The Kuwait Oil Company is planning to replace a 16 inch crude oil pipeline from Wafra to Burgan. In April 2011, an invitation to bid was issued for an EPC contract. By the end of July 2011, bids for the EPC contract were submitted. Towards the end of September 2011, the bids were under assessment. An award ceremony was held by the end of December 2011. The project scope includes replacing the 16 inch crude oil pipeline. KOC is the client for this project.
The Kuwait Oil Company is planning to replace a 16 inch crude oil pipeline from Wafra to Burgan. In April 2011, an invitation to bid was issued for an EPC contract. By the end of July 2011, bids for the EPC contract were submitted. Towards the end of September 2011, the bids were under assessment. An award ceremony was held by the end of December 2011. The project scope includes replacing the 16 inch crude oil pipeline. KOC is the client for this project.
The Kuwait Oil Company is planning to replace a 16 inch crude oil pipeline from Wafra to Burgan. In April 2011, an invitation to bid was issued for an EPC contract. By the end of July 2011, bids for the EPC contract were submitted. Towards the end of September 2011, the bids were under assessment. An award ceremony was held by the end of December 2011. The project scope includes replacing the 16 inch crude oil pipeline. KOC is the client for this project.
The Kuwait Oil Company is planning to replace a 16 inch crude oil pipeline from Wafra to Burgan. In April 2011, an invitation to bid was issued for an EPC contract. By the end of July 2011, bids for the EPC contract were submitted. Towards the end of September 2011, the bids were under assessment. An award ceremony was held by the end of December 2011. The project scope includes replacing the 16 inch crude oil pipeline. KOC is the client for this project.
Project Budget ($ US) Facility Status Al-Khafji Joint Operations (KJO) – Dorra Offshore Gas Field Development $5,000,000,000 Gas Field EPC ITB Equate – Olefins III $300,000,000 Ethylene EPC ITB Khafji Joint Operations (KJO) – Hout Field Associated Gas Facilities $500,000,000 Gas Gathering Centre EPC ITB Khafji Joint Operations (KJO) – Expansion of Oil Processing Facilities Unknown Refinery PMC ITB Khafji Joint Operations (KJO) – Gas and NGL Export Facilities $50,000,000 Natural Gas Liquefaction (NGL) EPC Khafji Joint Operations (KJO) – Natural Gas Pipeline $114,000,000 Gas Pipeline EPC ITB Khafji Joint Operations (KJO)- Hout Field Offshore Associated Gas Facilities Unknown Gas Pipeline EPC ITB KJO – Al-Khafji Offshore Facilities 400,000,000 Oil Processing Facility PMC ITB KNLOC – Lube Oil Project 400,000,000 Oil Production PMC ITB KNPC – Al Zour Refinery Marine Export Terminal (Package V) 1,100,000,000 Marine Terminal EPC KNPC – Al Zour Refinery Offsites and Utilities (Package III) 2,000,000,000 Offsites and Utilities EPC KNPC – Al Zour Refinery Process Package I 4,000,000,000 Refinery Feasibility Study KNPC – Al Zour Refinery Process Package II 2,000,000,000 Refinery Feasibility Study KNPC – Al Zour Refinery Tank Farm (Package IV) 1,200,000,000 Oil Storage Tanks Feasibility Study KNPC – Clean Fuel Project (Refineries Upgrade) 16,000,000,000 Refinery EPC ITB KNPC – Mina Al Ahmadi Refinery – Fourth Gas Train 900,000,000 Gas Production EPC KNPC – North LPG Tank Farm – Mina Al Ahmadi Refinery 1,200,000,000 Oil Storage Tanks EPC ITB KNPC – Super Sized Storage Tanks 865,000,000 Oil Storage Tanks Project Approval Pending KOC – Oil and Gas Pipeline Network Unknown Gas Network EPC KOC – Booster Station 132 (BS-132) 800,000,000 Oil Field Development EPC KOC – Booster Station 171 (BS-171) 800,000,000 Gas Gathering Centre EPC KOC – Fire Stations $100,000,000 Oil and Gas Field EPC KOC – Gas Booster Station 160 649,000,000 Gas Production Construction KOC – High Pressure Flow lines for Jurassic Wells $100,000,000 Flowlines EPC ITB KOC – Jurassic Early Production Facility (EPF) 1,500,000,000 Oil Production EPC KOC – Jurassic Reservoirs – Seismic Survey $250,000,000 Oil and Gas Field EPC ITB KOC – New Cross Country Pipeline $280,000,000 Oil EPC ITB KOC – South East Crude Oil Pipelines 85,000,000 Oil EPC ITB KOC – Transit Line (From Abdali Main Point To Abdali Mid-Point Manifold) $18,600,000 Oil Field Development EPC ITB KOC – North Heavy Oil Handling and Processing Facilities 2,000,000,000 Oil Field Development Feed ITB KOC – Sabriya and Umm Niga Gas Field Development – Phase II Unknown Gas Field Development Feasibility Study KOTC – Very Large Crude Carriers (VLCC’s) $1,500,000,000 Very Large Crude Carriers (VLCCs) EPC ITB Kuwait National Petroleum Company (KNPC) – Acid Gas Removal Plant (AGRP) 522,176,000 Acid Gas Feed Kuwait National Petroleum Company (KNPC) – Clean Fuel Project 2020 – Package I 6,000,000,000 Hydrotreating Feed Kuwait National Petroleum Company (KNPC) – Clean Fuel Project 2020 – Package II $6,000,000,000 Hydrotreating Feed Kuwait National Petroleum Company (KNPC) – Clean Fuel Project 2020 – Package III $6,000,000,000 Hydrotreating Feed *Sources: Data Media Systems
KOC ... planning to replace pipeline
Project name: Kuwait Oil Company (KOC) – During the third week of July 2011, bids for the EPC Crude Oil Pipeline Replacement contract were submitted. Name of client: KOC – Kuwait Oil Company Towards the end of September 2011, bids for the EPC Budget: Unknown contract were under assessment. Main contractor: Not yet appointed Towards the end of December 2011, the award cer- Facility type: Pipeline emony was held. Status: EPC ITB Project scope PMC: Not yet appointed The scope typically includes the replacement of 16 Location: Various inch crude oil pipeline. Project status Project structure The Kuwait Oil Company (KOC) is on track to re- The Kuwait Oil Company (KOC) is the client. place, 16 inch crude oil pipeline from Wafra to Burgan. Schedules for this project During the fourth week of April 2011, the Invitation Q4-2011 EPC ITB to Bid (ITB) has been issued for the EPC contract. Q2-2014 Expected completion