Analisa Harga Satuan
Analisa Harga Satuan
Analisa Harga Satuan
PEKERJAAN :
LOKASI :
A TENAGA
SUB JUMLAH A -
B BAHAN
SUB JUMLAH B -
C PERALATAN
Hydrolik Jacking Pile 1.0000 unit 26,500,000.00 26,500,000.00
Bulldozer 1.0000 unit 2,500,000.00 2,500,000.00
Water tank truck 1.0000 unit 750,000.00 750,000.00
Mesin Beton Molen / Concrete Mixer 3.0000 unit 500,000.00 1,500,000.00
Pompa Air 1.0000 unit 150,000.00 150,000.00
Generator set 1.0000 unit 150,000.00 150,000.00
Compressor 1.0000 unit 150,000.00 150,000.00
Theodolite 1.0000 unit 75,000.00 75,000.00
Mesin Las Listrik 1.0000 unit 250,000.00 250,000.00
Concrete Vibrator 1.0000 unit 75,000.00 75,000.00
Hand Stamper 1.0000 unit 150,000.00 150,000.00
Scafolding 300.0000 unit 2,500.00 750,000.00
A TENAGA
Pekerja 0.1000 Org/ Hr 75,000.00 7,500.00
Tukang 0.1000 Org/ Hr 80,000.00 8,000.00
Kepala Tukang 0.0100 Org/ Hr 90,000.00 900.00
Mandor 0.0050 Org/ Hr 100,000.00 500.00
B BAHAN
Kayu 5/7 0.0120 m³ 3,300,000.00 39,600.00
Paku Biasa 2" - 3" 0.0200 kg 15,000.00 300.00
Kayu Papan 3/20 0.0070 m³ 3,500,000.00 24,500.00
C PERALATAN
SUB JUMLAH C -
PEKERJAAN :
LOKASI :
Satuan Pembayaran : m2
Standar : A.2.2.1.9
A TENAGA
Pekerja 0.1000 Or/hr 75,000.00 7,500.00
Mandor 0.0500 Or/hr 100,000.00 5,000.00
B BAHAN
SUB JUMLAH B -
C PERALATAN
SUB JUMLAH C -
A TENAGA
Pekerja 6.6670 Org/ Hr 75,000.00 500,025.00
Mandor 0.3330 Org/ Hr 100,000.00 33,300.00
B BAHAN
SUB JUMLAH B -
C PERALATAN
SUB JUMLAH C -
Halaman 2
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A TENAGA
Pekerja 0.750 Org/ Hr 75,000.00 56,250.00
Mandor 0.025 Org/ Hr 100,000.00 2,500.00
B BAHAN
SUB JUMLAH B -
C PERALATAN
SUB JUMLAH C -
A TENAGA
Pekerja 0.900 Org/ Hr 75,000.00 67,500.00
Mandor 0.045 Org/ Hr 100,000.00 4,500.00
B BAHAN
SUB JUMLAH B -
C PERALATAN
SUB JUMLAH C -
Halaman 3
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A TENAGA
Pekerja 1.050 Org/ Hr 75,000.00 78,750.00
Mandor 0.067 Org/ Hr 100,000.00 6,700.00
B BAHAN
SUB JUMLAH B -
C PERALATAN
SUB JUMLAH C -
Pengurugan kembali 1 m3 galian di hitung dari 1/3 kali dari koefisien pekerjaan galian
A TENAGA
Pekerja 0.250 Org/ Hr 75,000.00 18,750.00
Mandor 0.008 Org/ Hr 100,000.00 833.33
B BAHAN
SUB JUMLAH B -
C PERALATAN
SUB JUMLAH C -
Halaman 4
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A TENAGA
Pekerja 0.500 Org/ Hr 75,000.00 37,500.00
Mandor 0.050 Org/ Hr 100,000.00 5,000.00
B BAHAN
Pekerja 0.750 Or/hr 75,000.00 56,250.00
Mandor 0.025 Or/hr 100,000.00 2,500.00
C PERALATAN
SUB JUMLAH C -
A UPAH
Pekerja 0.3000 Org/ Hr 75,000.00 22,500.00
Mandor 0.0100 Org/ Hr 100,000.00 1,000.00
B BAHAN
Pasir Urug 1.200 m³ 120,000.00 144,000.00
C UPAH
-
SUB JUMLAH C -
Halaman 5
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A TENAGA
Pekerja 0.3000 Org/ Hr 75,000.00 22,500.00
Mandor 0.0100 Org/ Hr 100,000.00 1,000.00
B BAHAN
Tanah Urug 1.200 m³ 80,500.00 96,600.00
C PERALATAN
-
SUB JUMLAH C -
A TENAGA
-
SUB JUMLAH A -
B BAHAN
Tiang Pancang Minipile Beton 25x25 1.000 m 205,000.00 205,000.00
C PERALATAN
-
SUB JUMLAH C -
Halaman 6
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A TENAGA
Pekerja 0.1875 Org/ Hr 75,000.00 14,062.50
Tukang 0.0388 Org/ Hr 80,000.00 3,104.00
Kepala Tukang 0.0039 Org/ Hr 90,000.00 349.20
Mandor 0.0172 Org/ Hr 100,000.00 1,720.00
B BAHAN
-
SUB JUMLAH B -
C PERALATAN
Hydraulic Jacking 0.090 jam 400,000.00 36,000.00
Alat Bantu 1.000 ls 15,000.00 15,000.00
A TENAGA
Pekerja 0.1875 Org/ Hr 75,000.00 14,062.50
Mandor 0.0172 Org/ Hr 100,000.00 1,720.00
B BAHAN
-
SUB JUMLAH B -
C PERALATAN
Mesin Las Listrik 0.1875 jam 150,000.00 28,125.00
Kawat Las 0.2490 kg 28,000.00 6,972.00
Halaman 7
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A TENAGA
Pekerja 0.1875 Org/ Hr 75,000.00 14,062.50
Mandor 0.0172 Org/ Hr 100,000.00 1,720.00
B BAHAN
-
SUB JUMLAH B -
C PERALATAN
Mesin Las Listrik 0.1875 jam 150,000.00 28,125.00
Alat Bantu 1.000 ls 15,000.00 15,000.00
16 Jenis Pekerjaan : Membuat 1 m3 Lantai Kerja Beton Mutu f'c = 7.4 Mpa (K100), Slump (3-6) cm, w/c=0.87
Satuan Pembayaran : m3
Standar : A.4.1.1.4
A TENAGA
Pekerja 1.2000 Org/ Hr 75,000.00 90,000.00
Tukang 0.2000 Org/ Hr 80,000.00 16,000.00
Kepala Tukang 0.0200 Org/ Hr 90,000.00 1,800.00
Mandor 0.0600 Org/ Hr 100,000.00 6,000.00
B BAHAN
Semen Portland / kg 230.000 kg 1,400.00 322,000.00
Pasir Beton / kg 893.000 kg 117.86 105,246.43
Kerikil (Maks 30 mm) / kg 1,027.000 Kg 191.11 196,271.11
Air 200.000 liter 200.00 40,000.00
C PERALATAN
SUB JUMLAH C
Halaman 8
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
17 Jenis Pekerjaan : Membuat 1 m3 beton mutu f'c = 14.5 Mpa (K175), Slump (12 ±2) cm, w/c=0.66
Satuan Pembayaran : m3
Standar : A.4.1.1.5
A TENAGA
Pekerja 1.6500 Org/ Hr 75,000.00 123,750.00
Tukang 0.2750 Org/ Hr 80,000.00 22,000.00
Kepala Tukang 0.0280 Org/ Hr 90,000.00 2,520.00
Mandor 0.0830 Org/ Hr 100,000.00 8,300.00
B BAHAN
Semen Portland / kg 326.000 kg 1,400.00 456,400.00
Pasir Beton / kg 760.000 kg 117.86 89,571.43
Kerikil (Maks 30 mm) / kg 1,029.000 Kg 191.11 196,653.33
Air 215.000 liter 200.00 43,000.00
C PERALATAN
SUB JUMLAH C
18 Jenis Pekerjaan : Membuat 1 m3 beton mutu f'c = 16.9 Mpa (K200), Slump (12 ±2) cm, w/c=0.61
Satuan Pembayaran : m3
Standar : A.4.1.1.6
A TENAGA
Pekerja 1.6500 Org/ Hr 75,000.00 123,750.00
Tukang 0.2750 Org/ Hr 80,000.00 22,000.00
Kepala Tukang 0.0280 Org/ Hr 90,000.00 2,520.00
Mandor 0.0830 Org/ Hr 100,000.00 8,300.00
B BAHAN
Semen Portland / kg 352.000 kg 1,400.00 492,800.00
Pasir Beton / kg 731.000 kg 117.86 86,153.57
Kerikil (Maks 30 mm) / kg 1,031.000 Kg 191.11 197,035.56
Air 215.000 liter 200.00 43,000.00
C PERALATAN
SUB JUMLAH C
Halaman 9
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
19 Jenis Pekerjaan : Membuat 1 m3 beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58
Satuan Pembayaran : m3
Standar : A.4.1.1.7
A TENAGA
Pekerja 1.6500 Org/ Hr 75,000.00 123,750.00
Tukang 0.2750 Org/ Hr 80,000.00 22,000.00
Kepala Tukang 0.0280 Org/ Hr 90,000.00 2,520.00
Mandor 0.0830 Org/ Hr 100,000.00 8,300.00
B BAHAN
Semen Portland / kg 371.000 kg 1,400.00 519,400.00
Pasir Beton / kg 698.000 kg 117.86 82,264.29
Kerikil (Maks 30 mm) / kg 1,047.000 Kg 191.11 200,093.33
Air 215.000 liter 200.00 43,000.00
C PERALATAN
SUB JUMLAH C
20 Jenis Pekerjaan : Membuat 1 m3 beton mutu f’c = 21.7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56
Satuan Pembayaran : m3
Standar : A.4.1.1.8
A TENAGA
Pekerja 1.6500 Org/ Hr 75,000.00 123,750.00
Tukang 0.2750 Org/ Hr 80,000.00 22,000.00
Kepala Tukang 0.0280 Org/ Hr 90,000.00 2,520.00
Mandor 0.0830 Org/ Hr 100,000.00 8,300.00
B BAHAN
Semen Portland / kg 384.000 kg 1,400.00 537,600.00
Pasir Beton / kg 692.000 kg 117.86 81,557.14
Kerikil (Maks 30 mm) / kg 1,039.000 Kg 191.11 198,564.44
Air 215.000 liter 200.00 43,000.00
C PERALATAN
SUB JUMLAH C
Halaman 10
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
21 Jenis Pekerjaan : Membuat 1 m3 beton mutu f’c = 24 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53
Satuan Pembayaran : m3
Standar : A.4.1.1.9
A TENAGA
Pekerja 1.6500 Org/ Hr 75,000.00 123,750.00
Tukang 0.2750 Org/ Hr 80,000.00 22,000.00
Kepala Tukang 0.0280 Org/ Hr 90,000.00 2,520.00
Mandor 0.0830 Org/ Hr 100,000.00 8,300.00
B BAHAN
Semen Portland / kg 406.000 kg 1,400.00 568,400.00
Pasir Beton / kg 684.000 kg 117.86 80,614.29
Kerikil (Maks 30 mm) / kg 1,026.000 Kg 191.11 196,080.00
Air 215.000 liter 200.00 43,000.00
C PERALATAN
SUB JUMLAH C
22 Jenis Pekerjaan : Membuat 1 m3 beton mutu f’c = 26.4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52
Satuan Pembayaran : m3
Standar : A.4.1.1.10
A TENAGA
Pekerja 1.6500 Org/ Hr 75,000.00 123,750.00
Tukang 0.2750 Org/ Hr 80,000.00 22,000.00
Kepala Tukang 0.0280 Org/ Hr 90,000.00 2,520.00
Mandor 0.0830 Org/ Hr 100,000.00 8,300.00
B BAHAN
Semen Portland / kg 413.000 kg 1,400.00 578,200.00
Pasir Beton / kg 681.000 kg 117.86 80,260.71
Kerikil (Maks 30 mm) / kg 1,021.000 Kg 191.11 195,124.44
Air 215.000 liter 200.00 43,000.00
C PERALATAN
SUB JUMLAH C
Halaman 11
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
23 Jenis Pekerjaan : Membuat 1 m3 beton mutu f’c = 28.8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,49
Satuan Pembayaran : m3
Standar : A.4.1.1.11
A TENAGA
Pekerja 2.1000 Org/ Hr 75,000.00 157,500.00
Tukang 0.3500 Org/ Hr 80,000.00 28,000.00
Kepala Tukang 0.0350 Org/ Hr 90,000.00 3,150.00
Mandor 0.1050 Org/ Hr 100,000.00 10,500.00
B BAHAN
Semen Portland / kg 439.000 kg 1,400.00 614,600.00
Pasir Beton / kg 670.000 kg 117.86 78,964.29
Kerikil (Maks 30 mm) / kg 1,006.000 Kg 191.11 192,257.78
Air 215.000 liter 200.00 43,000.00
C PERALATAN
SUB JUMLAH C
24 Jenis Pekerjaan : Membuat 1 m3 beton mutu f’c = 31.2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,48
Satuan Pembayaran : m3
Standar : A.4.1.1.12
A TENAGA
Pekerja 2.1000 Org/ Hr 75,000.00 157,500.00
Tukang 0.3500 Org/ Hr 80,000.00 28,000.00
Kepala Tukang 0.0350 Org/ Hr 90,000.00 3,150.00
Mandor 0.1050 Org/ Hr 100,000.00 10,500.00
B BAHAN
Semen Portland / kg 448.000 kg 1,400.00 627,200.00
Pasir Beton / kg 667.000 kg 117.86 78,610.71
Kerikil (Maks 30 mm) / kg 1,000.000 Kg 191.11 191,111.11
Air 215.000 liter 200.00 43,000.00
C PERALATAN
SUB JUMLAH C
Halaman 12
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A TENAGA
Pekerja 0.0700 Org/ Hr 75,000.00 5,250.00
Tukang 0.0700 Org/ Hr 80,000.00 5,600.00
Kepala Tukang 0.0070 Org/ Hr 90,000.00 630.00
Mandor 0.0040 Org/ Hr 100,000.00 400.00
B BAHAN
Besi Beton Ulir 10.500 kg 13,000.00 136,500.00
Kawat Beton 0.150 kg 20,000.00 3,000.00
C PERALATAN
-
SUB JUMLAH A -
A TENAGA
Pekerja 0.025 Org/ Hr 75,000.00 1,875.00
Tukang 0.025 Org/ Hr 80,000.00 2,000.00
Kepala Tukang 0.025 Org/ Hr 90,000.00 2,250.00
Mandor 0.001 Org/ Hr 100,000.00 100.00
B BAHAN
Besi Beton Polos 10.200 kg 12,200.00 124,440.00
Kawat Beton 0.050 kg 20,000.00 1,000.00
C PERALATAN
-
SUB JUMLAH C -
Halaman 13
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A TENAGA
Pekerja 0.520 Org/ Hr 75,000.00 39,000.00
Tukang 0.260 Org/ Hr 80,000.00 20,800.00
Kepala Tukang 0.026 Org/ Hr 90,000.00 2,340.00
Mandor 0.026 Org/ Hr 100,000.00 2,600.00
B BAHAN
Kayu/ Papan Bekisting 0.040 m³ 2,200,000.00 88,000.00
Paku Biasa 2" - 5" 0.300 kg 15,000.00 4,500.00
Minyak Bekisting/ Teak Oil 0.100 liter 9,500.00 950.00
C PERALATAN
-
SUB JUMLAH C -
A TENAGA
Pekerja 0.520 Or/hr 75,000.00 39,000.00
Tukang 0.260 Or/hr 80,000.00 20,800.00
Kepala Tukang 0.026 Or/hr 90,000.00 2,340.00
Mandor 0.026 Or/hr 100,000.00 2,600.00
C PERALATAN
-
SUB JUMLAH C -
Halaman 14
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A TENAGA
Pekerja 0.660 Or/hr 75,000.00 49,500.00
Tukang 0.330 Or/hr 80,000.00 26,400.00
Kepala Tukang 0.033 Or/hr 90,000.00 2,970.00
Mandor 0.033 Or/hr 100,000.00 3,300.00
B BAHAN
Kayu/ Papan Bekisting 0.040 m³ 2,200,000.00 88,000.00
Paku Biasa 2" - 5" 0.400 kg 15,000.00 6,000.00
Minyak Bekisting/ Teak Oil 0.200 liter 9,500.00 1,900.00
Kayu/ Papan Klas II 0.015 m³ 3,300,000.00 49,500.00
Plywood 9 mm 0.350 lbr 133,000.00 46,550.00
Dolken Kayu Ø (8-10)cm, panjang 4 m 2.000 btg 15,000.00 30,000.00
C PERALATAN
-
SUB JUMLAH C -
A TENAGA
Pekerja 0.660 Or/hr 75,000.00 49,500.00
Tukang 0.330 Or/hr 80,000.00 26,400.00
Kepala Tukang 0.033 Or/hr 90,000.00 2,970.00
Mandor 0.033 Or/hr 100,000.00 3,300.00
