Analysis of Rates For Water Supply and Sanitation
Analysis of Rates For Water Supply and Sanitation
Analysis of Rates For Water Supply and Sanitation
MINISTRY OF CONSTRUCTION
PUBLIC WORKS
ANALYSIS OF RATES
FOR
CONTENTS Page
I. INTERNAL INSTALLATION
(A) SANITARY APPLIANCES 1- 12
(B) SOIL AND SULLAGE 12- 22
(C) G.1 PIPE & FITTINGS, VALVES, COCKS, SHOWERS, HYDRANTS 23 - 34
(D) INTERNAL P.V.C RIGID WATER PIPE (Threaded & Coupling) 35 - 37
(E) INTERNAL P.V.C RIGID WATER PIPE (Solvent Joint) 37 - 40
(i i i) C.1 Reducer
(ill) C.1 Increasers
(\,) C.1 Loose Collar
CONTENTS Page
I. INTERNAL INSTALLATION
(A) SANITARY APPLIANCES.
1 Supplying and fixing white glazed 1.W.C Pan with
white glazed trap and foot tread (or) white glazed
1.W.C Pan with white glazed trap and squatting
plate, 10 litre flush cistern, bracket chain pulls, 15 mm
lead connector, flush pipe and all masonry work
complete.
( For one set )
Materials.
(I) 1.W.C pan with trap and one pair of foot Set. 1
tread (or)
1.W.C pan with trap and squatting plate.
(2) 10 litre flush cistern ( Foreign ) complete Set. 1
with C.1 brackets. (or)
Flush cistern ( local ) complete with flat iron
brackets.
(3) 15 mm lead Pipe (or) 15 mm Plastic Pipe m 0.5
(4) 15 mm brass coupling. each 1
(5) 20 mm brass coupling. each 1
(6) 40 mm brass coupling. each 1
(7) Flush pipe m 2.8
32 mm 0 lead pipe. (or)
40 mm 0 G.1 pipe. (or)
32 mm 0 P.V.C pipe water pipe
(8) Ready mixed tinman solder. kg 0.2
(9) Putty. kg 0.4
(10)40 mm x No. 8 wood Screws. each 6
(1 1) 20 mm Wood Screws. each 2
(12) 15 mm 0 G.1 Pipe. If over flow pipe is m 0.5
(13) 15 mm 0 G.1 Elbow necessray for flush each 1
(14) 15 mm 0 G.1 Jamnut cistern. each 2
(15) Brick each 100
(16) Sand cum 0.5
(17) Cement kg 46
(18) Shingle cum 0.1
(19) Sundries L.S
(20) Transport and handling charges L.S
Labour
(1) Plumber Man-Day 2
(2) Mason Man-Day 1
(3) Labour Man-Day 2
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Materials
(1) E.W.C pan with "P" (or) "S" outgo each 1
(2) 10 litre flush cistern (foreign) with brackets each 1
(or) local flush tank with flat iron brackets.
(3) 15 mm lead pipe. m 0.5
(4) 15 mm brass coupling. each 1
(5) 15 mm brass coupling. each 1
(6) 40 mm brass coupling. each 1
(7) Flush pipe.
32 mm 0 lead pipe (or)
40 mm 0 G.1 pipe (or) m 2.8
32 mm 0 P.V.C water pipe
(8) Ready mixed tinman solder. kg 0.2
(9) Putty kg 0.4
(10) 40 mm x No.8 wood screws. each 6
(11) 20 mm wood screws each 2
(12) 15 mm G.1 pipe. It overflow pipe is m 0.5
(13) 15 mm G.1 elbow. Necessary for flush each 1
(14) 15 mm Jamnut. Cistern. each 2
(15) 65 mm wood screws. each 4
16) E.W.C seat & cover Set. 1
(17) Sundries L.S -
(18) Transport & handling charges L.S
Labour
(I) Plumber. Man-Day 2
(2) Labour. Man-Day 1.5
Materials
(1) E.W.C pan with 'P' or 'St outgo. each 1
(2) 12 litre low level flush cistern with flush Set. 1
bend and brackets complete.
-
ir.
PARTICULARS Unit
in.
-
No.3 Item Cont:
(3) E.W.C Seat plastic (or) Bakelite seat with cover Set
(or) Wooden seat with cover
(4) 15 mm lead pipe (or) 15 mm plastic pipe m
(5) 15 mm brass coupling. each
(6) 20 mm brass coupling. each
(7) Ready mixed tinman solder kg
(8) 65 mm wood screws each
(9) Antisyphon connector 40 mm lead pipe (or) m
32 mm P.V.C water pipe
(10) Sundries
[11) Transport & handling charges.
Labour
:I) Plumber
:2) Labour
Materials
:1) Lavatory basin 550mm x400mm(or)625mmx450mm Set.
with 32 mm waste fitting, waste plug, chain & stay
15 mm N.P pillar tap (1) No & (1) pair of C.1
brackets.
:2) Waste pipe 32 mm G.1 pipe (or)
32 mm P.V.C rigid water pipe
(or) 32 mm lead pipe
(3) 12 mm lead pipe(or) Plastic pipe
(4) 32 mm brass coupling each
(5) 20 mm brass coupling each
(6) 15 mm brass coupling each
(7) Ready mixed tinman solder. kg
(8) 40 mm x No.8 wood screws each
(9) 20 mm wood screws each
(10) Putty kg
(11) Sundries L.S
(12) Transport and handling charges L.S
Labour
(1) Plumber
(2) Labour
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Materials
(1) M.0 basin 600mmx500mm with waste fittings,waste Set. 1
plug, chain & stay mixing valve & C.1 brackets.
(2) Waste pipe. 32 mm lead pipe (or) m 0.9
32 mm P.V.C water pipe 1
(3) 15 mm lead pipe. m 0.9
(4) 32 mm brass coupling. each 1
(5) 20 mm brass coupling. each 2
(6) 15 mm brass coupling. each 2
(7) Ready mixed tinman solder kg 0.2
(8) 40 mm x No.8 wood screws each 6
(9) 20 mm wood screws each 2
(10) Putty kg 0.2
(1 1) Sundries L.S
(12) Transport and handling charges. L.S
Labour
(1) Plumber Man-Day 2
(2) Labour Man-Day 1.5
Materials
(1) Lavatory basin 550mmx400mm( local ) each 1
(2) 32 mm waste fittings ( foreign ) each 1
(3) 32 mm waste plug , chain & stay. each 1
(4) 15 mm N.P pillar tap each 1
(5) 25mmx25mmx3mmangle iron(Brackets 2 Nos x4.92m) m 0.9
32 mm lead pipe (or) m 0.9
(6) Waste pipe
32 mm P.V.C water pipe 1
(7) 15 mm lead pipe m 0.5
(8) 32 mm brass coupling. each 1
(9) 20 mm brass coupling. each 1
- -
Sr.
PARTICULARS Unit Quantity Remarks.
No.
No.6 Item Cont:
(10) 312 mm Brass coupling. each 1
(1 1) Ready mixed tinnam solder 3 x 0.054 kg = 0.16 kg 0.2
(12) 40 mm x No.8 wood screws each 6
(13) 20 mm wood screws. each 2
(14) Putty kg 0.2
(15) Sundries L.S
(16) Transport and handling charges L.S
Labour
(1) Plumber Man-Day 2
(2) Labour Man-Day 1.5
Materials
(1) White glazed sink 600mmx450mmx250mm (or) Set 1
600mmx450mmx400mm with 40 mm waste fittings,
waste plug, chain & stay and C.1 brackets.
(2) 40 mm brass coupling. each 1
(3) Waste pipe 40 mm lead pipe (or) m 0.8
40 mm P.V.C water pipe 1
(4) Ready mixed tinman solder ( for lead waste pipe kg 0.1
only
(5) 20 mm wood screws. each 2
(6) Sundries L.S
(7) Transport & handling charges L.S
Labour
(1) Plumber Man-Day 2
(2) Labour Man-Day 1
I
150 mm x 40mm x 3.05 m = 0.018
50 mm x 25mm x 1.22 m = 0.002 cum 0.1
75 mm x 12mm x 2.44 m = 0.002
= 0.022
Sr.
PARTICULARS Unit Quantity Remarks.
No.
No.8 Item Cont:
(2) 25mrnx25mmx3mm angle iron ( Bracket ) m 1.3
(3) Sundries L.S
Labour
(1) Plumber Man-Day 0.5
(2) Carpenter Man-Day 2
Materials
(I) Wall urinal each 1
(2) Waste pipe 32 mm 0 lead pipe (or) m 0.8
32 mm 0 P.V.C water pipe
(3) 15 mm brass coupling each 1
(4) 15 mm lead pipe m 0.2
(5) Ready mixed tinman solder. kg 0.1
(6) 40 mm x No.8 wood screws each 4
(7) 20 mm wood screws each 2
(8) Sundries L.S
(9) Transport and handling charges L.S
Labour
(1) Plumber Man-Day 2
(2) Labour Man-Day 1
Materials
(1) One gallon automatic flush cistern. each 1
(2) 15 mm lead pipe. For cistern with m 0.5
(3) 15 mm brass coupling pet cock only, each 1
(4) 20 mm brass coupling not necessary each 1
(5) Ready mixed tinman solder. for drip tep. kg 0.2
(6) Flush pipe 25 mm G.1 pipe (or) m 0.9
25 mm P.V.C water pipe.
(7) 40 mm x No.8 wood screws each 6
(8) 25 mm socket each 1
(9) 25 mm Jamnut each 1
(10) 25 mm x 15 mm reducing socket each 1
(11) 15 mm Nipple each 1
Sr.
PARTICULARS Unit Quantity Remarks.
No.
No.9 Item Cont:
(12) 25 mm projection clamp each 1
(13) Sundries L.S -
(14) Transport and handling charges L.S -
Labour
(1) Plumber Man-Day 2
Materials
(1) Automatic flush cistern One (or) Two gallon each 1
(2) 15 mm lead pipe for cistern wl-pet m 0.5
(3) 15 mm brass coupling cock only, not each 1
(4) 20 mm brass coupling necessary for drip tap. each 1
(5) Ready mixed tinman solder kg 0.2
(6) 40 mm x No.8 wood screw No. 6
(7) 25 mm G.1 Pipe m 0.9
(8) 20 mm G.1 pipe. m 1.3
(9) 25 mm socket. each 1
(10) 25 mm Jamnut each 1
(11) 25 mm G.1 tee each 1
(12) 25 mm x 20 mm G.1 bushing each 2
(13) 20 mm x 15 mm G.1 elbow. each 2
(14) 15 mm G.1 nipple each 2
(15) 25 mm projection clamp. each 1
(16) 20 mm projection clamp. each 2
(17) Sundries L.S
(18) Transport & handling charges L.S
Labour
(1) Plumber Man-Day 2.5
Materials
(1) Automatic flush cistern One (or) Two gallons. each 1
(2) 15 mm lead pipe For cistern wl-pet m 0.5
(3) 15 mm brass coupling cock only, not each 1
(4) 20 mm brass coupling necessary for drip tap. each 1
(5) Ready mixed tinman solder kg 0.2
Sr.
PARTICULARS Unit Quantity Remarks.
No.
No.12 Item Cont:
( 6 ) 40 mm x No.8 wood screw each 6
( 7 ) 25 mm G.1 Pipe m 0.9
( 8 ) 20 mm G.1 pipe. m 1.9
( 9 ) 25 mm G.1 socket. each 1
(10) 25 mm G.1 Jamnut each 1
(11) 25 mm G.1 tee each 1
(12) 25 mm x 20 mm G.1 bushing each 2
(13) 20 mm x 15 mm G.1 tee. each 1
(14) 20 mm x 15 mm G.1 elbow. each 2
(15) 15 mm G.1 nipple each 3
(16) 25 mm projection clamp. each 1
(17) 20 mm projection clamp. each 3
(18) Sundries L.S
(19) Transport & handling charges L.S
Labour
(1) Plumber Man-Day 2.5
(2) Labour Man-Day 2
Materials
(1)Single stall urinal 450mm to 600mm wide with automatic Set. 1
flush cistern, flush pipe, dome grating and waste
fittings complete.
(2) 15 mm lead pipe. For cistern w/- pet m 0.5
(3) 15 mm brass coupling cock only not necessary each 1
(4) 20 mm brass coupling for drip tap. each 1
(5) Ready mixed tinman solder. kg 0.2
(6) 100 mm C.1 trap wl- 100 mm C.1 short pipe. each 1
(7) 40 mm x No.8 wood screws each 6
(8) Sundries L.S
(9) Transport & handling charges. L.S
Labour
(1) Plumber Man-Day 3
(2) Labour Man-Day 2
Labour
(1) Plumber Man-Day 2
Materials
(1) C.1 plunge bath (enamel coated) approx: size
19.69m x700mmx475mm supply fittings, waste fitt-
ings & overflow fittings(with or without panel) Set. 1
(2) 20 mm lead pipe m 0.9
(3) 40 mm lead pipe m 0.6
(4) 20 mm brass coupling each 4
(5) Ready mixed tinman solder kg 0.3
(6) Sundries L.S. -
(7) Transport & handling charges L.S.
Labour
(1) Plumber Man-Day 2
(2) Labour Man-Day 3
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Materials
(1) Stainless steel sink w/- double drainer 1350mmx450mm
with 40 mm waste fittings, waste plug, chain & stay Set. 1
(2) waste pipe
40 mm lead pipe ( or )
40 mm P.V.C water pipe
I m 0.9
Labour
(1) Plumber Man-Day 2
(2) Labour Man-Day 1
Material
(1) Laboratory sink 400mmx275mmx150mm fixed to wall type Set. 1
(2) 40 mm x No.8 Wood screws. each 4
(3) Waste pipe 40 mm lead pipe
(or) m 0.8
40 mm P.V.C Water pipe
(4) 20 mm Wood screw each 2
(5) Sundries L.S
(6) Transport & handling charges L.S
Labour
(1) Plumber Man-Day 2
(2) Labour Man-Day 0.5
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Materials
(1) White glazed 400mmx275mmx150rnm Laboratory sink Set. 1
(2) 32 mm acid proof waste fittings each 1
(3) Waste pipe 32 mm lead pipe (or)
32 mm P.V.C Water pipe
1 m 0.9
Labour.
1) Plumber Man-Day 2
2) Labour Man-Day 0.5
Materials
(1) 15 mm Swanneck tap each 1
(2) 15 mm lead pipe m 0.5
(3) 15 mm brass coupling each 1
(4) 20 mm brass coupling each 1
(5) Ready mixed tinman solder kg 0.2
Labour
(1) Plumber Man-Day 0.5
Materials
(1) Bed pan sink 600mmx500mm w/- loose "P" outlet
enamelled brackets urinal & bed pan jets with lever
handle taps,13.64 litre flush tank w/- brackets, flush
gipe & rod pull complete. Set. 1
Sr.
PARTICULARS Unit Quantity Remarks.
No.
No.20 Item Cont:
(2) 15 mm lead pipe 75mm x0.46m m 1.4
(3) 15 mm brass coupling each 3
(4) 20 mm brass coupling each 3
(5) Putty kg 0.4
(6) Sundries L.S
(7) Transport & rod pull complete. L.S -
Labour
(I) Plumber Man-Day 2
(2) Labour Man-Day 2
Materials
(1) 100 mm spike kg 0.7
(2) 20 mm 0 G.I. Pipe (Bobbins) m 0.6
(3) Jointing materials P.C.4 compound ( or ) kg 1.8
Lead wool kg 5.7
(4) Jute waste kg 0.9
(5) Bamboo each 15
(6) Coir yarn kg 1.8
(7) Sundries ( cement, sand, wood plug ) L.S -
(8) Transport and gandling charges L.S
Labour
1) Plumber Man-Day 3
2) Labour Man-Day 3
Materials
(1) 100 mm Spikes kg 0.7
(2) 15 mm G.1 pipe ( Bobbins ) m 0.6
(3) Jointing materials ( Pig lead ) kg 6.8
(4) Jute waste kg 0.9
(5) Bamboo each 15
(6) Coir yarn kg 1.8
(7) Sundries ( Cement, Sand, Fuel, Woodplug ) L.S
(8) Transport & handling charges L.S -
Labour
(1) Plumber Man-Day 4
(2) Labour Man-Day 4
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Materials.
(1) Flat iron clamp 40 mm x 6mm ( Saddle 3.05m ) kg 5.7
( Two joints per clamp )
(2) 50 mm x No.8 Wood screw. each 10
(3) Jointing material P.C.4 compound kg 1.8
(or) Lead wool kg 5.7
(4) Jute waste kg 0.9
(5) Bamboo each 15
(6) Coir yarn kg 1.8
(7) Sandries ( Cement, Sand, Wood Plugs ) L.S
(8) Transport & handling charges L.S
Labour.
(1) Plumber. Man-Day 3
(2) Labour. Man-Day 3
Materials.
(1) Flat iron clamp 40 mm x 6mm ( Saddle ) kg 5.7
(2) 50 mm x No.8 Wood screw. each 10
(3) Jointing material ( Pig lead ) kg 6.8
(4) Jute waste kg . 0.9
(5) Bamboo each 15
(6) Coir yarn kg 1.8
(7) Sandries ( Cement, Sand, Fule, Wood Plugs ) L.S
(8) Transport & handling charges L.S
Labour.
(1) Plumber. Man-Day 4
(2) Labour. Man-Day 4
Labour.
