REQUEST FOR INSPECTION

(To be filled in by contractor)


Contractor Request No:AKL-800- (Por-1)(ELECTRICAL
Date: Check the box if this request is for re-inspection.
Project Title :380 Kv OHTL works associated with integration of PP11 (Phase II)
Contractor No : 31131121/00 Bill No : Job No: 1-1111014.02
Contractor : ALSHARIF KEC
Inspection category & Application (Check Appropriate box)

Civil /Architectural X Electrical Safety

Mechanical Communication Other (Specify)


1. Item for Inspection : To check lattice steel grounding between stub & rebars of tower pile foundation
2. Relevant Space & Drawings : PTS-11CO338
3. Location :
4. Inspection Date : Time :
Work is ready for Inspection and complies with the scope of work and technical Specification

Name Signature & Date Mob.No :0547515566


Contractor QA/QC Engineers ( AL SHARIF KEC) Fax. No :01-4565340

TO BE FILLED IN BY CONSULTANTS

Please send your Inspector / safety Engineers to conduct inspection of the work covered by this
Inspection Request.

Tel.No: 054 232 2089


Civil / Mech/Elec. Engineer Project Manager Tel.No: 01-494 5400
TO BE FILLED IN BY INSPECTOR ( CONSULTANTS)
Inspection Result & Comments : Control No:
1 Inspection Date & Time :
2 Results and Comments : See below Refer to Logbook Page No.
Inspected by : Return :
Signature : Name : Engr.Mohammed Jalaluddin
Name/Dep/Div : ( CONSULTANT) Sr.Enginner,Civil & EM/FF works
Date : Tel. No.
Tel. No: 01-4643333, Fax No.01-2932536
Note : Send this inspection Request 48 hours in advance prior to start of the activity, except
re- Inspection and concreting work where only 24 hours advance notice required.
(Por-1)(ELECTRICAL)
e-inspection.

14.02

SCADA

of tower pile foundation

15566
5340

by this

2089

k Page No.
ed Jalaluddin
& EM/FF works

333, Fax No.01-2932536


REQUEST FOR INSPECTION
(To be filled in by contractor)
Contractor Request No:AKL-800- (Por-1)(ELECTRICAL
Date: Check the box if this request is for re-inspection.
Project Title :380 Kv OHTL works associated with integration of PP11 (Phase II)
Contractor No : 31131121/00 Bill No : Job No: 1-1111014.02
Contractor : ALSHARIF KEC
Inspection category & Application (Check Appropriate box)

Civil /Architectural X Electrical Safety

Mechanical Communication Other (Specify)


1. Item for Inspection : To check laying of grounding conductor & its thermo-welding to grounding rod
2. Relevant Space & Drawings : PTS-11CO338 & CA-273070,S.NO:01,R.NO:01

3. Location :
4. Inspection Date : Time :
Work is ready for Inspection and complies with the scope of work and technical Specification

Name Signature & Date Mob.No :0547515566


Contractor QA/QC Engineers ( AL SHARIF KEC) Fax. No :01-4565340

TO BE FILLED IN BY CONSULTANTS

Please send your Inspector / safety Engineers to conduct inspection of the work covered by this
Inspection Request.

Tel.No: 054 232 2089


Civil / Mech/Elec. Engineer Project Manager Tel.No: 01-494 5400
TO BE FILLED IN BY INSPECTOR ( CONSULTANTS)
Inspection Result & Comments : Control No:
1 Inspection Date & Time :
2 Results and Comments : See below Refer to Logbook Page No.
Inspected by : Return :
Signature : Name : Engr.Mohammed Jalaluddin
Name/Dep/Div : ( CONSULTANT) Sr.Enginner,Civil & EM/FF works
Date : Tel. No.
Tel. No: 01-4643333, Fax No.01-2932536
Note : Send this inspection Request 48 hours in advance prior to start of the activity, except
re- Inspection and concreting work where only 24 hours advance notice required.
(Por-1)(ELECTRICAL)
e-inspection.

