TCC Test

This one-line diagram shows the electrical network for a motor acceleration analysis, including two 6.6kV buses connected by cables, transformers, and circuit breakers feeding various loads totaling several megavolt-amperes. Buses and equipment are interconnected through cables and transformers to provide power to critical systems and spare capacity for future expansion.

Uploaded by

kumar
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views

TCC Test

This one-line diagram shows the electrical network for a motor acceleration analysis, including two 6.6kV buses connected by cables, transformers, and circuit breakers feeding various loads totaling several megavolt-amperes. Buses and equipment are interconnected through cables and transformers to provide power to critical systems and spare capacity for future expansion.

Uploaded by

kumar
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

One-Line Diagram - OLV1 (Motor Acceleration Analysis)

U1
762.102 MVAsc

U2
457.261 MVAsc

T2
12 MVA

Open
Bus2 6.6 kV

Bus1
6.6 kV

Cable1
Cable6 Cable2 Cable3 Cable11 Cable8
Cable22 Cable4 Cable5 Cable9 Cable10 Cable7
Cable12 Cable26
Cable23
Bus20
6.6 kV

TCC#2 TCC#7
250 kW TCC#3 TCC#4
HWT TRAFO1 500 kW 710 kW CO-17A SPARE
2.5 MVA 630 kW 200 kW TCC#5
SPARE MOTOR FEEDER 2.5 MVA 450 kW 710 kW
hwt trafo 2 2 MVA 2.5 MVA
SPARE TRAFO#1 TCC#1 500 kW
2 MVA 315 kW track hopper trafo#2 SPARE TRAFO#3
Track hopper trafo 2mva 2.5 MVA
Load1
1 MVA Load2
1 MVA

page 1 17:07:45 Jan 12, 2018 Project File: TCC SLD 120118