(1) Plumber. Man-Day 2.5
(2) Labour. Man-Day 2.5
Materials
(I) 100 mm Spikes kg 0.7
(2) 15 mm 0 G.1 pipe ( Bobbins ) m 0.6
(3) Jointing materials Pig lead kg 6.4
(4) Jute waste kg 0.7
(5) Bamboo each 15
(6) Coin yarn kg 1.8
(7) Sundries ( Cement, Sand, Wood plug & Fule ) L.S
(8) Transport & handling charges. L.S
Labour.
(1) Plumber. Man-Day 3
(2) Labour. Man-Day 2
Materials.
(1) Flat iron clamp 40 mm x 6 mm ( Saddle ) kg 5
(Two Joints per clamp )
(2) 50 mm x No.8 Wood screws each 10
(3) Jointing materials P.C.4 compound kg 1.4
( or ) Lead wool. kg 4.5
Sr. Unit Quantity Remarks.
PARTICULARS
No.
No.7 Item Cont:
(4) Jute waste kg 0.7
(5) Bamboo
(6) Coir yarn kg 1.8
(7) Sundries ( Cement, Sand, and Wood plug ) L.S
(8) Transport & handling charges. L.S -
Labour.
(1) Plumber. Man-Day 2.5
(2) Labour. Man-Day 2.5
Materials
(I) Flat iron clamp 40 mm x 6 mm ( Saddle ) kg 5
( Two Joints per clamp )
(2) 50 mm x No.8 Wood screws each 10
(3) Jointing materials Pig lead kg 6.4
(4) Jute waste kg 0.7
(5) Bamboo each 15
(6) Coir yarn kg 1.8
(7) Sundries (Cement, Sand,Wood plug and Fuel ) L.S
(8) Transport & handling charges. L.S
Labour.
(1) Plumber. Man-Day 3
(2) Labour. Man-Day 2
Materials
(1) 100 mm spikes kg 0.7
(2) 15 mm G.Lpipe ( Bobbins ) m 0.6
(3) Jointing materials P.C.4 compound kg 0.5
(or) Lead wood kg 2.3
(4) Jute waste kg 0.4
(5) Bamboo each 10
(6) Coir yarn kg 1.4
(7) Sundries (Cement, sand, and wood plugs ) L.S
(8) Transport & handling charges. L.S
Sr.
PARTICULARS Unit Quantity Remarks.
No.
No.9 Item Cont:
Labour.
(1) Plumber. Man-Day 2
(2) Labour. Man-Day 2
Materials
(I) 100 mm Spikes kg 0.7
(2) 15 mm G.I.pipe ( Bobbins ) m 0.6
(3) Jointing materials Pig lead kg 3.2
(4) Jute waste kg 0.4
(5) Bamboo each 10
(6) Coir yarn kg 1.4
(7) Sundries ( Cement, Sand, Wood plug & Fuel ) L.S
(8) Transport & handling charges. L.S
Labour.
(1) Plumber. Man-Day 2.5
(2) Labour. Man-Day 2.5
Materials
(1) Flat iron clamp 40 mm x 6 mm ( saddle ) kg 4
( two joints per clamp )
(2) 50 mm x No. 8 wood screws each 10
(3) Jointing material P.C.4 compound kg 0.7
(or) Lead wood kg 2.3
(4) Jute waste kg 0.4
(5) Bamboo each 10
(6) Coir yarn kg 1.4
(7) Sundries (Cement, sand, & wood plug ) L.S
(8) Transport & handling charge L.S
Labour.
(1) Plumber. Man-Day 2
(2) Labour. Man-Day 2
Labour.
(1) Plumber. Man-Day 2.5
(2) Labour. Man-Day 2.5
Materials
(1) P.C.4 compound (or) kg 1.8
Lead wool kg 5.7
(2) Jute waste kg 0.9
(3) Cement kg 13.7
(4) Sand cum 0.1
(5) Sundries L.S
(6) Transport & handling charges L.S
Labour.
(1) Plumber. Man-Day 2
(2) Labour. Man-Day 1
Materials
(1) Pig lead kg 6.8
(2) Jute waste kg 0.9
(3) Cement kg 13.7
(4) Sand cum 0.1
(5) Sundries L.S
(6) Transport & handling charges L.S
Sr.
PARTICULARS Unit Quantity Remarks.
No.
No.14 Item Cont:
Labour.
(1) Plumber. Man-Day 3
(2) Labour. Man-Day 2
Materials
(1) P.C.4 compound (or) kg 1.4
Lead wool kg 4.6
(2) Jute waste kg 0.7
(3) Cement kg 13.7
(4) Sand cum 0.1
(5) Sundries. L.S
(6) Transport & Handling Charges. L.S
Labour.
(1) Plumber. Man-Day 3
(2) Labour. Man-Day 1
Materials
(1) Pig lead kg 6.4
(2) Jute waste kg 0.7
(3) Cement kg 13.7
(4) Sand cum 0.1
(5) Sundries L.S -
(6) Transport & handling charges L.S
Labour.
(1) Plumber. Man-Day 3
(2) Labour. Man-Day 2
Materials
(1) P.C.4 compound (or) kg 0.7
Lead wool kg 2.3
(2) Jute waste kg 0.4
Sr.
PARTICULARS Unit Quantity Remarks.
No.
No.17 Item Cont:
(3) Cement kg 13.7
(4) Sand cum 0.1
(5) Sundries. L.S
(6) Transportand Handling Charges. L.S
Labour
(1) Plumber Man-Day 2.5
(2) Labour Man-Day 1
Materials
(I) Pig lead kg 3.2
(2) Jute waste kg 0.4
(3) Cement kg 13.7
(4) Sand cum 0.1
(5) Sundries L.S -
(6) Transport & handling charges L.S -
Labour
(1) Plumber Man-Day 2.5
(2) Labour Man-Day 2
Materials.
(1) 80 mm dia C.1 ( or ) alluminum grating each 10
(2) Sundries L.S.
Labour
(1) Plumber Man-Day 1
Materials.
(1) 100 mm dia C.I. ( or ) aluminum grating each 10
(2) Sundries L.S. -
Labour
(1) Plumber Man-Day 1
- -
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Materials.
(1) 80 mm C.I. Trap each 10
(2) 80 mm C.I. Short piece each 10
(3) P.C.4 compound kg 2.8
(4) Jute waste kg 1.4
(5) Sundries ( Cement, Sand & Shuttering ) L.S
(6) Transport & Handling charges L.S -
Labour
(1) Plumber Man-Day 3
(2) Labour Man-Day 2
Materials.
(1) 80 mm C.I. Trap each 10
(2) 80 mm C.I. Short piece each 10
(3) Lead wool kg 4.6
(4) Jute waste kg 0.7
(5) Sundries ( Cement, Sand & Shuttering ) L.S -
(6) Transport & Handling charges L.S -
Labour
(1) Plumber ~ a n l ~ 3a ~
(2) Labour Man-Day 2
Materials.
(1) 80 mm C.I. Trap each 10
(2) 80 mm C.I. Short piece each 10
(3) Pig lead kg 6.4
(4) Jute waste kg 0.7
(5) Sundries ( Cement, Sand & Shuttering) L.S
(6) Transport & Handling charges L.S
Sr.
PARTICULARS Unit Quantity Remarks.
No.
No.23 Item Cont:
Labour
(1) Plumber Man-Day 4
(2) Labour Man-Day 4
24 Supplying and fixing 250 mm C.1 gully trap with C.1 bucket
& grating including masonry support with 1:3:6 cement
concrete foundation 0.69mx0.69mx150 mm thick, 112 mm
brick work in 1:3 cement mortar about 250 m square
inside,0.53m high,l5 mm cement plaster 1:2 to exposed
surface.
( For One no. )
Materials
(1) C.1 gully trap complete. Set. 1
(2) Cement. kg 31.8
(3) Sand cum 0.1
(4) Brick each 50
(5) Shingle cum 0.1
(6) Transport & handling charges. L.S
Labour
(1) Mason Man-Day 1
(2) Labour Man-Day 1
Materials.
(1) Cement, kg 34
(2) Sand cum 0.1
(3) Brick each 32
(4) Shingle cum 0.1
(5) B.R.C. No.9 Sqft. 3
Labour
As per yellow book.
Labour.
(I) Plumber Man-Day 1
Materials.
(1) 100 mm C.1 dip tee. each 10
(2) Sundries. L.S
(3) Transport & handling charges L.S
Labour
(1) Plumber. Man-Day 1.5
Sr. Unit Quantity Remarks.
PARTICULARS
No.
Materials
(I) Pipe supporting clamps each 4
(2) Sundries ( paint, jute threads, cement & sand ) L.S
Labour
(1) Plumber Man-Day 6
(2) Labour Man-Day 8
Materials
(1) Pipe supporting clamps each 4
(2) Sundries ( paint, jute threads, cement & sand ) L.S
Labour
(I) Plumber Man-Day 6
(2) Labour Man-Day 7
Materials
(1) Pipe supporting clamps each 5
(2) Sundries L.S
Labour
(1) Plumber Man-Day 5
(2) Labour Man-Day 7
Materials
(1) Pipe supporting clamps each 6
(2) Sundries L.S
Labour
(I) Plumber Man-Day 4
(2) Labour Man-Day 5
Materials
(I) Pipe supporting clamps each 7
(2) Sundries L.S
Labour
(1) Plumber Man-Day 4
(2) Labour Man-Day 4
Materials
(I) Pipe supporting clamps each 8
(2) Sundries L.S
Labour
(1) Plumber Man-Day 3
(2) Labour Man-Day 4
Materials
(1) Pipe supporting clamps each 8
(2) Sundries L.S
Labour
(1) Plumber Man-Day 3
(2) Labour - - Man-Day 3
Sr.
PARTICULARS Unit Quantity Remarks.
No.
9 Fixing and jointing 15 mm G.1 Pipe with fittings
including supply of jointing materials and clamps.
( Internal work ) ( For 10 metre )
Materials
(1) Pipe supporting clamps each 8
(2) Sundries L.S
Labour
(1) Plumber Man-Day 3
(2) Labour Man-Day 3
G.M.Peet valves.
10 Supplying and fixing 20 mm G.M. Peet valve on wall.
( New work ) ( For 10 nos. )
Materials
(1) 20 mm G.M. Peet valve each 10
(2) Sundries ( Paint &jute thread ) L.S
(3) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 1.5
Materials
(1) 20 mm G.M. Peet valve. each 10
(2) 20 mmG.1. Short pipe 0.30 m m 3
(3) 20 mm G.I. Jarnnut each 10
(4) 20 mm G.I.Socket. each 10
(5) Sundries ( Paint &jute thread ) L.S
(6) Transporting & Handling Charges. L.S -
Labour
(1) Plumber Man-Day 1.5
Materials
(1) 25 mm G.M. Peet valve each 10
(2) Sundries L.S
(3) Transporting & Handling Charges. L.S -
Labour
(1) Plumber Man-Day 1.5
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Materials
(1) 25 mm G.M. Peet valve. each 10
(2) 25 mm G.I. Short pipe 0.30 m m 3
(3) 25 mm G.I. Jamnut each 10
(4) 25 mm G.I. Socket. each 10
(5) Sundries L.S -
(6) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 1.5
Materials
(1) 32 mm G.M. Peet valve each 10
(2) Sundries L.S
(3) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 2
Materials
(1) 32 mm G.M. Peet valve. each 10
(2) 32 mm G.I. Short pipe 0.30 m m 3
(3) 32 mm G.I. Jamnut each 10
(4) 32 mm G.I. Socket. each 10
(5) Sundries L.S -
(6) Transporting & Handling Charges. L.S -
Labour
(1) Plumber Man-Day 2
Materials
(1) 40 mm G.M. Peet valve. each 10
(2) Sundries L.S -
(3) Transporting & Handling Charges. L.S
Sr.
PARTICULARS Unit Quantity Remarks.
No.
N0.16 Item Cont:
Labour
(1) Plumber Man-Day 2.5
Materials
(1) 40 mm G.M. Peet valve. each 10
(2) 40 mm G.I. Short pipe 0.30 m m 3
(3) 40 mm G.I. Jamnut each 10
(4) 40 mm G.I. Socket. each 10
(5) Sundries L.S
(6) Transporting & Handling Charges. L.S -
Labour
(I) Plumber Man-Day 2.5
Materials
(1) 50 mm G.M. Peet valve each 10
(2) Sundries L.S
(3) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 3
Materials
(1) 50 mm G.M. Peet valve. each 10
(2) 50 mm G.I. Short pipe 0.30 m m 3
(3) 50 mm G.I. Jamnut No. 10
(4) 50 mm G.I. Socket. No. 10
(5) Sundries L.S
(6) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 3
Labour
(1) Plumber Man-Day 4
Materials
(1) 65 mm G.M. Peet valve. each 10
(2) 65 mm G.I. Short pipe 0.30 m m 4.6
(3) 65 mm G.I. Jamnut each 10
(4) 65 mm G.I. Socket. each 10
(5) Sundries L.S
(6) Transporting & Handling Charges. L.S
Labour
(I) Plumber Man-Day 4
Materials
(1) 80 mm G.M. Peet valve. each 10
(2) Sundries L.S
(3) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 5
Materials
(1) 80 mm G.M. Peet valve. each 10
(2) 80 mm G.I. Pipe 0.61m long m 6.1
(3) 80 mm G.I. Jamnut each 10
(4) 80 mm G.I. Socket. each 10
(5) Sundries L.S
(6) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 5
Sr.
PARTICULARS Unit Quantity Remarks.
No.
24 Supplying and fixing 100 mm G.M. Peet valve on wall.
( New work ) ( For 10 nos. )
Materials
(1) 100 mm G.M. Peet valve each 10
(2) Sundries L.S
(3) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 6
Materials
(1) 100 mm G.M. Peet valve. each 10
(2) 100 mm G.I. Pipe 0.61 m long m 6.1
(3) 100 mm G.I. Jamnut each 10
(4) 100 mm G.I. Socket. each 10
(5) Sundries L.S -
(6) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 6
Materials
(1) 20 rnrn G.M. Check valve each 10
(2) Sundries ( paint &jute thread ) L.S
(3) Transporting & Handling Charges. L.S -
Labour
(1) Plumber Man-Day 1.5
Materials
(1) 20 mm G.M. Check valve. each 10
(2) 20 mm G.I. Short pipe 0.30 m m 3
(3) 20 mm G.I. Jamnut each 10
(4) 20 mm G.I. Socket. each 10
Sr.
PARTICULARS Unit Quantity Remarks.
No.
No.27 Item Cont:
(5) Sundries L.S
(6) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 1.5
Materials
(1) 25 mm G.M. Check valve each 10
(2) Sundries ( paint &jute thread ) L.S
(3) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 1.5
Materials
(1) 25 mm G.M. Check valve. each 10
(2) 25 mm G.I. Pipe 0.30 m short m 3
(3) 25 mm G.I. Jamnut each 10
(4) 25 mm G.I. Socket. each 10
(5) Sundries L.S
(6) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 1.5
Materials
(1) 32 mm G.M. Check valve each 10
(2) Sundries ( paint &jute thread ) L.S
(3) Transporting & Handling Charges. L.S -
Labour
(1) Plumber Man-Day 2
Labour
(1) Plumber Man-Day 2
Materials
(1) 40 mm G.M. Check valve each 10
(2) Sundries ( paint &jute thread ) L.S
(3) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 2.5
Materials
(1) 40 mm G.M. Check valve. each 10
(2) 40 mm G.I. Short pipe 0.30 m m 3
(3) 40 mm G.I. Jamnut each 10
(4) 40 rnrn G.I. Socket. each 10
(5) Sundries L.S
(6) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 2.5
Sr.
PARTICULARS Unit Quantity Remarks.
No.
34 Supplying and fixing 50 mm G.M. Check valve on wall.
or underground.
( New work ) ( For 10 nos. )
Materials
(1) 50 mm G.M. Check valve each 10
(2) Sundries ( paint &jute thread ) L.S
(3) Transporting & Handling Charges. L.S -
Labour
(1) Plumber Man-Day 3
Materials
(1) 50 mm G.M. Check valve. each 10
(2) 50 mm G.I. Short pipe 0.30 m m 3
(3) 50 mm G.I. Jamnut each 10
(4) 50 mm G.I. Socket. each 10
(5) Sundries L.S
(6) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 3
Materials
(1) 65 mm G.M. Check valve each 10
(2) Sundries ( paint &jute thread ) L.S
(3) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 4
Materials
(1) 65 mm G.M. Check valve. each 10
(2) 65 mm G.I. Short pipe 0.46 m m 4.6
(3) 65 mm G.I. Jamnut each 10
(4) 65 mm G.I. Socket. each 10
(5) Sundries L.S -
Sr.
PARTICULARS Unit Quantity Remarks.
No.
No.37 Item Cont:
(6) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 4
Materials
(1) 80 mm G.M. Check valve each 10
(2) Sundries ( paint &jute thread ) L.S
(3) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 5
Materials
(1) 80 mm G.M. Check valve. each 10
(2) 80 mm G.I. Pipe 0.61 m long m 6.1
(3) 80 mm G.I. Jamnut each 10
(4) 80 mm G.I. Socket. each 10
(5) Sundries L.S
(6) Transporting & Handling Charges. L.S
Labour
(I) Plumber Man-Day 5
Materials
(1) 100 mm G.M. Check valve each 10
(2) Sundries ( paint &jute thread ) L.S
(3) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 6
Materials
(1) 100 mm G.M. Check valve. each 10
(2) 100 mm G.I. Pipe 0.61m long m 6.1
Sr. Unit Quantity Remarks.
