04 Gland Seal
04 Gland Seal
04 Gland Seal
Power Generation
Seal/Gland Steam System (MAW)
Design features
• Serves to prevent steam leaving or air entering the turbine via the turbine shaft glands
• Gland steam connections at all shaft ends
• Connection from spindle leak-off steam at the stem packing of the turbine main valves
• Condensation of the gland steam in the gland steam condenser
Gland steam header
HP IP
LP
Aux. steam
Seal steam
supply valve
Gland steam
condenser skid
Condenser
Leak off steam
For Training Only valve O&M Training 2
Seal/Gland Steam System (MAW)
• To prevent shaft seals from being exposed to too low of temperature of steam
• Warm-up is required on start up & during normal operation (seal steam supply valve -
closed & steam stagnates & cools down
• In the event of a load rejection the seal steam control valve would open and the cold
steam would enter the shaft seals.
Gland Steam Header [~0.073 psig (-2”wg)(-5 mbar)]
Gland Exhausters
HP IP LP
PT PT
Gland Exhauster
Header
To Turb. LS [~-4”wg (-10 mbar)]
Drains Seal Steam
Supply Skid
PT TE Temp. Before
Cooling
Water Cooling Water
From Desuperheated SS CV Outlet
Steam Supply Inlet
Gland Steam
Condenser
M
To Clean
Drains
Leakoff Steam
Skid
Features
• Both are: Pneumatically Actuated,
Single Stage, Globe Valves
• Seal steam pressure regulating
valve controls seal steam header
pressure (0.5 psig (35 mbar).
• Seal steam leakoff pressure
regulating valve relieves excess
pressure [>0.5 psig (35 mbar)] to
the condenser.
• Blower
• Draws and maintains vacuum in Gland Exhaust Condenser ≈ -4” H2O (-10 mbar)
Tasks
• Discharge of any condensate formed in turbine or valve casings
• Enables warm-up of turbine
Design features
• Separate headers for different pressure sections lead to the condenser’s standpipe
• Drain valves are controlled by the steam turbine controller
• Drain traps for drains from low-pressure drain points
ST
drains
Condenser
ST internal
drainage
Standpipe
Condenser
Condenser
Condenser
Condenser
Condenser
Condenser
Condenser
Condenser
Condenser
Condenser
Condenser
pipes
Conden
ser
• Primary control is the Sub Loop Controller Turbine Drain (SLC TD).
• SLC TD - Auto ON by SGC ST Step 4 (startup) and SGC ST Step 55 (shutdown)
• SLC TD can be turned on or off by operator
• Alarm if SLC is OFF & Condenser Vacuum < 0.8 Bara (24”HgA) & Turbine Speed > 10
rpm
Drain Groups
Upstream of MS ESV: (MAL09AA051 & MAL10AA051)
• OPEN ST SGC Step 5, or SLC TD – ON,
AND Temp Upstream ESV < 20ºC > Tsat for the present Psat
• NOTE Upon failure of superheat calculation Fails Open when power is < 13% and Fails
Closed when power is >15% power
• CLOSE SLC TD – ON, and Temp HP Inner Casing > 50ºC above Tsat for Psat
• NOTE SLC TD – ON, Upon failure of Steam Press Ahead HP Blading Channel (Fault) - Fails
Open when power is < 13% and Fails Closed when power is >15% power
• CLOSE SLC TD – ON, and Casing Temp > 50ºC above Tsat for Psat and Crkt CK OK
• NOTE SLC TD – ON, Upon failure of Steam Press Ahead HP Blading Channel (Fault) - Fails
Open when power is < 13% and Fails Closed when power is >15% power
• CLOSE SLC TD – ON, and Both CRH NRVs Open > 30 sec
• CLOSE SLC TD – ON, and Seal Steam Header Temp > 150ºC