Business 51

PROJECT WATCH – kuwait*


Project Budget ($ US) Facility Status
Al-Khafji Joint Operations (KJO) – Dorra Offshore Gas Field Development $5,000,000,000 Gas Field EPC ITB
Equate – Olefins III $300,000,000 Ethylene EPC ITB
Khafji Joint Operations (KJO) – Hout Field Associated Gas Facilities $500,000,000 Gas Gathering Centre EPC ITB
Khafji Joint Operations (KJO) – Expansion of Oil Processing Facilities Unknown Refinery PMC ITB
Khafji Joint Operations (KJO) – Gas and NGL Export Facilities $50,000,000 Natural Gas Liquefaction (NGL) EPC
Khafji Joint Operations (KJO) – Natural Gas Pipeline $114,000,000 Gas Pipeline EPC ITB
Khafji Joint Operations (KJO)- Hout Field Offshore Associated Gas Facilities Unknown Gas Pipeline EPC ITB
KJO – Al-Khafji Offshore Facilities 400,000,000 Oil Processing Facility PMC ITB
KNLOC – Lube Oil Project 400,000,000 Oil Production PMC ITB
KNPC – Al Zour Refinery Marine Export Terminal (Package V) 1,100,000,000 Marine Terminal EPC
KNPC – Al Zour Refinery Offsites and Utilities (Package III) 2,000,000,000 Offsites and Utilities EPC
KNPC – Al Zour Refinery Process Package I 4,000,000,000 Refinery Feasibility Study
KNPC – Al Zour Refinery Process Package II 2,000,000,000 Refinery Feasibility Study
KNPC – Al Zour Refinery Tank Farm (Package IV) 1,200,000,000 Oil Storage Tanks Feasibility Study
KNPC – Clean Fuel Project (Refineries Upgrade) 16,000,000,000 Refinery EPC ITB
KNPC – Mina Al Ahmadi Refinery – Fourth Gas Train 900,000,000 Gas Production EPC
KNPC – North LPG Tank Farm – Mina Al Ahmadi Refinery 1,200,000,000 Oil Storage Tanks EPC ITB
KNPC – Super Sized Storage Tanks 865,000,000 Oil Storage Tanks Project Approval Pending
KOC – Oil and Gas Pipeline Network Unknown Gas Network EPC
KOC – Booster Station 132 (BS-132) 800,000,000 Oil Field Development EPC
KOC – Booster Station 171 (BS-171) 800,000,000 Gas Gathering Centre EPC
KOC – Fire Stations $100,000,000 Oil and Gas Field EPC
KOC – Gas Booster Station 160 649,000,000 Gas Production Construction
KOC – High Pressure Flow lines for Jurassic Wells $100,000,000 Flowlines EPC ITB
KOC – Jurassic Early Production Facility (EPF) 1,500,000,000 Oil Production EPC
KOC – Jurassic Reservoirs – Seismic Survey $250,000,000 Oil and Gas Field EPC ITB
KOC – New Cross Country Pipeline $280,000,000 Oil EPC ITB
KOC – South East Crude Oil Pipelines 85,000,000 Oil EPC ITB
KOC – Transit Line (From Abdali Main Point To Abdali Mid-Point Manifold) $18,600,000 Oil Field Development EPC ITB
KOC – North Heavy Oil Handling and Processing Facilities 2,000,000,000 Oil Field Development Feed ITB
KOC – Sabriya and Umm Niga Gas Field Development – Phase II Unknown Gas Field Development Feasibility Study
KOTC – Very Large Crude Carriers (VLCC’s) $1,500,000,000 Very Large Crude Carriers (VLCCs) EPC ITB
Kuwait National Petroleum Company (KNPC) – Acid Gas Removal Plant (AGRP) 522,176,000 Acid Gas Feed
Kuwait National Petroleum Company (KNPC) – Clean Fuel Project 2020 – Package I 6,000,000,000 Hydrotreating Feed
Kuwait National Petroleum Company (KNPC) – Clean Fuel Project 2020 – Package II $6,000,000,000 Hydrotreating Feed
Kuwait National Petroleum Company (KNPC) – Clean Fuel Project 2020 – Package III $6,000,000,000 Hydrotreating Feed
*Sources: Data Media Systems

KOC ... planning to replace pipeline


Project name: Kuwait Oil Company (KOC) – During the third week of July 2011, bids for the EPC
Crude Oil Pipeline Replacement contract were submitted.
Name of client: KOC – Kuwait Oil Company Towards the end of September 2011, bids for the EPC
Budget: Unknown contract were under assessment.
Main contractor: Not yet appointed Towards the end of December 2011, the award cer-
Facility type: Pipeline emony was held.
Status: EPC ITB Project scope
PMC: Not yet appointed The scope typically includes the replacement of 16
Location: Various inch crude oil pipeline.
Project status Project structure
The Kuwait Oil Company (KOC) is on track to re- The Kuwait Oil Company (KOC) is the client.
place, 16 inch crude oil pipeline from Wafra to Burgan. Schedules for this project
During the fourth week of April 2011, the Invitation Q4-2011 EPC ITB
to Bid (ITB) has been issued for the EPC contract. Q2-2014 Expected completion

October 29 - November 4, 2012