Building SOR 18-19
Building SOR 18-19
Building SOR 18-19
2018-19
1 2 3 4 5 6
AC PIPE LINE
Cost of Synthetic 6mm thick rubber sheet 12kg/sqm - PHSSR
200 5666.36 49
300 13414.24 116
500 41808 325
ata for CI Fixures-Per Each Joint
7 8 9 10 11 12
onsidered from AP standard PH data upto 750mm dias (above 750mm - from SSR directly)
976.50 51.80 51.80 111.00 5749.80 6726.30
1.2608695652
325.3043478261
COMMON SSR: 2018-19 Lowering
14
For PVC Air valves
Lowering CI D/F pipes
15985.30
1054.00 SSR 20626
13425.45
811.00 SSR 17702
10654.16
624.00 SSR 14920
7523.59
667.56 PH data 9142.62
6992.61
591.11 PH data 8451.16
5467.72
456.97 PH data 6625.18
3896.30
341.07 PH data 4789.6
3346.84
291.96 PH data 4125.52
2868.12
242.48 PH data 3522.62
1760.63
198.88 PH data 2315.9
1203.01
157.76 PH data 1651.22
0.00
PH data 0
0.00
PH data 0
Labour charges for lowering as
Total for Each joint PHSSR 15-16
1153.88
122.21 PH data 1514.96
777.94
90.26 PH data 1062.38
709.11
62.73 PH data 930.9
444.09
49.88 PH data 627.62
0.00
PH data 0
0.00
PH data 0
429.09
38.4 PH data 585.82
249.46
30.36 PH data 369.16
215.35
30.36 PH data 369.16
204.05
30.36 PH data 369.16
450x450x250 260.00
450x450x300 277.00
450x450x350 284.00
450x450x400 290.00
450x450x450 296.00
500x500x250 315.00
500x500x300 334.00
500x500x350 342.00
500x500x400 349.00
500x500x450 356.00
500x500x500 363.00
600x600x300 466.00
600x600x350 475.00
600x600x400 485.00
600x600x450 492.00
600x600x500 499.00
600x600x600 516.00
80x80x40 18.13
80x80x50 19.13
100x100x40 22.05
100x100x50 23.05
125x125x50 29.56
150x150x50 38.00
200x200x50 57.80
350x350x100 161.08
400x400x100 202.75
450x450x100 249.76
500x500x150 308.94
600x600x150 440.59
700x700x150 608.40
DI S/S pipe Jointing charges
mm
1000 2036.96
900 1860.18
800 1569.73
750 1181.68
700 1043.73
600 827.87
500 676
450 557.76
400 464.64
350 422.25
300 344.73
DI S/S pipe Jointing charges
250 260.79
200 229.91
150 198.96
125 168
100 132.55
80 105.37
50
40
Lowering tee
Valve chambers
Rectangular
0.90x0.75x1.05m
0.90x0.90x1.40m
1.05x1.20x1.70m
1.20x1.20x2.10m
1.70x1.20x2.10m
3.0x2.0x2.50m
0%
Valve chambers
2018-19 Circular
1 Tamper Proof DI Flanged Single Chamber Air 9350.00 9350.00 9350.00 9350.00 13475.00 13475.00 13475.00 13475.00 13475.00 13475.00 23100.00 23100.00 23100.00
Release Valve with Body and cover made of
Ductile Iron Grade GGG-40/SG-400/15 or
GGG-50/SG-500/7 or Equivalent as per
IS1865, IS:3896-2 with Food Grade Epoxy
Powder Coating(EP-P) (Min:250 Micron)
inside and Outside of Color Blue RAL 5005
and subsequent revisions
2 Transportation charges (5% of basic) 467.50 467.50 467.50 467.50 673.75 673.75 673.75 673.75 673.75 673.75 1155.00 1155.00 1155.00
3 CI A/F Air Tee 1389.30 1389.30 1389.30 1689.69 2265.18 2911.94 2911.94 2911.94 4429.21 4429.21 6820.07 6820.07 9348.86
4 D/F CI pipes -0.60 m long 2 No's 2954.86 2954.86 2954.86 3623.06 4668.30 5879.06 5879.06 5879.06 8377.20 8377.20 11200.24 11200.24 14293.02