PARTICULARS
No.
No.41 Item Cont:
(3) 100 mm G.I. Jamnut each 10
(4) 100 mm G.I. Socket. each 10
(5) Sundries L.S
(6) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 6
Materials
(1) 15 mm Brass stop cock. each 10
(2) Sundries L.S
(3) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 1.5
Labour
(I) Plumber Man-Day 1.5
Materials
(1) 65 mm dia; G.M. wall hydrant each 10
(2) 15 mm 0 Bolt & Nuts 40 mm long. each 40
(3) Sundries L.S
(4) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 1.5
Sr. Unit Quantity Remarks.
PARTICULARS
No.
Materials.
(1) Pipe supporting clamps each 4
L.S -
(2) Sundries ( Paint, Jute, Waste)
Labour
(1) Plumber Man-Day 6
(2) Labour. Man-Day 8
Materials.
(1) Pipe supporting clamps each 4
(2) Sundries ( Paint, Jute threads ) L.S
Labour
(1) Plumber Man-Day 6
(2) Labour. Man-Day 7
Labour
(1) Plumber Man-Day 5
(2) Labour Man-Day 7
Materials.
(I) Pipe supporting clamps each 6
(2) Sundries ( Paint, Jute, Waste ) L.S
Labour
(I) Plumber Man-Day 4
(2) Labour. Man-Day 5
Materials.
(1) Pipe supporting clamps each 7
(2) Sundries ( Paint, Jute, Waste ) L.S
Labour
(1) Plumber Man-Day 4
(2) Labour. Man-Day 4
Materials.
(1) Pipe supporting clamps each 8
(2) Sundries ( Paint, Jute, Waste ) L.S
Labour
(1) Plumber Man-Day 3
(2) Labour. Man-Day 4
Sr. Quantity Remarks.
PARTICULARS Unit
No.
Materials.
(1) Pipe supporting clamps each 8
(2) Sundries ( Paint, Jute, Waste ) L.S
Labour
(1) Plumber Man-Day 3
(2) Labour. Man-Day 3
Materials.
(1) Pipe supporting clamps each 8
(2) Sundries ( Paint, Jute, Waste ) L.S
Labour
(1) Plumber Man-Day 3
(2) Labour. Man-Day 3
Materials.
(1) Pipe supporting clamps each 4
(2) P.V.C Cement ( 20 joints ) kg 0.2
(3) Sundries L.S
Labour
(1) Plumber Man-Day 4
(2) Labour. Man-Day 5
Labour
(1) Plumber Man-Day 3
(2) Labour. Man-Day 5
Materials.
(1) Pipe supporting clamps each 5
(2) P.V.C Cement ( 20 joints ) kg 0.1
(3) Sundries L.S
Labour
(1) Plumber Man-Day 3
(2) Labour. Man-Day 4
Materials.
(1) Pipe supporting clamps each 5.9
(2) P.V.C Cement ( 20 joints ) kg 0.1
(3) Sundries L.S
Labour
(1) Plumber Man-Day 3
(2) Labour. Man-Day 3
Materials.
(1) Pipe supporting clamps each 7
(2) P.V.C Cement ( 20 joints ) kg 0.1
(3) Sundries L.S
Labour
(1) Plumber Man-Day 2
(2) Labour. Man-Day 3
Materials.
(I) Pipe supporting clamps each 8
(2) P.V.C Cement ( 20 joints ) kg 0.1
(3) Sundries L.S
Labour
(1) Plumber Man-Day 2
(2) Labour. Man-Day 2
Labour
(1) Plumber Man-Day 2
(2) Labour. Man-Day 2
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Materials.
(1) Pipe supporting clamps each 8
(2) P.V.C Cement ( 20 joints ) kg 0.1
(3) Sundries L.S
Labour
(I) Plumber Man-Day 2
(2) Labour. Man-Day 2
Materials.
(1) 300 mm 0 C.I. Pipe ( Spigot & Socket ) m 10
(2) P.C. 4 Jointing compound ( For 8joints ). kg 2.7
(3) Jute waste ( For joints ) kg 2
(4) Sundries L.S
(5) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 6
(2) Labour. Man-Day 9
Materials.
(1) 300 mm 0 C.I. Pipe ( Spigot & Socket ) m 10
(2) Lead wool ( For 8joints ) . kg 18.5
(3) Jute waste ( For joints ) kg 2
(4) Sundries L.S
(5) Transporting & Handling Charges. L.S
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Cont: Item No.2.
Labour
(1) Plumber Man-Day 6
(2) Labour. Man-Day 9
Materials.
(1) 300 mm 0 C.I. Pipe ( Spigot & Socket ) m 10
(2) Pig lead ( For 8 joints ) . kg 17.6
(3) Jute waste ( For 8 joints ) kg 2
(4) Sundries ( Fuel ) L.S
(5) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 8
(2) Labour. Man-Day 11
Materials.
(1) 300 mm 0 C.I. Pipe ( Spigot & Socket ) m 10
(2) P.C. 4 jointing compound. ( For 8 joints ). kg 2.7
(3) Jute waste ( For 8 joints ) kg 2
(4) Sundries L.S
(5) Transporting & Handling Charges. L.S -
Labour
(I) Plumber Man-Day 6
(2) Labour. Man-Day 11
Labour
(1) Plumber Man-Day 6
(2) Labour. Man-Day 11
Materials.
(1) 300 mm 0 C.I. Pipe ( Spigot & Socket ) m 10
(2) Pig lead ( For 8 joints ). kg 17.6
(3) Jute waste ( For 8 joints ) kg 2
(4) Sundries ( Fuel ) L.S
(5) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 9
(2) Labour. Man-Day 14
Materials.
(1) 250 mm 0 C.I. Pipe ( Spigot & Socket ) m 10
(2) P.C. 4 compound ( For 8 joints ). kg 2.3
(3) Jute waste ( For 8 joints ) kg 1.8
(4) Sundries L.S
(5) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 5
(2) Labour. Man-Day 8
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Materials.
(1) 250 mm 0 C.I. Pipe ( Spigot & Socket ) m 10
(2) Lead wool ( For 8 joints ). kg 15.7
(3) Jute waste ( For 8 joints ) kg 1.8
(4) Sundries L.S
(5) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 6
(2) Labour. Man-Day 8
Materials.
(1) 250 mm 0 C.I. Pipe ( Spigot & Socket ) m 10
(2) Pig lead ( For 8 joints ). kg 15
(3) Jute waste ( For 8joints ) kg 1.8
(4) Sundries L.S
(5) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 7
(2) Labour. Man-Day 10
Materials.
(1) 250 mm 0 C.I. Pipe ( Spigot & Socket ) m 10
(2) Lead wool ( For 8 joints ) . kg 15.7
(3) Jute waste ( For 8 joints ) kg 1.8
(4) Sundries L.S
(5) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 6
(2) Labour. Man-Day 10
Materials.
(1) 250 mm 0 C.I. Pipe ( Spigot & Socket ) m 10
(2) Pig lead ( For 8joints ) . kg 0.2
(3) Jute waste ( For 8joints ) kg 1.8
(4) Sundries L.S
(5) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 7
(2) Labour. Man-Day 12
Labour
(1) Plumber Man-Day 5
(2) Labour. Man-Day 6
Materials.
(1) 200 mm 0 C.I. Pipe ( Spigot & Socket ) m 10
(2) Lead wool joint ( For 8 joints ). kg 13
(3) Jute waste ( For 8 joints ) kg 1.5
(4) Sundries L.S
(5) Transporting & Handling Charges. L.S
Labour
(I) Plumber Man-Day 5
(2) Labour. Man-Day 6
Materials.
(1) 200 mm 0 C.I. Pipe ( Spigot & Socket ) m 10
(2) Pig lead joint ( For 8 joints ). kg 12.6
(3) Jute waste ( For 8 joints ) kg 1.5
(4) Sundries L.S
(5) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 6
(2) Labour. Man-Day 7
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Materials.
(1) 200 mm 0 C.I. Pipe ( Spigot & Socket ) m 10
(2) P.C. 4 compound. ( For 8 joints ). kg 1.8
(3) Jute waste ( For 8 joints ) kg 1.5
(4) Sundries L.S
(5) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 5
(2) Labour. Man-Day 8
Materials.
(1) 200 mm 0 C.I. Pipe ( Spigot & Socket ) m 10
(2) Lead wool. ( For 8joints ) . kg 13
(3) Jute waste ( For 8 joints ) kg 1.5
(4) Sundries L.S
(5) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 5
(2) Labour. Man-Day 8
Materials.
(1) 200 mm 0 C.I. Pipe ( Spigot & Socket ) m 10
(2) Pig lead . ( For 8 joints ). kg 12.6
(3) Jute waste ( For 8 joints ) kg 1.5
(4) Sundries ( Fuel ) L.S
(5) Transporting & Handling Charges. L.S
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Contd: Item No.18.
Labour
(1) Plumber Man-Day 7
(2) Labour. Man-Day 9
Materials.
(1) 150 mm 0 C.I. Pipe ( Spigot & Socket ) m 10
(2) P.C. 4 compound ( For 8joints ). kg 1.2
(3) Jute waste ( For 8joints ) kg 0.9
(4) Sundries L.S -
(5) Transporting & Handling Charges. L.S -
Labour
(1) Plumber Man-Day 4
(2) Labour. Man-Day 5
Materials.
(1) 150 m m 0 C.I. Pipe ( Spigot & Socket ) m 10
(2) Lead wool. ( For 8joints ). kg 8
(3) Jute waste ( For 8joints ) kg 0.9
(4) Sundries L.S
(5) Transporting & Handling Charges. L.S
Labour
(I) Plumber Man-Day 4
(2) Labour. Man-Day 5
- -
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Contd: Item No.21.
Materials
(1) 150 mm 0 C.I. Pipe ( Spigot & Socket ) m 10
(2) Pig lead . ( For 8 joints ). kg 8.4
(3) Jute waste ( For 8 joints ) kg 0.9
(4) Sundries L.S
(5) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 5
(2) Labour. Man-Day 7
Materials.
(1) 150 mm 0 C.I. Pipe ( Spigot & Socket ) m 10
(2) P.C. 4 compound ( For 8 joints ). kg 1.2
(3) Jute waste ( For 8 joints ) kg 0.9
(4) Sundries L.S
(5) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 4
(2) Labour. Man-Day 7
Materials.
(1) 150 mm 0 C.I. Pipe ( Spigot & Socket) m 10
(2) Lead wool. ( For 8 joints ). kg 8
(3) Jute waste ( For 8 joints ) kg 0.9
(4) Sundries L.S
(5) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 4
(2) Labour. Man-Day 7
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Materials
(1) 150 mm 0 C.I. Pipe ( Spigot & Socket ) m 10
(2) Pig lead . ( For 8joints ). kg 8.4
(3) Jute waste ( For 8 joints ) kg 0.9
(4) Sundries (Fuel) L.S
(5) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 5
(2) Labour. Man-Day 7
Materials.
(1) 200 mm 0 C.I. Pipe ( Spigot & Socket ) m 10
(2) P.C. 4 compound ( For 8 joints ). kg 0.8
(3) Jute waste ( For 8 joints ) kg 0.4
(4) Sundries L.S -
(5) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 2
(2) Labour. Man-Day 3
Materials.
(1) 200 mm 0 C.I. Pipe ( Spigot & Socket ) m 10
(2) Lead wool. ( For 8 joints ). kg 5.4
(3) Jute waste ( For 8 joints ) kg 0.4
(4) Sundries L.S
(5) Transporting & Handling Charges. L.S
Sr.
PARTICULARS Unit QuantityRemarks.
No.
Contd: Item No.26.
Labour
(1) Plumber Man-Day 2
(2) Labour. Man-Day 3
Materials.
(1) 200 mm 0 C.I. Pipe ( Spigot & Socket ) m 10
(2) Pig lead ( For 8 joints ). kg 6.7
(3) Jute waste ( For 8 joints ) kg 0.4
(4) Sundries L.S
(5) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 3
(2) Labour. Man-Day 4
Materials.
(1) 200 mm 0 C.I. Pipe ( Spigot & Socket ) m 10
(2) P.C. 4 compound ( For 8 joints ). kg 0.8
(3) Jute waste ( For 8 joints ) kg 0.4
(4) Sundries L.S
(5) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 2
(2) Labour. Man-Day 3
I Labour
(1) Plumber Man-Day 2
(2) Labour. Man-Day 3
i Materials.
1' (1) 200 mm 0 C.I. Pipe ( Spigot & Socket ) m 10
(2) Pig lead ( For 8 joints ) . kg 6.7
(3) Jute waste ( For 8 joints ) kg 0.4
(4) Sundries L.S
(5) Transporting & Handling Charges. L.S
i
0
( Spigot & Socket ), half the depth in jute waste and
remaining half the depth in water-proofing material
I in trenches up to 0.92 m depth without earthwork.
( For 10 metre ) P.C. 4 Compound joint.
Materials.
(1) 80 mm 0 C.I. Pipe ( Spigot & Socket ) m 10
0.6
I
(2) P.C. 4 compound ( For 8 joints ). kg
(3) Jute waste ( For 8 joints ) kg 0.4
(4) Sundries L.S
(5) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 1
1 (2) Labour. Man-Day 2
i
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Materials.
(1) 80 mm 0 C.I. Pipe ( Spigot & Socket ) m 10
(2) Lead wool ( For 8 joints ). kg 4.2
(3) Jute waste ( For 8 joints ) kg 0.3
(4) Sundries L.S
(5) Transporting & Handling Charges. L.S
Labour
(I) Plumber Man-Day 1
(2) Labour. Man-Day 2
Materials.
(1) 80 mm 0 C.I. Pipe ( Spigot & Socket ) m 10
(2) Pig lead ( For 8 joints ). kg 5
(3) Jute waste ( For 8 joints ) kg 0.3
(4) Sundries L.S
(5) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 2
(2) Labour. Man-Day 3
Materials.
(1) 80 mm 0 C.I. Pipe ( Spigot & Socket ) m 10
(2) P.C.4 compound ( For 8joints ). kg 0.6
(3) Jute waste ( For 8 joints ) kg 0.3
(4) Sundries L.S
(5) Transporting & Handling Charges. L.S
,lr.
PARTICULARS Unit Quantity Remarks.
'4 0.
; Contd: Item No.34.
Labour
(1) Plumber Man-Day 1
(2) Labour. Man-Day 3
Materials.
(1) 80 mm 0 C.I. Pipe ( Spigot & Socket ) m 10
(2) Lead wool ( For 8 joints ) . kg 4.2
(3) Jute waste ( For 8joints ) kg 0.3
(4) Sundries L.S -
(5) Transporting & Handling Charges. L.S
I
Labour
I (1) Plumber Man-Day 1
(2) Labour. Man-Day 3
I
Labour
(1) Plumber Man-Day 2
(2) Labour. Man-Day 3
i ) C.I. TEE.
':7 Supplying, laying and jointing 300 mm 0 C.I. Tee,
'Y' Tee, equal (or) reducing ( Spigot & Socket ), half
I the depth in jute waste and remaining half the depth
in water-proofing material.
( For 10 nos. ) P.C. 4 compound joint.
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Contd: Item No.37.
Materials.
(1) 300 mm 0 C.I. Tee ( Spigot & Socket ) each 10
(2) P.C.4 compound ( For 20 joints ). kg 20.5
(3) Jute waste ( For 20 joints ) kg 14.8
(4) Sundries L.S
(5) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 24
(2) Labour. Man-Day 20
Materials.
(1) 300 mm 0 C.I. Tee ( Spigot & Socket ) each 10
(2) Lead wool ( For 20 joints ) . kg 140.7
(3) Jute waste ( For 20 joints ) kg 14.8
(4) Sundries L.S
(5) Transporting & Handling Charges. L.S
Labour
(1) Plumber Man-Day 25
(2) Labour. Man-Day 20
Materials
(1) 300 mm 0 C.I. Tee ( Spigot & Socket ) each 10
(2) Pig lead ( For 20 joints ). kg 183.1
(3) Jute waste ( For 20 joints ) kg 14.8
(4) Sundries L.S -
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 30
(2) Labour. Man-Day 25
PARTICULARS
1 r).
Materials
(1) 250 mm 0 C.I. Tee ( Spigot & Socket )
(2) P.C.4 compound.
(3) Jute waste.
(4) Sundries.
(5) Transport & Handling Charges.
Labour
(1) Plumber
(2) Labour.
' l Supplying, laying and jointing 250 mm C.I. Tee & 'Wye'
Tee, equal (or) reducing ( Spigot & Socket ) , half the
depth in jute waste and remaining half the depth in
water-proofing material in trenches.
( For 10 nos. ) Lead wool joint.
Materials
(1) 250 mm C.I. Tee ( Spigot & Socket )
(2) Lead wool
(3) Jute waste.
(4) Sundries.
(5) Transport & Handling Charges.
Labour
(1) Plumber
(2) Labour.
L .
(5) Transport & Handling Charges.
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Contd: Item No.42.