B BAHAN
Kayu/ Papan Bekisting 0.040 m³ 2,200,000.00 88,000.00
Paku Biasa 2" - 5" 0.400 kg 15,000.00 6,000.00
Minyak Bekisting/ Teak Oil 0.200 liter 9,500.00 1,900.00
Kayu/ Papan Klas II 0.018 m³ 3,300,000.00 59,400.00
Plywood 9 mm 0.350 lbr 133,000.00 46,550.00
Dolken Kayu Ø (8-10)cm, panjang 4 m 2.000 btg 15,000.00 30,000.00
C PERALATAN
-
SUB JUMLAH C -
Halaman 15
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A UPAH
Pekerja 0.660 Or/hr 75,000.00 49,500.00
Tukang 0.330 Or/hr 80,000.00 26,400.00
Kepala Tukang 0.033 Or/hr 90,000.00 2,970.00
Mandor 0.033 Or/hr 100,000.00 3,300.00
B BAHAN
Kayu/ Papan Bekisting 0.040 m³ 2,200,000.00 88,000.00
Paku Biasa 2" - 5" 0.400 kg 15,000.00 6,000.00
Minyak Bekisting/ Teak Oil 0.200 liter 9,500.00 1,900.00
Kayu/ Papan Klas II 0.015 m³ 3,300,000.00 49,500.00
Plywood 9 mm 0.350 lbr 133,000.00 46,550.00
Dolken Kayu Ø (8-10)cm, panjang 4 m 6.000 btg 15,000.00 90,000.00
C PERALATAN
-
SUB JUMLAH C -
A TENAGA
Pekerja 0.660 Or/hr 75,000.00 49,500.00
Tukang Kayu 0.330 Or/hr 80,000.00 26,400.00
Kepala Tukang 0.033 Or/hr 90,000.00 2,970.00
Mandor 0.033 Or/hr 100,000.00 3,300.00
A BAHAN
Kayu bekisting Kelas III 0.030 m3 2,200,000.00 66,000.00
Paku 5 cm - 10 cm 0.400 kg 15,000.00 6,000.00
Minyak Bekisting 0.200 ltr 9,500.00 1,900.00
Balok Kayu Kelas II 0.020 m3 3,300,000.00 66,000.00
Plywood Tebal 9 mm 0.350 lbr 133,000.00 46,550.00
Dolken Kayu Galam, ø (8-10)cm, 4 m 3.000 btg 15,000.00 45,000.00
Penjaga Jarak Bekisting/ Spacer 4.000 bh -
C PERALATAN
-
SUB JUMLAH C -
PEKERJAAN :
LOKASI :
Satuan Pembayaran : m2
Standar : A.4.1.1.26
B TENAGA
Pekerja 0.660 Or/hr 75,000.00 49,500.00
Tukang 0.330 Or/hr 80,000.00 26,400.00
Kepala Tukang 0.033 Or/hr 90,000.00 2,970.00
Mandor 0.033 Or/hr 100,000.00 3,300.00
B BAHAN
Kayu/ Papan Bekisting 0.030 m³ 2,200,000.00 66,000.00
Paku Biasa 2" - 5" 0.400 kg 15,000.00 6,000.00
Minyak Bekisting/ Teak Oil 0.150 liter 9,500.00 1,425.00
Kayu/ Papan Klas II 0.015 m³ 3,300,000.00 49,500.00
Plywood 9 mm 0.350 lbr 133,000.00 46,550.00
Dolken Kayu Ø (8-10)cm, panjang 4 m 2.000 btg 15,000.00 30,000.00
C PERALATAN
-
SUB JUMLAH C -
Halaman 17
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A TENAGA
Pekerja 6.350 Or/hr 75,000.00 476,250.00
Tukang Batu 0.275 Or/hr 80,000.00 22,000.00
Tukang Kayu 1.650 Or/hr 80,000.00 132,000.00
Tukang Besi 1.400 Or/hr 80,000.00 112,000.00
Kepala Tukang 0.333 Or/hr 90,000.00 29,970.00
Mandor 0.318 Or/hr 100,000.00 31,800.00
B BAHAN
Kayu bekisting Kelas III 0.320 m3 2,200,000.00 704,000.00
Paku 5 cm - 10 cm 3.200 kg 15,000.00 48,000.00
Minyak Bekisting 1.600 ltr 9,500.00 15,200.00
Besi Beton Polos 210.000 kg 12,200.00 2,562,000.00
Kawat Beton 3.000 kg 20,000.00 60,000.00
Semen Portland 336.000 kg 1,400.00 470,400.00
Pasir Beton 0.540 m3 165,000.00 89,100.00
Kerikil 0.810 m3 258,000.00 208,980.00
Balok Kayu Kelas II 0.140 m3 3,300,000.00 462,000.00
Plywood Tebal 9 mm 2.800 lbr 133,000.00 372,400.00
Dolken Kayu Galam, ø (8-10)cm, Panjang 16.000 btg 15,000.00 240,000.00
C PERALATAN
-
SUB JUMLAH C -
Halaman 18
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A UPAH
Pekerja 5.300 Or/hr 75,000.00 397,500.00
Tukang Batu 0.275 Or/hr 80,000.00 22,000.00
Tukang Kayu 1.300 Or/hr 80,000.00 104,000.00
Tukang Besi 1.050 Or/hr 80,000.00 84,000.00
Kepala Tukang 0.265 Or/hr 90,000.00 23,850.00
Mandor 0.265 Or/hr 100,000.00 26,500.00
B BAHAN
Kayu bekisting Kelas III 0.320 m3 2,200,000.00 704,000.00
Paku 5 cm - 10 cm 3.200 kg 15,000.00 48,000.00
Minyak Bekisting 1.600 ltr 9,500.00 15,200.00
Besi Beton Polos 157.500 kg 12,200.00 1,921,500.00
Kawat Beton 2.250 kg 20,000.00 45,000.00
Semen Portland 336.000 kg 1,400.00 470,400.00
Pasir Beton 0.540 m3 165,000.00 89,100.00
Kerikil 0.810 m3 258,000.00 208,980.00
Balok Kayu Kelas II 0.120 m3 3,300,000.00 396,000.00
Plywood Tebal 9 mm 2.800 lbr 133,000.00 372,400.00
Dolken Kayu Galam, ø (8-10)cm, Panjang 32.000 btg 15,000.00 480,000.00
C PERALATAN
Pekerja -
SUB JUMLAH B -
Halaman 19
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
36 Jenis Pekerjaan : Membuat 1 m' Kolom Praktis Beton Bertulang (11 x 11) cm
Satuan Pembayaran : m1
Standar : A.4.1.1.35
A TENAGA
Pekerja 0.180 Or/hr 75,000.00 13,500.00
Tukang Batu 0.020 Or/hr 80,000.00 1,600.00
Tukang Kayu 0.020 Or/hr 80,000.00 1,600.00
Tukang Besi 0.020 Or/hr 80,000.00 1,600.00
Kepala Tukang 0.006 Or/hr 90,000.00 540.00
Mandor 0.009 Or/hr 100,000.00 900.00
B BAHAN
Kayu bekisting Kelas III 0.002 m3 2,200,000.00 4,400.00
Paku 5 cm - 10 cm 0.010 kg 15,000.00 150.00
Minyak Bekisting ltr 9,500.00 -
Besi Beton Polos 3.000 kg 12,200.00 36,600.00
Kawat Beton 0.450 kg 20,000.00 9,000.00
Semen Portland 4.000 kg 1,400.00 5,600.00
Pasir Beton 0.006 m3 165,000.00 990.00
Kerikil 0.009 m3 258,000.00 2,322.00
C UPAH
-
SUB JUMLAH C -
Halaman 20
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
37 Jenis Pekerjaan : Membuat 1 m' Ring Balok Beton Bertulang (10 x 15) cm
Satuan Pembayaran : m3
Standar : A.4.1.1.36
A TENAGA
Pekerja 0.297 Or/hr 75,000.00 22,275.00
Tukang Batu 0.033 Or/hr 80,000.00 2,640.00
Tukang Kayu 0.033 Or/hr 80,000.00 2,640.00
Tukang Besi 0.033 Or/hr 80,000.00 2,640.00
Kepala Tukang 0.100 Or/hr 90,000.00 9,000.00
Mandor 0.015 Or/hr 100,000.00 1,500.00
B BAHAN
Kayu bekisting Kelas III 0.030 m3 2,200,000.00 66,000.00
Paku 5 cm - 10 cm 0.020 kg 15,000.00 300.00
Minyak Bekisting - ltr 9,500.00 -
Besi Beton Polos 3.600 kg 12,200.00 43,920.00
Kawat Beton 0.050 kg 20,000.00 1,000.00
Semen Portland 5.500 kg 1,400.00 7,700.00
Pasir Beton 0.009 m3 165,000.00 1,485.00
Kerikil 0.015 m3 258,000.00 3,870.00
C UPAH
-
SUB JUMLAH C -
A TENAGA
Biaya Pemasangan 1.000 m¹ 230,000.00 230,000.00
B BAHAN
Railing Tangga Bahan Stainlessteel 1.0000 m¹ 1,150,000.00 1,150,000.00
termasuk aksesoris
C PERALATAN
Peralatan (10% x Harga) 1.000 ls 115,000.00 115,000.00
Halaman 21
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A TENAGA
Pekerja 0.060 Or/hr 75,000.00 4,500.00
Tukang Batu 0.060 Or/hr 80,000.00 4,800.00
Kepala Tukang 0.006 Or/hr 90,000.00 540.00
Mandor 0.003 Or/hr 100,000.00 300.00
B BAHAN
Baja Struktural / Profil 1.150 kg 20,800.00 23,920.00
C UPAH
-
SUB JUMLAH C -
A TENAGA
Pekerja 0.6000 Org/ Hr 75,000.00 45,000.00
Tukang 0.2000 Org/ Hr 80,000.00 16,000.00
Kepala Tukang 0.0200 Org/ Hr 90,000.00 1,800.00
Mandor 0.0300 Org/ Hr 100,000.00 3,000.00
B BAHAN
Batu Bata Biasa (5 x 11 x 22) 140.0000 bh 500.00 70,000.00
Semen Portland / kg 43.5000 kg 1,400.00 60,900.00
Pasir Pasang 0.0800 m³ 140,000.00 11,200.00
C PERALATAN
-
SUB JUMLAH C -
Halaman 22
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A TENAGA
Pekerja 0.3000 Org/ Hr 75,000.00 22,500.00
Tukang 0.1000 Org/ Hr 80,000.00 8,000.00
Kepala Tukang 0.0100 Org/ Hr 90,000.00 900.00
Mandor 0.0150 Org/ Hr 100,000.00 1,500.00
B BAHAN
Batu Bata Biasa (5 x 11 x 22) 70.0000 bh 500.00 35,000.00
Semen Portland / kg 18.9500 kg 1,400.00 26,530.00
Pasir Pasang 0.0380 m³ 140,000.00 5,320.00
C PERALATAN
-
SUB JUMLAH C -
A TENAGA
Pekerja 0.3000 Org/ Hr 75,000.00 22,500.00
Tukang 0.1000 Org/ Hr 80,000.00 8,000.00
Kepala Tukang 0.0100 Org/ Hr 90,000.00 900.00
Mandor 0.0150 Org/ Hr 100,000.00 1,500.00
A BAHAN
Batu Bata Biasa (5 x 11 x 22) 70.0000 bh 500.00 35,000.00
Semen Portland / kg 11.5000 kg 1,400.00 16,100.00
Pasir Pasang 0.0430 m³ 140,000.00 6,020.00
C PERALATAN
-
SUB JUMLAH C -
Halaman 23
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
B TENAGA
Pekerja 0.3000 Org/ Hr 75,000.00 22,500.00
Tukang 0.1500 Org/ Hr 80,000.00 12,000.00
Kepala Tukang 0.0150 Org/ Hr 90,000.00 1,350.00
Mandor 0.0150 Org/ Hr 100,000.00 1,500.00
B BAHAN
Semen Portland / kg 10.2240 kg 1,400.00 14,313.60
Pasir Pasang 0.0200 m³ 140,000.00 2,800.00
C PERALATAN
-
SUB JUMLAH C -
A TENAGA
Pekerja 0.0300 Org/ Hr 75,000.00 2,250.00
Tukang 0.1500 Org/ Hr 80,000.00 12,000.00
Kepala Tukang 0.0150 Org/ Hr 90,000.00 1,350.00
Mandor 0.0150 Org/ Hr 100,000.00 1,500.00
B BAHAN
Semen Portland / kg 6.2400 kg 1,400.00 8,736.00
Pasir Pasang 0.0240 m³ 140,000.00 3,360.00
C PERALATAN
-
SUB JUMLAH C -
Halaman 24
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A TENAGA
Pekerja 0.2000 Org/ Hr 75,000.00 15,000.00
Tukang 0.1000 Org/ Hr 80,000.00 8,000.00
Kepala Tukang 0.0100 Org/ Hr 90,000.00 900.00
Mandor 0.0100 Org/ Hr 100,000.00 1,000.00
B BAHAN
Semen Portland / kg 3.2500 kg 1,400.00 4,550.00
C PERALATAN
-
SUB JUMLAH C -
A TENAGA
Biaya 1.0000 m2 55,000.00 55,000.00
B BAHAN
Aluminium Composit Panel 1.0500 m2 550,000.00 577,500.00
C PERALATAN
Peralatan 1.0000 ls 55,000.00 55,000.00
Halaman 25
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A TENAGA
Pekerja 0.2500 Org/ Hr 75,000.00 18,750.00
Tukang 0.1250 Org/ Hr 80,000.00 10,000.00
Kepala Tukang 0.0130 Org/ Hr 90,000.00 1,170.00
Mandor 0.0130 Org/ Hr 100,000.00 1,300.00
B BAHAN
Granit 60 x 60 2.778 bh 80,000.00 222,222.22
Semen Portland / kg 9.800 kg 1,400.00 13,720.00
Semen Warna 1.300 Kg 2,600.00 3,380.00
Pasir Pasang 0.045 m³ 140,000.00 6,300.00
C PERALATAN
-
SUB JUMLAH C -
A TENAGA
Pekerja 0.2600 Org/ Hr 75,000.00 19,500.00
Tukang 0.1300 Org/ Hr 80,000.00 10,400.00
Kepala Tukang 0.0130 Org/ Hr 90,000.00 1,170.00
Mandor 0.0130 Org/ Hr 100,000.00 1,300.00
B BAHAN
Granit 30 x 30 11.870 bh 25,000.00 296,750.00
Semen Portland / kg 10.000 kg 1,400.00 14,000.00
Semen Warna 1.500 Kg 2,600.00 3,900.00
Pasir Pasang 0.045 m³ 140,000.00 6,300.00
C PERALATAN
-
SUB JUMLAH C -
Halaman 26
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A TENAGA
Pekerja 0.2600 Org/ Hr 75,000.00 19,500.00
Tukang 0.1300 Org/ Hr 80,000.00 10,400.00
Kepala Tukang 0.0130 Org/ Hr 90,000.00 1,170.00
Mandor 0.0130 Org/ Hr 100,000.00 1,300.00
B BAHAN
Granit 30 x 60 5.556 bh 31,000.00 172,222.22
Semen Portland / kg 10.000 kg 1,400.00 14,000.00
Pasir Pasang 0.045 m³ 140,000.00 6,300.00
Semen Warna 1.500 Kg 2,600.00 3,900.00
C PERALATAN
-
SUB JUMLAH C -
A TENAGA
Pekerja 0.7000 Org/ Hr 75,000.00 52,500.00
Tukang 0.3500 Org/ Hr 80,000.00 28,000.00
Kepala Tukang 0.0350 Org/ Hr 90,000.00 3,150.00
Mandor 0.0350 Org/ Hr 100,000.00 3,500.00
B BAHAN
Keramik 40 X 40 1.050 doos 75,000.00 78,750.00
Semen Portland / kg 9.800 kg 1,400.00 13,720.00
Pasir Pasang 0.045 m³ 140,000.00 6,300.00
Semen Warna 0.500 Kg 2,600.00 1,300.00
C PERALATAN
-
SUB JUMLAH C -
Halaman 27
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A TENAGA
Pekerja 0.7000 Org/ Hr 75,000.00 52,500.00
Tukang 0.3500 Org/ Hr 80,000.00 28,000.00
Kepala Tukang 0.0350 Org/ Hr 90,000.00 3,150.00
Mandor 0.0350 Org/ Hr 100,000.00 3,500.00
B BAHAN
Keramik 30 x 30 1.050 doos 75,000.00 78,750.00
Semen Portland / kg 10.000 kg 1,400.00 14,000.00
Pasir Pasang 0.045 m³ 140,000.00 6,300.00
Semen Warna 0.500 Kg 2,600.00 1,300.00
C PERALATAN
-
SUB JUMLAH C -
A TENAGA
Pekerja 0.7000 Org/ Hr 75,000.00 52,500.00
Tukang 0.3500 Org/ Hr 80,000.00 28,000.00
Kepala Tukang 0.0350 Org/ Hr 90,000.00 3,150.00
Mandor 0.0350 Org/ Hr 100,000.00 3,500.00
B BAHAN
Keramik 20 x 20 1.050 doos 71,000.00 74,550.00
Semen Portland / kg 10.400 kg 1,400.00 14,560.00
Pasir Pasang 0.045 m³ 140,000.00 6,300.00
Semen Warna 0.500 Kg 2,600.00 1,300.00
C PERALATAN
-
SUB JUMLAH C -
Halaman 28
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A TENAGA
Pekerja 0.9000 Org/ Hr 75,000.00 67,500.00
Tukang 0.4500 Org/ Hr 80,000.00 36,000.00