5 MTAs 110 150 190 210 300 360 400 460 520 590 700 800 850
6 MS threaded flanges 234.00 298.00 322.00 338.00 464.00 502.00 662.00 932.00 1208.00 1514.00 1786.00 2026.00 2382.00
7 Jointing materials such as bolts nuts 616.88 616.88 616.88 1018.04 1055.72 1610.88 1610.88 1610.88 1763.72 1763.72 1763.72 1763.72 2671.40
and rubber vouchers including material
cost for main line - 4nos
8 Jointing materials such as bolts nuts 49.83 49.83 49.83 49.83 61.13 61.13 61.13 61.13 61.13 61.13 95.24 95.24 95.24
and rubber vouchers for Air valve fixing
9 Labour charges for lowering CI pipes 81.21 81.21 81.21 100.54 132.87 169.14 169.14 169.14 251.08 251.08 366.48 366.48 490.65
and tees - (2 jobs+1job)
10 Labour charges for fixing of valve 208.00 208.00 208.00 208.00 221.00 221.00 221.00 221.00 221.00 221.00 259.00 259.00 259.00
11 Add MA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12 Cost of RCC valve chamber of size 16965.00 16965.00 16965.00 23120.00 23120.00 23120.00 23120.00 23120.00 23120.00 23120.00 34782.00 34782.00 34782.00
13 Add: Overheads & CP 2105.09 2119.25 2127.97 2321.99 3174.60 3521.37 3548.60 3593.53 4217.94 4269.13 6432.51 6478.80 7439.94
14 Grand total 34532.00 34650.00 34723.00 42497.00 49612.00 52505.00 52732.00 53107.00 58318.00 58745.00 88460.00 88847.00 96867.00
local rates
from ssr
Air valves PN-16 on HDPE Mains
PN 1.6 #N/A 2018-19
SL PN 16 PN 16
Discription of Item
No. 40mm dia air valve 50mm dia air valve 50mm dia air valve 80mm air valve
Size of Pipeline 63mm 75mm 90mm 110mm 125mm 140mm 160mm 180mm 200mm 225mm 250mm 280mm 315mm
Size of A/F tee 80x40mm 80x40mm 80x40mm 100x40mm 125x50mm 150x50mm 150x50mm 150x50mm 200x50mm 200x50mm 250x80mm 250x80mm 300x80mm
0.90x0.75x 0.90x0.75x1. 0.90x0.75x 1.05m 0.90x0.90x 0.90x0.90x1.4 0.90x0.90x 0.90x0.90x 0.90x0.90x 0.90x0.90x 0.90x0.90x 1.05x1.20x 1.05x1.20x 1.05x1.20x
Size of Valve Chamber 1.05m 05m 1.40m 0m 1.40m 1.40m 1.40m 1.40m 1.40m 1.70m 1.70m 1.70m
1 Tamper Proof DI Flanged Single Chamber Air 9350.00 9350.00 9350.00 9350.00 13475.00 13475.00 13475.00 13475.00 13475.00 13475.00 23100.00 23100.00 23100.00
Release Valve with Body and cover made of
Ductile Iron Grade GGG-40/SG-400/15 or
GGG-50/SG-500/7 or Equivalent as per
IS1865, IS:3896-2 with Food Grade Epoxy
Powder Coating(EP-P) (Min:250 Micron)
inside and Outside of Color Blue RAL 5005
and subsequent revisions
2 Transportation charges(5%) 467.50 467.50 467.50 467.50 673.75 673.75 673.75 673.75 673.75 673.75 1155.00 1155.00 1155.00
3 Cost of Air Tee CI A/F 1389.30 1389.30 1389.30 1689.69 2265.18 2911.94 2911.94 2911.94 4429.21 4429.21 6820.07 6820.07 9348.86
4 Cost of 0.6m D/F CI pipes 2nos 2954.86 2954.86 2954.86 3623.06 4668.30 5879.06 5879.06 5879.06 8377.20 8377.20 11200.24 11200.24 14293.02
5 Cost of HDPE Tail pieces 2 nos 192.00 232.00 322.00 446.00 602.00 750.00 1048.00 1596.00 2052.00 2358.00 2762.00 3084.00 3556.00