Labour
(1) Plumber Man-Day 28
(2) Labour. Man-Day 22
Materials
(1) 200 mm C.I. Tee ( Spigot & Socket ) each 10
(2) P.C.4 comd. kg 13.7
(3) Jute waste. kg 11.4
(4) Sundries. L.S -
(5) Transport & Handling Charges. L.S -
Labour
(I) Plumber Man-Day 18
(2) Labour. Man-Day 15
Materials
(1) 200 mm C.I. Tee ( Spigot & Socket ) each 10
(2) Lead wool kg 99
(3) Jute waste. kg 11.4
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 19
(2) Labour. Man-Day 15
Labour
(I) Plumber
(2) Labour.
Materials
(1) 150 mm C.I. Tee ( Spigot & Socket ) each
(2) P.C.4 compound
(3) Jute waste.
(4) Sundries.
(5) Transport & Handling Charges.
Labour
(1) Plumber
(2) Labour.
Materials
(1) 150 mm C.I. Tee ( Spigot & Socket ) each
(2) Lead wool
(3) Jute waste.
(4) Sundries.
(5) Transport & Handling Charges.
Labour
(1) Plumber
[2) Labour.
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Materials
(1) 150 mm C.I. Tee ( Spigot & Socket ) each 10
(2) Pig lead kg 76.3
(3) Jute waste. kg 6.8
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 23
(2) Labour. Man-Day 15
Materials
(1) 100 mm C.I. Tee ( Spigot & Socket ) each 10
(2) P.C.4 compound kg 5.6
(3) Jute waste. kg 3.4
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 12
(2) Labour. Man-Day 8
Materials
(1) 100 mm C.I. Tee ( Spigot & Socket) each 10
(2) Lead wool kg 40.9
(3) Jute waste. kg 3.4
(4) Sundries. L.S -
(5) Transport & Handling Charges. L.S
PARTICULARS Unit Quantity Remarks.
).
Materials
(1) 100 mm C.I. Tee ( Spigot & Socket ) each 10
(2) Pig lead kg 50.9
(3) Jute waste. kg 3.4
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 15
(2) Labour. Man-Day 10
-':
Supplying, laying and jointing 80 mm C.I. Tee & 'Wye'
Tee, equal (or) reducing ( Spigot & Socket ), half the
depth in jute waste and remaining half the depth in
water-proofing material in trenches.
( For 10 nos. ) P.C . 4 compound joint.
Materials
I (1) 80 mm C.I. Tee ( Spigot & Socket ) each 10
(2) P.C.4 compound 4.1
1 (3) Jute waste.
(4) Sundries.
kg
kg
L.S
2.3
I Labour
I (1) Plumber Man-Day 10
(2) Labour. Man-Day 6
I
L .
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Contd: Item No.53.
Materials
(1) 80 mm C.I. Tee ( Spigot & Socket ) each 10
(2) Lead wool kg 31.8
(3) Jute waste. kg 1.4
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(I) Plumber Man-Day 10
(2) Labour. Man-Day 6
Materials
(1) 80 mm C.I. Tee ( Spigot & Socket ) each 10
(2) Pig lead kg 40.7
(3) Jute waste. kg 2.3
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 12
(2) Labour. Man-Day 8
Materials
(1) 300mmx250mm C.I. Tee ( Spigot & Socket ) each 10
(2) P.C.4 comp; (For 300mm-10 joints & 250mm-10 joints) kg 18.8
(3) Jute waste. kg 14.2
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 24
(2) Labour. Man-Day 20
PARTICULARS Unit Quantity Remarks.
).
Materials
/ (1) 300mmx250mm C.I. Tee ( Spigot & Socket ) each 10
1 (2) Lead Wool(For 300mm-10 joints & 250mm-10 joints) kg 129.8
1
I
(3) Jute waste(For 300mm-10 joints & 250mm-10 joints)
(4) Sundries.
kg
L.S
14.2
I
(5) Transport & Handling Charges. L.S
Labour
-
I Man-Day 25
(1) Plumber
(2) Labour. Man-Day 20
I
Materials
I
(1) 300mmx250mm C.I. Tee ( Spigot & Socket ) each 10
1 (2)Piglead. kg 129.7
I
(3) Jute waste. kg 14.2
I
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
I
I
Labour
i (I) Plumber Man-Day 30
i (2) Labour. Man-Day 25
I
Materials
(1) 300mmx200mm C.I. Tee ( Spigot & Socket ) each 10
(2) Lead wool kg 119.7
(3) Jute waste. kg 13.1
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 25
(2) Labour. Man-Day 20
Materials
(1) 300mmx200mm C.I. Tee ( Spigot & Socket ) each 10
(2) Pig lead. kg 117
(3) Jute waste. kg 13.1
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(I) Plumber Man-Day 30
(2) Labour. Man-Day 25
1/ Labour
(1) Plumber Man-Day 24
(2) Labour. Man-Day 20
I "'
Supplying. laying and jointing 300mmx150mm C.I. Tee
reducing ( Spigot & Socket ) half the depth in jute
waste and remaining half the depth in water proofing
materials, in trenches.
( For 10 nos. ) Lead wool joint.
1 Materials
(1) 300mmx150mm C.I. Tee ( Spigot & Socket ) each 10
(2) Lead wool kg 100.7
I
(3) Jute waste. kg 10.8
1 (4) Sundries. L.S
/ (5) Transport & Handling Charges. L.S
j Labour
j (1) Plumber Man-Day 25
1 (2) Labour. Man-Day 20
I
i
materials, in trenches.
( For 10 nos. ) Pig lead joint.
/I ,Materials
I (1) 300mmx150mm C.I. Tee ( Spigot & Socket ) each 10
1 (2) Pig lead kg 104.3
/ (3) Jute waste. kg 10.8
1 (4) Sundries. L.S
/ (5) Transport & Handling Charges. L.S
!
i Labour
' 1i (1) Plumber
(2) Labour.
Man-Day
Man-Day
30
25
I
4
i
Isr. PARTICULARS Unit Quantity Remarks.
' No.
Materials
1- (1) Plumber
(2) Labour.
Materials
/' (1) 250mmx200mm C.I. Tee ( Spigot & Socket ) each 10
(2) Leadwool. kg 108.9
(3) Jute waste. kg 12.5
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 23
(2) Labour. Man-Day 18
Materials
(1) 250mmx200mm C.I. Tee ( Spigot & Socket ) each 10
(2) Pig lead. kg 114.5
(3) Jute waste. kg 12.5
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
I '
! Contd: Item No.66
Labour
(1) Plumber
(2) Labour.
' - Supplying, laying and jointing 250mmx150mm C.I. Tee
I
reducing ( Spigot & Socket ) half the depth in jute
waste and remaining half the depth in water proofing
material, in trenches.
I ( For 10 nos. ) P.C.4 compd joint.
I
I1
Materials
(1) 250mmx150mm C.I. Tee ( Spigot & Socket )
(2) P.C.4 compound.
(3) Jute waste.
(4) Sundries.
(5) Transport & Handling Charges.
Labour
(1) Plumber
(2) Labour.
1 Materials
'I (1) 250mmx150mm C.I. Tee ( Spigot & Socket )
''
1 (2) Lead wool
(3) Jute waste.
(4) Sundries.
(5) Transport & Handling Charges.
' Labour
(1) Plumber
, (2) Labour.
I
c~r.
PARTICULARS Unit Quantity Remarks.
Jo.
Materials
(I) 250mmx150mm C.I. Tee ( Spigot & Socket ) each 10
(2) Pig lead. kg 101.7
(3) Jute waste. kg 10.3
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 28
(2) Labour. Man-Day 22
Materials
1
(1) 200mmx150mm C.I. Tee ( Spigot & Socket ) each 10
(2) P.C.4 compound. kg 11.4
(3) Jute waste. kg 9.1
1 (4) Sundries. L.S
1 (5) Transport & Handling Charges. L.S
I
, Labour
(1) Plumber Man-Day 18
(2) Labour. Man-Day 15
'
Materials
(1) 200mmx150mm C.I. Tee ( Spigot & Socket ) each 10
i (2) Lead wool kg 79.9
9.1
1, (3) Jute waste.
(4) Sundries.
kg
L.S
1 (5) Transport & Handling Charges. L.S
I Contd: Item N0.71
Labour
(1) Plumber
PARTICULARS Unit
Man-Day
Quantity Remarks.
19
(2) Labour. Man-Day 15
Materials
(1) 200mmx150mm C.I. Tee ( Spigot & Socket ) each 10
I (2) Pig lead kg 89
(3) Jute waste. kg 9.1
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
' Labour
(1) Plumber Man-Day 25
(2) Labour. Man-Day 18
Materials
I (I) 200mmx100mm C.I. Tee ( Spigot & Socket ) each 10
(2) P.C. 4 compound. kg 9.7
(3) Jute waste. kg 7.4
1 (4) Sundries. L.S
1 (5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 18
' (2) Labour. Man-Day 15
r--
I'.
PARTICULARS Unit
0.
-
-1 Supplying, laying and jointing 200mmx100mm C.I. Tee
reducing ( Spigot & Socket ) half the depth in jute
waste and remaining half the depth in water proofing
material, in trenches.
( For 10 nos. ) Lead wool joint.
Materials
(1) 200mmx100mm C.I. Tee ( Spigot & Socket ) each
(2) Lead wool. kg
(3) Jute waste. kg
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber han-Da
(2) Labour. Aan-Da
Materials
(I) 200mmx100mm C.I. Tee ( Spigot & Socket ) each
(2) Pig lead. kg
(3) Jute waste. kg
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber han-Da
(2) Labour. Aan-Da
Materials
(1) 150mmx100mm C.I. Tee ( Spigot & Socket ) each
(2) P.C.4 compound. kg
(3) Jute waste. kg
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
,
/
(1) Plumber
(2) Labour.
PARTICULARS Unit
Man-Day
Man-Day
Quantity :
15
10
!
Supplying, laying and jointing 150mmx100mm C.I. Tee
reducing ( Spigot & Socket ) half the depth in jute
waste and remaining half the depth in water proofing
, material, in trenches.
(For 10 nos. ) Lead wooljoint.
I
Materials
(1) 150mmx100mm C.I. Tee ( Spigot & Socket ) each 10
(2) Lead wool. kg 50.8
(3) Jute waste. kg 5.1
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
1~ a b o u r
(1) Plumber Man-Day 16
(2) Labour. Man-Day 10
,
'supplying, laying and jointing 150mmx100mm C.I. Tee
reducing ( Spigot & Socket ) half the depth in jute
waste and remaining half the depth in water proofing
material, in trenches.
( For 10 nos. ) Pig lead joint.
I Materials
(1) 150mmx100mm C.I. Tee ( Spigot & Socket ) each 10
'
' (2) pig lead
(3) Jute waste.
' (4) Sundries.
kg
kg
L.S
63.6
5.1
Labour
(1) Plumber dan-Da
(2) Labour. Xan-Da
Materials
(1) 150mmx80mm C.I. Tee ( Spigot & Socket ) each
(2) Lead wool. kg
(3) Jute waste. kg
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber
(2) Labour.
Materials
(1) 150mmx80mm C.I. Tee ( Spigot & Socket ) each
(2) Pig lead. kg
(3) Jute waste. kg
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber
(2) Labour.
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Materials
(I) 100mmx80mm C.I. Tee ( Spigot & Socket ) each 10
(2) P.C.4 compound. kg 4.9
(3) Jute waste. kg 2.9
(4) Sundries. L.S -
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 12
(2) Labour. Man-Day 8
Materials
(1) 100mmx80mm C.I. Tee ( Spigot & Socket ) each 10
(2) Lead wool. kg 36.3
(3) Jute waste. kg 2.9
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(I) Plumber Man-Day 13
(2) Labour. Man-Day 8
Materials
(1) 100mmx80mm C.I. Tee ( Spigot & Socket ) each 10
(2) Pig lead. kg 45.8
(3) Jute waste. kg 2.9
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Contd: Item No.84
Labour
(1) Plumber Man-Day 15
(2) Labour. Man-Day 10
( ii ) C.1 Bend.
85 Supplying, laying and jointing 300 mm C.I. Bend of any
degree ( Spigot & Socket ) half the depth in jute
waste and remaining half the depth in water proofing
materials, in trenches.
( For 10 nos. ) P.C.4 compound joint.
Materials
(1) 300 mm C.I. Tee ( Spigot & Socket ) each 10
(2) P.C.4 compd. ( For 20 joints ) kg 10.3
(3) Jute waste. kg 8.5
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 16
(2) Labour. Man-Day 12
Materials
(1) 300 mm C.I. bend (Spigot & Socket mention degrees) each 10
(2) Lead wool. kg 70.4
(3) Jute waste. kg 7.4
(4) Sundries. L.S -
(5) Transport & Handling Charges. L.S -
Labour
(1) Plumber Man-Day 17
(2) Labour. Man-Day 12
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Materials
(1) 300 mm C.I. bend (Spigot & Socket Mention degrees) each 10
(2) Pieg lead. kg 66.2
(3) Jute waste. kg 7.4
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 20
(2) Labour. Man-Day 16
Materials
(1) 250 mm C.I. bend (Spigot & Socket Mention degrees) each 10
(2) P.C.4 compound. kg 8.5
(3) Jute waste. kg 6.8
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 14
(2) Labour. Man-Day 12
Materials
(1) 250 mm C.I. bend (Spigot & Socket Mention degrees) each 10
(2) Lead wool. kg 59.5
(3) Jute waste. kg 6.8
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Contd: Item No.89
Labour
(1) Plumber Man-Day 15
(2) Labour. Man-Day 12
Materials
(1) 250 mm C.I. bend (Spigot & Socket Mention degrees) each 10
(2) Pig lead kg 63.6
(3) Jute waste. kg 6.8
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(I) Plumber Man-Day 18
(2) Labour. Man-Day 15
Materials
(1) 200 mm C.I. bend (Spigot & Socket Mention degrees) each 10
(2) P.C.4 compound. kg 6.8
(3) Jute waste. kg 5.7
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 12
(2) Labour. Man-Day 10
Labour
(1) Plumber Man-Day 13
(2) Labour. Man-Day 10
Materials
(1) 200 mm C.I. bend ( Spigot & Socket Mention degrees) each 10
(2) Pig lead. kg 356
(3) Jute waste. kg 5.7
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S -
Labour
(1) Plumber Man-Day 16
(2) Labour. Man-Day 12
Materials
(1) 150 mm C.I. bend ( Spigot & Socket Mention degrees) each 10
(2) P.C.4 compound. kg 4.6
(3) Jute waste. kg 3.4
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 10
(2) Labour. Man-Day 6
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Materials
(1) 150 mm C.I. bend ( Spigot & Socket Mention degrees) each 10
(2) Lead wool. kg 30.4
(3) Jute waste. kg 3.4
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 11
(2) Labour. Man-Day 6
Materials
(1) 150 mm C.I. bend ( Spigot & Socket Mention degrees) each 10
(2) Pig lead. kg 38.2
(3) Jute waste. kg 3.4
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 14
(2) Labour. Man-Day 10
Materials
(1) 100 mm C.I. bend ( Spigot & Socket Mention degrees) each 10
(2) P.C.4 compound. kg 2.9
(3) Jute waste. kg 1.7
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Contd: Item No.97
Labour
(1) Plumber Man-Day 8
(2) Labour. Man-Day 6
Materials
(1) 100 mm C.I. bend ( Spigot & Socket Mention degrees) each 10
(2) Lead wool. kg 20.5
(3) Jute waste. kg 1.2
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 9
(2) Labour. Man-Day 6
Materials
(1) 100 mm C.I. bend (Spigot & Socket Mention degrees) each 10
(2) Pig lead. kg 25.5
(3) Jute waste. kg 1.7
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(I) Plumber Man-Day 10
(2) Labour. Man-Day 7
Labour
(1) Plumber Man-Day 7
(2) Labour. Man-Day 4
Materials
(1) 80 mm C.I. bend (Spigot & Socket Mention degrees) each 10
(2) Lead wool. kg 15.9
(3) Jute waste. kg 1.2
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 7
(2) Labour. Man-Day 4
Materials
(1) 80 mm C.1, bend (Spigot & Socket Mention degrees) each 10
(2) Pig lead. kg 20.4
(3) Jute waste. kg 1.2
(4) Sundries. L.S -
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 8
(2) Labour. Man-Day 6
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Materials
(1) 300mmx250mm C.1 reducer, large end socket small
end spigot. each 10
(2) P.C.4 compound. kg 10.2
(3) Jute waste. kg 7.4
(4) Sundries. L.S -
(5) Transport & Handling Charges. L.S -
Labour
(1) Plumber Man-Day 16
(2) Labour. Man-Day 12
Materials
(1) 300mmx250mm C.1 reducer, large end socket small
end spigot. each 10
(2) Lead wool. kg 70.3
(3) Jute waste. kg 7.4
(4) Sundries. L.S -
(5) Transport & Handling Charges. L.S -
Labour
(1) Plumber Man-Day 17
(2) Labour. Man-Day 12
Labour
(1) Plumber Man-Day 20
(2) Labour. Man-Day 16
Materials
(1) 300mmx200mm C.1 reducer, large end socket small
end spigot. each 10
(2) P.C.4 compound. kg 10.2
(3) Jute waste. kg 7.4
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 16
(2) Labour. Man-Day 12
Materials
(I) 300mmx200mm C.1 reducer, large end socket small
end spigot. each 10
(2) Lead wool kg 70.3
(3) Jute waste. kg 7.4
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 17
(2) Labour. Man-Day 12
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Materials
(1) 300mmx200mm C.1 reducer, large end socket small
end spigot. each 10
(2) Pig lead. kg 66.2
(3) Jute waste. kg 7.4
(4) Sundries. L.S -
(5) Transport & Handling Charges. L.S -
Labour
(1) Plumber Man-Day 20
(2) Labour. Man-Day 16
Materials
(1) 250mmx200mm C.1 reducer, large end socket
small end spigot. each 10
(2) P.C.4 compound. kg 8.5
(3) Jute waste. kg 6.8
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S -
Labour
(I) Plumber Man-Day 14
(2) Labour. Man-Day 12
Materials
(1) 250mm200mm C.1 reducer, large end socket small
end spigot. each 10
(2) Lead wool. kg 59.5
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Contd: Item No.110
(3) Jute waste. kg 6.8
(4) Sundries. L.S -
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 15
(2) Labour. Man-Day 12
Materials
(1) 250mmx200mm C.1 reducer, large end socket small
end spigot. each 10
(2) Pige lead. kg 63.6
(3) Jute waste. kg 6.8
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 18
(2) Labour. Man-Day 15
Materials
(1) 250mrnx150mm C.1 reducer, large end socket small
end spigot. each 10
(2) P.C.4 compound. kg 8.5
(3) Jute waste. kg 6.8
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S -
Labour
(I) Plumber Man-Day 14
(2) Labour. Man-Day 12
Sr. Unit Quantity Remarks.
