QA/QC Training: Doc No. M707-QMS-FRM-A-0004 Rev. No. 00 Rev. Date 07 JUL 2018
QA/QC Training: Doc No. M707-QMS-FRM-A-0004 Rev. No. 00 Rev. Date 07 JUL 2018
QA/QC Training: Doc No. M707-QMS-FRM-A-0004 Rev. No. 00 Rev. Date 07 JUL 2018
M707-QMS-FRM-A-0004
Rev. No. 00
QA/QC Training Rev. Date 07th JUL 2018
Training Topic : Hydraulic Cements and Typical Concrete Tests______________ Date: 13th JUL 2018
6. What type of test is generally performed in fresh concrete to determine the workability?
A) Air content test B) Density test C) Slump test
7. Collection of first and last portion of the fresh concrete sampling process to be
completed within_______
A) 10 Min B) 15 Min C) 5 Min
10. According to SEC standard (70-TMSS-03, Rev.01) what is maximum limit of concrete
temperature during hot weather condition (May to October)?
A) 32*C B) 29*C C) 34*C
Page | 1