Kepala Tukang 0.0450 Org/ Hr 90,000.00 4,050.00
Mandor 0.0450 Org/ Hr 100,000.00 4,500.00
B BAHAN
Keramik 30 x 60 1.050 doos 76,000.00 79,800.00
Semen Portland / kg 9.300 kg 1,400.00 13,020.00
Pasir Pasang 0.018 m³ 140,000.00 2,520.00
Semen Warna 1.940 Kg 2,600.00 5,044.00
C UPAH
-
SUB JUMLAH C -
A TENAGA
Pekerja 0.9000 Org/ Hr 75,000.00 67,500.00
Tukang 0.4500 Org/ Hr 80,000.00 36,000.00
Kepala Tukang 0.0450 Org/ Hr 90,000.00 4,050.00
Mandor 0.0450 Org/ Hr 100,000.00 4,500.00
B BAHAN
Keramik 20 x 25 1.050 doos 74,800.00 78,540.00
Semen Portland / kg 9.300 kg 1,400.00 13,020.00
Pasir Pasang 0.018 m³ 140,000.00 2,520.00
Semen Warna 1.940 Kg 2,600.00 5,044.00
C UPAH
-
SUB JUMLAH C -
Halaman 29
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
55 Jenis Pekerjaan : Pemasangan 1 m2 Langit - Langit Gypsum Board Ukuran (120 x 240 x 9) mm, tebal 9 mm
Satuan Pembayaran : m2
Standar : -
A TEBAGA
Pekerja 0.1500 Org/ Hr 75,000.00 11,250.00
Tukang 0.4500 Org/ Hr 80,000.00 36,000.00
Kepala Tukang 0.0450 Org/ Hr 90,000.00 4,050.00
Mandor 0.0080 Org/ Hr 100,000.00 800.00
C PERALATAN
-
SUB JUMLAH C -
A TEBAGA
Pekerja 0.1500 Org/ Hr 75,000.00 11,250.00
Tukang 0.4500 Org/ Hr 80,000.00 36,000.00
Kepala Tukang 0.0450 Org/ Hr 90,000.00 4,050.00
Mandor 0.0080 Org/ Hr 100,000.00 800.00
C PERALATAN
-
SUB JUMLAH C -
Halaman 30
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A TENAGA
Pekerja 0.0500 Org/ Hr 75,000.00 3,750.00
Tukang 0.0500 Org/ Hr 80,000.00 4,000.00
Kepala Tukang 0.0030 Org/ Hr 90,000.00 270.00
Mandor 0.0030 Org/ Hr 100,000.00 300.00
B BAHAN
List Plafond Gypsum 1.0500 m¹ 28,750.00 30,187.50
C PERALATAN
-
SUB JUMLAH C -
A TENAGA
Pekerja 0.0500 Org/ Hr 75,000.00 3,750.00
Tukang 0.0500 Org/ Hr 80,000.00 4,000.00
Kepala Tukang 0.0030 Org/ Hr 90,000.00 270.00
Mandor 0.0030 Org/ Hr 100,000.00 300.00
B BAHAN
List Plafond PVC 1.0500 m¹ 25,000.00 26,250.00
C PERALATAN
-
SUB JUMLAH C -
Halaman 31
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A TENAGA
Pekerja 0.0500 Org/ Hr 75,000.00 3,750.00
Tukang 0.0500 Org/ Hr 80,000.00 4,000.00
Kepala Tukang 0.0030 Org/ Hr 90,000.00 270.00
Mandor 0.0030 Org/ Hr 100,000.00 300.00
B BAHAN
List Profil 1.0500 m¹ 15,000.00 15,750.00
C PERALATAN
-
SUB JUMLAH C -
60 Jenis Pekerjaan : Pengecatan 1 m2 Tembok Baru (1 Lapis Plamuur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
Satuan Pembayaran : m2
Standar : A.4.7.1.10
A TENAGA
Pekerja 0.0200 Org/ Hr 75,000.00 1,500.00
Tukang 0.0630 Org/ Hr 80,000.00 5,040.00
Kepala Tukang 0.0063 Org/ Hr 90,000.00 567.00
Mandor 0.0030 Org/ Hr 100,000.00 300.00
B BAHAN
Plamir 0.1000 kg 40,000.00 4,000.00
Cat Dasar Tembok 0.1000 kg 15,000.00 1,500.00
Cat Air 0.2600 kg 65,000.00 16,900.00
C PERALATAN
-
SUB JUMLAH C -
Halaman 32
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
61 Jenis Pekerjaan : 1 m2 Pengecatan Bidang Kayu Baru (1 Lapis Plamuur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
Satuan Pembayaran : m2
Standar : A.4.7.1.4
A TENAGA
Pekerja 0.0700 Org/ Hr 75,000.00 5,250.00
Tukang 0.0090 Org/ Hr 80,000.00 720.00
Kepala Tukang 0.0060 Org/ Hr 90,000.00 540.00
Mandor 0.0030 Org/ Hr 100,000.00 300.00
B BAHAN
Cat Menie 0.2000 kg 74,000.00 14,800.00
Plamir 0.1500 kg 40,000.00 6,000.00
Cat Dasar Kayu 0.1700 kg 36,225.00 6,158.25
Cat Minyak 0.2600 kg 85,000.00 22,100.00
Kuas 0.0100 bh 11,500.00 115.00
Pengencer 0.0300 kg 28,000.00 840.00
Amplas 0.2000 lbr 5,000.00 1,000.00
C PERALATAN
-
SUB JUMLAH C -
A TENAGA
Pekerja 1.000 Org/ Hr 75,000.00 75,000.00
Tukang 1.500 Org/ Hr 80,000.00 120,000.00
Kepala Tukang 0.150 Org/ Hr 90,000.00 13,500.00
Mandor 0.160 Org/ Hr 100,000.00 16,000.00
C PERALATAN
-
SUB JUMLAH C -
Halaman 33
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A TENAGA
Pekerja 3.300 Org/ Hr 75,000.00 247,500.00
Tukang 1.100 Org/ Hr 80,000.00 88,000.00
Kepala Tukang 0.010 Org/ Hr 90,000.00 900.00
Mandor 0.160 Org/ Hr 100,000.00 16,000.00
SUB JUMLAH A -
B BAHAN
Kloset Duduk 1.000 bh 1,735,000.00 1,735,000.00
Perlengkapan 6% x Kloset Duduk 1.000 ls 104,100.00 104,100.00
C PERALATAN
-
SUB JUMLAH C -
A TENAGA
Pekerja 1.000 Org/ Hr 75,000.00 75,000.00
Tukang 1.000 Org/ Hr 80,000.00 80,000.00
Kepala Tukang 0.100 Org/ Hr 90,000.00 9,000.00
Mandor 0.050 Org/ Hr 100,000.00 5,000.00
C PERALATAN
-
SUB JUMLAH C -
Halaman 34
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A TENAGA
Pekerja 1.200 Org/ Hr 75,000.00 90,000.00
Tukang 1.450 Org/ Hr 80,000.00 116,000.00
Kepala Tukang 0.150 Org/ Hr 90,000.00 13,500.00
Mandor 0.060 Org/ Hr 100,000.00 6,000.00
C PERALATAN
-
SUB JUMLAH C -
A TENAGA
Biaya Pemasangan 1.0000 bh 150,000.00 150,000.00
C PERALATAN
-
SUB JUMLAH C -
Halaman 35
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A TENAGA
Pekerja 0.010 Org/ Hr 75,000.00 750.00
Tukang 0.400 Org/ Hr 80,000.00 32,000.00
Kepala Tukang 0.040 Org/ Hr 90,000.00 3,600.00
Mandor 0.005 Org/ Hr 100,000.00 500.00
C UPAH
-
SUB JUMLAH C -
A TENAGA
Pekerja 0.010 Org/ Hr 75,000.00 750.00
Tukang 0.400 Org/ Hr 80,000.00 32,000.00
Kepala Tukang 0.040 Org/ Hr 90,000.00 3,600.00
Mandor 0.005 Org/ Hr 100,000.00 500.00
C UPAH
-
SUB JUMLAH C -
Halaman 36
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A TENAGA
Pekerja 0.010 Org/ Hr 75,000.00 750.00
Tukang 0.400 Org/ Hr 80,000.00 32,000.00
Kepala Tukang 0.040 Org/ Hr 90,000.00 3,600.00
Mandor 0.005 Org/ Hr 100,000.00 500.00
C UPAH
-
SUB JUMLAH C -
A TENAGA
Pekerja 0.010 Org/ Hr 75,000.00 750.00
Tukang 0.400 Org/ Hr 80,000.00 32,000.00
Kepala Tukang 0.040 Org/ Hr 90,000.00 3,600.00
Mandor 0.005 Org/ Hr 100,000.00 500.00
C UPAH
-
SUB JUMLAH C -
Halaman 37
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A UPAH
Pekerja 0.010 Org/ Hr 75,000.00 750.00
Tukang 0.100 Org/ Hr 80,000.00 8,000.00
Kepala Tukang 0.010 Org/ Hr 90,000.00 900.00
Mandor 0.005 Org/ Hr 100,000.00 500.00
C UPAH
-
SUB JUMLAH C -
A TENAGA
Biaya Pemasangan 1.000 bh 65,000.00 65,000.00
B BAHAN
Pembatas Urinoir dan Aksesoris 1.000 bh 325,000.00 325,000.00
C UPAH
-
SUB JUMLAH C -
Halaman 38
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A TENAGA
Pekerja 0.300 Org/ Hr 75,000.00 22,500.00
Tukang 0.450 Org/ Hr 80,000.00 36,000.00
Kepala Tukang 0.045 Org/ Hr 90,000.00 4,050.00
Mandor 0.015 Org/ Hr 100,000.00 1,500.00
B BAHAN
Bak Air Fiber 1.000 bh 489,800.00 489,800.00
Perlengkapan 12% x Bak Fiber 1.000 Ls 58,776.00 58,776.00
C PERALATAN
-
SUB JUMLAH C -
A TENAGA
Biaya Pemasangan 1.000 bh 45,000.00 45,000.00
B BAHAN
Cermin 1.000 bh 225,000.00 225,000.00
termasuk aksesoris
C UPAH
-
SUB JUMLAH C -
Halaman 39
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A TENAGA
Pekerja 0.030 Org/ Hr 75,000.00 2,250.00
Tukang 0.300 Org/ Hr 80,000.00 24,000.00
Kepala Tukang 0.030 Org/ Hr 90,000.00 2,700.00
Mandor 0.015 Org/ Hr 100,000.00 1,500.00
B BAHAN
Kitchen Zink 1.000 bh 425,000.00 425,000.00
C UPAH
-
SUB JUMLAH C -
A TENAGA
Biaya Pemasangan 1.0000 Bh 170,000.00 170,000.00
C UPAH
-
SUB JUMLAH C -
Halaman 40
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
74 Jenis Pekerjaan : Pembuatan dan Pemasangan 1 m3 Kusen Pintu dan Jendela, Kayu Kelas I
Satuan Pembayaran : m3
Standar : A.4.6.1.1
A TENAGA
Pekerja 7.0000 Org/ Hr 75,000.00 525,000.00
Tukang 21.0000 Org/ Hr 80,000.00 1,680,000.00
Kepala Tukang 2.1000 Org/ Hr 90,000.00 189,000.00
Mandor 0.3500 Org/ Hr 100,000.00 35,000.00
B BAHAN
Kayu/ Papan Klas I 1.1000 m³ 5,000,000.00 5,500,000.00
Paku Biasa 2" - 5" 1.2500 kg 15,000.00 18,750.00
Lem Kayu 1.0000 liter 30,000.00 30,000.00
C UPAH
-
SUB JUMLAH C -
75 Jenis Pekerjaan : Pembuatan dan Pemasangan 1 m2 Pintu Panel, Kayu Kelas I atau Kelas II
Satuan Pembayaran : m2
Standar : A.4.6.1.5
A TENAGA
Pekerja 1.0000 Org/ Hr 75,000.00 75,000.00
Tukang 3.0000 Org/ Hr 80,000.00 240,000.00
Kepala Tukang 0.3000 Org/ Hr 90,000.00 27,000.00
Mandor 0.0500 Org/ Hr 100,000.00 5,000.00
C PERALATAN
-
SUB JUMLAH C -
Halaman 41
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A TENAGA
Pekerja 0.2000 Org/ Hr 75,000.00 15,000.00
Tukang 0.6000 Org/ Hr 80,000.00 48,000.00
Kepala Tukang 0.0600 Org/ Hr 90,000.00 5,400.00
Mandor 0.0100 Org/ Hr 100,000.00 1,000.00
C PERALATAN
-
SUB JUMLAH C -
A TENAGA
Pekerja 0.0430 Org/ Hr 75,000.00 3,225.00
Tukang 0.0430 Org/ Hr 80,000.00 3,440.00
Kepala Tukang 0.0043 Org/ Hr 90,000.00 387.00
Mandor 0.0021 Org/ Hr 100,000.00 210.00
B BAHAN
Kusen Aluminium 1.1000 m¹ 125,000.00 137,500.00
Sekrup Fixer 2.0000 bh 500.00 1,000.00
Sealant 0.0600 tube 22,000.00 1,320.00
C PERALATAN
-
SUB JUMLAH C -
Halaman 42
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A TENAGA
Pekerja 0.0850 Or/hr 75,000.00 6,375.00
Tukang 0.0850 Or/hr 80,000.00 6,800.00
Kepala Tukang 0.0090 Or/hr 90,000.00 810.00
Mandor 0.0050 Or/hr 100,000.00 500.00
B BAHAN
Rangka Aluminiumm 4.4000 m1 125,000.00 550,000.00
Profil Kaca 1.0000 m2 111,625.00 111,625.00
Sealant 0.2700 tube 22,000.00 5,940.00
C PERALATAN
-
SUB JUMLAH C -
Halaman 43
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A TENAGA
Pekerja 0.0150 Or/hr 75,000.00 1,125.00
Tukang 0.1500 Or/hr 80,000.00 12,000.00
Kepala Tukang 0.0150 Or/hr 90,000.00 1,350.00
Mandor 0.0008 Or/hr 100,000.00 80.00
B BAHAN
Kaca tebal 5 mm 1.1000 m1 111,625.00 122,787.50
Sealant 0.0500 tube 22,000.00 1,100.00
C PERALATAN
-
SUB JUMLAH C -
A TENAGA
Pekerja 0.0250 Or/hr 75,000.00 1,875.00
Tukang 0.2500 Or/hr 80,000.00 20,000.00
Kepala Tukang 0.0250 Or/hr 90,000.00 2,250.00
Mandor 0.0013 Or/hr 100,000.00 130.00
B BAHAN
Kaca tebal 12 mm 1.1000 m1 180,000.00 198,000.00
Sealant 0.0700 tube 22,000.00 1,540.00
C PERALATAN
-
SUB JUMLAH C -
Halaman 44
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
Pintu Kaca Tempered Uk. 0.9 x 2.2 1.9800 m2/unit 246,174.50 487,425.51
Pintu Kaca Tempered Uk. 0.8 x 2.2 1.7600 m2/unit 246,174.50 433,267.12
Pintu Kaca Tempered Uk. 1.025 x 2.1 2.1525 m2/unit 246,174.50 529,890.61
Pintu Kaca Tempered Uk. 0.75 x 2.1 1.5750 m2/unit 246,174.50 387,724.84
Pintu Kaca Tempered Uk. 0.9 x 2.1 1.8900 m2/unit 246,174.50 465,269.81
Pintu Kaca Tempered Uk. 0.8 x 2.1 1.6800 m2/unit 246,174.50 413,573.16
Pintu Kaca Tempered Uk. 0.9 x 2.05 1.8450 m2/unit 246,174.50 454,191.95
Pintu Kaca Tempered Uk. 0.8 x 2.05 1.6400 m2/unit 246,174.50 403,726.18
Pintu Kaca Tempered Uk. 0.75 x 2.05 1.5375 m2/unit 246,174.50 378,493.29
Pintu Kaca Tempered Uk. 0.7 x 2.05 1.4350 m2/unit 246,174.50 353,260.41
A TENAGA
Pekerja 0.0100 Org/ Hr 75,000.00 750.00
Tukang 0.5000 Org/ Hr 80,000.00 40,000.00
Kepala Tukang 0.0500 Org/ Hr 90,000.00 4,500.00
Mandor 0.0050 Org/ Hr 100,000.00 500.00
B BAHAN
Kunci Tanam 2 Slaag 1.0000 bh 334,875.00 334,875.00
C PERALATAN
-
SUB JUMLAH C -
Halaman 45
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A TENAGA
Pekerja 0.0050 Org/ Hr 75,000.00 375.00
Tukang 0.5000 Org/ Hr 80,000.00 40,000.00
Kepala Tukang 0.0500 Org/ Hr 90,000.00 4,500.00
Mandor 0.0030 Org/ Hr 100,000.00 300.00
B BAHAN
Kunci Biasa 1.0000 bh 143,000.00 143,000.00
C PERALATAN
-
SUB JUMLAH C -
A TENAGA
Pekerja 0.0150 Org/ Hr 75,000.00 1,125.00
Tukang 0.1500 Org/ Hr 80,000.00 12,000.00
Kepala Tukang 0.0150 Org/ Hr 90,000.00 1,350.00
Mandor 0.0008 Org/ Hr 100,000.00 80.00
B BAHAN
Engsel Pintu 4 '' 1.0000 bh 88,000.00 88,000.00
C PERALATAN
-
SUB JUMLAH C -
Halaman 46
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A TENAGA