14.02

SCADA

lding to grounding rod

15566
5340

by this

2089

k Page No.
ed Jalaluddin
& EM/FF works

333, Fax No.01-2932536


REQUEST FOR INSPECTION
(To be filled in by contractor)
Contractor Request No:AKL- 800 - 1 (ELECTRICAL)
Portion II Part A
Date: 22-Dec-13 Check the box if this request is for re-inspection.
Project Title :380 Kv OHTL works associated with integration of PP11 (Phase II)
Contractor No : 31131121/00 Bill No : Job No: 1-1111014.02
Contractor : ALSHARIF KEC
Inspection category & Application (Check Appropriate box)

Civil /Architectural X Electrical Safety

Mechanical Communication Other (Specify)


1. Item for Inspection : To check laying of grounding conductor & its thermo-welding to grounding rod
2. Relevant Space & Drawings : PTS-11CO338 & CA-273070,S.NO:01,R.NO:01
3. Location : From 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15 (Total 15 towers)
4. Inspection Date : 23-Dec-13 Time : 10.00 AM
Work is ready for Inspection and complies with the scope of work and technical Specification

Name Signature & Date Mob.No :0547515566


Contractor QA/QC Engineers ( AL SHARIF KEC) Fax. No :01-4565340

TO BE FILLED IN BY CONSULTANTS

Please send your Inspector / safety Engineers to conduct inspection of the work covered by this
Inspection Request.

Tel.No: 054 232 2089


Civil / Mech/Elec. Engineer Project Manager Tel.No: 01-494 5400
TO BE FILLED IN BY INSPECTOR ( CONSULTANTS)
Inspection Result & Comments : Control No:
1 Inspection Date & Time :
2 Results and Comments : See below Refer to Logbook Page No.
Inspected by : Return :
Signature : Name : Engr.Mohammed Jalaluddin
Name/Dep/Div : ( CONSULTANT) Sr.Enginner,Civil & EM/FF works
Date : Tel. No.
Tel. No: 01-4643333, Fax No.01-2932536
Note : Send this inspection Request 48 hours in advance prior to start of the activity, except
re- Inspection and concreting work where only 24 hours advance notice required.
1 (ELECTRICAL)

e-inspection.

14.02

SCADA

lding to grounding rod

l 15 towers)

15566
5340

by this

2089

k Page No.
ed Jalaluddin
& EM/FF works

333, Fax No.01-2932536


Construction of 380kV D/C OHTL interconnected to Dharan South, New Dharan Central and DHO BSP

Portion XII - Construction of (2) 380kV D/C OHTL between Damma Housing -Ghazlan Power Plant and Dammam
SITE PROGRESS CERTIFICATION FOR TOWER GROUNDING RESISTANCE Model No. : Serial
MEASUREMENT No. :
SL.NO. DATE TOWER NO. LEG 25-50 mts 25-50 mts 25-50 mts Avg
A 3.12 1.02 2.6 2.25
1 T#3A
C 2.36 1.25 2.19 1.93

A 2.57 1.88 2.01 2.15


2 T#3B
C 2.31 2.43 2.21 2.32

A 3.1 1.31 2.49 2.30


3 T#4A
C 1.6 3.27 3.1 2.66
11-Oct-17
A 2.44 1.02 1.46 1.64
4 T#4B
C 1.74 1.59 1.81 1.71

A 1.36 1.09 1.01 1.15


5 T#5A
C 0.4 0.24 0.26 0.30

A 1.34 1.08 1.4 1.27


6 T#5B
C 2.31 1.78 1.92 2.00

A
7
C

A
8
C

A
9
C

A
10
C

A
11
C

A
12
C

QA/QC ENGINEER AL-SHARIF KEC Consultant Engineer

NAME: NAME:
SIGNATURE : SIGNATURE:

RFI # :- DATE:
Contract No.: 4400008460

mma Housing -Ghazlan Power Plant and Dammam Housing - Ghunan BSP
Megger DET4TC2
101221958
REMARKS

Consultant Engineer

NAME:
SIGNATURE:

DATE:
Construction of 380kV D/C OHTL interconnected to Dharan South, New Dharan Central and DHO BSP

