(N) Code Solutions: User Manual - BPMS
(N) Code Solutions: User Manual - BPMS
(N) Code Solutions: User Manual - BPMS
Document Information
Disclaimer: This document contains proprietary confidential information to be used solely for the project
Building Plan Management System across ULBs in State of Maharashtra, by accepting this document, agrees
that neither this document nor the information disclosed herein, nor any part thereof, shall be reproduced or
transferred to other documents, or used or disclosed to others for any purpose other than the project.
Table of Contents
1 Introduction to BPMS
As an ambitious project under the “Ease of Doing Business” initiative of Central
Government, Hon. Chief Minister has agreed and urban Development Department
has decided, of creating a portal and implementing Building Plan Management
System (BPMS) with a vision of standardizing various building permission processes
at Municipal Councils across Maharashtra.
http://mahavastu.maharashtra.gov.in/
• Architect
• Civil Engineer
• Structural Engineer
• Supervisor
2 Registration Process
2.1 New User Registration
For new user registration, click on the Register button on the home page.
Enter First Name, Last Name, Email ID, Mobile Number, and Address and click on
Submit button.
The mobile number and Email ID will be authenticated by sending an OTP (One
Time Password) to the registered mobile number and email ID.
Once the mobile number is authenticated, user has to set his password for the
portal.
Enter login credentials and click on Login button. The following screen appears for
registering for ULB.
• Select the category from drop down. [Architect, Chief Engineer, Structural
Engineer, Supervisor etc.]
• The other details (first name, last name, email Id, mobile number) will be
populated automatically based on the Aadhar number.
• Select the qualification from the drop down. [The qualifications are pre-
populated as per the category selected.]
• Enter your License Certificate number. Architect license can be verified from
the Council of Architecture. The link is provided below.
• The License expiry date will be displayed automatically. Note: Every ULB
registration is valid until 31st December of that year.
The following screen is the dashboard for assistant town planner. It will show the
number of new applications for scrutiny, new proposals, meetings etc.
Click on the New Proposal icon to see all the applications for scrutiny as shown
below:
Note: In case of Architect, the license of Architect from the council of Architecture
can be verified through a link which is given in the below screen:
<<>>
Once the documents are verified, the ATP will enter verification action as follows:
Select the action from the dropdown and click on Submit Button. The following
message is displayed.
Once the documents are verified, the ATP will forward the application to the next
level.
Select the status from the drop down. [Status: Forward, Reject]
Select from the dropdown the name of the person to whom the application is
forwarded. (Usually the application is forwarded to the Chief Officer (CO)).
On the dashboard, the CO will have applications pending for his approval as shown
in the screen below:
For approval, click on the Action button to action the application as shown below:
Once the application is approved, the applicant needs to pay the registration fees.
User will login with his credentials, and click on the Application Registration
Payment option.
The following screen will appear. Follow the process as shown in the screens below:
For this, the CO will login with his credentials and click on the Certificate Issue
Entry as shown in the screen below:
The Applicant will login in the portal with his credentials and select the
Certificate print option.
The same application form opens where Architect had registered earlier for new
ULB.
Architect just needs to select the name of other ULB from the dropdown.
All the other details will remain same. The uploaded documents also are visible
here for verification.
Note: The scrutiny and approval process with ATP and CO will be similar
to new registration
4 Building Permission
4.1.1 Application Form
For creating a new building plan, applicant needs to fill up the application form.
Applicant should first login into the portal with User ID and Password.
On the landing page, click on the Building Permission option as shown in the
screen below:
Fill in the initial details like Owner Name, Plot No., Revenue Survey number, City
Survey number, Road / street number, society number, Architect name etc.
Click on Save Draft Button. The application number will be generated. The
message is displayed as shown below:
Once the application number is generated, the applicant needs to enter the Owner
KYC details. Click on the Owner KYC button as shown below:
On the basis of Aadhar number the other details will be automatically populated.
Click on Submit button to authenticate the mobile number. The following message
is displayed.
Applicant can also print the application once the application number is generated.
Click on the Print button to print the application.
Step 2:
Step 3:
Step 4:
Step 5:
Note: Applicant can enter the details and click on save draft for future use.
Once all the steps are over, click on Final Submit button to create the proposal.
This option is enabled once the applicant fills the application form completely.
Click on Upload document button on each of the type of document and upload the
files in the specified format.
Note: Applicant can also upload any extra documents if he wishes to upload.
Once done, click on the checkbox for declaration and click on Submit button.
When clicked on View Building Details button, the following screen will be seen:
Once the proposal is submitted, the applicant needs to pay the pre-approval
payment for building permission.
Click on the Project verification option from the home page. The following screen
will appear.
