This packer is ideal for saving rig
time in both completing and
decompleting the well.
3
7" * 3-½” HYDRAULIC SET SINGLE STRING COMPLETION
4
9-5/8" * 4-½” HYDRAULIC SET SINGLE STRING COMPLETION
Schlumberger Private
ON/OFF CONNECTOR
MRP HYDRAULIC
SET SINGLE
STRING PACKER
SEATING NIPPLE
AUTOFILL VALVE
CERAMIC DISK
5
The Modular Retrievable Packer Applications
(MRP) is a hydraulically set, Single-string
straight-pull shear-release completions
retrievable packer for use in Zonal isolation
vertical and deviated wellbores Vertical, deviated, or
or in applications in which single horizontal wellbores
or multiple packers are set after
the wellhead has been installed. Benefits
A modular shell and body design Simplified
for low- to medium-pressure operations reduce
differentials allows configuration rig costs.
as a single-string production Eliminates tubing
packer. Its compact, modular movement during
design makes the MRP an installation.
Schlumberger Private
6
QHSB BIG BORE COMPLETIONS FAMILY
Schlumberger Private
these modifications is expected to take
place by mid 2007.
7
7" * 4-½” HYDRAULIC SET SINGLE STRING BIG BORE
RETRIEVABLE COMPLETION
POLISHED BORE
RECEPTACLE (PBR)
pressure applied down the tubing string
provides actuation of the packer’s setting
mechanism.
ANCHOR SEAL LATCH
An Anchor Seal Latch is used to seal
QHSB HYDRAULIC inside the Large Bore of the packer and
SET SINGLE
STRING PACKER
attach the tubing string to the packer. The
Anchor Latch is released by right-hand
rotation.
CERAMIC DISK
8
HYDRAULIC SET SINGLE STRING BIG BORE RETRIEVABLE
COMPLETION WITH MONITORING SYSTEM
Schlumberger Private
This completion helps monitor
reservoirs in real time, and assists
in early planning for optimal
reservoir recovery. POLISHED BORE
RECEPTACLE (PBR)
SEATING NIPPLE
SEATING NIPPLE
9
SINGLE TRIP SINGLE STRING SELECTIVE COMPLETION
SEATING NIPPLE
SEATING NIPPLE
10
9-5/8" * 4-½” HYDRAULIC SET SINGLE STRING
RETRIEVABLE COMPLETION
SEATING NIPPLE
Schlumberger Private
RECEPTACLE (PBR) WITH
CIRCULATING PORTS
SEATING NIPPLE
SEATING NIPPLE
LINER HANGER
ICD SCREENS
SWELL PACKER
ICD SCREENS
11
The QUANTUM HSB is a single- Applications
trip, gravel-pack, production Monobore completions
packer that features a dual-bore Production packer on
configuration. It provides a high-rate
sealbore with full tubing ID. The production wells
seal assembly combines with the
large bore of the packer to allow Benefits
full tubing ID. This packer is ideally Design is compatible
suited for multiple completion with
options or zones, including single- QUANTUM packer
selective and dual completions. system.
Single-completion configurations Design eliminates tubing
benefit from the packer’s large rotation.
internal diameter which is Bidirectional slips are
Schlumberger Private
12
MFIV RESERVOIR PROTECTION COMPLETIONS FAMILY
Schlumberger Private
For any further details regarding the FIV;
please contact any of Schlumberger’s
Completions team.
13
CONVENTIONAL ESP COMPLETION
QUANTUM
PACKER
QUANTUM BLANK
HOUSING
MESHRITE SCREENS
POLISHED BORE
RECEPTACLE (PBR)
14
TWO TRIP SINGLE STRING ESP FRIENDLY COMPLETION
Schlumberger Private
workover is required.
MECHANICAL FORMATION
ISOLATION VALVE (MFIV)
15
TWO TRIP ESP COMPLETION WITH RESERVOIR
PROTECTION
MILLOUT EXTENSION
FLUSH JOINTS
MECHANICAL
FORMATION ISOLATION
VALVE (MFIV)
MECHANICAL FORMATION
ISOLATION VALVE (MFIV)
16
9-5/8" TWO TRIP ESP COMPLETION WITH Y-TOOL FOR
RESERVOIR ACCESSIBILITY
ESP PACKER
SEATING NIPPLE
Schlumberger Private
Y-Tool
ESP PUMP
FLUSH JOINTS
NO-GO LOCATOR
SEAL ASSEMBLY
QUANTUM PACKER
MILLOUT EXTENSION
FLUSH JOINTS
MECHANICAL
FORMATION ISOLATION
VALVE (MFIV)
MECHANICAL FORMATION
ISOLATION VALVE (MFIV)
17
9-5/8" TWO TRIP DUAL POD ESP COMPLETION
NO-GO LOCATOR
SEAL ASSEMBLY
QUANTUM PACKER
MILLOUT EXTENSION
FLUSH JOINTS
MECHANICAL
FORMATION ISOLATION
VALVE (MFIV)
MECHANICAL FORMATION
ISOLATION VALVE (MFIV)
18
ESP BOTTOM DISCHARGE
ESP PACKER
SEATING NIPPLE
Schlumberger Private
MZ PACKER
NO-GO LOCATOR
SEAL ASSEMBLY
QUANTUM PACKER
MILLOUT EXTENSION
19
Schlumberger FIV* Formation Applications
Isolation Valve technology protects Fluid-loss control
formations from damage resulting Underbalanced perforating
from fluid loss during completions and drilling
and workover operations. The Two-way, well-control
mechanical formation isolation barrier valve
valve (MFIV) is the base version of Deepset lubricator valve
the FIV tool series; it can only be Multiple-zone completions
actuated mechanically. Suitable for Intelligent completions
high-pressure, high-temperature High-pressure, high-
environments, the MFIV tool temperature environments
serves as a barrier to isolate Well suspension and
reservoir fluids within the lower temporary abandonment
completion. Isolating the formation operations
Schlumberger Private
Schlumberger Private
working hand in hand with Saudi
Aramco to reach the optimum
completion design to help accomplish
that goal.
21
LEVEL 1 INTELLIGENT 5 LATERAL CONTROL
BULL PLUG
22
LEVEL 2 INTELLIGENT 2 LATERAL CONTROL
Schlumberger Private
STRING PACKER
pressure and temperature, pressure
drop, and fluid gradient. The TRFC
23
ESP ON REDA COIL
DEEP SET
TRSCSSSV
TRFC
SHROUDED TRFC
24
OPEN HOLE LEVEL 1 INTELLIGENT 2 LATERAL CONTROL
Schlumberger Private
This way Aramco has real-time data
that can help in taking on the spot
actions just by re-adjusting the CSX-3U SLIDING SLEEVE
TRFC’s.
SWELL PACKER
CENTRALIZER
TRFC
SWELL PACKER
CENTRALIZER
TRFC
CENTRALIZER
BULL PLUG
25
MULTI LATERAL COMPLETIONS FAMILY
26
LEVEL 3 MULTI LATERAL COMPLETION
POLISHED BORE
RECEPTACLE (PBR)
ANCHOR LATCH
QUANTUM X
PACKER
QUANTUM BLANK
HOUSING
FORMATION
ISOLATION VALVE
Schlumberger Private
SEATING NIPPLE
LOCATOR SEAL
ASSEMBLY
QUANTUM X
PACKER
QUANTUM BLANK
HOUSING
FORMATION
ISOLATION VALVE
WASH
DOWN SLOTTED SLOTTED
SHOE PBR LINER LINER
27
LEVEL 3 MULTI LATERAL COMPLETION
FLOW COUPLING
SEATING NIPPLE
Schlumberger Private
FLOW COUPLING
POLISHED BORE
RECEPTACLE (PBR)
RAPID
CONNECT
EXTENDER PRODUCTION
HONED SELECTIVE
SEATING NIPPLE RELEASE BORE LANDING
RAPID SUB PBR TOOL (PSLT)
FORMATION SEATING CONNECT
ISOLATION VALVE NIPPLE CONNECTOR
ANCHOR
LATCH QUANTUM
BLANK TEMPLATE RAPID
QUANTUM X HOUSING SEAL PBR CONNECT SEAL
PACKER LOCATOR TEMPLATE ASSEMBLY
28
SAND MANAGEMENT COMPLETIONS FAMILY
Schlumberger Private
risk of such a complicated job.
