GB/T 1032-2005
11.5.4 While taking the test results determine the value of cooling temperature.
试验结束时冷却价值温度的确定
1
HIGH VOLTAGE INDUCTION MOTOR TESTING (TEMPERATURE RISE)
GB/T 1032-2005
11.6.2 Determination of core temperature
The core temperature can be measured with temperature gauge or thermometer, for
large and medium-sized motors, there should be at least 2 thermometers, take the
heighest temperature as the core temperature.
铁心温度的测定
铁心温度用检温计或温度计测量,对大、中型电机,温度计应不少于 2 支,
取最高值作为铁心温度。
2
HIGH VOLTAGE INDUCTION MOTOR TESTING (TEMPERATURE RISE)
GB/T 1032-2005
While testing, the test motor should maintain a specific load, until all parts of the motor
reaches a steady thermal temperature and stop. While testing, record every half-hour test
where the motor voltage is U, Current I1, the input power P1, the frequency f, n, or slip
speed s1, Torque Td (limited A method and B (B1) method), Stator core and winding
temperature θN, bearings, inlet and outlet cooling air around the cooling medium and the
medium temperature θa. If a charged thermometer is used, the test should be the end of
every half-hour before the measurement of winding resistance.
While testing, should opt for a method, and should minimize the temperature
change of the cooling.
If using extrapolation to determine the temperature rise of the winding, shut down of the
motor after the power outage, winding resistance should be measured immediately, as
well as according to 11.7.7 Thermal tests determine the rated load resistance RN. For the
an external cooler and the motor cooling air pipe, while the motor gets disconnected from
the power supply, Should stop the supply of cooling medium.
If the Chrome license current gets a temperature increase test, corresponded rated
power of the winding temperature rise ΔθN (K) are translated as follows:
连续定额电动机
试验时,被试电机应保持额定负载,直到电机各部分温升达到热稳定状态为止。实
验过程中,每隔半小时记录被试电机的电压 U,电流 I1,输入功率 P1,频率 f,转
速 n 或转差 s1,转矩 Td(限于 A 法和 B(B1)法),绕组温度 θN 以及定子铁心、
轴承、风道进出口冷却介质和周围冷却介质的温度 θa。如采用带电测温法,还应
每隔半小时以及试验结束前测量绕组的电阻。
试验期间,应采取措施,尽量减少冷却介质温度的变化。
如采用外推法确定绕组的温升,电机在断电停机后,应立即测量绕组的电阻,并按
11.7.7 确定额定负载热试验后电阻 RN。 对采用外接冷却器及管道通风冷却的电机,
在电机切离电源的同时,应停止冷却介质的供给。
如以铬牌电流进行温升试验,对应于额定功率时的绕组温升 ΔθN(K)按下
述方法换算:
3
HIGH VOLTAGE INDUCTION MOTOR TESTING (TEMPERATURE RISE)
GB/T 1032-2005
Where:
式中:
IN-- Rated current, and current during rated power, In amperes (A), obtained from the
operating characteristics curve;
IN—额定电流,即额定功率时的电流,单位为安培(A),从工作特性曲线上求得;
I1-- Thermal test current, in amperes (A). Throughout the trial within the last 1 / 4 time,
current average measured in equal intervals of time.
I1—热试验的电流,单位为安培(A)。取在整个试验过程最后的 1/4 时间内,按
相等时间间隔测得的电流平均值;
Δθ-- Corresponding to the test current, the winding temperature rise of the I1, in units of
Kelvin (K). ( see 11.3.2)
Δθ—对应于试验电流,I1 的绕组温升,单位为开尔文(K)。(见 11.3.2)
When not within ± 5%, they should redo the thermal test.
短时定额(S2 工作工作制)电动机
试验应从实际冷状态下开始。试验的特续时间按定额的规定。试验时,按照工作时
限长短,每间隔 5min~15min 记录一次试验数据。其他实验要求同 11.7.1.1。
对应于额定功率时的绕组温升 ΔθN 按下述方法换算:
当{。。。。} 在 ±5%范围内时,按式(71)进行换算。
当(。。。。)不在±5%范围内时,应重做热试验。
11.7.1.3 The work to the amount of intermittent cycle (S3 work system) motor
If there are no other regulations, the test of each work period should be 10 min,
until the increase of temperature of all parts of motor reach the condition of thermal
stability. Temperature should be measured at the end of a working cycle of the load when
the end half the time. To reduce the test duration, at the beginning of the experiment a
specific load can be continued for some time.