Pekerja 0.0150 Org/ Hr 75,000.00 1,125.00
Tukang 0.1500 Org/ Hr 80,000.00 12,000.00
Kepala Tukang 0.0150 Org/ Hr 90,000.00 1,350.00
Mandor 0.0008 Org/ Hr 100,000.00 80.00
B BAHAN
Engsel Pintu Tanam Pintu Kaca Tempered 1.0000 bh 485,000.00 485,000.00
C PERALATAN
-
SUB JUMLAH C -
A TENAGA
Pekerja 0.0100 Org/ Hr 75,000.00 750.00
Tukang 0.1000 Org/ Hr 80,000.00 8,000.00
Kepala Tukang 0.0100 Org/ Hr 90,000.00 900.00
Mandor 0.0005 Org/ Hr 100,000.00 50.00
B BAHAN
Engsel Jendela 3 " 1.0000 bh 65,000.00 65,000.00
C PERALATAN
-
SUB JUMLAH B -
Halaman 47
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A TENAGA
Pekerja 0.0150 Org/ Hr 75,000.00 1,125.00
Tukang 0.1500 Org/ Hr 80,000.00 12,000.00
Kepala Tukang 0.0150 Org/ Hr 90,000.00 1,350.00
Mandor 0.0080 Org/ Hr 100,000.00 800.00
B BAHAN
Grendel Jendela / Spring Knip 1.0000 bh 33,500.00 33,500.00
C PERALATAN
-
SUB JUMLAH C -
A TENAGA
Pekerja 0.0150 Org/ Hr 75,000.00 1,125.00
Tukang 0.1500 Org/ Hr 80,000.00 12,000.00
Kepala Tukang 0.0150 Org/ Hr 90,000.00 1,350.00
Mandor 0.0080 Org/ Hr 100,000.00 800.00
B BAHAN
Kait Angin Kualitas Standar 1.0000 bh 16,500.00 16,500.00
C UPAH
-
SUB JUMLAH C -
Halaman 48
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A UPAH
Pekerja 0.0150 Org/ Hr 75,000.00 1,125.00
Tukang 0.1500 Org/ Hr 80,000.00 12,000.00
Kepala Tukang 0.0150 Org/ Hr 90,000.00 1,350.00
Mandor 0.0080 Org/ Hr 100,000.00 800.00
B BAHAN
Handle Pintu 1.0000 bh 143,800.00 143,800.00
C UPAH
-
SUB JUMLAH C -
A UPAH
Pekerja 0.0150 Org/ Hr 75,000.00 1,125.00
Tukang 0.1500 Org/ Hr 80,000.00 12,000.00
Kepala Tukang 0.0150 Org/ Hr 90,000.00 1,350.00
Mandor 0.0080 Org/ Hr 100,000.00 800.00
B BAHAN
Handle jendela 1.0000 bh 195,000.00 195,000.00
C UPAH
-
SUB JUMLAH C -
Halaman 49
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A UPAH
Pekerja 0.0500 Org/ Hr 75,000.00 3,750.00
Tukang 0.5000 Org/ Hr 80,000.00 40,000.00
Kepala Tukang 0.0500 Org/ Hr 90,000.00 4,500.00
Mandor 0.0030 Org/ Hr 100,000.00 300.00
B BAHAN
Door Closer 1.0000 bh 258,000.00 258,000.00
C UPAH
-
SUB JUMLAH C -
A BAHAN
Gawang Beton 0.2 x 0.35 0.4830 m³ 6,639,710.00 3,206,979.93
Aluminium Composit Panel 2.8000 m² 695,750.00 1,948,100.00
Pintu Kaca Tempered 12 mm 0.9 x 2.2 2.0000 bh 487,425.51 974,851.02
Stiker Kaca Buram 0.9000 m² 32,000.00 28,800.00
Engsel Pintu Kaca Tempered 4.0000 bh 549,510.50 2,198,042.00
Handle Pintu 2.0000 bh 174,982.50 349,965.00
Kunci Pintu 1.0000 bh 418,687.50 418,687.50
Door Closer 2.0000 bh 337,205.00 674,410.00
A BAHAN
Gawang Beton 0.2 x 0.35 0.4760 m³ 6,639,710.00 3,160,501.96
Aluminium Composit Panel 2.7200 m² 695,750.00 1,892,440.00
Pintu Kaca Tempered 12 mm 0.8 x 2.2 2.0000 bh 433,267.12 866,534.24
Stiker Kaca Buram 0.8000 m² 32,000.00 25,600.00
Engsel Pintu Kaca Tempered 4.0000 bh 549,510.50 2,198,042.00
Handle Pintu 2.0000 bh 174,982.50 349,965.00
Kunci Pintu 1.0000 bh 418,687.50 418,687.50
Door Closer 2.0000 bh 337,205.00 674,410.00
PEKERJAAN :
LOKASI :
A BAHAN
Kusen Aluminium 9.5000 m¹ 161,790.20 1,537,006.90
Pintu Kaca Tempered 12 mm 1.025 x 2.1 2.0000 bh 529,890.61 1,059,781.22
Stiker Kaca Buram 1.0250 m² 32,000.00 32,800.00
Kaca Bening 5 mm 4.2350 m² 152,286.75 644,934.39
Jendela 0.5 x 0.7 2.0000 bh 262,589.25 525,178.50
Engsel Pintu Kaca Tempered 4.0000 bh 549,510.50 2,198,042.00
Handle Pintu 2.0000 bh 174,982.50 349,965.00
Kunci Pintu 1.0000 bh 418,687.50 418,687.50
Engsel Jendela 4.0000 bh 82,170.00 328,680.00
Handle Jendela 2.0000 bh 231,302.50 462,605.00
Grendel Jendela 2.0000 bh 53,652.50 107,305.00
Kait Angin Jendela 4.0000 bh 34,952.50 139,810.00
Door Closer 2.0000 bh 337,205.00 674,410.00
A BAHAN
Kusen Aluminium 9.5000 m¹ 161,790.20 1,537,006.90
Pintu Kaca Tempered 12 mm 0.75 x 2.1 2.0000 bh 387,724.84 775,449.68
Stiker Kaca Buram 0.7500 m² 32,000.00 24,000.00
Kaca Bening 5 mm 0.9800 m² 152,286.75 149,241.02
Engsel Pintu Kaca Tempered 4.0000 bh 549,510.50 2,198,042.00
Handle Pintu 2.0000 bh 174,982.50 349,965.00
Kunci Pintu 1.0000 bh 418,687.50 418,687.50
Door Closer 2.0000 bh 337,205.00 674,410.00
A BAHAN
Kusen Aluminium 7.6000 m¹ 161,790.20 1,229,605.52
Pintu Kaca Tempered 12 mm 0.9 x 2.1 1.0000 bh 465,269.81 465,269.81
Stiker Kaca Buram 0.4500 m² 32,000.00 14,400.00
Kaca Bening 5 mm 0.6300 m² 152,286.75 95,940.65
Engsel Pintu Kaca Tempered 2.0000 bh 549,510.50 1,099,021.00
Handle Pintu 1.0000 bh 174,982.50 174,982.50
Kunci Pintu 1.0000 bh 418,687.50 418,687.50
Door Closer 1.0000 bh 337,205.00 337,205.00
Halaman 51
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A BAHAN
A BAHAN
A BAHAN
Halaman 52
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A BAHAN
A BAHAN
A BAHAN
A BAHAN
Halaman 53
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A BAHAN
Kusen Aluminium 20.8000 m¹ 161,790.20 3,365,236.16
Kaca Bening 5 mm 5.6700 m² 152,286.75 863,465.87
A BAHAN
Kusen Aluminium 28.5000 m1 161,790.20 4,611,020.70
Kaca Bening 5 mm 8.4000 m² 152,286.75 1,279,208.70
A BAHAN
Kusen Aluminium 14.9000 m1 161,790.20 2,410,673.98
Kaca Bening 5 mm 2.4000 m² 152,286.75 365,488.20
Jendela Kaca 0.5 x 0.7 3.0000 bh 262,589.25 787,767.75
Engsel Jendela 6.0000 bh 82,170.00 493,020.00
Handle Jendela 3.0000 bh 231,302.50 693,907.50
Grendel Jendela 3.0000 bh 53,652.50 160,957.50
Kait Angin Jendela 6.0000 bh 34,952.50 209,715.00
A BAHAN
Kusen Aluminium 18.4000 m¹ 161,790.20 2,976,939.68
Kaca Bening 5 mm 3.0000 m² 152,286.75 456,860.25
Jendela Kaca 0.5 x 0.7 3.0000 bh 262,589.25 787,767.75
Engsel Jendela 6.0000 bh 82,170.00 493,020.00
Handle Jendela 3.0000 bh 231,302.50 693,907.50
Grendel Jendela 3.0000 bh 53,652.50 160,957.50
Kait Angin Jendela 6.0000 bh 34,952.50 209,715.00
PEKERJAAN :
LOKASI :
A BAHAN
Kusen Aluminium 21.4400 m¹ 161,790.20 3,468,781.89
Kaca Bening 5 mm 3.9060 m² 152,286.75 594,832.05
Jendela Kaca 1.0 x 0.7 3.0000 bh 525,178.50 1,575,535.50
Engsel Jendela 6.0000 bh 82,170.00 493,020.00
Handle Jendela 3.0000 bh 231,302.50 693,907.50
Grendel Jendela 3.0000 bh 53,652.50 160,957.50
Kait Angin Jendela 6.0000 bh 34,952.50 209,715.00
A BAHAN
Kusen Aluminium 21.4400 m¹ 161,790.20 3,468,781.89
Kaca Bening 5 mm 3.9060 m² 152,286.75 594,832.05
Jendela Kaca 1.0 x 0.7 3.0000 bh 525,178.50 1,575,535.50
Engsel Jendela 6.0000 bh 82,170.00 493,020.00
Handle Jendela 3.0000 bh 231,302.50 693,907.50
Grendel Jendela 3.0000 bh 53,652.50 160,957.50
Kait Angin Jendela 6.0000 bh 34,952.50 209,715.00
A BAHAN
Kusen Aluminium 15.5000 m¹ 161,790.20 2,507,748.10
Kaca Bening 5 mm 4.2000 m² 152,286.75 639,604.35
Jendela Kaca 1.0 x 0.7 3.0000 bh 525,178.50 1,575,535.50
Engsel Jendela 6.0000 bh 82,170.00 493,020.00
Handle Jendela 3.0000 bh 231,302.50 693,907.50
Grendel Jendela 3.0000 bh 53,652.50 160,957.50
Kait Angin Jendela 6.0000 bh 34,952.50 209,715.00
Halaman 55
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A BAHAN
Kusen Aluminium 15.5000 m¹ 161,790.20 2,507,748.10
Kaca Bening 5 mm 4.2000 m² 152,286.75 639,604.35
Jendela Kaca 1.0 x 0.7 3.0000 bh 525,178.50 1,575,535.50
Engsel Jendela 6.0000 bh 82,170.00 493,020.00
Handle Jendela 3.0000 bh 231,302.50 693,907.50
Grendel Jendela 3.0000 bh 53,652.50 160,957.50
Kait Angin Jendela 6.0000 bh 34,952.50 209,715.00
A BAHAN
Kusen Aluminium 8.4400 m¹ 161,790.20 1,365,509.29
Kaca Bening 5 mm 2.0160 m² 152,286.75 307,010.09
Jendela Kaca 0.96 x 0.7 1.0000 bh 504,171.36 504,171.36
Engsel Jendela 2.0000 bh 82,170.00 164,340.00
Handle Jendela 1.0000 bh 231,302.50 231,302.50
Grendel Jendela 1.0000 bh 53,652.50 53,652.50
Kait Angin Jendela 2.0000 bh 34,952.50 69,905.00
A BAHAN
Kusen Aluminium 8.4400 m¹ 161,790.20 1,365,509.29
Jendela Kaca 0.96 x 0.7 3.0000 bh 504,171.36 1,512,514.08
Engsel Jendela 6.0000 bh 82,170.00 493,020.00
Handle Jendela 3.0000 bh 231,302.50 693,907.50
Grendel Jendela 3.0000 bh 53,652.50 160,957.50
Kait Angin Jendela 6.0000 bh 34,952.50 209,715.00
Halaman 56
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A BAHAN
Kusen Aluminium 8.0400 m¹ 161,790.20 1,300,793.21
Jendela Kaca 0.86 x 0.7 3.0000 bh 451,653.51 1,354,960.53
Engsel Jendela 6.0000 bh 82,170.00 493,020.00
Handle Jendela 3.0000 bh 231,302.50 693,907.50
Grendel Jendela 3.0000 bh 53,652.50 160,957.50
Kait Angin Jendela 6.0000 bh 34,952.50 209,715.00
A BAHAN
Kusen Aluminium 5.6000 m¹ 161,790.20 906,025.12
Kaca Bening 5 mm 1.0750 m² 152,286.75 163,708.26
A BAHAN
Kusen Aluminium 10.8300 m¹ 161,790.20 1,752,187.87
Kaca Bening 5 mm 1.2740 m² 152,286.75 194,013.32
Jendela Kaca 0.91 x 0.7 2.0000 bh 477,912.44 955,824.87
Engsel Jendela 4.0000 bh 82,170.00 328,680.00
Handle Jendela 2.0000 bh 231,302.50 462,605.00
Grendel Jendela 2.0000 bh 53,652.50 107,305.00
Kait Angin Jendela 4.0000 bh 34,952.50 139,810.00
A BAHAN
Kusen Aluminium 10.8300 m¹ 161,790.20 1,752,187.87
Kaca Bening 5 mm 1.2740 m² 152,286.75 194,013.32
Jendela Kaca 0.91 x 0.7 2.0000 bh 477,912.44 955,824.87
Engsel Jendela 4.0000 bh 82,170.00 328,680.00
Handle Jendela 2.0000 bh 231,302.50 462,605.00
Grendel Jendela 2.0000 bh 53,652.50 107,305.00
Kait Angin Jendela 4.0000 bh 34,952.50 139,810.00
Halaman 57
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A BAHAN
Kusen Aluminium 25.7500 m¹ 161,790.20 4,166,097.65
Kaca Bening 5 mm 5.6000 m² 152,286.75 852,805.80
A BAHAN
Kusen Aluminium 20.2000 m¹ 161,790.20 3,268,162.04
Kaca Bening 5 mm 1.4000 m² 152,286.75 213,201.45
Jendela Kaca 1 x 0.7 6.0000 bh 525,178.50 3,151,071.00
Engsel Jendela 12.0000 bh 82,170.00 986,040.00
Handle Jendela 6.0000 bh 231,302.50 1,387,815.00
Grendel Jendela 6.0000 bh 53,652.50 321,915.00
Kait Angin Jendela 12.0000 bh 34,952.50 419,430.00
A BAHAN
Kusen Aluminium 15.3800 m¹ 161,790.20 2,488,333.28
Kaca Bening 5 mm 1.4000 m² 152,286.75 213,201.45
Jendela Kaca 0.86 x 0.7 2.0000 bh 451,653.51 903,307.02
Jendela Kaca 1.0 x 0.7 2.0000 bh 525,178.50 1,050,357.00
Engsel Jendela 8.0000 bh 82,170.00 657,360.00
Handle Jendela 4.0000 bh 231,302.50 925,210.00
Grendel Jendela 4.0000 bh 53,652.50 214,610.00
Kait Angin Jendela 8.0000 bh 34,952.50 279,620.00
Halaman 58
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A BAHAN
Kusen Aluminium 15.3800 m¹ 161,790.20 2,488,333.28
Jendela Kaca 0.96 x 0.7 2.0000 bh 504,171.36 1,008,342.72
Engsel Jendela 4.0000 bh 82,170.00 328,680.00
Handle Jendela 2.0000 bh 231,302.50 462,605.00
Grendel Jendela 2.0000 bh 53,652.50 107,305.00
Kait Angin Jendela 4.0000 bh 34,952.50 139,810.00
A BAHAN
Kusen Aluminium 12.4800 m¹ 161,790.20 2,019,141.70
Kaca Bening 5 mm 1.8456 m² 152,286.75 281,060.43
Jendela Kaca 0.78 x 0.7 2.0000 bh 409,639.23 819,278.46
Engsel Jendela 4.0000 bh 82,170.00 328,680.00
Handle Jendela 2.0000 bh 231,302.50 462,605.00
Grendel Jendela 2.0000 bh 53,652.50 107,305.00
Kait Angin Jendela 4.0000 bh 34,952.50 139,810.00
A BAHAN
Kusen Aluminium 21.4400 m¹ 161,790.20 3,468,781.89
Kaca Bening 5 mm 2.1000 m² 152,286.75 319,802.18
Jendela Kaca 1.0 x 0.7 3.0000 bh 525,178.50 1,575,535.50
Jendela Kaca 0.86 x 0.7 3.0000 bh 451,653.51 1,354,960.53
Engsel Jendela 12.0000 bh 82,170.00 986,040.00
Handle Jendela 6.0000 bh 231,302.50 1,387,815.00
Grendel Jendela 6.0000 bh 53,652.50 321,915.00
Kait Angin Jendela 12.0000 bh 34,952.50 419,430.00
Halaman 59
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A BAHAN
Kusen Aluminium 21.4400 m¹ 161,790.20 3,468,781.89
Kaca Bening 5 mm 2.1000 m² 152,286.75 319,802.18