PARTICULARS
No.
Materials
(1) 250mmx150mm C.1 reducer, large end socket small
end spigot. each 10
(2) Lead wool. kg 5.9
(3) Jute waste. kg 6.8
(4) Sundries. L.S -
(5) Transport & Handling Charges. L.S
Labour
(I) Plumber Man-Day 15
(2) Labour. Man-Day 12
Materials
(I) 250mmx150mm C.1 reducer, large end socket
small end spigot. each 10
(2) Pig lead. kg 63.6
(3) Jute waste. kg 6.8
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 18
(2) Labour. Man-Day 15
Materials
(1) 200mmx150mm C.1 reducer, large end socket small
end spigot. each 10
(2) P.C.4 compound. kg 6.8
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Contd: Item No.115
(3) Jute waste. kg 5.7
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 12
(2) Labour. Man-Day 10
Materials
(1) 200mmx150mm C.1 reducer, large end socket small
end spigot. each 10
(2) Lead wool. kg 49.5
(3) Jute waste. kg 5.7
(4) Sundries. L.S -
(5) Transport & Handling Charges. L.S -
Labour
(1) Plumber Man-Day 13
(2) Labour. Man-Day 10
Materials
(1) 200mmx150mm C.1 reducer, large end socket small
end spigot. each 10
(2) Pig lead. kg 630.6
(3) Jute waste. kg 5.7
(4) Sundries. L.S -
(5) Transport & Handling Charges. L.S -
Labour
(1) Plumber Man-Day 16
(2) Labour. Man-Day 12
Sr. Unit Quantity Remarks.
PARTICULARS
No.
118 Supplying, laying and jointing 200mmx100mm C.I. Taper
( Reducers and incresers) half the depth in jute
waste and remaining half the depth in water
proofing materials.
( For 10 nos. ) P.C.4 compound joint.
Materials
(1) 200mmx100mm C.1 reducer, large end socket small
end spigot. each 10
(2) P.C.4 compound. kg 6.8
(3) Jute waste. kg 5.7
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 12
(2) Labour. Man-Day 10
Materials
(1) 200mmx100mm C.1 reducer, large end socket small
end spigot. each 10
(2) Lead wool. kg 49.5
(3) Jute waste. kg 5.7
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S -
Labour
(1) Plumber Man-Day 13
(2) Labour. Man-Day 10
Materials
(1) 200mmx100mm C.1 reducer, large end socket small end
spigot. each 10
(2) Pig lead. kg 50.9
(3) Jute waste. kg 5.7
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Contd: Item No.120.
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(I) Plumber Man-Day 16
(2) Labour. Man-Day 12
121 Supplying, laying and jointing 150mmx100mm C.I. Taper
( Reducers and increasers) half the depth in jute
waste and remaining half the depth in water proofing
materials.
( For 10 nos. ) P.C.4 compound joint.
Materials
(1) 150rnmx100mm C.1 reducer, large end socket
small end spigot. each 10
(2) P.C.4 compound. kg 4.6
(3) Jute waste. kg 3.4
(4) Sundries. L.S -
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 10
(2) Labour. Man-Day 6
Materials
(I) 150mmx100mm C.1 reducer, large end socket
small end spigot. each 10
(2) Lead wool. kg 30.4
(3) Jute waste. kg 3.4
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 11
(2) Labour. Man-Day 6
123 Supplying, laying and jointing 150mrnx100mrn C.I.
Taper ( Reducers and increasers) half the depth in jute
waste and remaining half the depth in water proofing
materials.
( For 10 nos. ) Pig lead joint.
Sr. Unit Quantity Remarks.
PARTICULARS
No.
Contd: Item No. 123
Materials
(1) 150mmx100mm C.1 reducer, large end socket
small end spigot. each 10
(2) Pig lead. kg 38.2
(3) Jute waste. kg 3.4
(4) Sundries. L.S -
(5) Transport & Handling Charges. L.S -
Labour
(1) Plumber Man-Day 14
(2) Labour. Man-Day 10
Materials
(1) 150mmx80mm C.1 reducer, large end socket
small end spigot. each 10
(2) P.C.4 compound kg 3.3
(3) Jute waste. kg 3.4
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 10
(2) Labour. Man-Day 6
Materials
(1) 150mmx80mm C.1 reducer, large end socket
small end spigot. each 10
(2) Lead wool . kg 30.4
(3) Jute waste. kg 3.4
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S ..
Labour
(I) Plumber Man-Day 11
(2) Labour. Man-Day 6
Sr. Unit Quantity Remarks.
PARTICULARS
No.
Materials
(1) 150mmx80mm C.1 reducer, large end socket
small end spigot. each 10
(2) Pig lead . kg 38.2
(3) Jute waste. kg 3.4
L.S -
(4) Sundries.
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 14
(2) Labour. Man-Day 10
Materials
(1) 100mmx80mm C.1 reducer, large end socket
small end spigot. each 10
(2) P.C.4 compound kg 2.9
(3) Jute waste. kg 1.7
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S -
Labour
(1) Plumber Man-Day 8
(2) Labour. Man-Day 6
Labour
(1) Plumber Man-Day 9
(2) Labour. Man-Day 6
Materials
(1) 100mmx80mm C.1 reducer, large end socket
small end spigot. each 10
(2) Pig lead . kg 25.5
(3) Jute waste. kg 1.7
(4) Sundries. L.S -
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 10
(2) Labour. Man-Day 7
1i v ) C.1 INCREASERS
130 Supplying, laying and jointing 250mmx300mm C.I. Increasers
small end socket, large end spigot, half the depth in
jute waste and remaining half the depth in water
proofing materials.
(For 10nos.) P.C.4compound joint.
Materials
(1) 250mmx300mm C.1 increasers, small end socket
large end spigot. each 10
(2) P.C.4 compound kg 8.5
(3) Jute waste. kg 6.8
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 16
(2) Labour. Man-Day 12
PARTICULARS Unit
Materials
(1) 250mmx300mm C.1 increasers, small end socket
large end spigot. each
(2) Lead wool . kg
(3) Jute waste. kg
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber
(2) Labour.
Materials
(1) 250mmx300mm C.1 increasers, small end socket
large end spigot. each
(2) Pig lead. kg
(3) Jute waste. kg
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
11) Plumber
'2) Labour.
Labour
(I) Plumber Man-Day 16
(2) Labour. Man-Day 12
Materials
(1) 200mmx300mm C.1 increasers, small end socket
large end spigot. each 10
(2) Lead wool. kg 49.5
(3) Jute waste. kg 5.7
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(I) Plumber Man-Day 17
(2) Labour. Man-Day 12
Materials
(1) 200mmx300mm C.1 increasers, small end socket
large end spigot. each 10
(2) Pig lead. kg 50.9
(3) Jute waste. kg 5.7
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 20
(2) Labour. Man-Day 16
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Materials
(1) 200mmx250mm C.1 increasers, small end socket
large end spigot. each 10
(2) P.C.4 compound. kg 6.8
(3) Jute waste. kg 5.7
(4) Sundries. L.S -
(5) Transport & Handling Charges. L.S -
Labour
(1) Plumber Man-Day 14
(2) Labour. Man-Day 12
Materials
(1) 200mmx250mm C.1 increasers, small end socket
large end spigot. each 10
(2) Lead wool. kg 49.5
(3) Jute waste. kg 5.7
(4) Sundries. L.S -
(5) Transport & Handling Charges. L.S -
Labour
(1) Plumber Man-Day 15
(2) Labour. Man-Day 12
Materials
(1) 200mmx250mm C.1 increasers, small end socket
large end spigot. each 10
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Contd: Item No. 138
(2) Pig lead. kg 50.9
(3) Jute waste. kg 5.7
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S -
Labour
(I) Plumber Man-Day 18
(2) Labour. Man-Day 15
Materials
(1) 150mmx250mm C.1 increasers, small end socket
large end spigot. each 10
(2) P.C.4 compound kg 4.6
(3) Jute waste. kg 3.4
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 14
(2) Labour. Man-Day 12
Materials
(1) 150mmx250mm C.1 increasers, small end socket
large end spigot. each 10
(2) Lead wool. kg 30.4
(3) Jute waste. kg 3.4
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 15
(2) Labour. Man-Day 12
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Materials
(1) 150mmx250mm C.1 increasers, small end socket
large end spigot. each 10
(2) Pig lead. kg 38.2
(3) Jute waste. kg 3.4
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 18
(2) Labour. Man-Day 15
Materials
(1) 150mmx200mm C.1 increasers, small end socket
large end spigot. each 10
(2) P.C.4 compound kg 4.6
(3) Jute waste. kg 3.4
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 12
(2) Labour. Man-Day 10
Materials
(1) 150mmx200mm C.1 increasers, small end socket
large end spigot. each 10
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Contd: Item No. 143
(2) Lead wool. kg 30.4
(3) Jute waste. kg 3.4
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 13
(2) Labour. Man-Day 10
Materials
(1) 150mmx200mm C.1 increasers, small end socket
large end spigot. each 10
(2) Pig lead. kg 38.2
(3) Jute waste. kg 3.4
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 16
(2) Labour. Man-Day 12
Materials
(1) 100mmx200mm C.1 increasers, small end socket
large end spigot. each 10
(2) P.C.4 compound kg 2.9
(3) Jute waste. kg 1.7
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 12
(2) Labour. Man-Day 10
PARTICULARS Unit Remark!
Materials
(I) 100mmx200mm C.1 increasers, small end socket
large end spigot. each
(2) Lead wool. kg
(3) Jute waste. kg
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber
(2) Labour.
Materials
(1) 100mmx200mm C.1 increasers, small end socket
large end spigot. each
(2) Pig lead. kg
(3) Jute waste. kg
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
:1) Plumber
:2) Labour.
Labour
1) Plumber Man-Day 10
2) Labour. Man-Day 6
Materials
(1) 100mmx150mm C.1 increasers, small end socket
large end spigot. each 10
(2) Lead wool. kg 20.5
(3) Jute waste. kg 1.7
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 11
(2) Labour. Man-Day '6
Materials
(I) 100mmx150mm C.1 increasers, small end socket
large end spigot. each 10
(2) Pig lead. kg 25.5
(3) Jute waste. kg 1.7
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Sr. Unit Quantity Remarks.
PARTICULARS
No.
Contd: Item No. 150
Labour
(1) Plumber Man-Day 14
(2) Labour. Man-Day 10
Materials
(1) 80mmx150mm C.1 increasers, small end socket
large end spigot. each 10
(2) P.C.4 compound kg 2
(3) Jute waste. kg 1.2
(4) Sundries. L.S -
(5) Transport & Handling Charges. L.S -
Labour
(1) Plumber Man-Day 10
(2) Labour. Man-Day 6
Materials
(1) 80mmx150mm C.1 increasers, small end socket
large end spigot. each 10
(2) Lead wool. kg 15.9
(3) Jute waste. kg 1.2
(4) Sundries. L.S -
(5) Transport & Handling Charges. L.S
Labour
(I) Plumber Man-Day 11
(2) Labour. Man-Day 6
--
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Contd: Item No. 153
Materials
(1) 80mmx150mm C.1 increasers, small end socket
large end spigot. each 10
(2) Pig lead. kg 20.4
(3) Jute waste. kg 1.2
(4) Sundries. L.S -
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 14
(2) Labour. Man-Day 10
Materials
(1) 80mrnx100mm C.1 increasers, small end socket
large end spigot. each 10
(2) P.C.4 compound kg 2
(3) Jute waste. kg 1.2
(4) Sundries. L.S -
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 8
(2) Labour. Man-Day 6
Materials
(1) 80mmx100mm C.1 increasers, small end socket
large end spigot. each 10
(2) Lead wool. kg 15.9
(3) Jute waste. kg 1.2
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Contd: Item No. 155
Labour
(1) Plumber Man-Day 9
(2) Labour. Man-Day 6
Materials
(1) 80mmx100mm C.1 increasers, small end socket
large end spigot. each 10
(2) Pig lead. kg 20.4
(3) Jute waste. kg 1.2
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 10
(2) Labour. Man-Day 7
Materials
(1) 300mm C.1 loose collar. each 10
(2) P.C.4 compound kg 20.5
(3) Jute waste. kg 14.8
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 16
(2) Labour. Man-Day 12
Labour
(1) Plumber Man-Day 17
(2) Labour. Man-Day 12
Materials
(1) 300mm C.1 loose collar. each 10
(2) Pig lead. kg 132.3
(3) Jute waste. kg 14.8
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(I) Plumber Man-Day 20
(2) Labour. Man-Day 16
Materials
(1) 250mm C.1 loose collar. each 10
(2) P.C.4 compound kg 17
(3) Jute waste. kg 13.7
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(I) Plumber Man-Day 14
(2) Labour. Man-Day 12
--
Sr. Unit Quantity Remarks.
PARTICULARS
No.
Materials
(1) 250mm C.1 loose collar. each 10
(2) Lead wool. kg 118.9
(3) Jute waste. kg 13.7
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 15
(2) Labour. Man-Day 12
Materials
(I) 250mm C.1 loose collar each 10
(2) Pig lead. kg 127.2
(3) Jute waste. kg 13.7
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(I) Plumber Man-Day 18
(2) Labour. Man-Day 15
Materials
(I) 200mm C.1 loose collar. each 10
(2) P.C.4 compound kg 13.7
(3) Jute waste. kg 11.4
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Contd: Item No. 163
Labour
(1) Plumber Man-Day 12
(2) Labour. Man-Day 10
Labour
(1) Plumber Man-Day 13
(2) Labour. Man-Day 10
Materials
(1) 200mm C.1 loose collar. each 10
(2) Pig lead. kg 101.7
(3) Jute waste. kg 11.4
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 16
(2) Labour. Man-Day 12
Materials
(1) 150mm C.1 loose collar. each 10
(2) P.C.4 compound kg 9.1
(3) Jute waste. kg 6.8
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Contd: Item No. 166
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 10
(2) Labour. Man-Day 6
Materials
(1) 150mm C.1 loose collar. each 10
(2) Lead wool. kg 60.8
(3) Jute waste. kg 6.8
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 11
(2) Labour. Man-Day 6
Materials
(1) 150mm C.1 loose collar. each 10
(2) Pig lead. kg 76.3
(3) Jute waste. kg 6.8
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 14
(2) Labour. Man-Day 10
Labour
(1) Plumber Man-Day 8
(2) Labour. Man-Day 6
Materials
(1) lOOmm C.1 loose collar. each 10
(2) Lead wool. kg 40.9
(3) Jute waste. kg 3.4
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S -
Labour
(1) Plumber Man-Day 9
(2) Labour. Man-Day 6
Materials
(1) 100mm C.1 loose collar. each 10
(2) Pig lead. kg 50.9
(3) Jute waste. kg 3.4
(4) Sundries. L.S -
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 10
(2) Labour. Man-Day 7
Sr. Unit Quantity Remarks.
PARTICULARS
No.
Materials
(1) 80 mm C.1 loose collar. each 10
(2) P.C.4 compound kg 4.1
(3) Jute waste. kg 2.3
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour.
(I) Plumber Man-Day 7
(2) Labour. Man-Day 4
Materials
(1) 80 mm C.1 loose collar. each 10
(2) Lead wool. kg 31.8
(3) Jute waste. kg 2.3
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 7
(2) Labour. Man-Day 4
Materials
(1) 80 mm C.1 loose collar. each 10
(2) Pig lead. kg 40.7
(3) Jute waste. kg 2.3
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Contd: Item No. 174
Labour
(1) Plumber Man-Day 8
(2) Labour. Man-Day 6
Materials
(1) 300 mm dia. C.1 Sluice valve both ends flanged. each 10
(2) Sundries. L.S -
(3) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 16
(2) Labour. Man-Day 16
176 Supplying and fixing 250 mm C.I. Sluice valve both end
flanged.
( For 10 nos. )
Materials
(1) 250 mm dia. C.1 Sluice valve both ends flanged. each 10
(2) Sundries. L.S
(3) Transport & Handling Charges. L.S -
Labour
(1) Plumber Man-Day 12
(2) Labour. Man-Day 12
177 Supplying and fixing 200 mm C.I. Sluice valve both end
flanged.
