Building Permit Service Pole Estimate
Building Permit Service Pole Estimate
Building Permit Service Pole Estimate
Materials Labor
Item Description Qty Unit Total Amount
Unit Cost Total Cost Unit Cost Total Cost
I. GENERAL REQUIREMENTS
1.01 Mobilization 1.00 lot 0.00 3,000.00 3,000.00 3,000.00
1.02 Demobilization 1.00 lot 0.00 3,000.00 3,000.00 3,000.00
1.03 Permits
a. Building Permit Drawing with sign and seal of Professionals 1.00 lot - 40,000.00 40,000.00 40,000.00
b. Building permit assistance 1.00 lot - 15,000.00 15,000.00 15,000.00
1.04 Electrical wiring fee 1.00 lot - 400.00 400.00 400.00
SUB- TOTAL 61,400.00 6,000.00 61,400.00
II. SITE WORKS
2.01 Electrical Service pole 1.00 lot 22,500.00 22,500.00 2,500.00 2,500.00 25,000.00
SUB- TOTAL 2,500.00 2,500.00 25,000.00
DIRECT COST PHP 86,400.00