6 Cost of MS flanges 2nos 234.00 298.00 322.00 338.00 464.00 502.00 662.00 932.00 1208.00 1514.00 1786.00 2026.00 2382.00
7 Jointing materials such as bolts nuts 616.88 616.88 616.88 1018.04 1055.72 1610.88 1610.88 1610.88 1763.72 1763.72 2541.08 2541.08 2671.40
and rubber vouchers including material
cost for main line - 4nos
8 Jointing materials such as bolts nuts 49.83 49.83 49.83 49.83 61.13 61.13 61.13 61.13 61.13 61.13 95.24 95.24 95.24
and rubber vouchers for Air valve fixing
9 Labour charges for lowering CI pipes 81.21 81.21 81.21 100.54 132.87 169.14 169.14 169.14 251.08 251.08 366.48 366.48 490.65
and tees - (2 jobs+1job)
10 Labour charges for fixing of valve 208.00 208.00 208.00 208.00 221.00 221.00 221.00 221.00 221.00 221.00 259.00 259.00 259.00
11 Add MA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12 Cost of RCC valve chamber of size 16965.00 16965.00 16965.00 23120.00 23120.00 23120.00 23120.00 23120.00 23120.00 23120.00 34782.00 34782.00 34782.00
13 Add: Overheads & CP 2116.26 2130.42 2145.94 2354.12 3215.72 3574.47 3636.82 3748.19 4426.52 4509.84 6819.09 6895.60 7808.36
14 Part B - Total 34625.00 34743.00 34873.00 42765.00 49955.00 52948.00 53469.00 54398.00 60059.00 60754.00 91686.00 92325.00 99942.00
PN 16
100mm air valve
355mm 400mm 450mm
350x100mm 400x100mm 450x100mm
1.05x1.20x 1.05x1.20x 1.20x1.20x2.10
1.70m 1.70m m
9 208.00 208.00 221.00 221.00 259.00 259.00 259.00 301.00 301.00 301.00 516.00 516.00
10 Add MA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 16965 23120 23120 23120 23120 34782 34782 34782 34782 59056 59056 59056
Cost of RCC valve chamber
12 Add: Overheads & CP 2031.96 2209.67 3040.65 3344.43 3949.72 6124.10 6925.80 9094.88 10286.11 11507.13 17131.91 20691.67
Total 33921 41559 48494 51029 56080 85887 92577 110677 120618 155081 202019 231725
Air valves on DI mains
2018-19
40mm air 50mm air 50mm air 50mm air 80mm air 80mm air 100mm air 100mm air 100mm air 150mm air 150mm air 150mm air 200mm air 200mm air
Discription of Item
valve valve valve valve valve valve valve valve valve valve valve valve valve valve
Sno
Dia of pipeline 100mm line 125mm line 150mm line 200mm line 250mm line 300mm line 350mm line 400mm line 450mm line 500mm line 600mm line 700mm line 800mm line 900mm line
Size of tee 100x40 125x50 150x50 200x50 250x80 300x80 350x100 400x100 450x100 500x150 600x150 700x150 800x200 900x200
0.90x0.90x 0.90x0.90x 0.90x0.90x 0.90x0.90x 1.05x1.20x 1.05x1.20x 1.05x1.20x 1.05x1.20x 1.20x1.20x2.1 1.20x1.20x2. 1.70x1.20x2.1 1.70x1.20x2. 3.0x2.0x
Size of Valve Chamber 1.40m 1.40m 1.40m 1.40m 1.70m 1.70m 1.70m 1.70m 0m 10m 0m 10m 3.0x2.0x 2.5m
2.5m
PN 1.6 PN16 PN16 PN16 PN16 PN16 PN16 PN16 PN16 PN16 PN16 PN16 PN16 PN1.6 PN1.6
1 Tamper Proof DI Flanged Single Chamber 9350.00 13475.00 13475.00 13475.00 23100.00 23100.00 29975.00 29975.00 29975.00 57475.00 57475.00 57475.00 66538.00 66538.00
Air Release Valve with Body and cover
made of Ductile Iron Grade GGG-40/SG-
400/15 or GGG-50/SG-500/7 or Equivalent