Jendela Kaca 1.0 x 0.7 3.0000 bh 525,178.50 1,575,535.50
Jendela Kaca 0.86 x 0.7 3.0000 bh 451,653.51 1,354,960.53
Engsel Jendela 12.0000 bh 82,170.00 986,040.00
Handle Jendela 6.0000 bh 231,302.50 1,387,815.00
Grendel Jendela 6.0000 bh 53,652.50 321,915.00
Kait Angin Jendela 12.0000 bh 34,952.50 419,430.00
A BAHAN
Kusen Aluminium 15.1400 m¹ 161,790.20 2,449,503.63
Kaca Bening 5 mm 1.9110 m² 152,286.75 291,019.98
Jendela Kaca 1.0 x 0.7 3.0000 bh 525,178.50 1,575,535.50
Engsel Jendela 6.0000 bh 82,170.00 493,020.00
Handle Jendela 3.0000 bh 231,302.50 693,907.50
Grendel Jendela 3.0000 bh 53,652.50 160,957.50
Kait Angin Jendela 6.0000 bh 34,952.50 209,715.00
A BAHAN
Kusen Aluminium 15.1400 m¹ 161,790.20 2,449,503.63
Kaca Bening 5 mm 1.9110 m² 152,286.75 291,019.98
Jendela Kaca 1.0 x 0.7 3.0000 bh 525,178.50 1,575,535.50
Engsel Jendela 6.0000 bh 82,170.00 493,020.00
Handle Jendela 3.0000 bh 231,302.50 693,907.50
Grendel Jendela 3.0000 bh 53,652.50 160,957.50
Kait Angin Jendela 6.0000 bh 34,952.50 209,715.00
Halaman 60
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A BAHAN
Kusen Aluminium 16.0000 m¹ 161,790.20 2,588,643.20
Kaca Bening 5 mm 2.1000 m² 152,286.75 319,802.18
Jendela Kaca 0.5 x 0.7 3.0000 bh 262,589.25 787,767.75
Engsel Jendela 6.0000 bh 82,170.00 493,020.00
Handle Jendela 3.0000 bh 231,302.50 693,907.50
Grendel Jendela 3.0000 bh 53,652.50 160,957.50
Kait Angin Jendela 6.0000 bh 34,952.50 209,715.00
A BAHAN
Kusen Aluminium 6.1000 m¹ 161,790.20 986,920.22
Kaca Bening 5 mm 0.3500 m² 152,286.75 53,300.36
Jendela Kaca 0.5 x 1.45 3.0000 bh 543,934.88 1,631,804.63
Engsel Jendela 2.0000 bh 82,170.00 164,340.00
Handle Jendela 1.0000 bh 231,302.50 231,302.50
Grendel Jendela 1.0000 bh 53,652.50 53,652.50
Kait Angin Jendela 2.0000 bh 34,952.50 69,905.00
A BAHAN
Kusen Aluminium 12.5000 m¹ 161,790.20 2,022,377.50
Kaca Bening 5 mm 1.4000 m² 152,286.75 213,201.45
Jendela Kaca 1.0 x 0.7 2.0000 bh 525,178.50 1,050,357.00
Engsel Jendela 4.0000 bh 82,170.00 328,680.00
Handle Jendela 2.0000 bh 231,302.50 462,605.00
Grendel Jendela 2.0000 bh 53,652.50 107,305.00
Kait Angin Jendela 4.0000 bh 34,952.50 139,810.00
Halaman 61
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A BAHAN
Kusen Aluminium 9.3200 m¹ 161,790.20 1,507,884.66
Kaca Bening 5 mm 0.7000 m² 152,286.75 106,600.73
Jendela Kaca 1.0 x 0.7 1.0000 bh 525,178.50 525,178.50
Jendela Kaca 0.86 x 0.7 1.0000 bh 451,653.51 451,653.51
Engsel Jendela 4.0000 bh 82,170.00 328,680.00
Handle Jendela 2.0000 bh 231,302.50 462,605.00
Grendel Jendela 2.0000 bh 53,652.50 107,305.00
Kait Angin Jendela 4.0000 bh 34,952.50 139,810.00
A BAHAN
Kusen Aluminium 9.3200 m¹ 161,790.20 1,507,884.66
Kaca Bening 5 mm 0.7000 m² 152,286.75 106,600.73
Jendela Kaca 1.0 x 0.7 1.0000 bh 525,178.50 525,178.50
Jendela Kaca 0.86 x 0.7 1.0000 bh 451,653.51 451,653.51
Engsel Jendela 4.0000 bh 82,170.00 328,680.00
Handle Jendela 2.0000 bh 231,302.50 462,605.00
Grendel Jendela 2.0000 bh 53,652.50 107,305.00
Kait Angin Jendela 4.0000 bh 34,952.50 139,810.00
A BAHAN
Kusen Aluminium 9.3200 m¹ 161,790.20 1,507,884.66
Kaca Bening 5 mm 2.0020 m² 152,286.75 304,878.07
Halaman 62
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A BAHAN
Kusen Aluminium 6.5200 m¹ 161,790.20 1,054,872.10
Kaca Bening 5 mm 0.6370 m² 152,286.75 97,006.66
Jendela Kaca 1.0 x 0.7 1.0000 bh 525,178.50 525,178.50
Engsel Jendela 2.0000 bh 82,170.00 164,340.00
Handle Jendela 1.0000 bh 231,302.50 231,302.50
Grendel Jendela 1.0000 bh 53,652.50 53,652.50
Kait Angin Jendela 2.0000 bh 34,952.50 69,905.00
A BAHAN
Kusen Aluminium 6.5200 m¹ 161,790.20 1,054,872.10
Kaca Bening 5 mm 0.6370 m² 152,286.75 97,006.66
Jendela Kaca 1.0 x 0.7 1.0000 bh 525,178.50 525,178.50
Engsel Jendela 2.0000 bh 82,170.00 164,340.00
Handle Jendela 1.0000 bh 231,302.50 231,302.50
Grendel Jendela 1.0000 bh 53,652.50 53,652.50
Kait Angin Jendela 2.0000 bh 34,952.50 69,905.00
A BAHAN
Kusen Aluminium 6.1400 m¹ 161,790.20 993,391.83
Jendela Kaca 0.86 x 0.7 2.0000 bh 451,653.51 903,307.02
Engsel Jendela 4.0000 bh 82,170.00 328,680.00
Handle Jendela 2.0000 bh 231,302.50 462,605.00
Grendel Jendela 2.0000 bh 53,652.50 107,305.00
Kait Angin Jendela 4.0000 bh 34,952.50 139,810.00
A BAHAN
Kusen Aluminium 8.3000 m¹ 161,790.20 1,342,858.66
Kaca Bening 5 mm 1.6380 m² 152,286.75 249,445.70
Halaman 63
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A BAHAN
Kusen Aluminium 3.5200 m¹ 161,790.20 569,501.50
Jendela Kaca 0.96 x 0.7 1.0000 bh 504,171.36 504,171.36
Engsel Jendela 2.0000 bh 82,170.00 164,340.00
Handle Jendela 1.0000 bh 231,302.50 231,302.50
Grendel Jendela 1.0000 bh 53,652.50 53,652.50
Kait Angin Jendela 2.0000 bh 34,952.50 69,905.00
A BAHAN
Kusen Aluminium 6.7000 m¹ 161,790.20 1,083,994.34
Kaca Bening 5 mm 0.7000 m² 152,286.75 106,600.73
Jendela Kaca 1.0 x 0.7 1.0000 bh 525,178.50 525,178.50
Engsel Jendela 2.0000 bh 82,170.00 164,340.00
Handle Jendela 1.0000 bh 231,302.50 231,302.50
Grendel Jendela 1.0000 bh 53,652.50 53,652.50
Kait Angin Jendela 2.0000 bh 34,952.50 69,905.00
A BAHAN
Kusen Aluminium 2.5200 m¹ 161,790.20 407,711.30
Jendela Kaca 0.46 x 0.7 1.0000 bh 241,582.11 241,582.11
Engsel Jendela 2.0000 bh 82,170.00 164,340.00
Handle Jendela 1.0000 bh 231,302.50 231,302.50
Grendel Jendela 1.0000 bh 53,652.50 53,652.50
Kait Angin Jendela 2.0000 bh 34,952.50 69,905.00
Halaman 64
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A BAHAN
Kusen Aluminium 3.1000 m¹ 161,790.20 501,549.62
Jendela Kaca 0.8 x 0.65 1.0000 bh 420,142.80 420,142.80
Engsel Jendela 2.0000 bh 82,170.00 164,340.00
Handle Jendela 1.0000 bh 231,302.50 231,302.50
Grendel Jendela 1.0000 bh 53,652.50 53,652.50
Kait Angin Jendela 2.0000 bh 34,952.50 69,905.00
A BAHAN
Kusen Aluminium 6.5200 m¹ 161,790.20 1,054,872.10
Kaca Bening 5 mm 1.3440 m² 152,286.75 204,673.39
A BAHAN
Kusen Aluminium 73.9500 m¹ 161,790.20 11,964,385.29
Kaca Bening 5 mm 22.2836 m² 152,286.75 3,393,497.02
A BAHAN
Kusen Aluminium 25.2600 m¹ 161,790.20 4,086,820.45
Pintu Multiplek 12 mm 0.8 x 2.05 1.0000 bh -
Kaca Bening 5 mm 8.3150 m² 152,286.75 1,266,264.33
Stiker Kaca Buram 2.8200 m² 32,000.00 90,240.00
Engsel Pintu 3.0000 bh 112,810.50 338,431.50
Handle Pintu 1.0000 bh 174,982.50 174,982.50
Kunci Pintu 1.0000 bh 418,687.50 418,687.50
Halaman 65
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A BAHAN
Kusen Aluminium 21.3300 m¹ 161,790.20 3,450,984.97
Pintu Kaca Tempered 12 mm 0.9 x 2.05 1.0000 bh 454,191.95 454,191.95
Kaca Bening 5 mm 9.3975 m² 152,286.75 1,431,114.73
Stiker Kaca Buram 2.8263 m² 32,000.00 90,442.08
Engsel Pintu Kaca Tempered 2.0000 bh 549,510.50 1,099,021.00
Handle Pintu 1.0000 bh 174,982.50 174,982.50
Kunci Pintu 1.0000 bh 418,687.50 418,687.50
A BAHAN
Kusen Aluminium 14.1000 m¹ 161,790.20 2,281,241.82
Kaca Bening 5 mm 4.5100 m² 152,286.75 686,813.24
Stiker Kaca Buram 1.6500 m² 32,000.00 52,800.00
A BAHAN
Kusen Aluminium 33.2200 m¹ 161,790.20 5,374,670.44
Pintu Kaca Tempered 12 mm 0.7 x 2.05 2.0000 bh 353,260.41 706,520.82
Kaca Bening 5 mm 21.5000 m² 152,286.75 3,274,165.13
Stiker Kaca Buram 5.5000 m² 32,000.00 176,000.00
Engsel Pintu Kaca Tempered 4.0000 bh 549,510.50 2,198,042.00
Handle Pintu 2.0000 bh 174,982.50 349,965.00
Kunci Pintu 2.0000 bh 418,687.50 837,375.00
Halaman 66
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A BAHAN
Kusen Aluminium 21.3300 m¹ 161,790.20 3,450,984.97
Pintu Kaca Tempered 12 mm 0.9 x 2.05 1.0000 bh 454,191.95 454,191.95
Kaca Bening 5 mm 9.3975 m² 152,286.75 1,431,114.73
Stiker Kaca Buram 2.8263 m² 32,000.00 90,442.08
Engsel Pintu Kaca Tempered 2.0000 bh 549,510.50 1,099,021.00
Handle Pintu 1.0000 bh 174,982.50 174,982.50
Kunci Pintu 1.0000 bh 418,687.50 418,687.50
A BAHAN
Kusen Aluminium 12.3000 m¹ 161,790.20 1,990,019.46
Kaca Bening 5 mm 4.2350 m² 152,286.75 644,934.39
Stiker Kaca Buram 1.5500 m² 32,000.00 49,600.00
A BAHAN
Kusen Aluminium 27.5500 m¹ 161,790.20 4,457,320.01
Kaca Bening 5 mm 11.2200 m² 152,286.75 1,708,657.34
Stiker Kaca Buram 4.1000 m² 32,000.00 131,200.00
A BAHAN
Kusen Aluminium 16.0500 m¹ 161,790.20 2,596,732.71
Pintu Kaca Tempered 12 mm 0.8 x 2.05 1.0000 bh 403,726.18 403,726.18
Kaca Bening 5 mm 3.4475 m² 152,286.75 525,008.57
Stiker Kaca Buram 1.8500 m² 32,000.00 59,200.00
Engsel Pintu Kaca Tempered 2.0000 bh 549,510.50 1,099,021.00
Handle Pintu 1.0000 bh 174,982.50 174,982.50
Kunci Pintu 1.0000 bh 418,687.50 418,687.50
PEKERJAAN :
LOKASI :
A BAHAN
Kusen Aluminium 27.6000 m¹ 161,790.20 4,465,409.52
Kaca Bening 5 mm 8.7725 m² 152,286.75 1,335,935.51
Stiker Kaca Buram 2.9968 m² 32,000.00 95,897.60
A BAHAN
Kusen Aluminium 15.4200 m¹ 161,790.20 2,494,804.88
Pintu Kaca Tempered 12 mm 0.9 x 2.05 1.0000 bh 454,191.95 454,191.95
Kaca Bening 5 mm 3.7650 m² 152,286.75 573,359.61
Stiker Kaca Buram 2.0350 m² 32,000.00 65,120.00
Engsel Pintu Kaca Tempered 2.0000 bh 549,510.50 1,099,021.00
Handle Pintu 1.0000 bh 174,982.50 174,982.50
Kunci Pintu 1.0000 bh 418,687.50 418,687.50
154 Jenis Pekerjaan : Pemasangan Partisi Tipe 1K dan Backdrop Ukuran 6.5 x 2.9 m
Satuan Pembayaran : unit
A BAHAN
Kusen Aluminium 106.6200 m¹ 161,790.20 17,250,071.12
Kaca Bening 5 mm 33.9735 m² 152,286.75 5,173,713.90
Stiker Kaca Buram 33.9735 m² 32,000.00 1,087,152.00
Backdrop uk. 6.5 x 2.9 1.0000 ls 14,137,500.00 14,137,500.00
A BAHAN
Kusen Aluminium 131.6400 m¹ 161,790.20 21,298,061.93
Pintu Kaca Tempered 12 mm 0.9 x 2.05 1.0000 bh 454,191.95 454,191.95
Kaca Bening 5 mm 57.8300 m² 152,286.75 8,806,742.75
Stiker Kaca Buram 4.0302 m² 32,000.00 128,966.40
Engsel Pintu Kaca Tempered 2.0000 bh 549,510.50 1,099,021.00
Handle Pintu 1.0000 bh 174,982.50 174,982.50
Kunci Pintu 1.0000 bh 418,687.50 418,687.50
PEKERJAAN :
LOKASI :
A BAHAN
Kusen Aluminium 13.5880 m¹ 161,790.20 2,198,405.24
Pintu Kaca Tempered 12 mm 0.75 x 2.05 4.0000 bh 378,493.29 1,513,973.18
Kaca Bening 5 mm 30.0100 m² 152,286.75 4,570,125.37
Stiker Kaca Buram 13.2990 m² 32,000.00 425,568.00
Engsel Pintu Kaca Tempered 8.0000 bh 549,510.50 4,396,084.00
Handle Pintu 4.0000 bh 174,982.50 699,930.00
Kunci Pintu 4.0000 bh 418,687.50 1,674,750.00
A BAHAN
Kusen Aluminium 21.3200 m¹ 161,790.20 3,449,367.06
Kaca Bening 5 mm 8.3325 m² 152,286.75 1,268,929.34
Stiker Kaca Buram 3.0000 m² 32,000.00 96,000.00
A BAHAN
Kusen Aluminium 22.2100 m¹ 161,790.20 3,593,360.34
Pintu Kaca Tempered 12 mm 0.9 x 2.05 1.0000 bh 454,191.95 454,191.95
Kaca Bening 5 mm 13.0325 m² 152,286.75 1,984,677.07
Stiker Kaca Buram 6.1030 m² 32,000.00 195,296.00
Engsel Pintu Kaca Tempered 2.0000 bh 549,510.50 1,099,021.00
Handle Pintu 1.0000 bh 174,982.50 174,982.50
Kunci Pintu 1.0000 bh 418,687.50 418,687.50
A BAHAN
Kusen Aluminium 20.5700 m¹ 161,790.20 3,328,024.41
Kaca Bening 5 mm 7.3425 m² 152,286.75 1,118,165.46
Stiker Kaca Buram 2.6850 m² 32,000.00 85,920.00
PEKERJAAN :
LOKASI :
A BAHAN
Kusen Aluminium 9.7500 m¹ 161,790.20 1,577,454.45
Pintu Kaca Tempered 12 mm 0.9 x 2.05 1.0000 bh 454,191.95 454,191.95
Kaca Bening 5 mm 3.2425 m² 152,286.75 493,789.79
Stiker Kaca Buram 1.2236 m² 32,000.00 39,156.64
Engsel Pintu Kaca Tempered 2.0000 bh 549,510.50 1,099,021.00
Handle Pintu 1.0000 bh 174,982.50 174,982.50
Kunci Pintu 1.0000 bh 418,687.50 418,687.50
A BAHAN
Kusen Aluminium 37.5400 m¹ 161,790.20 6,073,604.11
