cleanliness,
effectiveness and
control
B. Production Schedule
C. Labor Requirement
Big Blue Coarse Sediment Pentair Pentek Big Blue and Big Black
Filter Filtration Heavy Duty Filter (
- Large capacity
filtration,
including high-
flow and heavy
sediment
applications
Supplies
Brush
Empty
Bottles 6
Gallons
Caustic
Soda
D. Raw Materials Requirement
attached from our mobile. These will help customers to properly segregate their
trash without going too far. The person in-charge or on-duty will check time to
c. Washing and sanitizing of tools and equipment before and after use.
d. Food materials and ingredients shall be stored, handled transported and kept
unwholesomeness.
Machinery / Equipment
Knives, Chopping Boards, Spatula, Measuring cups and Measuring Spoons should
be sanitized.
Vegetables and meats should be washed by flowing water before peeling and
chopping.
The cook and the assistants (peeler/chopper) must observe proper dress code use of
disposal system.
mobile store.
Left ingredient and seasoning must be stored properly away from contamination
G. Production Cost
1. Total Production Cost per Year
Pakbet Ilokano
18 25 22.5 24 9 21 15 22 23
Direct Materials 16.12 4,351.32 8,058.00 7,252.20 7,735.68 2,900.88 6,768.72 4,834.80 7,091.04 7,413.36
Direct Labor 1.50 405.00 750.00 675.00 720.00 270.00 630.00 450.00 660.00 690.00
Manufacturing
Overhead 1.00 270.00 500.00 450.00 480.00 180.00 420.00 300.00 440.00 460.00
Total Cost of
Goods
Manufactured 5,026.32 9,308.00 8,377.20 8,935.68 3,350.88 7,818.72 5,584.80 8,191.04 8,563.36 65,156.00
Pakbet Ilokano
Direct Materials Ml/grams/pieces Price Ml/grams/pieces Used Per Price per unit
Unit
Rice 5 kg 175 100g 3.50
Okra 500 g 14 25g 0.70
Egg Plant 500 g 19 25g 0.95
Bitter Melon 500 g 25 25g 1.25
Pork Belly 1 kg 190 10g 1.90
Chicharon 75 g 20 1g 0.27
Bagoong 150.95 g 12 ½ tbs 0.04
Onion 100 g 7 5g 0.35
Tomato 250 g 9.50 5g 0.19
Garlic 100g 8.00 5g 0.40
Straw 250g 7 25g 0.70
Ginger 100g 8.00 5g 0.40
Oil 250g 14 1 tbs 0.06
Oyster Sauce 30g 5 1 tbs 0.17
Magic Sarap 96g 32.20 1g 0.34
Water 1 liter 15 100 ml 1.50
Kalabasa 1000g 15 30g 0.45
Cup 12 pcs 30 1 pc 2.50
Spork 1 PK 16 1 PC O.45
Total Direct
Materials 16.12
Direct Labor
Cook 0.50 0.50
Peeler 0.50 0.50
Chopper 0.50 0.50
Total Direct Labor
1.50
Overhead
Gasul 11 kg 900 1.00
TOTAL
OVERHEAD 1.00
Total Production
Cost Per UNIT 18.62
MARK-UP 55.75%
10.38
SELLING PRICE
PER UNIT 29.00
FINANCIAL PLAN
A. Total Project Cost
Pre-operating Expenses
Permit and Licenses Php 1,000.00
Equipment Php 3,995.00
Tools and Supplies Php 339.00 Php
5,334.00
_____________________
TOTAL PROJECT COST
Php204,061.17
B. Sources of Financing
Initial capital of Php 35,000. 00
D. Profitability Indices
1. ROI
JUNE JULY AUGUST
2. Break-even Point