This document contains two equipment maintenance planning reports from PT.CHAROEN POKPHAND INDONESIA for the months of November and December 2017. The reports list machines, their locations, planned and actual dates for oil replacement or adding. Over 150 machines across various floors and areas are included spanning elevators, mixers, conveyors and more. The reports are signed by the maintenance supervisor, schedule head, and maintenance manager.
This document contains two equipment maintenance planning reports from PT.CHAROEN POKPHAND INDONESIA for the months of November and December 2017. The reports list machines, their locations, planned and actual dates for oil replacement or adding. Over 150 machines across various floors and areas are included spanning elevators, mixers, conveyors and more. The reports are signed by the maintenance supervisor, schedule head, and maintenance manager.
This document contains two equipment maintenance planning reports from PT.CHAROEN POKPHAND INDONESIA for the months of November and December 2017. The reports list machines, their locations, planned and actual dates for oil replacement or adding. Over 150 machines across various floors and areas are included spanning elevators, mixers, conveyors and more. The reports are signed by the maintenance supervisor, schedule head, and maintenance manager.
This document contains two equipment maintenance planning reports from PT.CHAROEN POKPHAND INDONESIA for the months of November and December 2017. The reports list machines, their locations, planned and actual dates for oil replacement or adding. Over 150 machines across various floors and areas are included spanning elevators, mixers, conveyors and more. The reports are signed by the maintenance supervisor, schedule head, and maintenance manager.
Download as XLS, PDF, TXT or read online from Scribd
Download as xls, pdf, or txt
You are on page 1of 2
PT.
CHAROEN POKPHAND INDONESIA F-04/CPI-MTN-B02
KRIAN EQUIPMENT MAINTENANCE PLANNING REPORT OIL REPLACE / ADDING Date : 01 / 11 / 2017 to 30 / 11 / 2017 No Machine Name Location Planning Date Execution Date