Pintu Kaca Tempered 12 mm 0.9 x 2.05 1.0000 bh 454,191.95 454,191.95
Kaca Bening 5 mm 17.0750 m² 152,286.75 2,600,296.26
Stiker Kaca Buram 6.8750 m² 32,000.00 220,000.00
Engsel Pintu Kaca Tempered 2.0000 bh 549,510.50 1,099,021.00
Handle Pintu 2.0000 bh 174,982.50 349,965.00
Kunci Pintu 1.0000 bh 418,687.50 418,687.50
A BAHAN
Kusen Aluminium 34.8900 m¹ 161,790.20 5,644,860.08
Kaca Bening 5 mm 14.8500 m² 152,286.75 2,261,458.24
Stiker Kaca Buram 5.4250 m² 32,000.00 173,600.00
Halaman 70
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A BAHAN
Kusen Aluminium 43.6000 m¹ 161,790.20 7,054,052.72
Pintu Kaca Tempered 12 mm 0.9 x 2.05 1.0000 bh 454,191.95 454,191.95
Kaca Bening 5 mm 13.8300 m² 152,286.75 2,106,125.75
Stiker Kaca Buram 5.7225 m² 32,000.00 183,120.00
Engsel Pintu Kaca Tempered 2.0000 bh 549,510.50 1,099,021.00
Handle Pintu 1.0000 bh 174,982.50 174,982.50
Kunci Pintu 1.0000 bh 418,687.50 418,687.50
A BAHAN
Kusen Aluminium 43.6000 m¹ 161,790.20 7,054,052.72
Pintu Kaca Tempered 12 mm 0.9 x 2.05 1.0000 bh 454,191.95 454,191.95
Kaca Bening 5 mm 13.8300 m² 152,286.75 2,106,125.75
Stiker Kaca Buram 5.7225 m² 32,000.00 183,120.00
Engsel Pintu Kaca Tempered 2.0000 bh 549,510.50 1,099,021.00
Handle Pintu 1.0000 bh 174,982.50 174,982.50
Kunci Pintu 1.0000 bh 418,687.50 418,687.50
A BAHAN
Kusen Aluminium 20.1900 m¹ 161,790.20 3,266,544.14
Kaca Bening 5 mm 9.6525 m² 152,286.75 1,469,947.85
Stiker Kaca Buram 3.5250 m² 32,000.00 112,800.00
A BAHAN
Kusen Aluminium 33.9000 m¹ 161,790.20 5,484,687.78
Kaca Bening 5 mm 14.3000 m² 152,286.75 2,177,700.53
Stiker Kaca Buram 5.2000 m² 32,000.00 166,400.00
PEKERJAAN :
LOKASI :
A BAHAN
Kusen Aluminium 38.2700 m¹ 161,790.20 6,191,710.95
Kaca Bening 5 mm 15.4825 m² 152,286.75 2,357,779.61
Stiker Kaca Buram 5.6350 m² 32,000.00 180,320.00
A BAHAN
Kusen Aluminium 37.6000 m¹ 161,790.20 6,083,311.52
Pintu Kaca Tempered 12 mm 0.9 x 2.05 1.0000 bh 454,191.95 454,191.95
Pintu Kaca Tempered 12 mm 0.8 x 2.05 1.0000 bh 403,726.18 403,726.18
Kaca Bening 5 mm 10.2650 m² 152,286.75 1,563,223.49
Stiker Kaca Buram 5.0000 m² 32,000.00 160,000.00
Engsel Pintu Kaca Tempered 4.0000 bh 549,510.50 2,198,042.00
Handle Pintu 2.0000 bh 174,982.50 349,965.00
Kunci Pintu 2.0000 bh 418,687.50 837,375.00
A BAHAN
Kusen Aluminium 44.5000 m¹ 161,790.20 7,199,663.90
Pintu Kaca Tempered 12 mm 0.9 x 2.05 1.0000 bh 454,191.95 454,191.95
Kaca Bening 5 mm 17.4050 m² 152,286.75 2,650,550.88
Stiker Kaca Buram 7.0000 m² 32,000.00 224,000.00
Engsel Pintu Kaca Tempered 2.0000 bh 549,510.50 1,099,021.00
Handle Pintu 1.0000 bh 174,982.50 174,982.50
Kunci Pintu 1.0000 bh 418,687.50 418,687.50
Halaman 72
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
A BAHAN
Kusen Aluminium 37.4200 m¹ 161,790.20 6,054,189.28
Pintu Kaca Tempered 12 mm 0.8 x 2.05 1.0000 bh 403,726.18 403,726.18
Kaca Bening 5 mm 13.5675 m² 152,286.75 2,066,150.48
Stiker Kaca Buram 5.5395 m² 32,000.00 177,264.00
Engsel Pintu Kaca Tempered 2.0000 bh 549,510.50 1,099,021.00
Handle Pintu 1.0000 bh 174,982.50 174,982.50
Kunci Pintu 1.0000 bh 418,687.50 418,687.50
A BAHAN
Kusen Aluminium 20.7000 m¹ 161,790.20 3,349,057.14
Kaca Bening 5 mm 5.6925 m² 152,286.75 866,892.32
Stiker Kaca Buram 1.9700 m² 32,000.00 63,040.00
A BAHAN
Kusen Aluminium 20.7000 m¹ 161,790.20 3,349,057.14
Kaca Bening 5 mm 5.6925 m² 152,286.75 866,892.32
Stiker Kaca Buram 1.9700 m² 32,000.00 63,040.00
A BAHAN
Kusen Aluminium 37.4200 m¹ 161,790.20 6,054,189.28
Pintu Kaca Tempered 12 mm 0.8 x 2.05 1.0000 bh 403,726.18 403,726.18
Kaca Bening 5 mm 13.5675 m² 152,286.75 2,066,150.48
Stiker Kaca Buram 5.5395 m² 32,000.00 177,264.00
Engsel Pintu Kaca Tempered 2.0000 bh 549,510.50 1,099,021.00
Handle Pintu 1.0000 bh 174,982.50 174,982.50
Kunci Pintu 1.0000 bh 418,687.50 418,687.50
PEKERJAAN :
LOKASI :
A BAHAN
Kusen Aluminium 44.5000 m¹ 161,790.20 7,199,663.90
Pintu Kaca Tempered 12 mm 0.9 x 2.05 1.0000 bh 454,191.95 454,191.95
Kaca Bening 5 mm 17.4050 m² 152,286.75 2,650,550.88
Stiker Kaca Buram 7.0000 m² 32,000.00 224,000.00
Engsel Pintu Kaca Tempered 2.0000 bh 549,510.50 1,099,021.00
Handle Pintu 1.0000 bh 174,982.50 174,982.50
Kunci Pintu 1.0000 bh 418,687.50 418,687.50
A BAHAN
Kusen Aluminium 29.4000 m¹ 161,790.20 4,756,631.88
Pintu Kaca Tempered 12 mm 0.75 x 2.05 2.0000 bh 378,493.29 756,986.59
Kaca Bening 5 mm 11.1550 m² 152,286.75 1,698,758.70
Stiker Kaca Buram 6.4600 m² 32,000.00 206,720.00
Engsel Pintu Kaca Tempered 4.0000 bh 549,510.50 2,198,042.00
Handle Pintu 2.0000 bh 174,982.50 349,965.00
Kunci Pintu 2.0000 bh 418,687.50 837,375.00
A BAHAN
Kusen Aluminium 15.3700 m¹ 161,790.20 2,486,715.37
Pintu Kaca Tempered 12 mm 0.75 x 2.05 2.0000 bh 378,493.29 756,986.59
Kaca Bening 5 mm 6.4950 m² 152,286.75 989,102.44
Stiker Kaca Buram 3.4854 m² 32,000.00 111,532.80
Engsel Pintu Kaca Tempered 4.0000 bh 549,510.50 2,198,042.00
Handle Pintu 2.0000 bh 174,982.50 349,965.00
Kunci Pintu 2.0000 bh 418,687.50 837,375.00
Halaman 74
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
177 Jenis Pekerjaan : Pemasangan Partisi Double Multiplek 6 mm Rangka Multiplek 18 mm Fin. HPL Tipe A
Satuan Pembayaran : unit
A BAHAN
Partisi Double Multiplek 4.4100 m² 502,953.00 2,218,022.73
Kaca Bening 5 mm 0.6600 m² 152,286.75 100,509.26
178 Jenis Pekerjaan : Pemasangan Partisi Double Multiplek 6 mm Rangka Multiplek 18 mm Fin. HPL Tipe B
Satuan Pembayaran : unit
A BAHAN
Partisi Double Multiplek 5.4000 m² 502,953.00 2,715,946.20
Kaca Bening 5 mm 0.8250 m² 152,286.75 125,636.57
179 Jenis Pekerjaan : Pemasangan Partisi Double Multiplek 6 mm Rangka Multiplek 18 mm Fin. HPL Tipe C
Satuan Pembayaran : unit
A BAHAN
Partisi Double Multiplek 6.3360 m² 502,953.00 3,186,710.21
Kaca Bening 5 mm 0.9810 m² 152,286.75 149,393.30
180 Jenis Pekerjaan : Pemasangan Partisi Double Multiplek 6 mm Rangka Multiplek 18 mm Fin. HPL Tipe D
Satuan Pembayaran : unit
A BAHAN
Partisi Double Multiplek 4.2480 m² 502,953.00 2,136,544.34
Kaca Bening 5 mm 0.6330 m² 152,286.75 96,397.51
Halaman 75
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
181 Jenis Pekerjaan : Pemasangan Partisi Double Multiplek 6 mm Rangka Multiplek 18 mm Fin. HPL Tipe E
Satuan Pembayaran : unit
A BAHAN
Partisi Double Multiplek 5.4000 m² 502,953.00 2,715,946.20
Kaca Bening 5 mm 0.8400 m² 152,286.75 127,920.87
182 Jenis Pekerjaan : Pemasangan Partisi Double Multiplek 6 mm Rangka Multiplek 18 mm Fin. HPL Tipe F
Satuan Pembayaran : unit
A BAHAN
Partisi Double Multiplek 4.3920 m² 502,953.00 2,208,969.58
Kaca Bening 5 mm 0.6570 m² 152,286.75 100,052.39
B TENAGA
Biaya Pemasangan 1.000 ls 25,000.00 25,000.00
B BAHAN
Rangka Atap Baja Ringan 1.000 m² 125,000.00 125,000.00
termasuk aksesoris
C PERALATAN
-
SUB JUMLAH C -
Halaman 76
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
B TENAGA
Pekerja 0.200 Org/ Hr 75,000.00 15,000.00
Tukang 0.100 Org/ Hr 80,000.00 8,000.00
Kepala Tukang 0.010 Org/ Hr 90,000.00 900.00
Mandor 0.001 Org/ Hr 100,000.00 100.00
B BAHAN
Atap Genteng Metal 0.35 mm 1.300 bh 95,000.00 123,500.00
Paku Biasa 2" - 5" 0.200 kg 15,000.00 3,000.00
C PERALATAN
-
SUB JUMLAH C -
B TENAGA
Pekerja 0.140 Org/ Hr 75,000.00 10,500.00
Tukang 0.070 Org/ Hr 80,000.00 5,600.00
Kepala Tukang 0.007 Org/ Hr 90,000.00 630.00
Mandor 0.007 Org/ Hr 100,000.00 700.00
B BAHAN
Atap Bitumen Selulosa 40 x 106 cm, t = 3.390 lbr 48,000.00 162,720.00
Sekrup Atap Bitumen 16.900 bh 1,200.00 20,280.00
C PERALATAN
-
SUB JUMLAH C -
Halaman 77
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
B TENAGA
Pekerja 0.140 Org/ Hr 75,000.00 10,500.00
Tukang 0.070 Org/ Hr 80,000.00 5,600.00
Kepala Tukang 0.007 Org/ Hr 90,000.00 630.00
Mandor 0.007 Org/ Hr 100,000.00 700.00
B BAHAN
Perabung Genteng Metal Bulat 1.280 bh 26,000.00 33,280.00
Paku Biasa 2" - 3" 0.050 kg 15,000.00 750.00
C PERALATAN
-
SUB JUMLAH C -
B TENAGA
Pekerja 0.250 Org/ Hr 75,000.00 18,750.00
Tukang 0.150 Org/ Hr 80,000.00 12,000.00
Kepala Tukang 0.015 Org/ Hr 90,000.00 1,350.00
Mandor 0.013 Org/ Hr 100,000.00 1,300.00
B BAHAN
Perabung Genteng Bitumen 1.100 lbr 69,000.00 75,900.00
Sekrup Atap Bitumen 10.240 bh 1,200.00 12,288.00
C PERALATAN
-
SUB JUMLAH C -
Halaman 78
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
B TENAGA
Pekerja 0.100 Org/ Hr 75,000.00 7,500.00
Tukang 0.200 Org/ Hr 80,000.00 16,000.00
Kepala Tukang 0.020 Org/ Hr 90,000.00 1,800.00
Mandor 0.005 Org/ Hr 100,000.00 500.00
B BAHAN
Lisplank GRC 1.000 m¹ 287,500.00 287,500.00
C PERALATAN
-
SUB JUMLAH C -
B TENAGA
Pekerja 0.100 Org/ Hr 75,000.00 7,500.00
Tukang 0.200 Org/ Hr 80,000.00 16,000.00
Kepala Tukang 0.020 Org/ Hr 90,000.00 1,800.00
Mandor 0.005 Org/ Hr 100,000.00 500.00
B BAHAN
Singap Ukir GRC 1.000 m² 690,000.00 690,000.00
C PERALATAN
-
SUB JUMLAH C -
Halaman 79
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
B TENAGA
Pekerja 0.100 Org/ Hr 75,000.00 7,500.00
Tukang 0.200 Org/ Hr 80,000.00 16,000.00
Kepala Tukang 0.020 Org/ Hr 90,000.00 1,800.00
Mandor 0.005 Org/ Hr 100,000.00 500.00
B BAHAN
Selembayung GRC 1.000 psg 600,000.00 600,000.00
C PERALATAN
-
SUB JUMLAH C -
B TENAGA
Pekerja 0.200 Org/ Hr 75,000.00 15,000.00
Mandor 0.010 Org/ Hr 100,000.00 1,000.00
B BAHAN
Waterproofing Membran 1.050 m² 35,000.00 36,750.00
C PERALATAN
-
SUB JUMLAH C -
Halaman 80
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
B TENAGA
Pekerja 0.200 Org/ Hr 75,000.00 15,000.00
Mandor 0.010 Org/ Hr 100,000.00 1,000.00
B BAHAN
Waterproofing Membran 1.050 m² 22,500.00 23,625.00
C PERALATAN
-
SUB JUMLAH C -
B TENAGA
Pekerja 0.250 Org/ Hr 75,000.00 18,750.00
Tukang 0.500 Org/ Hr 80,000.00 40,000.00
Kepala Tukang 0.050 Org/ Hr 90,000.00 4,500.00
Mandor 0.001 Org/ Hr 100,000.00 130.00
B BAHAN
Paving Blok tebal 6 cm 1.010 m² 98,000.00 98,980.00
Pasir Beton / m³ 0.050 m³ 165,000.00 8,250.00
C PERALATAN
Peralatan 10 % 1.000 ls 9,800.00 9,800.00
Halaman 81
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
B TENAGA
Pekerja 0.250 Org/ Hr 75,000.00 18,750.00
Tukang 0.500 Org/ Hr 80,000.00 40,000.00
Kepala Tukang 0.050 Org/ Hr 90,000.00 4,500.00
Mandor 0.001 Org/ Hr 100,000.00 130.00
B BAHAN
Kanstin 30x60 1.667 bh 41,000.00 68,333.33
C PERALATAN
Peralatan 10 % 1.000 ls 4,100.00 4,100.00
B TENAGA
Biaya Penanaman 1.000 m² 4,047.50 4,047.50
B BAHAN
Rumput Gajah Mini 1.050 m² 31,700.00 33,285.00
Tanah Hitam 0.050 m³ 143,800.00 7,190.00
C PERALATAN
-
SUB JUMLAH C -
Halaman 82
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
B TENAGA
Biaya Penanaman 1.000 m² 28,047.50 28,047.50
B BAHAN
Pohon Palem Putri 1.050 btg 250,000.00 262,500.00
Tanah Hitam 0.125 m³ 143,800.00 17,975.00
C PERALATAN
-
SUB JUMLAH C -
B TENAGA
Biaya Penanaman 1.000 m² 17,547.50 17,547.50
B BAHAN
Pohon Pucuk Merah 1.050 btg 150,000.00 157,500.00
Tanah Hitam 0.125 m³ 143,800.00 17,975.00
C PERALATAN
-
SUB JUMLAH C -
Halaman 83
ANALISA HARGA SATUAN PEKERJAAN
(Permen PUPR No. 28/PRT/M/2016)
PEKERJAAN :
LOKASI :
B TENAGA
Biaya Penanaman 1.000 m² 28,047.50 28,047.50
B BAHAN
Pohon Ketapang 1.050 btg 250,000.00 262,500.00
Tanah Hitam 0.125 m³ 143,800.00 17,975.00
C PERALATAN
-
SUB JUMLAH C -
Halaman 84
ANALISA HARGA SATUAN PEKERJAAN ELEKTRIKAL MEKANIKAL
PEKERJAAN : -
LOKASI : -
203 1 Unit Pengadaan dan pemasangan jet pump lengkap dengan sumur bor
Bahan :
1.0000 Paket Pompa Jet Pump Rp 5,400,000.00 Rp 5,400,000.00
#REF!
#REF!
