Progress Update BDL Sour: Location Activity # Activity

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 6

Progress Update

BDL Sour

Location Activity # Activity


Top of Roof TR.1 Waterproofing
Top of Roof TR.2 Fixing for Drain Pipe
Top of Roof TR.3 Repair & paint for Drop Beams

Roof Floor R.1 Waterproofing


Roof Floor R.2 Drainage Pipes
Roof Floor R.3 Thermal Isolation & Cement Tiles
Roof Floor R.4 Roof Handrail
Roof Floor R.5 Zinc Coping
Roof Floor R.6 Steel Door Restoration
Roof Floor R.7 Shafts to be constructed
Roof Floor R.8 Concrete to be poured above WP in Pads
Roof Floor R.9 Clostra Submittal

First Floor F.1 Repair Around all openings in walls


First Floor F.2 Mosaic Tiles
First Floor F.3 Grouting Joints of Mosaic Tiles
First Floor F.4 Polishing of Mosaic Tiles
First Floor F.5 Drain Pipes for Balconies
First Floor F.6 Bathroom Surface Preparation
First Floor F.7 Bathroom Waterproofing
First Floor F.8 Bathroom Tiling
First Floor F.9 Windows Surface Preperation
First Floor F.10 Applying EPDM Membrane
First Floor F.11 Concrete Upstands
First Floor F.12 Waterproofing Balcony
First Floor F.13 Tiling the Battery & UPS Room
First Floor F.14 Block Work and Plaster Work in shafts & attics
First Floor F.15 Restoration of existing Steel Doors
First Floor F.16 Balcony Handrails
First Floor F.17 Bathroom Ceiling Paint
First Floor F.18 Doors
First Floor F.19 Internal Partitions
First Floor F.20 Marble Tiles

Mezzanine Floor M.1 block and plaster for temporary door and shaft
Mezzanine Floor M.2 ceiling repair & painted
Mezzanine Floor M.3 structure steel I beam to be fixed.
Mezzanine Floor M.4 steps to be casted.
Mezzanine Floor M.5 MEP Works

Ground Floor GF.1 Plaster Patch Up next to Safe


Ground Floor GF.2 Repair Around all openings in walls
Ground Floor GF.3 Mosaic Tiles
Ground Floor GF.4 Polishing of Mosaic Tiles
Ground Floor GF.5 Restoration of Existing Steel Doors
Ground Floor GF.6 MEP works above False Ceiling

Ground Floor GF.7 Bathroom Surface Preperation for Waterproofing

Ground Floor GF.8 Bathroom Waterproofing

Ground Floor GF.9 Bathroom Tiling

Ground Floor GF.10 Waterproofing of Windows

Ground Floor GF.11 preparation for the are for tiling in the main entry .
Ground Floor GF.12 Bullet Proof Glazing Testing
Ground Floor GF.13 Drawers
Ground Floor GF.14 Microphones & Speakers
Ground Floor GF.15 Marble Tiles

Basement Floor B.1 Plaster Patchup


Basement Floor B.2 structure steel I beam to be fixed.
Basement Floor B.3 repair for plaster ceiling
Basement Floor B.4 Paint Ceiling
Basement Floor B.5 MEP works High Level
Basement Floor B.6 Tiling Works

Internal Stair IS.1 Extension of Landing


Internal Stair IS.2 Plaster Works Repair
Internal Stair IS.3 Paint Repair
Internal Stair IS.4 Tiles Delivery
Internal Stair IS.5 Tiling
Internal Stair IS.6 Handrail SteelRestoration
Internal Stair IS.7 Wooden Handrail Topping

Main Building Façade MF.1 L.Shape Stones Delivery & Installation


Main Building Façade MF.2 Grout Repair
Main Building Façade MF.3 Stone Sills Delivery & Installation
Main Building Façade MF.4 Windows delivery & Installation
Main Building Façade MF.5 WaterRepellant Sample

External Works EX.1 Fence Restoration


Thursday Friday
Status 11/1/2018 11/2/2018
No Action No Action
No Action No Action
No Action No Action

No Action No Action
Coring On-Going
No Action No Action
Sample Awaited No Action / Sample Aw.
Sample Awaited No Action / Sample Aw.
No action No Action
No action No Action
No action No Action
Awaiting Submittal No Action / Awaiting Sub.

On-going On-Going
On-Going On-Going
No Action No Action
No Action No Action / Aw. Joint Filling
No action No Action
On-going No Action
No Action No Action / Aw Surf. Prep
No action No Action / Aw W.P
No action No Action
Awaiting ESI No Action / Awaiting ESI
Reply / CG Not Reply / CG Not ready Yet
ready Yet
No action Done
No action No Action / Aw Cleaning
ESI :Awaiting No Action / Aw ESI Tile
Selection of Tiles Selection
No action No Action
No action No Action
Awaiting Submittal No Action / Aw Sub
No Action No Action
Awaited Submittal No Action / Aw Sample
Colors Viewing on Tuesday
Awaited Submittal No Action / Aw Sub
No Action / Aw Del

No Action No Action
No Action No Action
On-going Done
No Action No Action
No Action No Action

No Action No Action
No Action No Action
No Action No Action
No Action No Action
No Action No Action
On-going On-Going / Slow Progress
Awaiting ESI No Action / Aw Comments to
Mechanical be rectified
Inspection
Awaiting ESI No Action / Aw Comments to
Mechanical be rectified
Inspection
Awaiting ESI No Action / Aw Comments to
Mechanical be rectified
Inspection
Awaiting Surface No Action / Aw Sur Prep
Prep
Awaiting Tiles No Action / Aw Til Submittal
Submittal
No Action No Action / Aw Test
Awaiting Submittal No Action / Aw Sub
Awaiting Submittal No Action / Aw Sub
No Action

No Action No Action
On-going Done
No Action No Action
No Action No Action
No Action No Action
No Action No Action

No Action No Action
No Action No Action
No Action No Action
No Action No Action
Awaiting Landings No Action / Aw Subm
Pouring Reply
No Action No Action
No Action No Action

No Action No Action
No Action No Action
No Action No Action
No Action
No Action No Action

On-Going On-Going On-going