Portion XII - Construction of (2) 380kV D/C OHTL between Damma Housing -Ghazlan Power Plant and Dammam
SITE PROGRESS CERTIFICATION FOR TOWER GROUNDING RESISTANCE Model No. : Serial
MEASUREMENT No. :
SL.NO. DATE TOWER NO. LEG 25-50 mts 25-50 mts 25-50 mts Avg
A 2.57 2.6 2.68 2.62
1 T#2A
C 2.4 2.71 2.14 2.42

A 2.87 2.86 2.04 2.59


2 T#2B
C 2.4 2.57 2.51 2.49

A 1.7 1.68 1.42 1.60


3 T#6A
C 1.57 1.67 1.45 1.56

A 1.3 1.34 1.87 1.50


4 T#6B
C 1.28 1.43 1.41 1.37

A 1.42 1.61 1.71 1.58


5 T#7A
C 1.64 1.78 1.91 1.78

A 2.41 2.91 2.76 2.69


6 T#7B
C 2.67 2.59 2.46 2.57
12-Oct-17
A 2.81 2.01 2.41 2.41
7 T#8A
C 2.14 2.22 2.53 2.30

A 2.17 2.46 2.74 2.46


8 T#8B
C 2.16 2.18 2.22 2.19

A 1.94 1.36 1.46 1.59


9 T#9A
C 1.79 1.45 1.24 1.49

A 1.7 1.84 1.97 1.84


10 T#9B
C 1.46 1.87 1.74 1.69

A 1.79 1.48 1.26 1.51


11 T#10A
C 1.86 1.87 1.21 1.65

A 1.48 1.74 1.46 1.56


12 T#10B
C 1.48 1.52 1.15 1.38

QA/QC ENGINEER AL-SHARIF KEC Consultant Engineer

NAME: NAME:
SIGNATURE : SIGNATURE:

RFI # :- DATE:
Contract No.: 4400008460

mma Housing -Ghazlan Power Plant and Dammam Housing - Ghunan BSP
Megger DET4TC2
101221958
REMARKS

Consultant Engineer

NAME:
SIGNATURE:

DATE:
Construction of 380kV D/C OHTL interconnected to Dharan South, New Dharan Central and DHO BSP

Portion XII - Construction of (2) 380kV D/C OHTL between Damma Housing -Ghazlan Power Plant and Dammam
SITE PROGRESS CERTIFICATION FOR TOWER GROUNDING RESISTANCE Model No. : Serial
MEASUREMENT No. :
SL.NO. DATE TOWER NO. LEG 25-50 mts 25-50 mts 25-50 mts Avg
A 1.46 1.78 1.46 1.57
1 T#11A
C 1.74 1.45 1.24 1.48

A 1.72 1.67 1.46 1.62


2 T#11B
C 1.47 1.67 1.54 1.56

A 1.21 1.34 1.4 1.32


3 T#12A
C 1.54 1.61 1.36 1.50

A 1.27 1.29 1.45 1.34


4 T#12B
C 1.74 1.46 1.24 1.48

A 1.56 1.34 1.27 1.39


5 T#13A
C 1.76 1.58 1.66 1.67

A 1.94 1.48 1.62 1.68


6 T#13B
C 1.49 1.57 1.24 1.43
18-Oct-17
A 1.25 1.67 1.76 1.56
7 T#14A
C 1.37 1.57 1.64 1.53

A 2.49 2.79 1.99 2.42


8 T#14B
C 2.46 2.06 2.47 2.33

A 2.02 2.78 2.41 2.40


9 T#15A
C 2.49 2.54 2.11 2.38

A 2.02 2.4 2.14 2.19


10 T#15B
C 2.16 1.97 2.46 2.20

A 1.48 1.42 1.68 1.53


11 T#16A
C 1.65 1.27 1.37 1.43

A 1.76 1.64 1.57 1.66


12 T#16B
C 1.04 1.09 1.12 1.08

QA/QC ENGINEER AL-SHARIF KEC Consultant Engineer

NAME: NAME:
SIGNATURE : SIGNATURE:

RFI # :- DATE:
Contract No.: 4400008460

mma Housing -Ghazlan Power Plant and Dammam Housing - Ghunan BSP
Megger DET4TC2
101221958
REMARKS