as per IS1865, IS:3896-2 with Food Grade
Epoxy Powder Coating(EP-P) (Min:250
Micron) inside and Outside of Color Blue
RAL 5005 and subsequent revisions
2 Transportation charges (5% of basic) 467.50 673.75 673.75 673.75 1155.00 1155.00 1498.75 1498.75 1498.75 2873.75 2873.75 2873.75 3326.90 3326.90
3 Cost of DI Air Tee D/S branch flanged 1665.00 1998.00 2997.00 3219.00 4107.00 5328.00 6660.00 7992.00 9879.00 15624.00 21204.00 27404.00 31318.86 35233.71
4 Labour charges for S/S jointing including 265.10 336.00 397.92 459.82 521.58 689.46 844.50 929.28 1115.52 1352.00 1655.74 2087.46 3139.46 3720.36
cost of rubber gaskets (2 jobs)
5 Jointing materials such as bolts nuts and 49.83 61.13 61.13 95.24 95.24 95.24 174.58 174.58 174.58 306.39 306.39 306.39 337.01 337.01
rubber vouchers for Air valve fixing (1 set)
7 Labour charges for fixing of Air valve 221.00 221.00 221.00 221.00 259.00 259.00 301.00 301.00 301.00 516.00 516.00 516.00 589.71 589.71
8 Labour charges for lowering of tee 1 job 37.05 44.46 51.87 71.63 91.39 118.56 148.20 177.84 219.83 311.22 422.37 545.87 716.30 896.61
Add MA on labpur charges 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9 Cost of RCC valve chamber 23120.00 23120.00 23120.00 23120.00 34782.00 34782.00 34782.00 34782.00 59056.00 59056.00 79812.00 79812.00 171800.00 171800.00
10 Add: Overheads & CP 1641.35 2288.59 2434.04 2480.03 3993.17 4185.97 5391.82 5588.75 5876.74 10682.11 11498.31 12418.03 14427.30 15063.95
Grand total 36817.00 42218.00 43432.00 43815.00 68104.00 69713.00 79776.00 81419.00 108096.00 148196.00 175764.00 183439.00 292194.00 297506.00
ves on DI mains
200mm air
valve
1000mm
line
1000x200
3.0x2.0x 2.5m
PN1.6
66538.00
3326.90
39148.57
4073.92
337.01
589.71
1096.68
0.00
171800.00
15672.33
302583.00
Air valves on BWSC & MS mains
2018-19
80mm air 100mm air 100mm 100mm air 150mm air 150mm air 150mm air
Discription of Item
valve valve air valve valve valve valve valve
Sno
350mm 400mm 450mm 600mm
Dia of pipeline 300mm line 500mm line 700mm line
line line line line
3 Cost of MS Air Tee branch flanged 3332.18 3890.46 4369.00 4847.53 5525.45 6482.51 7439.57
4 Jointing materials such as bolts nuts and rubber 95.24 174.58 174.58 174.58 306.39 306.39 306.39
vouchers for Air valve fixing (1 set)
5 Labour charges for fixing of Air valve 259.00 301.00 301.00 301.00 516.00 516.00 516.00
6 Labour charges for lowering of tee 1 job 106.89 124.80 140.15 155.50 177.24 207.95 238.65
7 Add MA on labpur charges 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8 Cost of RCC valve chamber 23120.00 34782.00 34782.00 59056.00 59056.00 79812.00 79812.00
9 Add: Overheads & CP 3818.78 4896.58 4963.82 5031.06 9104.87 9239.36 9373.84
Grand total 54987.00 75643.00 76204.00 101039.00 135035.00 156913.00 158035.00
Data Sheet for Fixing sluice valves on PVC Mains
PN - 1.6
Discription of Item/ Dia of valve 80mm dia 100mm dia 125mm dia 150mm dia 200mm dia 250mm dia
SL
No.
