Enterprise Level
Corporate Standards
E P C E P C E P C
Project A Project B Project Y
Project Standards Project Standards Project Standards
Material
Plan Sourcing Receive
Standards
Transport
Define
SPRD Design
E&PI Acquire
MSCM Build
SITE
Material Supplier
Milestones
Plan Sourcing Receiving
Receive
Standards
Libraries Database
Dimensional Inventory
Geometry Organize
WBS Inquiry
Analyze
Process Store
Data Control
Forecasts and
Specifications
Specify BillQuantify
of Material Awarding
Select Availability
Reservations
Material Take-
Summarize Expediting
Expedite Issuing
Install
Off
Transport
Logistics
Specifications
Piping
2D
Systems
Engineering
Structural
• Catalogue
Corporate
E&I • Descriptions
or Project
• Dimensional
Data
Mechanical
3D
Systems
Others
Attributes
External
Catalogues
Manual Project
Requisitions Controls
Manual Design Field
BOM Systems Requisitions
Planning
Engineering
Material
Take Off
• Bill of Material (Rule
• Requisition (inquiry) or
• Revision Control Based) (Purchase)
• Flexible WBS • Validation
• Downstream
Attributes
Rev.
VDR’s
Documents Procurement
Release
eSupplier
Expediting
RFQ and
Awarding
Inquiry
Logistics
Project
Controls
Technical
Input
Doc’s Planning Receiving
ERP
and
Progress
Corporate History
Warehouse
Bill of
Quality Material
Material
Construction
Transfers
Receiving:
- Order
- Release Notes Forecast/
- Logistics Reservation
- Direct Receiving
Warehouse
Management
Material Issuing
OS&D’s Planning
ERP
Supplier Purchasin
Manual
g& Allocate Approve
Databas Purchase
Order
Contract Buyers
e Order
Plan
Allocate
Buyers
Order
Generate Issue from Fabricatio Surveillanc
Expeditin e
Requisitio Requisitio Purchase n and
g
ns n Requisitio Tracking Inspections
n
Order
Request from Transport
Tagged Load Material
for Inquiry &
Item Lists BOM Transfer
Quotation Requisitio Logistics
n
Technical
&
Receive Material MRR by
SPRD Commerci Site
Quotation Receipt Release
Set-Up al Set-Up
s by PO Note
Evaluatio
n
Configure Over,
Configure E&PI RFQ Material
Specs for Inventory Short & PO Close
BOM Set-Up Revision Issue by
Bulks Control Damage Out
BOM
Report
Constructio
Material
Design n Over Scrap and
Issue by
Tools Work Issue Surplus
Reservation
Packages
Eng. & Proc. Integration Mat. Supply Chain Module
SPRD E&PI MSCM SITE