Capacity Daywise generation in MU 1st to 15th Sep 1st Apr to 15th Sep
Station Unit
(MW) 13-09-18 14-09-18 15-09-18 Gen (MU) PLF (%) Gen (MU) PLF (%)
Kothagudem - ABC Unit 1 60.0 1.16 1.18 1.19 17.14 79.36 180.37 74.56
Unit 3 60.0
Kothagudem - VI Unit 11 500.0 12.08 11.98 11.02 154.27 85.71 1592.61 79.00
Kothagudem - V, VI Station 1000.0 18.99 23.80 22.91 322.31 89.53 3360.03 83.32
Total Kakatiya - I & II 1100.0 25.22 25.71 25.89 364.00 91.92 3903.52 88.01
TSGENCO Thermal 2882.50 55.1 60.6 58.98 844.64 81.40 9190.35 79.07
Kothagudem # 3 (60 MW) is under shutdown due to turbine panel control problem from 05:23 on 20/05/17
Kothagudem # VII (800 MW) is under shutdown due to turbine tripped on generator cold gas tempurature high at 03:23 hrs on 01/07/18 and
released for further construction works.
Ramagundam # B (62.5 MW) is under shutdown for annual overhaul from 06:29 on 18/08/18
Kothagudem # 6 (120 MW) is under outage due to boiler tube leak from 08:23 on 15/09/18