Dia of Pipeline 63mm line 75mm line 90mm line 110mm line 125mm line 140mm line 160mm line 180mm line 200mm line 225mm line 250mm line
0.90x0.75x 0.90x0.75x1.05 0.90x0.75x 1.05m 0.90x0.90x 0.90x0.90x1.40 0.90x0.90x 0.90x0.90x 0.90x0.90x 0.90x0.90x 1.40m 0.90x0.90x 1.40m 1.05x1.20x
Size of Chamber 1.05m m 1.40m m 1.40m 1.40m 1.40m 1.70m
A) MATERIALS
1 Resilient Seated Soft Sealing" Gate Valves 9922.00 9922.00 9922.00 12957.00 16679.00 20401.00 20401.00 20401.00 29975.00 29975.00 38225.00
(Sluice Valves) with Body and Bonnet of
Ductile Iron GGG-40/SG-400/15 or GGG-
50/SG-500/7 or Equivalent as per IS1865,
IS:3896-2, without bypass upto 400mm dia
and with bypass above 400mm dia
2 Transportation charges(5%) 496.10 496.10 496.10 647.85 833.95 1020.05 1020.05 1020.05 1498.75 1498.75 1911.25
3 Cost of 0.6m CI D/F pipes 2954.86 2954.86 2954.86 3623.06 4668.30 5879.06 5879.06 5879.06 8377.20 8377.20 11200.24
4 Cost of MTA's 110.00 150.00 190.00 210.00 300.00 360.00 400.00 460.00 520.00 590.00 700.00
5 Cost of M S threaded flanges two nos 234.00 298.00 322.00 338.00 464.00 502.00 662.00 932.00 1208.00 1514.00 1786.00
6 Jointing materials such as bolts nuts 308.44 308.44 308.44 509.02 527.86 805.44 805.44 805.44 881.86 881.86 1270.54
and rubber vouchers including material
cost for main line - 2nos
7 Jointing materials such as bolts nuts 190.49 190.49 190.49 349.16 360.32 612.78 612.78 612.78 674.02 674.02 1037.22
and rubber vouchers for Sluice valve
fixing
8 Labour charges for lowering CI pipes 36.43 36.43 36.43 46.08 59.86 75.28 75.28 75.28 108.31 108.31 146.65
(2 jobs)
9 Lowering of valve and keeping in postion 87.61 87.61 87.61 116.33 152.57 197.18 197.18 197.18 325.29 325.29 462.28
10 Add MA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 Cost of RCC valve chamber 16965.00 16965.00 16965.00 23120.00 23120.00 23120.00 23120.00 23120.00 23120.00 23120.00 34782.00
12 Add: Overheads & CP 1952.38 1966.54 1975.25 2559.14 3273.84 4064.46 4091.69 4136.62 5931.84 5983.03 7725.04
Grand total 33257.00 33375.00 33448.00 44476.00 50440.00 57037.00 57264.00 57639.00 72620.00 73047.00 99246.00
xing sluice valves on PVC Mains
2018-19
38225.00 70965.00
1911.25 3548.25
11200.24 14293.02
800.00 850.00
2026.00 2382.00
1270.54 1335.70
1037.22 1070.33
146.65 189.31
462.28 658.15
0.00 0.00
34782.00 34782.00
7771.33 12973.97
99633.00 143048.00
Data Sheet for Fixing Sluice valves on HDPE Mains
PN-1.6 2018-19
125mm
SL Discription of Item/ Dia of valve 80mm dia 100mm dia 150mm dia 200mm dia 250mm dia 300mm dia
dia
No
. 63mm 125mm
Dia of Pipeline 75mm line 90mm line 110mm line 140mm line 160mm line 180mm line 200mm line 225mm line 250mm line 280mm line 315mm line