Consultant Engineer

NAME:
SIGNATURE:

DATE:
Construction of 380kV D/C OHTL interconnected to Dharan South, New Dharan Central and DHO BSP

Portion XII - Construction of (2) 380kV D/C OHTL between Damma Housing -Ghazlan Power Plant and Dammam
SITE PROGRESS CERTIFICATION FOR TOWER GROUNDING RESISTANCE Model No. : Serial
MEASUREMENT No. :
SL.NO. DATE TOWER NO. LEG 25-50 mts 25-50 mts 25-50 mts Avg
A 1.82 1.67 1.49 1.66
1 T#17A
C 1.64 1.28 1.62 1.51

A 1.67 1.52 1.2 1.46


2 T#17B
C 1.69 2.01 1.89 1.86

A 2.31 2.9 2.4 2.54


3 T#18A
C 1.99 2.41 2.18 2.19

A 1.89 1.93 2.17 2.00


4 T#18B
C 2.24 2.04 1.98 2.09
21-Oct-17
A 1.67 1.34 1.25 1.42
5 T#19A
C 1.64 1.84 1.47 1.65

A 2.79 2.47 2.67 2.64


6 T#19B
C 2.41 3.4 2.97 2.93

A 4.34 4.82 5.01 4.72


7 T#20A
C 4.97 4.38 4.79 4.71

A 7.41 7.64 7.81 7.62


8 T#20B
C 7.37 8.4 8.12 7.96

0.00
9
0.00

0.00
10
0.00

0.00
11
0.00

0.00
12
0.00

QA/QC ENGINEER AL-SHARIF KEC Consultant Engineer

NAME: NAME:
SIGNATURE : SIGNATURE:

RFI # :- DATE:
Contract No.: 4400008460

mma Housing -Ghazlan Power Plant and Dammam Housing - Ghunan BSP
Megger DET4TC2
101221958
REMARKS

Consultant Engineer

NAME:
SIGNATURE:

DATE:
Construction of 380kV D/C OHTL interconnected to Dharan South, New Dharan Central and DHO BSP

Portion XII - Construction of (2) 380kV D/C OHTL between Damma Housing -Ghazlan Power Plant and Dammam
SITE PROGRESS CERTIFICATION FOR TOWER GROUNDING RESISTANCE Model No. : Serial
MEASUREMENT No. :
SL.NO. DATE TOWER NO. LEG 25-50 mts 25-50 mts 25-50 mts Avg
A 0.75 0.79 0.81 0.78
1 T#21A
C 1.1 0.87 1 0.99

A 1.7 1.2 1.1 1.33


2 T#21B
C 1.4 0.9 1.4 1.23

A 1.21 1.05 1.09 1.12


3 T#22A
C 1.74 1.4 1.14 1.43

A 1.27 1.4 1.36 1.34


4 T#22B
C 1.21 0.98 1.54 1.24

A 3.1 1.2 1.97 2.09


5 T#23A
C 2.01 1.48 1.91 1.80

A 1.87 1.86 1.64 1.79


6 T#23B
C 1.97 1.88 1.74 1.86

A 1.34 1.2 1.13 1.22


7 T#24A
C 1.03 1.48 1.64 1.38
11-Feb-18
A 1.32 1.02 1.54 1.29
8 T#24B
C 1.97 2.01 1.62 1.87

A 1.24 1.64 1.36 1.41


9 T#25A
C 1.21 1.54 1.32 1.36

A 1.03 1.57 1.71 1.44


10 T#25B
C 1.97 2.1 2.01 2.03

A 1.36 1.78 1.97 1.70


11 T#26A
C 1.24 1.6 1.34 1.39

A 1.35 1.57 1.99 1.64


12 T#26B
C 1.45 1.54 1.35 1.45

A 1.032 1.02 1.367 1.14


13 T#27A
C 2.01 1.54 4.1 2.55
11-Feb-18

A 1.025 1.02 1.54 1.20


14 T#27B
C 1.64 1.54 1.36 1.51

QA/QC ENGINEER AL-SHARIF KEC Consultant Engineer

NAME: PRABHAKAR SEKAR NAME:

