Saudi Aramco Inspection Checklist: Piping / Equipment Internal Cleaning Inspection
Saudi Aramco Inspection Checklist: Piping / Equipment Internal Cleaning Inspection
Saudi Aramco Inspection Checklist: Piping / Equipment Internal Cleaning Inspection
00 30-Jun-16
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Piping / Equipment Internal Cleaning Inspection SAIC-L-2017 15-Nov-17 MECH-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
A General Requirements (Note: Use SATR-A-2008 to document findings using this checklist)
SAES-L-350,
C3 Ball valves shall be flushed in fully open position.
Appendix A
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
For stainless steel lines, flushing medium chloride ion content is less
than 50 mg/L. (NOTE: After flushing, the piping systems shall be SAES-L-350,
C5
completely drained, dried to a dew point below -1°C) and protected Appendix A
against corrosion.
SAES-L-350,
C6 For lines below 4" dia., minimum velocity of water fushing is 3 m/s.
Appendix A
For lines 4" dia. and above, high pressure jet (rotating hose or SAES-L-350,
C7
nozzle) at a minimum pressure of 60.8 mPa (8.8 psi) is used. Appendix A
D Pneumatic Flushing
Medium used for pneumatic flushing is dry air (dew point -1°C or SAES-L-350,
D1
less) or steam with a minimum exit velocity of 15 m/s. Appendix A
The air shocking pressure shall never exceed the working pressure SAES-L-350,
E2
of the system and shall never be more than 810 kPa (115 psi). Appendix A
Safety precautions are considered in consultation with Area Loss SAES-L-350,
E3
Prevention Division. Appendix A
F Mechanical Scrapers
Mechanical scrapers are used on piping system that will not cause SAES-L-350,
F1
damage to the pipe interior surface (ie: piping with internal coating). Appendix A
F3 Internal scrapers have full bore contact with the pipe inside diameter. Procedure detail
REMARKS:
ATTACHMENT:
1. SATR-A-2008, Piping / Equipment Internal Cleaning Inspection
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
THE ABOVE STATEMENT IS CLEARLY STATED AND INTENDED IN SAUDI ARAMCO STDS TO PREVENT VALVE SEAT DAMAGE.
Code fabricated test implements can easily replace valves during system hydrotests. Cavities & other low points in the
line where debris can accumulate require special attention during cleaning. Typical flushing with air or water is
inadequate in the removal of debris from valve cavities and low points. This accumulated debris (sand, scale, metal
shavings, slag, etc) creates serious corrosion and operational problems for COMPANY. Cleaning methods shall
demonstrate adequate cleaning for all piping system components and equipment. Where items such as valve cavities
exhibit an inadequate level of cleanliness, adequate cleaning & inspection shall be performed at earliest opportunity and
addressed no later than immediately after hydrotest. Avoid flushing lines through valves & install field hydrotested valves
"after" system testing where possible. Preservation checks of valves utilizing "AMBIENT" Lay-up methods is required.
REFERENCE DOCUMENTS:
1. SAES-A-004, General Requirements for Pressure Testing, (7 Jan 2016)
2. SAES-L-350, Construction of Plant Piping, (22 April, 2009)
3. SAES-L-450, Construction of On-Land and Near-Shore Pipelines, (12 October 2015)
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION TEST SYSTEM No./Test Pack No. PLANT NO.
DRAWING NUMBER (P&ID/ISO) / REV. No. PIPE CLEANING DIAGRAM (If applicable) LOCATION WORK PERMIT REQD?
SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME
SAUDI ARAMCO TIP (SATIP) NUMBER SATIP Activity No. TEST IN ACCORDANCE WITH: a) Procedure No. b) Supporting SAIC No.
System Description:
Service Fluid: MAOP: System Material Type:
Internal Cleanliness Report for On-Plot Piping & Equipment (See Remarks)
Method of internal cleaning
(For piping systems states in detail the cleaning methods used (reference Company approved procedure)
and equipment)
Limits of internal cleaning states whether cleaning was full or partial and details the system limits for cleaning (specific line #) and/or
(State Partial or Full and terminating ends) equipment details/limits "as inspected"
Type Of Debris states what was found during cleaning and any other unusual findings that could affect system integrity
(sand, mill scale,
electrodes, debris, etc.) "as inspected"
Valve Cavities & Other Low Point states exactly how low points remaining in line/equipment were cleaned. methods are adequate for
System Components removal of debris (sample selected by Company to witness shall demonstrate this). See Note 2
RESULT (ACC/REJ)
REMARKS: