The document outlines heat protection measures at site ZZ2, including an air conditioned cooling room in a 20ft Halliburton container, drinking water and ice available in two coolers, using the cooling room for shade, work during peak temperature hours could not be avoided due to a short timeline and was conducted using one crew for rig up and rig down activities.
The document outlines heat protection measures at site ZZ2, including an air conditioned cooling room in a 20ft Halliburton container, drinking water and ice available in two coolers, using the cooling room for shade, work during peak temperature hours could not be avoided due to a short timeline and was conducted using one crew for rig up and rig down activities.
The document outlines heat protection measures at site ZZ2, including an air conditioned cooling room in a 20ft Halliburton container, drinking water and ice available in two coolers, using the cooling room for shade, work during peak temperature hours could not be avoided due to a short timeline and was conducted using one crew for rig up and rig down activities.
The document outlines heat protection measures at site ZZ2, including an air conditioned cooling room in a 20ft Halliburton container, drinking water and ice available in two coolers, using the cooling room for shade, work during peak temperature hours could not be avoided due to a short timeline and was conducted using one crew for rig up and rig down activities.
• Cooling room - Halliburton 20ft container is air conditioned and was
operational. • Drinking water – Provided along with ice and available in 2 coolers. • Shade – Cooling room as above. • Work during peak temperature hours – Not avoided due to short timeline and conducted at Peak hours. • Resting and cycling crew – Only one crew available for rig up and rig down.