SIGNATURE : SIGNATURE:

RFI # :- ASKEC-M707-A-PXII-ELE-65 DATE:


Contract No.: 4400008460

mma Housing -Ghazlan Power Plant and Dammam Housing - Ghunan BSP
Megger DET4TC2
101221958
REMARKS
Consultant Engineer

NAME:

SIGNATURE:

DATE:
Construction of 380kV D/C OHTL interconnected to Dharan South, New Dharan Central and DHO BSP

Portion XII - Construction of (2) 380kV D/C OHTL between Damma Housing -Ghazlan Power Plant and Dammam
SITE PROGRESS CERTIFICATION FOR TOWER GROUNDING RESISTANCE Model No. : Serial
MEASUREMENT No. :
SL.NO. DATE TOWER NO. LEG 25-50 mts 25-50 mts 25-50 mts Avg
A 1.36 1.578 2.101 1.68
1 T#28A
C 1.67 2.59 2.1 2.12

A 2.34 2.47 2.36 2.39


2 T#28B
C 2.14 2.14 2.31 2.20

A 2.35 1.64 2.4 2.13


3 T#29A
C 2.64 2.14 2.78 2.52

A 2.49 2.67 2.14 2.43


4 T#29B
C 1.97 2.01 2.4 2.13
12-Feb-18
A 2.36 2.01 2.14 2.17
5 T#30A
C 2.45 2.02 1.97 2.15

A 1.36 1.64 1.95 1.65


6 T#30B
C 2.97 2.01 2.16 2.38

A 1.69 2.14 2.34 2.06


7 T#31A
C 1.69 2.14 2.49 2.11

A 2.79 2.41 2.34 2.51


8 T#31B
C 2.78 2.46 2.15 2.46

A 2.5 2.1 2.3 2.30


9 T#32A
C 3.01 2.94 2.47 2.81

A 1.69 2.01 1.97 1.89


10 T#32B
C 1.64 2.06 2.1 1.93

A 0.00
11
C 0.00

A 0.00
12
C 0.00

QA/QC ENGINEER AL-SHARIF KEC Consultant Engineer

NAME: PRABHAKAR SEKAR NAME:


SIGNATURE : SIGNATURE:

RFI # :- ASKEC-M707-A-PXII-ELE-66 DATE:


Contract No.: 4400008460

mma Housing -Ghazlan Power Plant and Dammam Housing - Ghunan BSP
Megger DET4TC2
101221958
REMARKS

Consultant Engineer

NAME:
SIGNATURE:

DATE:
Construction of 380kV D/C OHTL interconnected to Dharan South, New Dharan Central and DHO BSP

Portion XII - Construction of (2) 380kV D/C OHTL between Damma Housing -Ghazlan Power Plant and Dammam
SITE PROGRESS CERTIFICATION FOR TOWER GROUNDING RESISTANCE Model No. : Serial
MEASUREMENT No. :
SL.NO. DATE TOWER NO. LEG 25-50 mts 25-50 mts 25-50 mts Avg
A 1.13 1.051 1.41 1.20
1 T#1A
C 2.39 1.04 2.01 1.81

A 0.68 0.87 0.91 0.82


2 T#1B
C 0.62 0.45 0.71 0.59

A 0.00
3
C 0.00

A 0.00
4
C 0.00
20-Feb-18
A 0.00
5
C 0.00

A 0.00
6
C 0.00

A 0.00
7
C 0.00

A 0.00
8
C 0.00

A 0.00
9
C 0.00

A 0.00
10
C 0.00

A 0.00
11
C 0.00

A 0.00
12
C 0.00

QA/QC ENGINEER AL-SHARIF KEC Consultant Engineer

NAME: NAME:
SIGNATURE : SIGNATURE:

RFI # :- DATE:
Contract No.: 4400008460

mma Housing -Ghazlan Power Plant and Dammam Housing - Ghunan BSP
Megger DET4TC2
101221958
REMARKS

Consultant Engineer

NAME:
SIGNATURE:

DATE: