Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
0% found this document useful (0 votes)
66 views

Why Use Washers

This document contains input parameters for calculating lateral earth pressures and passive resistance for a soldier beam and drilled shaft retaining wall with a height of 9.15m. It includes soil properties like unit weight, friction angle, wall geometry properties like spacing and diameters, and calculation results like active and passive pressures, wedge resistances, and factor of safeties using the Wang-Reese and Broms methods.

Uploaded by

APGENCO EE
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
66 views

Why Use Washers

This document contains input parameters for calculating lateral earth pressures and passive resistance for a soldier beam and drilled shaft retaining wall with a height of 9.15m. It includes soil properties like unit weight, friction angle, wall geometry properties like spacing and diameters, and calculation results like active and passive pressures, wedge resistances, and factor of safeties using the Wang-Reese and Broms methods.

Uploaded by

APGENCO EE
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 14

INPUTS

Height of Soldier Beam above final Excavation Level = 9.15 m

Soil type loose sand -

γwt = 16.93 KN/m3

φ major Layer = 29.0 Degree

φ Layer which pile is Embeded Layer = 29.0 Degree

αa = 90.0 Degree

αp = 90.0 Degree

β = 0.0 Degree

q = 12.0 KN/m2

δ = 19.3 Degree

Kh = 0.20

Kv = 0.00

θ = 11.31 Degree

Drilled Shaft Diameter (b) = 0.305 m

Soldier Beam Center to center Spacing(s) = 2.44 m

Clear Spacing Between Drilled Shafts(sc)= 2.135 m

β 1 =45+ φ /2 59.5

a 9.70 Degree

K0 (major layer) = 0.515

ka (major layer)= 0.347

kp (major layer)= 2.882

K0 (layer which pile is embeded)


= 0.515

ka ( (layer which pile is embeded)= 0.347

kp ( (layer which pile is embeded)= 2.882

Height of wall = 9.15 m

H1 -from crest to first anchor 2.25 m

Hn+1 from bottom to last anchor 3.75 m

Pe = 44.71 KN/m2
PS = 4.16 KN/m2

RS(SUBGRADE REACTION FORCE) = 39.24 KN/m

Total Subgrade Reaction force 95.75 KN

Active
Toe Depth
Pressure

(m) (KN/m2)

0.00 53.75

0.50 56.69

1.00 59.62

1.50 62.56

2.00 65.50

8.465 2.50 68.44

0.212 3.00 71.37

2.882 3.50 74.31

0.450 4.00 77.25

0.134 4.50 80.18

13.91 5.00 83.12

13.91 5.50 86.06

----------------------------------------- 6.00 89.00

67.72

0.323

0.997

0.179

101.52

101.52
Embedment depth calculations (Wang-Reese meth
Wedge Wedge Wedge Wedge
Active Rankine di Resistance Resistance Resistance Resistance Flow
Force Continuous (single Pile) d=di d=h1,alpha=0 (intersecting Resistance
Wedges)

(KN) (KN/m) (KN/m) (KN/m) (KN/m) (KN/m) (KN/m) (KN/m)

0.00 0.00 -3.68 0.00 295.41 136.66 0.00 0.00

9.45 59.53 -3.18 13.91 214.13 95.61 13.91 81.89

19.87 119.06 -2.68 40.76 145.79 61.62 40.76 163.77

31.28 178.58 -2.18 80.54 90.39 34.71 80.54 245.66

43.67 238.11 -1.68 133.26 47.93 14.88 133.26 327.54

57.03 297.64 -1.18 198.92 18.41 2.11 198.92 409.43

71.37 357.17 -0.68 277.52 1.82 -3.59 277.52 491.32

86.69 416.69 -0.18 369.05 -1.83 -2.21 369.05 573.20

103.00 476.22 0.32 473.53 7.45 6.24 473.53 655.09

120.28 535.75 0.82 590.94 29.68 21.76 590.94 736.98

138.53 595.28 1.32 721.28 64.84 44.36 721.28 818.86

157.77 654.81 1.82 864.57 112.94 74.03 864.57 900.75

177.99 714.33 2.32 1020.79 173.98 110.76 1020.79 982.63


lations (Wang-Reese method)
Minimum broms- Total
Total
Wang-Reese passive Passive
Passive FS(W.R) FS(Broms)
Passive Resistance Force
Force (W.R)
Resistance figure 41b (Broms)

(KN/m) (KN/m) (KN) (KN) - -

0.00 0.00 0.00

13.91 22.32 2.98

40.76 44.65 16.41

80.54 66.97 47.01

133.26 89.29 101.52

198.92 111.61 186.65

277.52 133.94 309.14

369.05 156.26 475.71

473.53 178.58 693.09

590.94 200.91 968.01

721.28 223.23 1307.19

864.57 245.55 1717.36

1020.79 267.88 2205.25