line line
0.90x0.75x 0.90x0.75x1. 0.90x0.75x 0.90x0.90x 0.90x0.90x 0.90x0.90x 0.90x0.90x 0.90x0.90x 0.90x0.90x 0.90x0.90x 1.05x1.20x 1.05x1.20x 1.05x1.20x
Size of Chamber 1.05m 05m 1.05m 1.40m 1.40m 1.40m 1.40m 1.40m 1.40m 1.40m 1.70m 1.70m 1.70m
without bypass
1 Resilient Seated Soft Sealing" Gate Valves (Sluice 9922 9922 9922 12957 16679 20401 20401 20401 29975 29975 38225 38225 70965
Valves) with Body and Bonnet of Ductile Iron GGG-
40/SG-400/15 or GGG-50/SG-500/7 or Equivalent as
per IS1865, IS:3896-2, without bypass upto 400mm dia
and with bypass above 400mm dia
2 Transportation charges(5%) 496.10 496.10 496.10 647.85 833.95 1020.05 1020.05 1020.05 1498.75 1498.75 1911.25 1911.25 3548.25
3 Cost of 0.6m CI D/F pipes 2nos 2954.86 2954.86 2954.86 3623.06 4668.30 5879.06 5879.06 5879.06 8377.20 8377.20 11200.24 11200.24 14293.02
4 Cost of HDPE Tial pieces 2 nos 192.00 232.00 322.00 446.00 602.00 750.00 1048.00 1596.00 2052.00 2358.00 2762.00 3084.00 3556.00
5 Cost of MS flanges 2nos 234.00 298.00 322.00 338.00 464.00 502.00 662.00 932.00 1208.00 1514.00 1786.00 2026.00 2382.00
6 Jointing materials such as bolts nuts and 308.44 308.44 308.44 509.02 527.86 805.44 805.44 805.44 881.86 881.86 1270.54 1270.54 1335.70
rubber vouchers including material cost for
main line - 2nos
7 Jointing materials such as bolts nuts and 190.49 190.49 190.49 349.16 360.32 612.78 612.78 612.78 674.02 674.02 1037.22 1037.22 1070.33
rubber vouchers for Sluice valve fixing
8 Labour charges for lowering CI pipes (2 jobs) 36.43 36.43 36.43 46.08 59.86 75.28 75.28 75.28 108.31 108.31 146.65 146.65 189.31
9 Lowering of valve and keeping in postion 87.61 87.61 87.61 116.33 152.57 197.18 197.18 197.18 325.29 325.29 462.28 462.28 658.15
10 Add MA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 Cost of RCC valve chamber 16965.00 16965.00 16965.00 23120.00 23120.00 23120.00 23120.00 23120.00 23120.00 23120.00 34782.00 34782.00 34782.00
12 Add: Overheads & CP 1963.55 1977.70 1993.23 2591.28 3314.96 4117.56 4179.91 4291.28 6140.42 6223.75 8005.78 8082.30 13342.40
Grand total 33350 33469 33598 44744 50783 57480 58001 58930 74361 75056 101589 102227 146122
350mm dia 400mm dia
4936.25 6311.25
15188.06 18538.32
7436.00 9908.00
4034.00 5004.00
1918.14 3037.66
1603.12 2698.58
238.66 290.98
1111.50 1364.67
0.00 0.00
34782.00 34782.00
18406.22 23605.48
188379 231766
Data Sheet for Fixing sluice valves on DI Mains
PN-1.6 2018-19
without bypass upto 400mm dia DI Double flanged sluice valves
SL
No Discription of Item/ Dia of Sluice valve 80 mm 100 mm 125 mm 150 mm 200 mm 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm
.