For winding rotor motors, for each start, the motor winding should be in series
with additional resistance or reactance, the average of the starting current limited being
within 2 times rated current range (Base load special renewal rate of the rated current
value). During end of each work cycle, the motor should stop rotating within 3s.
4
HIGH VOLTAGE INDUCTION MOTOR TESTING (TEMPERATURE RISE)
GB/T 1032-2005
Other experiments require the same as 11.7.1.1.
For the rated power of the winding temperature rise ΔθN calculated by the rules of
11.7.1.2.
断续周期工作制定额(S3 工作制)电动机
如无其他规定,试验时每一个工作周期应为 10 min,直到电机各部分温度升
达到热稳定状态为止。温度的测定应在最后一个工作周期负载时间的一半终了时进
行。为了缩短试验时间,在实验开始时负载可适当地特续一段时间。
对绕线转子电动机,每次起动时,应在转子绕组中串入附加电阻或电抗,将
起动电流的平均值限制在 2 倍额定电流(基准负载特续率时的额定电流值)范围内。
每一工作周期的运行结束时,电动机应在 3s 内停止转动。
其他实验要求同 11.7.1.1。
对应于额定功率时的绕组温升 ΔθN 按 11.7.1.2 的规定换算。
Where:
Po-- Rated voltage no-load input power, in watts (W), no load test strike;
Por-- 1 / 2 rated voltage no-load input power, in watts (W), no load test strike.
降低电压负载法
采用降低电压负载时,应进行下列热试验:
a) 以额定频率和额定电压进行空载热试验,并确定此时的绕组温升 Δθ0、铁
心温升 ΔθFe0。
b) 以额定频率、1/2 额定电压和额定电流进行热试验,并确定此时绕组温升
Δθr,铁心温升 ΔθFer。
此时,额定电流按 10.8.2 的方法确定。试验要求同 11.7.1.1。
对应于额定功率时的绕组温升 Δθ(K)和铁心温升 ΔθFeN(K)按下时确定:
5
HIGH VOLTAGE INDUCTION MOTOR TESTING (TEMPERATURE RISE)
GB/T 1032-2005
式中:
Po—额定电压时的空载输入功率,单位为瓦特(W),由空载试验求取;
Por—1/2 额定电压时的空载输入功率,单位为瓦特(W),由空载试验求取。
6
HIGH VOLTAGE INDUCTION MOTOR TESTING (TEMPERATURE RISE)
GB/T 1032-2005
M: Test Motor
G: Auxiliary power generator
U1: Terminal voltage (rated voltage);
7
HIGH VOLTAGE INDUCTION MOTOR TESTING (TEMPERATURE RISE)
GB/T 1032-2005
f1: Frequency (nominal frequency)
I1: Primary current of induction motor
U2: auxiliary voltage
f2: Auxiliary power supply frequency
P1: Input power
Note 1: The auxiliary power supply phase sequence should be the same as the main
power supply.
Note 2: U2 should be less than U1 (U1 usually the 10% ~ 20%), U2 is to produce the
required rated current I1 applied voltage.
定子叠频法
试验线路如图 7 所示。主电源和负电源均为发电机。副电源均为发电机。副电源发
电机的额定电流应不小于被试电机的额定电流,电压等级应与被试电机相同。
M:被试电动机
T:串接变压器
G: 辅助电源发电机
U1: 端电压(额定电压);
f1: 频率(额定频率)
I1:感应电机的初级电流
U2: 辅助电压
f2 : 辅助电源频率;
P1: 输入功率
注 1: 辅助电源相序应与主电源相同。
注 2: U2 应小于 U1 (通常为 U1 的 10%~20%),U2 是产生额定电流 I1 所必修施
加的电压值。
When the stator is superimposed,Impose on the main & auxiliary power of test motor
winding should be same. At the front of the terminal the main and auxiliary power can be
started by the test motor, if the steering is in line, the phase sequence will be the same.