29
SINGLE ZONE FRAC & PACK COMPLETIONS
SEATING NIPPLE
Schlumberger Private
ANCHOR LATCH
PREMIUM SCREENS
SNAP LATCH
QL SUMP PACKER
30
STACKED FRAC & PACK COMPLETIONS
ANCHOR LATCH
Schlumberger Private
LONG STROKE SAFETY SHEAR SUB
PREMIUM SCREENS
ANCHOR LATCH
SNAP LATCH
MULTI SEAL ASSEMBLY
QL SUMP PACKER
31
QUANTUM SINGLE-ZONE COMPLETION SYSTEM
Quantum Packer
Ported Housing
Schlumberger Private
Locating Collar
Check Valve
Screen
Perforations
Casing
Seal Assembly
Sunp Packer
33
SINGLE SELECTIVE AND DUAL COMPLETIONS
34
In most cases, multizone sandcontrol equipment can also be
used for single-zone well completions. In a multizone
completion, the lowest completed zone is isolated before the
zone immediately above it is packed; then that zone is isolated
and the one above it is packed, and so on until all the zones
have been packed. The gravelpack assembly is installed, and
the gravel slurry is pumped. Once the freshly treated zones
are isolated from fluid loss, the well can be completed either
with a single production string or with dual production strings.
Schlumberger Private
to allow rotation of the tubing as required while running the
completion.
Circulating gravel
Using innovative Schlumberger technology, the gravel pack
can be performed in the squeeze or the
circulating positions, while monitoring annulus pressure, and
with or without taking fluid returns.
Excess gravel
Any remaining gravel slurry is reversed out and measured.
When reversing out fluids, the formation is protected from fluid
loss. The service tool and wash pipe are retrieved from the
well, and the production tubing is installed. The formation is
protected from fluid loss during this process as well.
Production
The QUANTUM packer is a retrievable production packer. If
the well is to be completed with a single production tubing
string, the well can be produced through either the upper or
lower zones. The original producing zone is later isolated, and
the remaining zone is produced. The well can also be
configured with a dual packer, so both zones are produced
simultaneously, with each having the capability of being
isolated independently. Single Selective Dual
Completion Completion
35
ALTERNATE PATH MULTIZONE COMPLETIONS
36
Excess gravel
Any remaining gravel slurry is reversed out and measured. The formation is protected from fluid
loss by the service tool while fluids are being reversed out. The QUANTUM service tool and
wash pipe are retrieved from the well, and the production tubing is installed. During this process,
the formation is protected from fluid loss with a largebore flapper valve or another fluidloss
prevention device like the FIV Formation Isolation Valve tool.
Production
Production tubing is run and sealed in the bore of the QUANTUM retrievable production packer.
The production tubing can also be extended to seal in the Alternate Path MZ packer sealbore to
provide a single selective completion. The well is then placed on production. If excess water
production is problematic, standard zonal isolation techniques, such as setting a bridge plug, can
be employed.
Schlumberger Private
37
QUANTUM HORIZONTAL COMPLETIONS SYSTEM
38
Packer setting
When the sand-control assembly is at depth and the open hole
is circulated to solids-free fluid, the QUANTUM packer is set
by dropping a ball and applying pressure to the tubing.
Schlumberger Private
tested after releasing the service tool and isolating the bypass
ports in the packer bore. In this position, the hydrostatic
communication to the formation is through the workstring
crossover ports, which start in the lower polished bore
receptacle. The packer pressure test position is disabled as
soon as the test is completed.
Pregravel-pack treatments
The antiswab features of the service tool allow movement of
the tool into different positions without the risk of swabbing or
surging the formation. In the reverse position prior to gravel
packing, the annulus is in communication with the formation.
Prior to gravel packing, while the service tool is in the
circulating position, fluid can be pumped down the annulus to
circulate the fluids from the open hole into the workstring. The
service tool can then be shifted to the reverse position to
circulate openhole fluids out of the wellbore. Pickle treatments
are recommended prior to this operation.
Circulating
The FBSD module enables the gravel pack to be performed in
the set-down position, eliminating tool movement due to
thermal contraction, floatingrig heave, or hydraulic effects.
Additionally, the FBSD capability provides visual surface
indications of tool positions and the ability to capture realtime
bottomhole pressures throughout the entire operation.
39
Excess gravel and filtercake cleanup
Any remaining gravel slurry is reversed out and measured.
At this point, the formation is isolated and protected from
fluid loss. The Schlumberger openhole system service tool
eliminates the need for an additional trip for postgravelpack
filtercake cleanup. The MudSOLV module enables the
service tool to be converted back to the wash-down mode
to allow cleanup fluids to be spotted across the formation
before pulling the tool. The service tool and wash pipe are
retrieved from the well, and the production tubing is
installed. During this process, the formation is also
protected from fluid loss by an FIV Formation Isolation
Valve or flapper valve tool.
Producing
Since the QUANTUM packer is a retrievable production
packer, production tubing is run and sealed in the packer,
and the well is placed on production. If necessary, the
Schlumberger Private
40
+966 50 320 8642