on80mm dia on 100mm on 125mm
Size of pipeline 150mm line 200mm line 250mm line 300mm line 350mm line 400mm line 450mm line 500mm line 600mm line
line dia line dia line
0.90x0.75x 1.05m 0.90x0.90x 0.90x0.90x 0.90x0.90x 0.90x0.90x 1.05x1.20x 1.05x1.20x 1.70m 1.05x1.20x 1.70m 1.05x1.20x 1.70m 1.20x1.20x 1.20x1.20x 1.70x1.20x
Size of Valve chamber 1.40m 1.40m 1.40m 1.40m 1.70m 2.10m 2.10m 2.10m
Class of valve PN-16 PN-16 PN-16 PN-16 PN-16 PN-16 PN-16 PN-16 PN-16 PN-16 PN-16 PN-16
1 Resilient Seated Soft Sealing" Gate Valves (Sluice 9922.00 12957.00 16679.00 20401.00 29975.00 38225.00 70965.00 98725.00 126225.00 210100.00 263725.00 337975.00
Valves) with Body and Bonnet of Ductile Iron GGG-
40/SG-400/15 or GGG-50/SG-500/7 or Equivalent
as per IS1865, IS:3896-2, without bypass upto
400mm dia and with bypass above 400mm dia
2 Transportation chargers (5% of basic cost) 496.10 647.85 833.95 1020.05 1498.75 1911.25 3548.25 4936.25 6311.25 10505.00 13186.25 16898.75
3 Cost of Dismantling Joint (upto 300mm dia CI and 5546.10 7245.00 9240.00 10265.85 14557.20 17329.20 27,729.45 62,774.25 71,932.35 78,041.25 93,406.95 108,690.75
remaining MS) including 5% transportation
4 Cost of DI flanged sockets - 2 Nos 1850.24 2081.52 2775.36 3237.92 4856.88 6475.84 8,557.36 11,101.44 14,108.08 17,577.28 22,202.88 33,960.96
5 Jointing materials such as bolts nuts and rubber 154.22 254.51 263.93 402.72 440.93 635.27 667.85 959.07 1518.83 1770.80 2053.73 2855.62
washers for dismantling joint including cost of
materials (1 joints)
6 Cost of Jointing materials for valve fixing(Bolts 122.25 190.49 360.32 612.78 674.02 1037.22 1070.33 1603.12 2698.58 3152.08 3685.13 5224.21
nuts, rubbersheet) (2 joints)
7 Jointing of DI S/S 2 Jobs Labour 210.74 265.10 336.00 397.92 459.82 521.58 689.46 844.50 929.28 1115.52 1352.00 1655.74
8 Lowering of valve and keeping in postion 87.61 116.33 152.57 197.18 325.29 462.28 658.15 1111.50 1364.67 1784.57 2068.62 3513.57
9 Add MA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10 Cost of RCC valve chamber 16965.00 23120.00 23120.00 23120.00 23120.00 34782.00 34782.00 34782.00 34782.00 59056.00 59056.00 79812.00
11 Add: Overheads & CP 2503.70 3234.62 4171.79 4974.30 7187.07 9067.27 15505.56 24786.81 30645.74 44118.93 54688.81 69541.96
12 Grand total 37858.00 50112.00 57933.00 64630.00 83095.00 110447.00 164173.00 241624.00 290516.00 427221.00 515425.00 660129.00
on DI Mains
1200mm
700mm line 800mm line 900mm line 1000mm line 1100mm line
line
1.70x1.20x2.10
m 3.00x2.00x2.5 3.00x2.00x2.50 3.00x2.00x2. 3.00x2.00x2.