1.0000 Unit Sumur Bor Rp 6,500,000.00 Rp 6,500,000.00 Rp 11,900,000.00
Upah :
1.0000 oh Tukang pipa Rp 80,000.00 Rp 80,000.00
1.0000 oh Kepala tukang pipa Rp 90,000.00 Rp 90,000.00
0.5000 oh Mandor Rp 100,000.00 Rp 50,000.00 Rp 220,000.00
Jumlah Bahan + Upah + Peralatan Rp 12,120,000.00
Overhead + Profit ( 10% ) Rp 1,212,000.00
Total Harga Satuan Pekerjaan Rp 13,332,000.00
Halaman 85
ANALISA HARGA SATUAN PEKERJAAN ELEKTRIKAL MEKANIKAL
PEKERJAAN : -
LOKASI : -
Upah :
0.1667 oh Tukang pipa Rp 80,000.00 Rp 13,333.33
0.0833 oh Kepala tukang pipa Rp 90,000.00 Rp 7,497.69
0.0416 oh Mandor Rp 100,000.00 Rp 4,164.29 Rp 24,995.31
Jumlah Bahan + Upah + Peralatan Rp 191,068.33
Overhead + Profit ( 10% ) Rp 19,106.83
Total Harga Satuan Pekerjaan Rp 210,175.16
Upah :
0.1000 oh Tukang pipa Rp 80,000.00 Rp 8,000.00
0.0500 oh Kepala tukang pipa Rp 90,000.00 Rp 4,498.62
0.0250 oh Mandor Rp 100,000.00 Rp 2,498.57 Rp 14,997.19
Jumlah Bahan + Upah + Peralatan Rp 160,270.24
Overhead + Profit ( 10% ) Rp 16,027.02
Total Harga Satuan Pekerjaan Rp 176,297.26
Upah :
0.0667 oh Tukang pipa Rp 80,000.00 Rp 5,333.33
0.0333 oh Kepala tukang pipa Rp 90,000.00 Rp 2,999.08
0.0167 oh Mandor Rp 100,000.00 Rp 1,665.71 Rp 9,998.12
Jumlah Bahan + Upah + Peralatan Rp 68,652.89
Overhead + Profit ( 10% ) Rp 6,865.29
Total Harga Satuan Pekerjaan Rp 75,518.18
Upah :
0.0500 oh Tukang pipa Rp 80,000.00 Rp 4,000.00
0.0250 oh Kepala tukang pipa Rp 90,000.00 Rp 2,249.31
0.0125 oh Mandor Rp 100,000.00 Rp 1,249.29 Rp 7,498.59
Jumlah Bahan + Upah + Peralatan Rp 53,800.66
Overhead + Profit ( 10% ) Rp 5,380.07
Total Harga Satuan Pekerjaan Rp 59,180.73
Upah :
0.0333 oh Tukang pipa Rp 80,000.00 Rp 2,666.67
0.0167 oh Kepala tukang pipa Rp 90,000.00 Rp 1,499.54
0.0083 oh Mandor Rp 100,000.00 Rp 832.86 Rp 4,999.06
Jumlah Bahan + Upah + Peralatan Rp 43,908.13
Overhead + Profit ( 10% ) Rp 4,390.81
Total Harga Satuan Pekerjaan Rp 48,298.94
Halaman 86
ANALISA HARGA SATUAN PEKERJAAN ELEKTRIKAL MEKANIKAL
PEKERJAAN : -
LOKASI : -
Upah :
0.0333 oh Tukang pipa Rp 80,000.00 Rp 2,666.67
0.0167 oh Kepala tukang pipa Rp 90,000.00 Rp 1,499.54
0.0083 oh Mandor Rp 100,000.00 Rp 832.86 Rp 4,999.06
Jumlah Bahan + Upah + Peralatan Rp 50,499.06
Overhead + Profit ( 10% ) Rp 5,049.91
Total Harga Satuan Pekerjaan Rp 55,548.97
Upah :
0.0333 oh Tukang pipa Rp 80,000.00 Rp 2666.67
0.0167 oh Kepala tukang pipa Rp 90,000.00 Rp 1499.54
0.0083 oh Mandor Rp 100,000.00 Rp 832.86 Rp 4,999.06
Jumlah Bahan + Upah + Peralatan Rp 125,911.06
Overhead + Profit ( 10% ) Rp 12,591.11
Total Harga Satuan Pekerjaan Rp 138,502.17
Upah :
0.0333 oh Tukang pipa Rp 80,000.00 Rp 2666.67
0.0167 oh Kepala tukang pipa Rp 90,000.00 Rp 1499.54
0.0083 oh Mandor Rp 100,000.00 Rp 832.86 Rp 4,999.06
Jumlah Bahan + Upah + Peralatan Rp 164,323.06
Overhead + Profit ( 10% ) Rp 16,432.31
Total Harga Satuan Pekerjaan Rp 180,755.37
Upah :
0.0333 oh Tukang pipa Rp 80,000.00 Rp 2666.67
0.0167 oh Kepala tukang pipa Rp 90,000.00 Rp 1499.54
0.0083 oh Mandor Rp 100,000.00 Rp 832.86 Rp 4,999.06
Jumlah Bahan + Upah + Peralatan Rp 447,199.06
Overhead + Profit ( 10% ) Rp 44,719.91
Total Harga Satuan Pekerjaan Rp 491,918.97
Upah :
0.0333 oh Tukang pipa Rp 80,000.00 Rp 2666.67
0.0167 oh Kepala tukang pipa Rp 90,000.00 Rp 1499.54
0.0083 oh Mandor Rp 100,000.00 Rp 832.86 Rp 4,999.06
Jumlah Bahan + Upah + Peralatan Rp 639,127.06
Overhead + Profit ( 10% ) Rp 63,912.71
Total Harga Satuan Pekerjaan Rp 703,039.77
Halaman 87
ANALISA HARGA SATUAN PEKERJAAN ELEKTRIKAL MEKANIKAL
PEKERJAAN : -
LOKASI : -
Upah :
0.0333 oh Tukang pipa Rp 80,000.00 Rp 2666.67
0.0167 oh Kepala tukang pipa Rp 90,000.00 Rp 1499.54
0.0083 oh Mandor Rp 100,000.00 Rp 832.86 Rp 4,999.06
Jumlah Bahan + Upah + Peralatan Rp 797,263.06
Overhead + Profit ( 10% ) Rp 79,726.31
Total Harga Satuan Pekerjaan Rp 876,989.37
Upah :
0.1667 oh Tukang Listrik Rp 80,000.00 Rp 13,333.33
0.3333 oh Kepala Tukang Listrik Rp 90,000.00 Rp 30,000.00
0.0333 oh Mandor Rp 100,000.00 Rp 3,333.33 Rp 46,666.67
Jumlah Bahan + Upah + Peralatan Rp 1,030,666.67
Overhead + Profit ( 10% ) Rp 103,066.67
Total Harga Satuan Pekerjaan Rp 1,133,733.33
Upah :
0.1667 oh Tukang Listrik Rp 80,000.00 Rp 13,333.33
0.3333 oh Kepala Tukang Listrik Rp 90,000.00 Rp 30,000.00
0.0333 oh Mandor Rp 100,000.00 Rp 3,333.33 Rp 46,666.67
Jumlah Bahan + Upah + Peralatan Rp 778,666.67
Overhead + Profit ( 10% ) Rp 77,866.67
Total Harga Satuan Pekerjaan Rp 856,533.33
Upah :
0.1667 oh Tukang Listrik Rp 80,000.00 Rp 13,333.33
0.3333 oh Kepala Tukang Listrik Rp 90,000.00 Rp 30,000.00
0.0333 oh Mandor Rp 100,000.00 Rp 3,333.33 Rp 46,666.67
Jumlah Bahan + Upah + Peralatan Rp 658,666.67
Overhead + Profit ( 10% ) Rp 65,866.67
Total Harga Satuan Pekerjaan Rp 724,533.33
Upah :
0.1667 oh Tukang Listrik Rp 80,000.00 Rp 13,333.33
0.1500 oh Kepala Tukang Listrik Rp 90,000.00 Rp 13,500.00
0.0333 oh Mandor Rp 100,000.00 Rp 3,333.33 Rp 30,166.67
Jumlah Bahan + Upah + Peralatan Rp 546,046.67
Overhead + Profit ( 10% ) Rp 54,604.67
Total Harga Satuan Pekerjaan Rp 600,651.33
Halaman 88
ANALISA HARGA SATUAN PEKERJAAN ELEKTRIKAL MEKANIKAL
PEKERJAAN : -
LOKASI : -
Upah :
0.1667 oh Tukang Listrik Rp 80,000.00 Rp 13,333.33
0.1500 oh Kepala Tukang Listrik Rp 90,000.00 Rp 13,500.00
0.0333 oh Mandor Rp 100,000.00 Rp 3,333.33 Rp 30,166.67
Jumlah Bahan + Upah + Peralatan Rp 426,046.67
Overhead + Profit ( 10% ) Rp 42,604.67
Total Harga Satuan Pekerjaan Rp 468,651.33
Upah :
0.0830 oh Tukang Listrik Rp 80,000.00 Rp 6,640.00
0.0167 oh Kepala Tukang Listrik Rp 90,000.00 Rp 1,503.00
0.0167 oh Mandor Rp 100,000.00 Rp 1,670.00 Rp 9,813.00
Jumlah Bahan + Upah + Peralatan Rp 319,413.00
Overhead + Profit ( 10% ) Rp 31,941.30
Total Harga Satuan Pekerjaan Rp 351,354.30
Upah :
0.0830 oh Tukang Listrik Rp 80,000.00 Rp 6,640.00
0.0167 oh Kepala Tukang Listrik Rp 90,000.00 Rp 1,503.00
0.0167 oh Mandor Rp 100,000.00 Rp 1,670.00 Rp 9,813.00
Jumlah Bahan + Upah + Peralatan Rp 156,213.00
Overhead + Profit ( 10% ) Rp 15,621.30
Total Harga Satuan Pekerjaan Rp 171,834.30
Upah :
0.0830 oh Tukang Listrik Rp 80,000.00 Rp 6,640.00
0.0167 oh Kepala Tukang Listrik Rp 90,000.00 Rp 1,503.00
0.0167 oh Mandor Rp 100,000.00 Rp 1,670.00 Rp 9,813.00
Jumlah Bahan + Upah + Peralatan Rp 99,813.00
Overhead + Profit ( 10% ) Rp 9,981.30
Total Harga Satuan Pekerjaan Rp 109,794.30
Upah :
0.0333 oh Tukang Listrik Rp 80,000.00 Rp 2,666.67
0.0667 oh Kepala Tukang Listrik Rp 90,000.00 Rp 6,000.00
0.0667 oh Mandor Rp 100,000.00 Rp 6,666.67 Rp 15,333.33
Jumlah Bahan + Upah + Peralatan Rp 226,533.33
Overhead + Profit ( 10% ) Rp 22,653.33
Total Harga Satuan Pekerjaan Rp 249,186.67
Halaman 89
ANALISA HARGA SATUAN PEKERJAAN ELEKTRIKAL MEKANIKAL
PEKERJAAN : -
LOKASI : -
Upah :
0.0333 oh Tukang Listrik Rp 80,000.00 Rp 2,666.67
0.0667 oh Kepala Tukang Listrik Rp 90,000.00 Rp 6,000.00
0.0667 oh Mandor Rp 100,000.00 Rp 6,666.67 Rp 15,333.33
Jumlah Bahan + Upah + Peralatan Rp 193,533.33
Overhead + Profit ( 10% ) Rp 19,353.33
Total Harga Satuan Pekerjaan Rp 212,886.67
Upah :
0.0333 oh Tukang Listrik Rp 80,000.00 Rp 2,666.67
0.0667 oh Kepala Tukang Listrik Rp 90,000.00 Rp 6,000.00
0.0667 oh Mandor Rp 100,000.00 Rp 6,666.67 Rp 15,333.33
Jumlah Bahan + Upah + Peralatan Rp 581,833.33
Overhead + Profit ( 10% ) Rp 58,183.33
Total Harga Satuan Pekerjaan Rp 640,016.67
Upah :
0.0333 oh Tukang Listrik Rp 80,000.00 Rp 2,666.67
0.0667 oh Kepala Tukang Listrik Rp 90,000.00 Rp 6,000.00
0.0667 oh Mandor Rp 100,000.00 Rp 6,666.67 Rp 15,333.33
Jumlah Bahan + Upah + Peralatan Rp 515,833.33
Overhead + Profit ( 10% ) Rp 51,583.33
Total Harga Satuan Pekerjaan Rp 567,416.67
Upah :
0.0333 oh Tukang Listrik Rp 80,000.00 Rp 2,666.67
0.0667 oh Kepala Tukang Listrik Rp 90,000.00 Rp 6,000.00
0.0667 oh Mandor Rp 100,000.00 Rp 6,666.67 Rp 15,333.33
Jumlah Bahan + Upah + Peralatan Rp 207,833.33
Overhead + Profit ( 10% ) Rp 20,783.33
Total Harga Satuan Pekerjaan Rp 228,616.67
Upah :
0.0333 oh Tukang Listrik Rp 80,000.00 Rp 2,666.67
0.0667 oh Kepala Tukang Listrik Rp 90,000.00 Rp 6,000.00
0.0667 oh Mandor Rp 100,000.00 Rp 6,666.67 Rp 15,333.33
Jumlah Bahan + Upah + Peralatan Rp 895,333.33
Overhead + Profit ( 10% ) Rp 89,533.33
Total Harga Satuan Pekerjaan Rp 984,866.67
Halaman 90
ANALISA HARGA SATUAN PEKERJAAN ELEKTRIKAL MEKANIKAL
PEKERJAAN : -
LOKASI : -
Upah :
0.0800 oh Tukang Listrik Rp 80,000.00 Rp 6,400.00
0.0800 oh Kepala Tukang Listrik Rp 90,000.00 Rp 7,200.00
0.0250 oh Mandor Rp 100,000.00 Rp 2,500.00 Rp 16,100.00
Jumlah Bahan + Upah + Peralatan Rp 47,191.50
Overhead + Profit ( 10% ) Rp 4,719.15
Total Harga Satuan Pekerjaan Rp 51,910.65
Upah :
0.0800 oh Tukang Listrik Rp 80,000.00 Rp 6,400.00
0.0800 oh Kepala Tukang Listrik Rp 90,000.00 Rp 7,200.00
0.0250 oh Mandor Rp 100,000.00 Rp 2,500.00 Rp 16,100.00
Jumlah Bahan + Upah + Peralatan Rp 47,191.50
Overhead + Profit ( 10% ) Rp 4,719.15
Total Harga Satuan Pekerjaan Rp 51,910.65
Upah :
0.0800 oh Tukang Listrik Rp 80,000.00 Rp 6,400.00
0.0800 oh Kepala Tukang Listrik Rp 90,000.00 Rp 7,200.00
0.0250 oh Mandor Rp 100,000.00 Rp 2,500.00 Rp 16,100.00
Jumlah Bahan + Upah + Peralatan Rp 43,050.00
Overhead + Profit ( 10% ) Rp 4,305.00
Total Harga Satuan Pekerjaan Rp 47,355.00
Upah :
0.0800 oh Tukang Listrik Rp 80,000.00 Rp 6,400.00
0.0800 oh Kepala Tukang Listrik Rp 90,000.00 Rp 7,200.00
0.0250 oh Mandor Rp 100,000.00 Rp 2,500.00 Rp 16,100.00
Jumlah Bahan + Upah + Peralatan Rp 56,354.50
Overhead + Profit ( 10% ) Rp 5,635.45
Total Harga Satuan Pekerjaan Rp 61,989.95
Upah :
0.3000 oh Tukang Listrik Rp 80,000.00 Rp 24,000.00
0.3000 oh Kepala Tukang Listrik Rp 90,000.00 Rp 27,000.00
0.1600 oh Mandor Rp 100,000.00 Rp 16,000.00 Rp 67,000.00
Jumlah Bahan + Upah + Peralatan Rp 197,625.00
Overhead + Profit ( 10% ) Rp 19,762.50
Total Harga Satuan Pekerjaan Rp 217,387.50
Halaman 91
ANALISA HARGA SATUAN PEKERJAAN ELEKTRIKAL MEKANIKAL
PEKERJAAN : -
LOKASI : -
Upah :
0.3000 oh Tukang Listrik Rp 80,000.00 Rp 24,000.00
0.3000 oh Kepala Tukang Listrik Rp 90,000.00 Rp 27,000.00
0.1600 oh Mandor Rp 100,000.00 Rp 16,000.00 Rp 67,000.00
Jumlah Bahan + Upah + Peralatan Rp 229,125.00
Overhead + Profit ( 10% ) Rp 22,912.50
Total Harga Satuan Pekerjaan Rp 252,037.50
Upah :
0.1600 oh Tukang Listrik Rp 80,000.00 Rp 12,800.00
0.1600 oh Kepala Tukang Listrik Rp 90,000.00 Rp 14,400.00
0.0800 oh Mandor Rp 100,000.00 Rp 8,000.00 Rp 35,200.00
Jumlah Bahan + Upah + Peralatan Rp 96,725.00
Overhead + Profit ( 10% ) Rp 9,672.50
Total Harga Satuan Pekerjaan Rp 106,397.50
Upah :
0.3000 oh Tukang Listrik Rp 80,000.00 Rp 24,000.00
0.3000 oh Kepala Tukang Listrik Rp 90,000.00 Rp 27,000.00
0.1600 oh Mandor Rp 100,000.00 Rp 16,000.00 Rp 67,000.00
Jumlah Bahan + Upah + Peralatan Rp 242,125.00
Overhead + Profit ( 10% ) Rp 24,212.50
Total Harga Satuan Pekerjaan Rp 266,337.50
Upah :
0.0600 oh Tukang Listrik Rp 80,000.00 Rp 4,800.00
0.0600 oh Kepala Tukang Listrik Rp 90,000.00 Rp 5,400.00
0.0250 oh Mandor Rp 100,000.00 Rp 2,500.00 Rp 12,700.00
Jumlah Bahan + Upah + Peralatan Rp 51,200.00
Overhead + Profit ( 10% ) Rp 5,120.00
Total Harga Satuan Pekerjaan Rp 56,320.00
Halaman 92
ANALISA HARGA SATUAN PEKERJAAN ELEKTRIKAL MEKANIKAL
PEKERJAAN : -
LOKASI : -
Upah :
0.3000 oh Tukang Listrik Rp 80,000.00 Rp 24,000.00
0.3000 oh Kepala Tukang Listrik Rp 90,000.00 Rp 27,000.00
0.1600 oh Mandor Rp 100,000.00 Rp 16,000.00 Rp 67,000.00
Jumlah Bahan + Upah + Peralatan Rp 276,350.00
Overhead + Profit ( 10% ) Rp 27,635.00
Total Harga Satuan Pekerjaan Rp 303,985.00
Upah :