( For 10 nos. )
Materials
(1) 200 mm dia. C.1 Sluice valve both ends flanged. Nos. 10
(2) Sundries. L.S -
(3) Transport & Handling Charges. L.S -
Labour
(1) Plumber Man-Day 8
(2) Labour. Man-Day 10
Sr.
PARTICULARS Unit Quantity Remarks.
No.
178 Supplying and fixing 150 mm C.I. Sluice valve both end
flanged.
( For 10 nos. )
Materials
(1) 150 mm dia. C.1 Sluice valve both ends flanged. each 10
(2) Sundries. L.S
(3) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 6
(2) Labour. Man-Day 8
179 Supplying and fixing 100 mm C.I. Sluice valve both end
flanged.
( For 10 nos. )
Materials
(1) 100 mm dia. C.1 Sluice valve both ends flanged. each 10
(2) Sundries. L.S
(3) Transport & Handling Charges. L.S
Labour
(I) Plumber Man-Day 4
(2) Labour. Man-Day 6
Materials
(1) 80 mm dia. C.1 Sluice valve both ends flanged. each 10
(2) Sundries. L.S
(3) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 2
(2) Labour. Man-Day 4
181 Supplying and fixing 300 mm C.I. Sluice valve both end
socket.
( For 10 nos. ) P.C.4 compound joint.
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Contd: Item No. 181
Materials
(1) 300 mm dia. C.1 Sluice valve both ends socket. each 10
(2) P.C.4 compound. kg 20.5
(3) Jute waste. kg 14.8
(4) Sundries. L.S -
(5) Transport & Handling Charges. L.S
Labour
(I) Plumber Man-Day 18
(2) Labour. Man-Day 18
Materials
(1) 300 mm dia. C.1 Sluice valve both ends socket. each 10
(2) Lead wool. kg 140.7
(3) Jute waste. kg 14.8
(4) Sundries. L.S -
(5) Transport & Handling Charges. L.S -
Labour
(1) Plumber Man-Day 19
(2) Labour. Man-Day 18
Materials
(1) 300 mm dia. C.1 Sluice valve both ends socket. each 10
(2) Pig lead. kg 132.3
(3) Jute waste. kg 14.8
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 20
(2) Labour. Man-Day 20
Labour
(1) Plumber Man-Day 17
(2) Labour. Man-Day 17
Materials
(1) 250 mm dia. C.1 Sluice valve both ends socket. each 10
(2) Lead wool. kg 11.9
(3) Jute waste. kg 13.7
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 18
(2) Labour. Man-Day 17
Materials
(1) 250 mm dia. C.1 Sluice valve both ends socket. each 10
(2) Pig lead. kg 111.9
(3) Jute waste. kg 13.7
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 19
(2) Labour. Man-Day 19
Labour
(1) Plumber Man-Day 15
(2) Labour. Man-Day 15
Materials
(1) 200 mm dia. C.1 Sluice valve both ends socket. each 10
(2) Lead wool. kg 68.1
(3) Jute waste. kg 11.4
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 16
(2) Labour. Man-Day 15
Materials
(1) 200 mm dia. C.1 Sluice valve both ends socket. each 10
(2) Pig lead. kg 91.6
(3) Jute waste. kg 11.4
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 18
(2) Labour. Man-Day 18
- - - -
Sr. PARTICULARS Unit Quantity Remarks.
No.
Contd: Item No. 190
Materials
(1) 150 mm dia. C.1 Sluice valve both ends socket. each 10
(2) P.C. 4 compound. kg 9.1
(3) Jute waste. kg 6.8
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 12
(2) Labour. Man-Day 12
Materials
(1) 150 mm dia. C.1 Sluice valve both ends socket. each 10
(2) Lead wool. kg 47.7
(3) Jute waste. kg 6.8
(4) Sundries. L.S -
(5) Transport & Handling Charges. L.S
Labour
(I) Plumber Man-Day 13
(2) Labour. Man-Day 12
Materials
(1) 150 mm dia. C.1 Sluice valve both ends socket. each 10
(2) Pig lead. kg 61
(3) Jute waste. kg 6.8
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 14
(2) Labour. Man-Day 14
Labour
(1) Plumber Man-Day 8
(2) Labour. Man-Day 8
194 Supplying and fixing 100 mm C.I. Sluice valve both
ends socket.
( For 10 nos. ) Lead wool joint.
Materials
(1) 100 mm dia. C.1 Sluice valve both ends socket. each 10
(2) Lead wool. kg 34
(3) Jute waste. kg 3.7
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 8
(2) Labour. Man-Day 8
Materials
(1) 100 mm dia. C.1 Sluice valve both ends socket. each 10
(2) Pig lead. kg 45.8
(3) Jute waste. kg 4.1
(4) Sundries. L.S
5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 9
(2) Labour. Man-Day 9
Labour
(1) Plumber Man-Day 6
(2) Labour. Man-Day 6
Materials
(1) 80 mm dia. C.1 Sluice valve both ends socket. each 10
(2) Lead wool. kg 24
(3) Jute waste. kg 2.3
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 6
(2) Labour. Man-Day 6
Materials
(1) 80 mm dia. C.1 Sluice valve both ends socket. each 10
(2) Pig lead. kg 40.7
(3) Jute waste. kg 2.3
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 7
(2) Labour. Man-Day 7
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Materials
(1) Brick. each 500
(2) Cement. kg 459
(3) Sand. cum 0.9
(4) Shingle. cum 1.1
(5) B.R.C No.9 sqm 2.8
(6) 450mmx450mm C.I. Manhole cover & frame. Nos. 1
(7) Sundries. L.S
(8) Transport & Handling Charges. L.S
Labour
Same as Civil works' analysis of rate.
Materials
(1) Brick. each 400
(2) Cement. kg 313.9
(3) Sand. cum 0.7
(4) Shingle. cum 0.7
(5) B.R.C No.9 sqm 1.8
(6) 450mmx450mm C.I. Manhole cover & frame. Nos. 1
(7) Sundries. L.S
(8) Transport & Handling Charges. L.S
Labour
Same as Civil works' analysis of rate.
J vii ) HYDRANT.
201 Supplying and fixing 65mm dia. C.I. Fire hydrant
( under ground type ) .
( For 10 nos. )
Sr. Unit Quantity Remarks.
PARTICULARS
No.
Contd: Item No. 201
Materials
(1) 65mm dia. C.1 Fire hydrant. each 10
(2) Sundries. L.S
(3) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 3
(2) Labour. Man-Day 3
Materials
(1) 100 mrn dia. C.1 Fire hydrant. each 10
(2) Sundries. L.S
(3) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 3
(2) Labour. Man-Day 3
Labour
Same as Civil works' analysis of rate.
Materials
(1) lOOmm C.I. reflux valve both end flanged. each 10
(2) Sundries. L.S -
(3) Transport & Handling Charges. L.S -
Labour
(I) Plumber Man-Day 2.5
(2) Labour. Man-Day 2
Materials
(1) 80mm C.I. reflux valve both end flanged. each 10
(2) Sundries. L.S
(3) Transport & Handling Charges. L.S -
Labour
(1) Plumber Man-Day 2
(2) Labour. Man-Day 2
Materials
(1) 65 mm C.I. reflux valve both end flanged. each 10
(2) Sundries. L.S
(3) Transport & Handling Charges. L.S -
Labour
(1) Plumber Man-Day 2
(2) Labour. Man-Day 2
Sr. Unit Quantity Remarks.
PARTICULARS
No.
Materials
(I) 300mm C.1 Cross, wye cross( equal or reducing each 10
Spigot and socket. )
(2) P.C. 4 compound. kg 30.7
(3) Jute waste. kg 22.2
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 26
(2) Labour. Man-Day 20
Materials
(1) 300mm C.1 Cross, y e cross( equal or reducing each 10
Spigot and socket. )
(2) Lead wool. ( For 30 joints ) kg 211
(3) Jute waste. ( For 30 joints ) kg 22.2
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 27
(2) Labour. Man-Day 20
Labour
(1) Plumber Man-Day 30
(2) Labour. Man-Day 28
Materials
(I) 250mm C.1 Cross, Wye cross (equal or reducing each 10
Spigot and socket. )
(2) P.C.4 compound. ( For 30 joints ) kg 25.6
(3) Jute waste. ( For 30 joints ) kg 20.5
(4) Sundries. L.S -
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 25
(2) Labour. Man-Day 18
Materials
(1) 250mm C.1 Cross, Wye cross (equal or reducing each 10
Spigot and socket. )
(2) Lead wool. ( For 30 joints ) kg 178.3
(3) Jute waste. ( For 30 joints ) kg 20.5
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
- -~ - - - ~
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Contd: Item No. 212
Labour
(1) Plumber Man-Day 26
(2) Labour. Man-Day 18
Materials
(1) 250mm C.1 Cross, Wye cross (equal or reducing each 10
Spigot and socket. )
(2) Pig lead. ( For 30 joints ) kg 190.7
(3) Jute waste. ( For 30 joints ) kg 20.5
(4) Sundries. L.S -
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 28
(2) Labour. Man-Day 20
Materials
(1) 200mm C.1 Cross, Wye cross (equal or reducing each 10
Spigot and socket. )
(2) P.C.4 compound.( For 30 joints ). kg 20.4
(3) Jute waste. ( For 30 joints ). kg 17
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 20
(2) Labour. Man-Day 16
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Materials
(I) 200mm C.1 Cross, Wye cross (equal or reducing each 10
Spigot and socket. )
(2) Lead wool. ( For 30 joints ) kg 148.4
(3) Jute waste. ( For 30 joints ) kg 17
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 21
(2) Labour. Man-Day 16
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Materials
(I) 200mm C.1 Cross, Wye cross (equal or reducing each 10
Spigot and socket. )
(2) Pig lead. ( For 30 joints ) kg 152.6
(3) Jute waste. ( For 30 joints ) kg 17
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S -
Labour
(1) Plumber Man-Day 24
(2) Labour. Man-Day 18
Materials
(1) 150mm C.1 Cross, Wye cross (equal or reducing each 10
Spigot and socket. )
(2) P.C.4 compound. ( For 30 joints ) kg 13.7
(3) Jute waste. ( For 30 joints ) kg 10.3
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 16
(2) Labour. Man-Day 14
Labour
(I) Plumber Man-Day 17
(2) Labour. Man-Day 14
Materials
(1) 150mm C.1 Cross, Wye cross (equal or reducing each 10
Spigot and socket. )
(2) Pig lead. ( For 30 joints ) kg 114.5
(3) Jute waste. ( For 30 joints ) kg 10.3
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S -
Labour
(I) Plumber Man-Day 20
(2) Labour. Man-Day 16
Materials
(1) lOOmm C.1 Cross, Wye cross (equal or reducing each 10
Spigot and socket. )
(2) P.C.4 compound. ( For 30 joints ) kg 8.5
(3) Jute waste. ( For 30 joints ) kg 5.1
(4) Sundries. L.S -
(5) Transport & Handling Charges. L.S -
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Contd: Item No. 220.
Labour
(1) Plumber Man-Day 12
(2) Labour. Man-Day 12
Materials
(1) lOOmm C.1 Cross, Wye cross (equal or reducing each 10
Spigot and socket. )
(2) Lead wool. ( For 30 joints ) kg 6 1.3
(3) Jute waste. ( For 30 joints ) kg 5.1
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 12
(2) Labour. Man-Day 12
Materials
(1) lOOmm C.1 Cross, Wye cross (equal or reducing each 10
Spigot and socket. )
(2) Pig lead. ( For 30 joints ) kg 76.3
(3) Jute waste. ( For 30 joints ) kg 5.1
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 14
(2) Labour. Man-Day 14
Sr.
PARTICULARS Unit Quantity Remarks.
No.
223 Supplying, laying and jointing 80mm C.I. Cross, Wye
cross, equal or reducing ( Spigot & Socket ), half the
depth in jute waste and remaining half the depth in
water proofing material, in trenches.
( For 10 nos. ) P.C.4 compound joint.
Materials
(1) 80mm C.1 Cross, Wye cross (equal or reducing each 10
Spigot and socket. )
(2) P.C.4 compound. ( For 30 joints ) kg 6.2
(3) Jute waste. ( For 30 joints ) kg 3.4
(4) Sundries. L.S
(5) Transport & Handling Charges. L.S -
Labour
(1) Plumber Man-Day 10
(2) Labour. Man-Day 8
Materials
(1) 80mm C.1 Cross, Wye cross (equal or reducing each 10
Spigot and socket. )
(2) Lead wool. ( For 30 joints ) kg 47.7
(3) Jute waste. ( For 30 joints ) kg 3.4
(4) Sundries. L.S -
(5) Transport & Handling Charges. L.S -
Labour
(1) Plumber Man-Day 10
(2) Labour. Man-Day 8
Labour
(1) Plumber Man-Day 12
(2) Labour. Man-Day 10
Materials
(1) 300mm Ductile Iron Pipe complete with rubber m 10
gasket.
(2) Lubricant ( 10joint approx: ) kg 0.5
(3) Sundries. L.S
(4) Transport & Handling Charges. L.S
Labour
(I) Plumber Man-Day 12
(2) Labour. Man-Day 17
Materials
(1) 300mm Ductile Iron Pipe complete with rubber m 10
gasket.
(2) Lubricant ( 10 joint approx: ) kg 0.5
(3) Sundries. L.S
(4) Transport & Handling Charges. L.S
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Contd: Item No. 2.
Labour
(1) Plumber Man-Day 14
(2) Labour. Man-Day 21
Materials
(1) 250mm Ductile Iron Pipe complete with rubber m 10
gasket.
(2) Lubricant ( 10joint approx: ) kg 0.4
(3) Sundries. L.S
(4) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 11
(2) Labour. Man-Day 15
Materials
(1) 250mm Ductile Iron Pipe complete with rubber m 10
gasket.
(2) Lubricant ( 10joint approx: ) kg 0.4
(3) Sundries. L.S
(4) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 11
(2) Labour. Man-Day 18
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Materials
(1) 200mm Ductile Iron Pipe complete with rubber rn 10
gasket.
(2) Lubricant ( 10joint approx: ) kg 0.4
(3) Sundries. L.S
(4) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 9
(2) Labour. Man-Day 11
Materials
(I) 200mm Ductile Iron Pipe complete with rubber m 10
gasket .
(2) Lubricant ( 10 joint approx: ) kg 0.4
(3) Sundries. L.S
(4) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 10
(2) Labour. Man-Day 14
Materials
(1) 150rnm Ductile Iron Pipe complete with rubber m 10
gasket.
(2) Lubricant ( 10 joint approx: ) kg 0.3
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Contd: Item No. 7.
(3) Sundries. L.S
(4) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 7
(2) Labour. Man-Day 10
Materials
(1) 150mm Ductile Iron Pipe complete with rubber m 10
gasket.
(2) Lubricant ( 10joint approx: ) kg 0.3
(3) Sundries. L.S
(4) Transport & Handling Charges. L.S
Labour
(I) Plumber Man-Day 7.5
(2) Labour. Man-Day 11
Labour
(I) Plumber Man-Day 5
(2) Labour. Man-Day 6
Labour
(1) Plumber Man-Day 5
(2) Labour. Man-Day 7.5
Materials
(I) 80mm Ductile Iron Pipe complete with rubber m 10
gasket.
(2) Lubricant ( 10joint approx: ) kg 0.2
(3) Sundries. L.S
(4) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 3
(2) Labour. Man-Day 4
Materials
(1) 80mm Ductile Iron Pipe complete with rubber m 10
gasket .
(2) Lubricant ( 10joint approx: ) kg 0.2
(3) Sundries. L.S
(4) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 3
(2) Labour. Man-Day 5
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Materials
(1) Necessary pipe fittings including rubber gasket each
(2) Lubricant ( 10joint approx: ) kg 0.5
(3) Sundries. L.S
(4) Transport & Handling Charges. L.S -
Labour
(1) Plumber Man-Day 10
(2) Labour. Man-Day 8
Materials
(I) Necessary pipe fittings including rubber gasket each
(2) Lubricant ( 10joint approx: ) kg 0.4
(3) Sundries. L.S
(4) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 9
(2) Labour. Man-Day 7.5
Labour
(1) Plumber Man-Day 8
(2) Labour. Man-Day 6
Materials
(1) Necessary pipe fittings including rubber gasket each
(2) Lubricant ( 10 joint approx: ) kg 0.3
(3) Sundries. L.S
(4) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 7
(2) Labour. Man-Day 5
Materials
(1) Necessary pipe fittings including rubber gasket each
(2) Lubricant ( 10joint approx: ) kg 0.2
(3) Sundries. L.S
(4) Transport & Handling Charges. L.S
Labour
(1) Plumber Man-Day 5
(2) Labour. Man-Day 3.5
Labour
(1) Plumber Man-Day 4
(2) Labour. Man-Day 3
Materials
(1) Sundries. L.S -
Labour
(1) Plumber Man-Day 1
(2) Labour. Man-Day 1
Materials
(1) Sundries. L.S
Labour
(1) Plumber Man-Day 1
(2) Labour. Man-Day 1
Materials
(1) Sundries. L.S -
Labour
(1) Plumber Man-Day 1
(2) Labour. Man-Day 1
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Materials
(1) Sundries. L.S
Labour
(1) Plumber Man-Day 1.5
(2) Labour. Man-Day 1.5
Materials
(I) Sundries. L.S
Labour
(I) Plumber Man-Day 2
(2) Labour. Man-Day 2
Materials
(I) Sundries. L.S
Labour
(1) Plumber Man-Day 2
(2) Labour. Man-Day 2
Materials
(1) Sundries. L.S
Labour
(1) Plumber Man-Day 2
(2) Labour. Man-Day 3
Sr. PARTICULARS Unit Quantity Remarks.