Click on Pay Online and follow the process as shown in the screens below:
To see all the applications pending for approval, click on the New Applicant icon
on the dashboard.
Select the module from the dropdown. The list of applications will be displayed.
Note: In case of any discrepancy in the documents, the ATP will ask the applicant
to re-submit the documents. The applicant can log-in and re-submit the documents
through the Re-Submit Document option. Once again, the ATP has to verify the
documents until they are proper. On verification of all the uploaded documents,
the following message is displayed:
For each of the application where the document verification is over, the ATP will
then select the site visit date.
On the decided date, the site visit will be done. ATP will enter the site visit report
as per the questionnaire.
Proposal Approval:
Click on Close.
Click on the Verify button on Consolidated Scrutiny Entry. Here, all the
scrutiny for documents, site visit and the remarks will be displayed. The ATP will
re-check all the remarks.
Once all the reports and entries are checked, the ATP will submit the report and
will be forwarded to next level of scrutiny.
Select the status from the dropdown and select the authority name from the drop
down, enter remarks if any, and click on Submit button.
Dashboard will be displayed for all the applications pending for CO to complete.
Check all the details of the proposal like Project Details, Client and Site details,
Building and floor details, uploaded documents, Department NOC status etc.
Once everything is checked, enter proposal approval remarks and click on Submit
button.
Once the application is approved by the Chief Officer, ATP verifies the payment to
be made by the applicant post approval.
If the amount calculated is proper, select the option against verified option. Click
on Submit button.
Once the ATP verifies the amount to be paid, the applicant has to login and make
the necessary payment.
Note: The online payment process is same as described in section 3.1.3. Please
refer the above screens for payment.
Once the Architect pays the development charges, the ATP will verify the payment.
On successful post approval payment, the Chief Officer checks the commencement
certificate and gives the digital signature on the certificate.
Chief Office logs in to the system with his username and password.
Once the certificate is digitally signed, applicant can print the certificate from the
portal.
5 Plinth Completion
This service will be applicable when the building development is under construction
and plinth of the building is completed and the same is recorded in the system and
the certificate is taken for plinth so that further work of building the floors can be
continued by the builder.
The process flow for Plinth Completion Certificate is similar to Building Permission.
• Applicant logs in to the system and create proposal for plinth completion.
• Once the required documents for plinth are uploaded in the proposal, the
proposal goes in for two levels of scrutiny.
• Assistant town planner will check all the uploaded documents, do the site
visit, check for details and once approved, will forward the proposal to the
chief officer for final approval.
• Chief Officer will log in to the system and re-check the details of the proposal
and if everything is okay, will approve the proposal.
• The certificate will be generated, will be digitally signed by the chief officer
and will be available for applicant to print from the portal.
Note: Plinth completion certificate service is free of cost. So the sections for
pre-approval and post approval payment will not be included in the flow.
6 Part Occupancy
This service can be availed any time before applying for Full Occupancy certificate.
• Part of the building is complete as per the final plan with all the amenities
planned and want to be sold.
• Few floors of the building is complete and want the certificate so that there
is a confirmation that the building that is partially complete is as per the
norms specified in the plan of the building.
• Applicant logs in to the system and create proposal for part occupancy.
• Applicant puts of the details of the completed part of the building in the
system.
• Once the required documents for part occupancy are uploaded in the
proposal, the applicant pays the pre-approval charges for the proposal
• Assistant town planner will check all the uploaded documents, do the site
visit, check for details and once approved, will forward the proposal to the
chief officer for final approval.
• Chief Officer will log in to the system and re-check the details of the proposal
and if everything is okay, will approve the proposal.
• On approval of the proposal, the assistant town planner will verify the
project for charges levied to the applicant.
• Applicant will pay the post-approval charges for the proposal through portal.
• On payment of post-approval charges, the chief officer will digitally sign the
part occupancy completion certificate.
7 Full Occupancy
This service can be availed when the building is completed and is ready to be
occupied.
• Full building is complete as per the final plan with all the amenities planned
and want to be sold.
• Applicant logs in to the system and create proposal for Full occupancy.
• Once the required documents for full occupancy are uploaded in the
proposal, the applicant pays the pre-approval charges for the proposal.
• Assistant town planner will check all the uploaded documents, do the site
visit, check for details and once approved, will forward the proposal to the
chief officer for final approval.
• Chief Officer will log in to the system and re-check the details of the proposal
and if everything is okay, will approve the proposal.
• On approval of the proposal, the assistant town planner will verify the
project for charges levied to the applicant.
• Applicant will pay the post-approval charges for the proposal through portal.
• On payment of post-approval charges, the chief officer will digitally sign the
full occupancy completion certificate.