0.3000 oh Tukang Listrik Rp 80,000.00 Rp 24,000.00
0.3000 oh Kepala Tukang Listrik Rp 90,000.00 Rp 27,000.00
0.1600 oh Mandor Rp 100,000.00 Rp 16,000.00 Rp 67,000.00
Jumlah Bahan + Upah + Peralatan Rp 301,850.00
Overhead + Profit ( 10% ) Rp 30,185.00
Total Harga Satuan Pekerjaan Rp 332,035.00
Halaman 93
DAFTAR HARGA SATUAN BAHAN, UPAH DAN SEWA ALAT
### : #REF!
### : #REF!
### : #REF!
I UPAH
1 Pekerja Org/ Hr 75,000.00
2 Tukang Org/ Hr 80,000.00
3 Kepala Tukang Org/ Hr 90,000.00
4 Mandor Org/ Hr 100,000.00
5 Operator Alat Berat Org/ Hr 100,000.00
6 Pembantu Operator Alat Berat Org/ Hr 80,000.00
7 Mekanik Org/ Hr 100,000.00
8 Pembantu Mekanik Org/ Hr 80,000.00
II BAHAN BANGUNAN
A BAHAN PASANGAN
9 Air liter 200.00
10 Batu Bata Biasa (5 x 11 x 22) bh 500.00
11 Kerikil / m³ m³ 258,000.00
12 Kerikil (Maks 30 mm) / kg Kg 191.11
13 Pasir Pasang m³ 140,000.00
14 Pasir Urug m³ 120,000.00
15 Pasir Beton / m³ m³ 165,000.00
16 Pasir Beton / kg kg 117.86
17 Semen Portland / Zak sak 70,000.00
18 Semen Portland / kg kg 1,400.00
19 Semen Warna Kg 2,600.00
20 Tanah Urug m³ 80,500.00
21 Tiang Pancang Minipile Beton 25x25 m 205,000.00
22 Paving Blok tebal 6 cm m² 98,000.00
23 Kanstin 30x60 bh 41,000.00
B BAHAN KAYU
24 Kayu/ Papan Klas I m³ 5,000,000.00
25 Kayu/ Papan Klas II m³ 3,300,000.00
26 Kayu 5/7 m³ 3,300,000.00
27 Kayu Papan 3/20 m³ 3,500,000.00
28 Plywood 4 mm lbr 72,000.00
29 Plywood 9 mm lbr 133,000.00
30 Plywood 18 mm lbr 172,000.00
31 Pelapis Kayu Bahan HPL m² 43,000.00
32 Cerucuk Kayu dia. 6 - 8 Panjang 6 m btg 20,000.00
33 Kayu/ Papan Bekisting m³ 2,200,000.00
34 Dolken Kayu Ø (8-10)cm, panjang 4 m btg 15,000.00
Halaman 94
DAFTAR HARGA SATUAN BAHAN, UPAH DAN SEWA ALAT
### : #REF!
### : #REF!
### : #REF!
B BAHAN BESI
35 Besi Beton Polos kg 12,200.00
36 Besi Beton Ulir kg 13,000.00
37 Baja Struktural / Profil kg 20,800.00
38 Paku Biasa 2" - 3" kg 15,000.00
39 Paku Biasa 2" - 5" kg 15,000.00
40 Paku Sekrup kg 28,000.00
41 Sekrup Fixer bh 500.00
42 Sekrup Atap Bitumen bh 1,200.00
43 Kawat Beton kg 20,000.00
44 Kawat Duri m 3,500.00
45 Kawat Las kg 28,000.00
46 Aluminium Composit Panel m² 550,000.00
47 Railing Tangga Bahan Stainlessteel m¹ 1,150,000.00
D BAHAN MINYAK
48 Minyak Bekisting/ Teak Oil liter 9,500.00
49 Lem Kayu liter 30,000.00
50 Residu liter 11,500.00
51 Meni Besi liter 25,000.00
E BAHAN ATAP
52 Atap Genteng Metal 0.35 mm bh 95,000.00
53 Atap Genteng Metal 0.30 mm bh 80,000.00
54 Atap Bitumen Selulosa 40 x 106 cm, t = 3 mm lbr 48,000.00
55 Perabung Genteng Metal Bulat bh 26,000.00
56 Perabung Genteng Metal Persegi bh 25,000.00
57 Perabung Genteng Bitumen lbr 69,000.00
58 Rangka Atap Baja Ringan m² 125,000.00
59 Lisplank GRC m¹ 287,500.00
60 Singap Ukir GRC m² 690,000.00
61 Selembayung GRC psg 600,000.00
62 Waterproofing Membran m² 35,000.00
63 Sreed Pelindung Waterproofing m² 22,500.00
F BAHAN PLAFOND
64 Gypsum Board 6 mm lbr 76,375.00
65 Gypsum PVC m² 85,000.00
66 Cornest kg 7,500.00
67 Metal stud C 36.7x76x4mm btg 48,000.00
68 List Plafond Gypsum m¹ 28,750.00
69 List Plafond PVC m¹ 25,000.00
70 List Profil m¹ 15,000.00
Halaman 95
DAFTAR HARGA SATUAN BAHAN, UPAH DAN SEWA ALAT
### : #REF!
### : #REF!
### : #REF!
I BAHAN SANITAIR
102 Kloset Jongkok bh 415,000.00
103 Kloset Duduk bh 1,735,000.00
104 Urinoir bh 1,587,000.00
105 Washtafel bh 1,425,000.00
106 Kran Air bh 94,100.00
107 Kran Air Washtafel bh 185,000.00
Halaman 96
DAFTAR HARGA SATUAN BAHAN, UPAH DAN SEWA ALAT
### : #REF!
### : #REF!
### : #REF!
J BAHAN FINISHING
118 Cat Minyak kg 85,000.00
119 Cat Air kg 65,000.00
120 Cat Dasar Kayu kg 36,225.00
121 Cat Dasar Tembok kg 15,000.00
122 Cat Menie kg 74,000.00
123 Plamir kg 40,000.00
124 Kuas bh 11,500.00
125 Pengencer kg 28,000.00
126 Amplas lbr 5,000.00
K BAHAN PIPA
127 Pipa PVC 1.5 inch m¹ 15,345.00
128 Pipa PVC 2 inch m¹ 19,635.00
129 Pipa PVC 3 inch m¹ 38,637.50
130 Pipa PVC 4 inch m¹ 64,020.00
131 Pompa Jet Pump, Kap ; 27 ltr/mnt, Head 82 m Paket 5,400,000.00
132 Sumur Bor unit 6,500,000.00
133 Pipa Polypropeline dia. 2 ” / PN - 10 m¹ 127,748.48
134 Pipa Polypropeline dia. 1,5 ” / PN - 10 m¹ 111,748.50
135 Pipa Polypropeline dia. 1 ” / PN - 10 m¹ 45,119.05
136 Pipa Polypropeline dia. 3/4 ” / PN - 10 m¹ 35,616.98
137 Pipa Polypropeline dia. 0,5 ” / PN - 10 m¹ 29,930.05
138 Pipa Polypropeline dia. 0,5 ” / PN - 20 m¹ 35,000.00
139 Ball Tap Plastik dia 1/2" bh 100,760.00
140 Ball Tap Plastik dia 3/4" bh 132,770.00
141 Ball Tap Plastik dia 1 1/4" bh 368,500.00
142 Ball Tap Plastik dia 1 1/2" bh 528,440.00
143 Ball Tap Plastik dia 2" bh 660,220.00
144 Kabel TR, NYFGBY 4 X 150 mm2 m¹ 820,000.00
145 Kabel TR, NYY 4 X 150 mm2 m¹ 610,000.00
146 Kabel TR, NYFGBY 4x95 mm2 m¹ 510,000.00
Halaman 97
DAFTAR HARGA SATUAN BAHAN, UPAH DAN SEWA ALAT
### : #REF!
### : #REF!
### : #REF!
L BAHAN LANSEKAP
174 Rumput Gajah Mini m² 31,700.00
175 Pohon Palem Putri btg 250,000.00
176 Pohon Pucuk Merah btg 150,000.00
177 Pohon Ketapang btg 250,000.00
178 Tanah Hitam m³ 143,800.00
III PERALATAN
179 Hydraulic Jacking jam 400,000.00
180 Mesin Las Listrik jam 150,000.00
Halaman 98
DAFTAR HARGA SATUAN BAHAN, UPAH DAN SEWA ALAT
### : #REF!
### : #REF!
### : #REF!
Catatan :
- Berat Jenis (BJ) Pasir Cor 1.4 ton/m3
- Berat Jenis (BJ) Batu Pecah 1.35 ton/m4
Halaman 99
DAFTA
DI LINGKUNGAN DIN
NO. JE
I TENAGA KERJA
1 MANDOR
2 KEPALA TUKANG
3 TUKANG
4 PEKERJA
5 OPERATOR
6 PEMBANTU OPERATOR
7 SOPIR
8 PEMBANTU SOPIR
9 MEKANIK
10 PEMBANTU MEKANIK
II BAHAN
A. BAHAN STRUKTUR
1 PASIR URUG
2 PASIR PASANG
3 PASIR BETON / COR
4 TANAH URUG / TIMBUN (TERIMA DITEMPAT)
5 PASIR HALUS
6 KERIKIL / KORAL BETON
7 SIRTU
8 SIRTU GALIAN / GRAVEL
9 BATU PECAH
10 GEOTEXTILE
11 BATU BATA UK. 5 x 10 x 20 CM
12 BATU BATA RINGAN / HEUBEL UK. 10 x 20 x 60 CM
13 SEMEN TYPE PCC (PORTLAND COMPOSITE CEMENT)
14 PORTLAND CEMENT PUTIH
15 PAVING BLOK TEBAL 6 CM
16 CONEBLOCK TEBAL 10X10x20 CM
17 KANSTEEN CONEBLOCK UK. 30 X 60 CM
18 GRASS BLOK TEBAL 6 CM
B. BAHAN KAYU
1 KAYU KELAS I
2 KAYU KELAS II
3 KAYU KELAS III
4 KAYU LAMBERZIRING
5 KAYU PIRI-PIRI BIASA
6 KAYU PAPAN
7 TRIPLEKS 3
8 TRIPLEKS 3.6
9 TRIPLEKS 4
10 TRIPLEKS 6
11 TRIPLEKS 6
12 TRIPLEKS 9
13 TRIPLEKS 12
14 TRIPLEKS JATI 4
15 KAYU CEROCOK DIA 5-10 CM
16 KAYU DOLKEN DIA 5-10 CM
17 KAYU PERANCAH / BEKISTING
18 KAYU PROFIL
19 PAPAN LISPLANK UKIRAN (LEBAH BERGAYUT)
20 LISPLANK UKIR (GRC)
21 SINGAP UKIR (PAPAN)
22 SINGAP UKIR (GRC)
23 GRC POLOS (TANPA MOTIF)
24 SELEMBAYUNG UKIR (KAYU)
25 SELEMBAYUNG UKIR (FIBERGLASS)
26 SELEMBAYUNG UKIR (GRC)
27 KAYU BAKAR
D. BAHAN LANTAI
1 KERAMIK
- KERAMIK UKURAN 60x60
- KERAMIK UKURAN 40x40
- KERAMIK UKURAN 30x30
- KERAMIK UKURAN 25x25
- KERAMIK UKURAN 20x25
- KERAMIK UKURAN 20x20
- PLIN KERAMIK 10X20
- PLIN KERAMIK 10X30
- PLIN KERAMIK 10X40
- PLIN KERAMIK 10X60
- PLIN KERAMIK TANGGA / STEP NOSING
- PLIN KERAMIK KM/WC / WBIS WARNA Uk. 20 CM
- BON-BON KERAMIK
2 GRANIT
- GRANIT UKURAN 80X80
- GRANIT UKURAN 60X60
- GRANIT UKURAN 40X40
- GRANIT UKURAN 20x20
3 MARMER
4 KARPET
5 PARQUET
6 BATU TEMPEL HITAM
7 BATU TEMPEL PALIMANAN
8 BATU TEPLEK
9 VINIL
E. BAHAN ATAP
1 SENG GELOMBANG BJLS 20 K
2 SENG GELOMBANG WARNA BJLS 20 K
3 PERABUNG SENG PLAT BJLS 30 K
4 ATAP BITUMENT GELOMBANG ACRYLIC BACE
5 ATAP GENTENG METAL 0,35 MM
6 ATAP GENTENG METAL 0,30 MM
7 PERABUNG BITUMEN
G. BAHAN PIPA
1 STOPKRAN DIA. 3/4
2 KRAN AIR DIA. 1/2
3 KRAN AIR DIA. 3/4
4 PIPA PVC 1/2
5 PIPA PVC 3/4
6 PIPA PVC 1
7 PIPA PVC 1,5
8 PIPA PVC 2
9 PIPA PVC 3
10 PIPA PVC 4
11 ELBOW PVC 4
12 SOCKET 4
13 PIPA BESI HIGH PRESSURE GIP
14 PIPA BESI HIGH PRESSURE GIP
15 PIPA BESI HIGH PRESSURE GIP
16 PIPA BESI HIGH PRESSURE HITAM 2 "
17 PIPA BESI HIGH PRESSURE HITAM 2,5 "
18 PIPA BESI HIGH PRESSURE HITAM 3 "
19 PIPA BESI HIGH PRESSURE HITAM 4 "
20 PIPA BESI HIGH PRESSURE HITAM 6 "
21 PIPA GALVANIS DIA 1.6"
H. BAHAN SANITAIR
1 KLOSET JONGKOK
2 KLOSET DUDUK
3 FLOOR DRAIN
4 CLEAN OUT 0.2" (SARINGAN AIR KOTOR)
K. BAHAN KACA
1 KACA BENING
2 KACA BENING
3 KACA NAKO (RANGKA 9 DAUN + BESI)
4 KACA BURAM (DOP)
5 KACA BURAM (DOP)
6 KACA BLOK / GLASSBLOCK
7 KACA PATRY TEBAL 8 MM BINGKAI TEMBAGA (3 LAPIS)
8 KACA PATRY TEBAL 16 MM BINGKAI TEMBAGA (3 LAPIS)
9 KACA PATRY TEBAL 17 MM BINGKAI KUNINGAN (3 LAPIS)
L. BAHAN LISTRIK
1 TITIK LAMPU (KABEL INSTALASI STANDAR PLN)
2 LAMPU PIJAR
3 LAMPU PIJAR
4 LAMPU NEON (JANTUNG) 35 WATT
5 LAMPU TL KOMPLIT
6 LAMPU TL KOMPLIT
7 LAMPU TL KOMPLIT
8 LAMPU TL KOMPLIT
9 LAMPU TL KOMPLIT
M. BAHAN PINTU
1 PINTU PANIL KELAS I
2 PINTU PANIL KELAS II
3 PINTU TERALI BESI dia 12 mm
4 PINTU KACA 10 mm
5 PINTU TEAKWOOD
6 PINTU PLYWOOD
7 PINTU FIBER WARNA
8 PINTU PANIL KACA
9 PINTU ALUMUNIUM KACA (KOMPLIT)
10 PINTU FIBERGLASS MOTIF
11 PINTU BESI ROLLING DOOR
N. BAHAN FINISHING
1 CAT MINYAK
2 CAT TEMBOK
3 CAT VERNISH
4 CAT KAYU DASAR / MENI
5 ALKALI
6 KAPUR TEMBOK
7 MINYAK CAT / THINNER
8 RESIDU
9 DEMPUL
10 PLAMIR
11 KERTAS PASIR / AMPLAS
12 PLITUR
13 TEMPAT ADUKAN CAT
CM
CM
CM
CM
"
"
"
"
"
"
"
"
"
"
"
"
1"
3/4 "
1/2 "
2 "
3 "
3 MM
5 MM
3 MM
5 MM
25 WATT
40 WATT
dto
Ir. S Y A F R I, MT
NIP. 19640128 199203 1 002
3 4
HARI 100,000.00
HARI 90,000.00
HARI 80,000.00
HARI 75,000.00
HARI 100,000.00
HARI 80,000.00
HARI 80,000.00
HARI 75,000.00
HARI 100,000.00
HARI 80,000.00
M3 120,000.00
M3 140,000.00
M3 165,000.00
M3 80,500.00
M3 88,125.00
M3 258,000.00
M3 240,000.00
M3 270,000.00
M3 385,000.00
M2 27,000.00
Bh 600.00
Bh 11,515.00
Kg 1,400.00
Kg 2,600.00
Bh 3,500.00
Bh 3,500.00
Bh 41,000.00
Bh 23,500.00
M3 660,000.00
M3 700,000.00
M3 807,500.00
M3 927,500.00
M3 958,300.00
M3 6,000,000.00
M3 3,500,000.00
M3 2,200,000.00
M3 4,900,000.00
M3 2,200,000.00
M3 2,200,000.00
LBR 58,700.00
LBR 68,000.00
LBR 72,000.00
LBR 95,700.00
LBR 107,000.00
LBR 133,000.00
LBR 175,000.00
LBR 100,000.00
BTG 32,600.00
BTG 25,000.00
M3 2,300,000.00
M' 4,500.00
M' 92,000.00
M' 287,500.00
M2 402,500.00
M2 690,000.00
M' 550,000.00
Bh 345,000.00
Bh 793,500.00
Bh 600,000.00
IKAT 83,375.00
M2 175,000.00
M2 92,000.00
M2 75,000.00
M2 74,000.00
M2 74,800.00
M2 71,000.00
Bh 3,000.00
Bh 3,500.00
Bh 5,000.00
Bh 6,000.00
Bh 17,300.00
Bh 9,400.00
M' 8,100.00
Bh 186,900.00
Bh 82,800.00
Bh 35,132.50
Bh 8,100.00
M2 1,250,000.00
M2 17,000.00
M2 238,000.00
M2 230,000.00
M2 175,000.00
M2 74,800.00
M2 34,500.00
LBR 77,000.00
LBR 90,000.00
LBR 31,700.00
M2 180,000.00
M2 95,000.00
M2 80,000.00
LBR 25,000.00
Bh 31,700.00
Bh 27,500.00
Bh 27,500.00
M' 9,125.00
M' 10,375.00
M' 12,000.00
M' 15,440.00
M' 21,300.00
M' 60,400.00
M' 67,300.00
Bh 25,300.00
Bh 19,200.00
M' 49,000.00
M' 35,250.00
M' 21,500.00
M' 60,000.00
M' 70,000.00
M' 80,000.00
M' 140,000.00
M' 193,000.00
BTG 850,000.00
Bh 415,000.00
Bh 1,735,000.00
Bh 327,000.00
Bh 50,000.00
Bh 334,875.00
Bh 232,062.50
Bh 143,000.00
Bh 17,300.00
Bh 88,000.00
Bh 65,000.00
Bh 45,000.00
Bh 33,500.00
Bh 16,500.00
Bh 195,000.00
Bh 143,800.00
Bh 80,000.00
Bh 500,000.00
Bh 258,000.00
Bh 250,000.00
M2 76,375.00
M2 111,625.00
UNIT 211,500.00
M2 133,950.00
M2 135,125.00
Bh 25,000.00
M2 1,900,000.00
M2 2,400,000.00
M2 2,600,000.00
TITIK 190,000.00
Bh 35,000.00
Bh 45,000.00
Bh 75,000.00
Bh 95,000.00
Bh 150,000.00
Bh 450,000.00
Bh 260,000.00
Bh 400,000.00
Bh 4,025,000.00
Bh 690,000.00
Bh 1,527,500.00
Bh 2,467,500.00
LBR 684,000.00
LBR 225,000.00
LBR 281,325.00
LBR 1,339,500.00
LBR 2,000,000.00
LBR 500,000.00
M2 700,000.00
Kg 93,000.00
Kg 86,550.00
Kg 60,000.00
Kg 36,225.00
Kg 30,000.00
Kg 88,770.00
LTR 28,000.00
Kg 11,500.00
Kg 29,900.00
Kg 40,000.00
LBR 5,000.00
LTR 46,000.00
Bh 10,000.00
dto
Ir. S Y A F R I, MT