No.
Materials
(1) Sundries. L.S
Labour
(1) Plumber Man-Day 3
(2) Labour. Man-Day 3
Materials
(1) Brick. each 30
(2) Sand. cum 0.1
(3) Shingle. cum 0.1
(4) Cement. kg 24
(5) B.R.C No. 9 cum 0.3
(6) 150mmx150mm C.I. Surface box. No. 1
(7) Sundries L.S
Labour
Same as Civil Works' analysis of rate.
Materials
(1) Sundries. L.S -
Labour
(1) Plumber Man-Day 1
(2) Labour. Man-Day 1
Sr.
No. I PARTICULARS
Materials
(1) Sundries.
Labour
(1) Plumber
(2) Labour.
Materials
(1) Sundries.
Labour
(1) Plumber
(2) Labour.
Materials
(1) Sundries.
Labour
(1) Plumber
(2) Labour.
Materials
(1) Sundries.
-
ir. Unit
PARTICULARS
lo.
-
:ontd: Item No.5
,abour
1) Plumber Ian-Daj
2) Labour. lan-Daj
daterials
1) Sundries.
,abour
1) Plumber
2) Labour.
vlaterials
:I) Sundries.
Labour
:1) Plumber
;2) Labour.
Uaterials
(1) Sundries.
Labour
(I) Plumber
(2) Labour.
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Materials.
(1) P.V.C Cement ( 10 joints) kg 0.1
(2) Sundries. L.S -
Labour.
(1) Plumber. Man-Day 0.5
(2) Labour. Man-Day 1
Materials.
(1) P.V.C Cement ( 10 joints) kg 0.1
(2) Sundries. L.S -
Labour.
(I) Plumber. Man-Day 1
(2) Labour. Man-Day 1
Materials.
(1) P.V.C Cement ( 10 joints) kg 0.1
(2) Sundries. L.S -
Labour.
(1) Plumber. Man-Day 1
(2) Labour. Man-Day 1
PARTICULARS Unit
vlaterials.
:1) P.V.C Cement ( 10 joints)
12) Sundries.
,abour.
:1) Plumber.
:2) Labour.
Materials.
:1) P.V.C Cement ( 10 joints)
(2) Sundries.
Labour.
(1) Plumber.
(2) Labour.
Materials.
(1) P.V.C Cement ( 10 joints)
(2) Sundries.
Labour.
(1) Plumber. Man-Da
(2) Labour. Man-Da
Labour.
(1) Plumber. Man-Day 1.5
(2) Labour. Man-Day 2
Materials.
(1) P.V.C Cement ( 10 joints) kg 0.1
(2) Sundries. L.S
Labour.
(1) Plumber. Man-Day 2
(2) Labour. Man-Day 2
( G ) SEWERS.
Materials
(1) lOOmrn dia; x 1.83 m R.C.C. pipe. each 6
(2) Cement. kg 23.9
(3) Sand. cum 0.1
(4) Shingle. cum 0.1
(5) Sundries. L.S
(6) Transport & Handling charges. L.S
Labour
(I) Plumber. Man-Day 2
(2) Mason. Man-Day 1
(3) Labour. Man-Day 3
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Materials
(1) lOOmm dia; x 1.83 m R.C.C. pipe. each 6
(2) Cement. kg 23.9
(3) Sand. cum 0.1
(4) Shingle. cum 0.1
(5) Sundries. L.S
(6) Transport & Handling charges. L.S -
Labour
(1) Plumber. Man-Day 2
(2) Mason. Man-Day 1
(3) Labour. Man-Day 4
Materials
(1) lOOmm dia; x 1.83 m R.C.C. pipe. each 6
(2) Cement. kg 23.9
(3) Sand. cum 0.1
(4) Shingle. cum 0.1
(5) Sundries. L.S -
(6) Transport & Handling charges. L.S -
Labour
(1) Plumber. Man-Day 2
(2) Mason. Man-Day 1
(3) Labour. Man-Day 5
Labour
(1) Plumber. dan-Da
(2) Mason. dan-Da
(3) Labour. Aan-Da
Materials
(1) 150mm dia; x 1.83 m R.C.C. pipe. each
(2) Cement. kg
(3) Sand. cum
(4) Shingle. cum
(5) Sundries. L.S
(6) Transport & Handling charges. L.S
Labour
(1) Plumber.
(2) Mason.
(3) Labour.
Materials
(1) 150mm dia; x 1.83 m R.C.C. pipe. each
:2) Cement. kg
:3) Sand. cum
14) Shingle. cum
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Contd: Item No.6.
(5) Sundries. L.S
(6) Transport & Handling charges. L.S
Labour
(I) Plumber. Man-Day 3
(2) Mason. Man-Day 2
(3) Labour. Man-Day 8
Materials
(1) 225mm dia; x 1.83m R.C.C. pipe. each 6
(2) Cement. kg 78.9
(3) Sand. cum 0.2
(4) Shingle. cum 0.4
(5) Sundries. L.S
(6) Transport & Handling charges. L.S
Labour
(1) Plumber. Man-Day 3
(2) Mason. Man-Day 2
(3) Labour. Man-Day 7
Materials
(1) 225mm dia; x 1.83m R.C.C. pipe. each 6
(2) Cement. kg 78.9
(3) Sand. cum 0.2
(4) Shingle. cum 0.4
(5) Sundries. L.S
(6) Transport & Handling charges. L.S
Labour
(I) Plumber. Man-Day 3
(2) Mason. Man-Day 2
(3) Labour. Man-Day 8
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Materials
(1) 225mm dia; x 1.83m R.C.C. pipe. each 6
(2) Cement. kg 78.9
(3) Sand. cum 0.2
(4) Shingle. cum 0.4
(5) Sundries. L.S
(6) Transport & Handling charges. L.S
Labour
(1) Plumber. Man-Day 3
(2) Mason. Man-Day 2
(3) Labour. Man-Day 9
Materials
(I) 300mm dia; x 1.83m R.C.C. pipe. each 6
(2) Cement. kg 107.2
(3) Sand. cum 0.3
(4) Shingle. cum 0.6
(5) Sundries. L.S
(6) Transport & Handling charges. L.S
Labour
(I) Plumber. Man-Day 4
(2) Mason. Man-Day 3
(3) Labour. Man-Day 8
Materials
(1) 300mm dia; x 1.83m R.C.C. pipe. each 6
(2) Cement. kg 107.2
Sr. PARTICULARS Unit Quantity Remarks.
No.
Contd: Item No.11.
(3) Sand. cum 0.28
(4) Shingle. cum 0.56
(5) Sundries. L.S
(6) Transport & Handling charges. L.S
Labour
(1) Plumber. Man-Day 4
(2) Mason. Man-Day 3
(3) Labour. Man-Day 10
Materials
(1) 300mm dia; x 1.83m R.C.C. pipe. each 6
(2) Cement. kg 107.2
(3) Sand. cum 0.3
(4) Shingle. cum 0.6
(5) Sundries. L.S
(6) Transport & Handling charges. L.S -
Labour
(1) Plumber. Man-Day 4
(2) Mason. Man-Day 3
(3) Labour. Man-Day 12
Materials
(1) 375mm dia; x 1.83m R.C.C. pipe. each 6
(2) Cement. kg 127.6
(3) Sand. cum 0.4
(4) Shingle. cum 0.7
(5) Sundries. L.S
(6) Transport & Handling charges. L.S
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Contd: Item No.13.
Labour
(1) Plumber. Man-Day 5
(2) Mason. Man-Day 3
(3) Labour. Man-Day 10
Materials
(I) 375mm dia; x 1.83m R.C.C. pipe. each 6
(2) Cement. kg 127.6
(3) Sand. cum 0.4
(4) Shingle. cum 0.7
(5) Sundries. L.S
(6) Transport & Handling charges. L.S
Labour
(1) Plumber. Man-Day 5
(2) Mason. Man-Day 3
(3) Labour. Man-Day 13
Materials
(1) 375mm dia; x 1.83m R.C.C. pipe. each 6
(2) Cement. kg 127.6
(3) Sand. cum 0.4
(4) Shingle. cum 0.7
(5) Sundries. L.S
(6) Transport & Handling charges. L.S
Labour
(1) Plumber. Man-Day 5
(2) Mason. Man-Day 3
(3) Labour. Man-Day 16
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Materials
(1) lOOmm dia; x 0.61 m Stoneware pipe. each 18
(2) Cement. kg 67
(3) Sand. cum 0.2
(4) Shingle. cum 0.3
(5) Sundries. L.S
(6) Transport & Handling charges. L.S -
Labour
(I) Plumber. Man-Day 4
(2) Mason. Man-Day 1
(3) Labour. Man-Day 4
Materials
(1) lOOmm dia; x 0.61 m Stoneware pipe. each 18
(2) Cement. kg 67
(3) Sand. cum 0.2
(4) Shingle. cum 0.3
(5) Sundries. L.S
(6) Transport & Handling charges. L.S
Labour
(1) Plumber. Man-Day 4
(2) Mason. Man-Day 1
(3) Labour. Man-Day 5
Labour
(1) Plumber. Man-Day 4
(2) Mason. Man-Day 1
(3) Labour. Man-Day 6
Materials
(1) 150mm dia; x 0.61 m Stoneware pipe. each 18
(2) Cement. kg 119
(3) Sand. cum 0.3
(4) Shingle. cum 0.5
(5) Sundries. L.S -
(6) Transport & Handling charges. L.S -
Labour
(1) Plumber. Man-Day 4
(2) Mason. Man-Day 2
(3) Labour. Man-Day 5
Materials
(1) 150mm dia; x 0.61 m Stoneware pipe. each 18
(2) Cement. kg 119
(3) Sand. cum 0.3
(4) Shingle. cum 0.5
(5) Sundries. L.S
(6) Transport & Handling charges. L.S
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Contd: Item No.20.
Labour
(1) Plumber. Man-Day 4
(2) Mason. Man-Day 2
(3) Labour. Man-Day 6
Materials
(1) 150mm dia; x 0.61 m Stoneware pipe. each 18
(2) Cement. kg 119
(3) Sand. cum 0.3
(4) Shingle. cum 0.5
(5) Sundries. L.S
(6) Transport & Handling charges. L.S
Labour
(1) Plumber. Man-Day 4
(2) Mason. Man-Day 2
(3) Labour. Man-Day 7
Materials
(1) 200mm dia; x 0.76 m Stoneware pipe. each 15
(2) Cement. kg 184.6
(3) Sand. cum 0.4
(4) Shingle. cum 0.8
(5) Sundries. L.S
(6) Transport & Handling charges. L.S
Labour
(1) Plumber. Man-Day 4
(2) Mason. Man-Day 2
(3) Labour. Man-Day 6
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Materials
(1) 200mm dia; x 0.76 m Stoneware pipe. each 15
(2) Cement. kg 184.6
(3) Sand. cum 0.4
(4) Shingle. cum 0.8
(5) Sundries. L.S
(6) Transport & Handling charges. L.S
Labour
(1) Plumber. Man-Day 4
(2) Mason. Man-Day 2
(3) Labour. Man-Day 7
Materials
(1) 200mm dia; x 0.76 m Stoneware pipe. each 15
(2) Cement. kg 184.6
(3) Sand. cum 0.4
(4) Shingle. cum 0.8
(5) Sundries. L.S
(6) Transport & Handling charges. L.S
Labour
(1) Plumber. Man-Day 4
(2) Mason. Man-Day 2
(3) Labour. Man-Day 8
Labour
(1) Plumber. Man-Day 2
(2) Mason. Man-Day 1
(3) Labour. Man-Day 3
Materials
(I) lOOmm C.I. Pipe ( Spigot & Socket ) m 10
(2) P.C.4 compound. ( For 8 joints). kg 0.8
(3) Jute waste. (For 8 joints ) kg 0.4
(4) Cement. kg 10.5
(5) Sand. cum 0.1
(6) Shingle. cum 0.1
(7) Sundries. L.S
(8) Transport & Handling Charges. L.S
Labour
(1) Plumber. Man-Day 2
(2) Mason. Man-Day 1
(3) Labour. Man-Day 4
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Materials
(1) lOOmm C.I. Pipe ( Spigot & Socket ) m 10
(2) P.C.4 compound. ( For 8 joints ). kg 0.8
(3) Jute waste. ( for 8 joints ) kg 0.4
(4) Cement. kg 10.5
(5) Sand. cum 0.1
(6) Shingle. cum 0.1
(7) Sundries. L.S
(8) Transport & Handling Charges. L.S
Labour
(1) Plumber. Man-Day 3
(2) Mason. Man-Day 1
(3) Labour. Man-Day 5
Materials
(I) 150mm C.I. Pipe ( Spigot & Socket ) m 10
(2) P.C.4 compound. ( For 8 joints ). kg 1.2
(3) Jute waste. (For 8 joints ) kg 0.9
(4) Cement. kg 17.9
(5) Sand. cum 0.1
(6) Shingle. cum 0.1
(7) Sundries. L.S
(8) Transport & Handling Charges. L.S
Labour
(1) Plumber. Man-Day 3
(2) Mason. Man-Day 1
(3) Labour. Man-Day 4
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Materials
(1) 150mm C.I. Pipe ( Spigot & Socket ) m 10
(2) P.C.4 compound. ( For 8 joints ). kg 1.2
(3) Jute waste.( For 8 joints ) kg 0.9
(4) Cement. kg 17.9
(5) Sand. cum 0.1
(6) Shingle. cum 0.1
(7) Sundries. L.S
(8) Transport & Handling Charges. L.S
Labour
(I) Plumber. Man-Day 3
(2) Mason. Man-Day 1
(3) Labour. Man-Day 6
Materials
(I) 150mm C.I. Pipe ( Spigot & Socket ) m 10
(2) P.C.4 compound. ( For 8 joints ). kg 1.2
(3) Jute waste. (For 8 joints ) kg 0.9
(4) Cement. kg 17.9
(5) Sand. cum 0.1
(6) Shingle. cum 0.1
(7) Sundries. L.S
(8) Transport & Handling Charges. L.S
Labour
(1) Plumber. Man-Day 3
(2) Mason. Man-Day 1
(3) Labour. Man-Day 8
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Materials
(1) 200mm C.I. Pipe ( Spigot & Socket ) m 10
(2) P.C.4 compound. ( For 8 joints ). kg 1.8
(3) Jute waste. ( For 8 joints ) kg 1.5
(4) Cement. kg 35.8
(5) Sand. cum 0.1
(6) Shingle. cum 0.2
(7) Sundries. L.S
(8) Transport & Handling Charges. L.S
Labour
(1) Plumber. Man-Day 3
(2) Mason. Man-Day 1
(3) Labour. Man-Day 5
Materials
(1) 200mm C.I. Pipe ( Spigot & Socket ) m 10
(2) P.C.4 compound. ( For 8 joints ). kg 1.8
(3) Jute waste. (For 8 joints ) kg 1.5
(4) Cement. kg 35.8
(5) Sand. cum 0.1
(6) Shingle. cum 0.2
(7) Sundries. L.S
(8) Transport & Handling Charges. L.S
Labour
(1) Plumber. Man-Day 3
(2) Mason. Man-Day 1
(3) Labour. Man-Day 7
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Materials
(1) 200mm C.I. Pipe ( Spigot & Socket ) m 10
(2) P.C.4 compound. ( For 8 joints ). kg 1.8
(3) Jute waste. (For 8joints ) kg 1.5
(4) Cement. kg 35.8
(5) Sand. cum 0.1
(6) Shingle. cum 0.2
(7) Sundries. L.S
(8) Transport & Handling Charges. L.S
Labour
(1) Plumber. Man-Day 3
(2) Mason. Man-Day 2
(3) Labour. Man-Day 9
Materials
(1) 250mm C.I. Pipe ( Spigot & Socket ) m 10
(2) P.C.4 compound. ( For 8 joints ). kg 2.30
(3) Jute waste. (For 8 joints ) kg 1.8
(4) Cement. kg 35.8
(5) Sand. cum 0.1
(6) Shingle. cum 0.2
(7) Sundries. L.S
(8) Transport & Handling Charges. L.S
Labour
(1) Plumber. Man-Day 3
(2) Mason. Man-Day 2
(3) Labour. Man-Day 7
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Materials
(1) 250mm C.I. Pipe ( Spigot & Socket ) m 10
(2) P.C.4 compound. ( For 8 joints ). kg 0.8
(3) Jute waste. (For 8 joints ) kg 1.8
(4) Cement. kg 35.8
(5) Sand. cum 0.1
(6) Shingle. cum 0.2
(7) Sundries. L.S
(8) Transport & Handling Charges. L.S
Labour
(1) Plumber. Man-Day 3
(2) Mason. Man-Day 2
(3) Labour. Man-Day 8
Materials
(1) 250mm C.I. Pipe ( Spigot & Socket ) m 10
(2) P.C.4 compound. ( For 8 joints ). kg 2.3
(3) Jute waste. (For 8joints ) kg 1.8
(4) Cement. kg 35.8
(5) Sand. cum 0.1
(6) Shingle. cum 0.2
(7) Sundries. L.S
(8) Transport & Handling Charges. L.S
Labour
(I) Plumber. Man-Day 4
(2) Mason. Man-Day 2
(3) Labour. Man-Day 10
Sr.