While testing, first start the main motor with the test motor, to the rated frequency,
rated voltage no-load operation. After that, start up the auxiliary motor, Adjust its speed
to correspond to the speed of the value of a frequency f2. Rated frequency being 50Hz
motor, f2 should be selected within the range 38Hz ~ 42Hz. After that, Auxiliary power
generator will be put into excitation, adjust the magnetic current, be tested to full load
current of the motor stator current in the loading process, adjust the main power supply at
any time, maintain the rated voltage by the test motor, While maintaining the same
frequency f2. Subjects the motor full load current at rated voltage value can be
determined as 10.7 or 10.9. Experimental requirements to meet with 11.7.1.1.
While regulating the load by the test motor, such as the meter pointer swings largest
or try a larger vibration in he motor and test power equipment, auxiliary supply voltage
should be reduced, The value of the frequency f2 by another auxiliary power unit to
adjust speed, then re-test.
8
HIGH VOLTAGE INDUCTION MOTOR TESTING (TEMPERATURE RISE)
GB/T 1032-2005
采用定子叠频法时,施于被试电机绕组的主、副电源的相序应相同。可在接线前由
主、副电源起动被试电机,若转向一致,即为同相序。
试验时,首先由主电源起动被试电机,使其在额定频率、额定电压下空载运行。
随后,起动副电源组,将其转速调节到对应于某一频率 f2 的转速值。对额定频率
为 50Hz 的电机,f2 应在 38Hz~42Hz 范围内选择。然后,将副电源发电机投入励磁,
调节磁电流,使被试电机的定子电流达到满载电流值在加载过程中,要随时调节主
电源电压,使被试电机的端电压保持额定值,并同时保持频率 f2 不变。被试电机
在额定电压时满载电流值可按 10.7 或 10.9 的方法确定。实验要求同 11.7.1.1。
在调节被试电机的负载时,如仪表指针摆动较大或被试电机和试验电源设备
的振动较大,应先降低副电源电压,按另一个频率 f2 的值调整副电源机组的转速,
再行试验。
多种定额电机
具有多种定额的电机(如多速或油井用电机),应在出现最高温升的定额状
态下进行试验。如事先无法预知,应分别在每种定额状态进行试验。双频电机可在
任一方便的频率下进行试验,只是要把负载调节到等效于一个频率下运行的负载,
且电机以该频率运行时将会出现最大温升。
使用系数大于 1.0 的电机,应在使用系数负载状态下进行热实验,以确定电
机的温升值。按 9.1 和 9.2 计算电机性能时,应当用使用系数为 1.0(额定功率)时
的热试验数值。
9
HIGH VOLTAGE INDUCTION MOTOR TESTING (TEMPERATURE RISE)
GB/T 1032-2005
连续定额电机,要达到温度稳定需要较长时间,为了缩短试验时间,电机在预
热阶段容许适当过载(25%~35%)。
If not specified in Table 4, the lag time to read the initial resistance reading, should as
soon as possible read additional resistance readings to the time interval 20s ~ 60s. Take at
least 5~10 readings, plot these readings as time curve, extrapolated to Table 4 under the
motor fixed delay time. Proposed to use semi-logarithmic coordinate paper to draw
curves, Resistance plotted in logarithmic ruler, if so, it can be considered that the
resistance is the break down resistance. If after shut down the results show that the
temperature is increasing, which ever will be the highest value, if not obtain the 1st value
in two times of the time specified in the table 4, the maximum delayed time should be
agreed upon.
断电时的电阻
热试验结束应迅速断电停机。要仔细地安排试验程序和适当数量的实验人员,
尽快地读取读数以获得可靠的数据。
10
HIGH VOLTAGE INDUCTION MOTOR TESTING (TEMPERATURE RISE)
GB/T 1032-2005
从断电瞬间算起,如在表 4 规定的时间间隔内读到了最初电阻度数,则用此读
数按式(69)计算绕组温升。
11