PARTICULARS Unit Quantity Remarks.
No.
Materials
(1) 300mm C.I. Pipe ( Spigot & Socket ) m 10
(2) P.C.4 compound. ( For 8 joints ). kg 2.7
(3) Jute waste. (For 8joints ) kg 2
(4) Cement. kg 47.7
(5) Sand. cum 0.2
(6) Shingle. cum 0.3
(7) Sundries. L.S
(8) Transport & Handling Charges. L.S
Labour
(1) Plumber. Man-Day 5
(2) Mason. Man-Day 2
(3) Labour. Man-Day 8
Materials
(I) 300mm C.I. Pipe ( Spigot & Socket ) m 10
(2) P.C.4 compound. ( For 8joints ) . kg 2.7
(3) Jute waste. (For 8 joints ) kg 2
(4) Cement. kg 47.7
(5) Sand. cum 0.2
(6) Shingle. cum 0.3
(7) Sundries. L.S
(8) Transport & Handling Charges. L.S
Labour
(1) Plumber. Man-Day 5
(2) Mason. Man-Day 2
(3) Labour. Man-Day 10
Sr. PARTICULARS Unit Quantity Remarks.
No.
Materials
(1) 300mm C.I. Pipe ( Spigot & Socket ) m 10
(2) P.C.4 compound. ( For 8 joints ) . kg 2.7
(3) Jute waste. (For 8 joints ) kg 2
(4) Cement. kg 47.7
(5) Sand. cum 0.2
(6) Shingle. cum 0.3
(7) Sundries. L.S
(8) Transport & Handling Charges. L.S
Labour
(I) Plumber. Man-Day 5
(2) Mason. Man-Day 3
(3) Labour. Man-Day 11
P.V.C CEMENT
REQUIREMENTS
15 mm 400
20 mm 333
25 mm 300
32 mm 267
40 mm 167
50 mm 100
80 mm 67
100 mm 33
Requirement of Lubricant
for Ductile Iron Pipe
80 mm 12
100 mm 16
150 mm 24
200 mm 32
250 mm 40
300 mm 48
WATER QUALITY STANDARDS FOR DRINKING WATER (W.H.0 1972 1
EXCEPT RADIOACTIVE QUALITY 1
MAXIMUM MAXIMUM
SUBSTANCE DESIRABLE PERMISSIBLE
CONCENTRATION CONCENTRATION
For untreated waters : Not more than 3 Coliforms per 100 ml.
Samples taken from distribution networks.
Before inserting the gastket, the spigot of the one pipe and interior of the socket of
the adjacent pipe should be thoroughly cleaned.
(11) Fittings
When fittings are required for use in the run of main with Tyton Joints, one
of the following types is employed according to the standard applicable to the
straight pipes.
Sr.
Particulars Unit Quantity Remarks.
No.
I11 SANITARY APPLIANCES (Internal Accessories)
1 Supplying and fixing 1.W.C Pan with trap and foot tread,
high level flush tank and accessories complete.
( For one set )
Material
(1) 1.W.C Pan Set 1
(2) High Level Flush Tank with Accessories Set 1
(3) Flexible Connector 15mmxl5mm each 1
(4) 15mm 0 L-Valve each 1
(5) Brick each 100
(6) Cement kg 45.4
(7) Sand cum 0.5
(8) Aggregate cum 0.1
Labour
(1) Plumber Man-Day 2
(2) Mason Man-Day 1
(3) Worker Man-Day 2
2 Supplying and fixing E.W.C pan with "P" (or) "S" outgo,
low level flush cistern, E.W.C Seat with cover
and accessories complete
( For one set )
Materials
(1) E.W.C Pan Set 1
(2) Low Level Flush Tank with Accessories each 1
(3) Hand Spray each 1
(4) Flexible Connector 15mmxl5mm each 1
(5) 15mm 0 L-Valve each 1
(6) Seal Tape each
Labour
(1) Plumber Man-Day 2
(2) Worker Man-Day 1.5
Sr. Particulars Unit Quantity Remarks.
No.
Pair 1
(4) Sink Bracket
(5) Flexible Connector 15mmx15mm each i
-167
Sr.
Particulars Unit Quantity Remarks.
No.
Materials.
(1) Wall hand urinal (any size) each 1
(2) Flush valve (or) Automatic Flush sensor Set. 1
(3) Waste Pipe 32 mm 0 m 1
(4) Inlet and Outlet Accessaries L.S
(5) Urinal bracket with screws Pair 1
Labour
(1) Plumber Man-Day 2
(2) Worker Man-Day 2
Materials
(1) Stall urinal (any size) each 1
(2) Flush valve (or) Automatic Flush sensor each 1
(3) Waste Pipe 32 mm 0 m 1
(4) Inlet and Outlet Accessaries L.S
(5) Urinal bracket with screws Pair 1
Labour
(1) Plumber Man-Day 3
(2) Worker Man-Day 3
Materials
(1) Hand Dryer ( any size ) each 10
(2) Wall plug with screw each 40
Labour
(1) Plumber Man-Day 2
(2) Worker Man-Day 3
Sr.
Particulars Unit Quantity Remarks.
No.
8 Supplying and Installaion of Shower encloser
complete set without masonary work.
(For one no.)
Materials
(1) Glass (or) Fiber Trampar encloser Set 1
(2) Silicon Compound each 1
Labour
(1) Plumber Man-Day 2
(2) Worker Man-Day 3
Materials
(1) Bathtub, Jargucy complete Set. 1
Labour
(1) Plumber Man-Day 5
(2) Worker Man-Day 7
Materials
(1) Glass Mirror Set. 1
(2) Towel Rail each 1
(3) Tooth brush holder each 1
(4) Soap Holder each 1
(5) Paper Holder each 1
(6) Hook robe each 1
(7) Glass shelf with bracket each 1
(8) Screw and Wall Plug L.S
Labour
(1) Plumber Man-Day 2
(2) Worker Man-Day 3
Sr.
Particulars Unit Quantity Remarks.
No.
IV INTERNAL SOIL, SULLAGE & VENT PIPE
Materials
(1) 100 mm 0 P.V.C pipe (8.5) m 10.5
(2) P.V.C cement kg 0.1
(3) 100 mm 0 saddle each 10
(4) 32 mm 0 Screw with plastic wall plug each 20
Labour
(1) Plumber Man-Day 4
(2) Worker Man-Day 5
Materials
( 1 ) 100 mm 0 P.V.C fitting each 10
( 2 ) P.V.C cement kg 0.3
Labour
(1) Plumber Man-Day 1
(2) Worker Man-Day 1
Materials
(1) 80 mm 0 P.V.C pipe (8.5) m 10.5
(2) P.V.C cement kg 0.1
(3) 80 mm 0 Saddle each 10
(4) 32 mm 0 screw with plastic wall plug each 20
Labour
(1) Plumber Man-Day 3
(2) Worker Man-Day 4
Labour
(1) Plumber Man-Day 1
(2) Worker Man-Day 0.5
Materials
(1) 50 mm 0 P.V.C pipe (8.5) m 10.5
(2) P.V.C cement kg 0.1
(3) 50 mm 0 Saddle each 10
(4) 32 mm 0 screw with plastic wall plug each 20
Labour
(1) Plumber Man-Day 3
(2) Worker Man-Day 3
Materials
(1) 50 mm 0 PVC fitting Joint 10
(2) PVC cement kg 0.2
Labour
(1) Plumber Man-Day 0.5
(2) Worker Man-Day 0.5
Materials
(1) 40 mm 0 P.V.C pipe (8.5) m 10.5
(2) P.V.C cement kg 0.1
(3) 40 mm 0 Saddle each 10
(4) 32 mm screw with plastic wall plug each 20
-
r. Unit lemarks
Particulars
lo.
-
Eon: Item No.(7)
iabour
:I) Plumber
:2) Worker
Materials
:I) 40 mm 0 P.V.C fititng each
(2) P.V.C cement kg
Labour
(1) Plumber
Materials
(1) 32 mm 0 P.V.C pipe (8.5) m
(2) P.V.C cement kg
(3) 32 mm 0 Saddle each
(4) 32 mm screw with plastic wall plug each
Labour
(1) Plumber Jan-Da
(2) Worker Jan-Da
Materials
(1) 32 mm 0 P.V.C fitting each
(2) P.V.C cement kg
Labour
(1) Plumber
Particulars Unit Quantit
WATER TANK INSTALLATION
Materials
(1) 1000 litre Water tank each
Labour
(1) Up to 6 metre ; Plumber vlan-Day 2
Worker Ylan-Day 3
(2) Up to 10 metre; Plumber Jlan-Day 2
Worker ifan-Day 4
(3) Up to 12 metre; Plumber dan-Day 2
Worker /Ian-Day 5
(4) Up to 15 metre; Plumber /Ian-Day 2
Worker /Ian-Day 6
Materials
:I) 1800 litre Water tank each 1
Labour
:1) Up to 10 metre; Plumber San-Day 2
Worker San-Day 7
:2) Up to 12 metre; Plumber tan-Day 2
Worker tan-Day 8
:3) Up to 15 metre; Plumber tan-Day 2
Worker fan-Day 9
Sr.
Particulars Unit Quantity Remarks.
No.
VI. HOT WATER PIPE & INSTALLATION
Materials
(1) (P.A.P) Hot water pipe 15mm 0, 20 mm 0 m 10.5
(2) Fitting (Brass coupling type) L.S
Labour
(I) Plumber Man-Day 3
(2) Worker Man-Day 4
Materials
(1) (P.A.P) Hot water pipe 25 mmo m 10.5
(2) Fitting (Brass coupling type) L.S
Labour
(1) Plumber Man-Day 4
(2) Worker Man-Day 4
Materials
(1) Water Heater (Boiler Type) each 1
(2) Heater bracket Pair 1
(3) 9 mm 0 Steel wall plug with washer each 8
(4) Flexible steel connector each 2
(5) Angle valve each 2
Labour.
(30 to 80 litre)
(1) Plumber Man-Day 2
(2) Worker Man-Day 3
Labour.
(100 litre and above)
(1) Plumber Man-Day 3
(2) Worker Man-Day 3
Sr.
Particulars Unit Quantity Remarks.
No.
4 Supplying and Installation of Instant Water Heater
without electrical work.
( For one no. )
Materials
(1) Instant Water Heater with accessories Set. 1
(2) 15mrnx15mm Steel connector each 2
(3) Seal tape Coil 4
(4) Angle valve each 2
Labour.
(1) Plumber Man-Day 2
(2) Worker Man-Day 2
--
-
Sr. Unit
Particulars
No.
-
WII. INTERNAL INSTALLATION
Labour.
(1) Worker
Labour.
[I) Worker
Labour.
(1) Worker for 115mm wall
(2) Worker for 230mm wall
(3) Worker for 345mm wall
(4) Worker for 450mm wall
Labour.
(1) Worker for 100mm Thk; R.C.Cfloor &wall
(2) Worker for 150mm Thk; R.C.C floor &wall
aaterials
11) Saddle bracket, M.S,G.I,PVC each
:2) No.7 Plastic wall plug each
:3) 32mm Steel screw each
Labour.
(1) Plumber
(2) Worker
-
Sr.
Particulars Unit Remarks
go
-
6 Supplying and Installation of saddle bracket lOOmm 0
to 300mm 0
( For 10 nos. )
Materials
(1) Saddle bracket, M.S,G.I each
(2) 9mm 0 Steel wall plug each
Labour.
(1) Plumber
(2) Worker
Materials
(1) Hanger ring bracket each
(2) 9 mm 0 Hanger rod m
(3) 9 mm 0 Steel wall plug with Jamnor each
Labour.
(1) Plumber Aan-Da,
(2) Worker Aan-Da
Materials
(1) Hanger ring bracket each
(2) 15 mm 0 Hanger rod m
(3) 15 mm 0 Steel wall plug with Jamnor each
Labour.
(1) Plumber
(2) Worker
Sr.
Particulars Unit Quantity Remarks.
No.
VIII. EXTERNAL P.V.C WATER PIPE (Solvent Joint)
Materials.
(1) 150 mm 0 P.V.C Pipe m 10.5
(2) P.V.C Cement kg 0.1
Labour.
(1) Plumber. Man-Day 3
(2) Worker Man-Day 4
Materials.
(1) 150 mm 0 P.V.C Fitting Joints 10
(2) P.V.C Cement kg 0.1
Labour.
(1) Plumber. Man-Day 1.5
(2) Worker Man-Day 1.5
Materials.
(1) 200 mm 0 P.V.C Pipe m 10.5
(2) P.V.C Cement kg 0.2
Labour.
(1) Plumber. Man-Day 4
(2) Worker Man-Day 5
Materials.
(1) 200 mm 0 P.V.C Fitting Joints 10
(2) P.V.C Cement kg 0.7
Sr. Unit Quantity Remarks.
Particulars
No.
Con: Item No.@)
Labour.
(1) Plumber. Man-Day 2
(2) Worker Man-Day 2
Materials.
(1) 250 mm 0 P.V.C Pipe m 10.5
(2) P.V.C Cement kg 0.2
Labour.
(1) Plumber. Man-Day 6
(2) Worker Man-Day 8
Materials.
(1) 250 mm 0 P.V.C Fitting Joints 10
(2) P.V.C Cement kg 1
Labour.
(1) Plumber. Man-Day 3
(2) Worker Man-Day 3.5
Materials.
(1) 300 mm 0 P.V.C Pipe m 10.5
(2) P.V.C Cement Tin 1
Labour.
(1) Plumber. Man-Day 7
(2) Worker Man-Day 9
Sr. Particulars Unit Quantity Remarks.
No.
8 Fixing and jointing 300 mm 0 P.V.C Fittings with supply
of jointing materials.
( For 10 joints. )
Materials.
(1) 300 mm 0 P.V.C Fitting Joints 10
(2) P.V.C Cement Tin 5
Labour.
(1) Plumber. Man-Day 4
(2) Worker Man-Day 3.5
Materials.
(1) Water Sprinkler each 10
(2) Necessary fittings L.S
(3) Seal tape each 10
Labour.
(1) Plumber. Man-Day 2
(2) Worker Man-Day 3
Sr.
Particulars Unit Quantity Remarks.
No.
X. SWIMMING POOL & SPA POOL EQUIPMENT INSTALLATION
1 Supplying and Installation of Swimming pool equipment
(not including piping work).
( For one pool )
Materials.
(1) High rate filter with multi valve (Any size) Set. 2
(2) Self priming pump (Any size) Set. 2
(3) 50 mm 0 Ball flout valve (for inlet pipe line) each 1
(4) P.V.C over flow grating for 225mm channel L.S
(5) 40 mm 0 floor inlet nozzle each 5
(6) 40 mm 0 vaccum fitting each 2
(7) Chemical dozing pump (for Alum & Soda ash) Set. 2
(8) Chemical dozing pump - 2L/H x 6 bar
(for chlorine) Set. 1
(9) Paddle with motor for chemical tank Set. 3
(10) 225mrnx225mm(or)300mmx300mm main drain Set. 1
frame & grating
(1 1) 150 mm 0 Stainless steel strainer each 3
(12) Stainless steel pool ladder Set. 2
(13) Miscellaneous Item. 1
Labour.
(Up to 180000 litre)
(1) Plumber Man-Day 40
(2) Worker Man-Day 90
Labour.
(Above 180000 litre)
(1) Plumber Man-Day 97
(2) Worker Man-Day 155
Materials.
(1) Delux test kid for pH Set. 1
(2) Delux test kid for chlorine Set. 1
(3) 40 mm 0 -30m flexible vaccum hose pipe each 2
(4) 450 mm Nylon wall brush each 1
(5) 40 mm 0 Vaccum head each 1
(6) 150 mm Stainless steel algae brush each 1
(7) Leaf skimmer each 1
(8) Portable vaccum pump Set. 1
(9) Chlorine powder 90% (50 kg) Drum 2
Sr.
Particulars Unit Quantity Remarks.
No.
Con: Item No.(2)
(10) Aluminium sulphate (50 kg) kg 250
Labour.
(Up to 180000 litre)
(1) Plumber each 40
(2) Worker each 90
Labour.
(Above 180000 litre)
(1) Plumber Man-Day 80
(2) Worker Man-Day 100
Materials.
(1) 1.5 k.W Blower pump(Commercial) Set. 1
(2) 1.5 k.W Self priming pump with strainer pump Set. 2
(3) 0.75 k.W Drain pump Set. 1
(4) 40 mm 0 Adjustable jet air fitting set Set. 4
(5) 25 mm 0 Air volume control with venturg air pipe Set. 2
(6) 20 mm 0 Amti-vartex main drain frame and grate Set. 1
(7) 40 mm 0 x 90 degree Suction fitting each 2
(8) Miscellaneous Item. 1
Labour.
(I) Plumber Man-Day 50
(2) Worker Man-Day 90
-
Sr.
Particulars Unit Remark
-
No,
XI, G.1 WATER PIPE (External)
1 Laying and jointing 150mm G.1 pipe with fitting including
supply of jointing materials. (External work)
(For 10 metre)
Materials
(1) Sundries
Labour
(1) Plumber
(2) Labour
Materials
(1) Sundries
Labour
(1) Plumber
(2) Labour
Materials
(1) Sundries
,abour
11) Plumber
12) Labour
daterials
11) Sundries
,abour
11) Plumber
12) Labour