3.00x2.00x2.50m
0m m 50m 50m
PN-16 PN-16 PN-16 PN-16 PN-16 PN-16
375100.00 650100.00 705100.00 842600.00 960850.00 1094225
2 Transportation charges 647.85 833.95 1020.05 1498.75 1911.25 3548.25 4936.25 6311.25 10505.00 13186.25
3 Cost of Dismantling Joint 7245.00 9240.00 10265.85 14557.20 17329.20 27729.45 62774.25 71932.35 78041.25 93406.95
4 Cost of Tail peces-2 nos 2979.38 3856.02 4852.22 6951.88 9361.12 12024.78 15188.06 18538.32 22176.72 26005.16
5 Cost of CID Joints including bolts & 844.96 1080.41 1344.53 1920.86 2455.29 2933.47 4605.75 5502.03 6510.43 9428.10
Nuts - 2Nos
6 Jointing materials such as bolts nuts 154.22 254.51 263.93 402.72 440.93 635.27 667.85 959.07 1518.83 1770.80
and rubber washers for dismantling joint
including cost of materials (1 joints)
7 Cost of Jointing materials for valve 122.25 190.49 360.32 612.78 674.02 1037.22 1070.33 1603.12 2698.58 3152.08
fixing(Bolts nuts, rubbersheet) (2 joints)
8 Lowering of valve and keeping in postio 116.33 152.57 197.18 325.29 462.28 658.15 1111.50 1364.67 1784.57 2068.62
9 Labour charges for lowering CI 46.08 59.86 75.28 108.31 146.65 189.31 238.66 290.98 583.92 682.14
pipes (2 jobs)
10 Add MA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 Cost of RCC valve chamber ### 23120.00 23120.00 ### 34782.00 34782.00 34782.00 34782.00 59056.00 59056.00
12 Add: Overheads & CP 6566.93 7551.80 8427.73 10820.22 14403.00 21035.57 30511.17 36421.32 53503.59 64328.30
Total 54800.00 63019.00 70328.00 90293.00 120191.00 175538.00 254611.00 303930.00 446479.00 536809.00
Air valves on DI mains
Size of tee 100x40 125x50 150x50 200x80 250x80 300x80 350x100 400x100 450x100 500x150 600x150
0.90x0.90x1. 0.90x0.90x1. 0.90x0.90x1. 0.90x0.90x1. 1.05x1.20x1. 1.05x1.20x1. 1.05x1.20x1. 1.05x1.20x1 1.20x1.20x2. 1.20x1.20x2. 1.70x1.20x2.
Size of Valve Chamber
40m 40m 40m 40m 70m 70m 70m .70m 10m 10m 10m
A) MATERIALS PN1.0 PN1.0 PN1.0 PN1.0 PN1.6 PN1.6 PN1.6 PN1.6 PN1.6 PN1.6 PN1.6
1 Cost of Kinetic Double Air valve 2638.00 2638.00 2638.00 2638.00 - - -
heavy dury suitable for working
pressure upto 16 kg/cm2 without
isolating valve, confirming to IS 14845
2 Cost of Kinetic Air valve as per IS 13265.00 13265.00 13265.00 13265.00 18288.00 36027.00 36027.00
14845 heavy duty with isolating valve
bevel gear operated as per IS 14846
2 Transportation charges (10% of basic) 263.80 263.80 263.80 263.80 1326.50 1326.50 1326.50 1326.50 1828.80 3602.70 3602.70
3 Cost of CI Air Tee 862.27 1042.13 1475.91 2385.79 3433.21 4962.02 5051.95 9961.07 12960.50 16240.30 25116.92
4 Cost of CID joints - 2nos 497.04 632.04 825.14 1114.80 1512.10 1819.52 3017.90 3583.72 4329.40 6080.58 9376.24
6 Jointing materials such as bolts nuts 506.96 532.10 702.38 749.84 1095.46 1166.66 1530.44 2404.68 2970.98 3351.04 5324.32
and rubber vouchers for main line
jointing (2 joints)
7 Jointing materials such as bolts nuts 88.22 138.70 138.70 138.70 142.19 142.19 253.48 253.48 253.48 351.19 351.19
and rubber vouchers for Air valve
fixing (1 set)
Part A - Total 4856.00 5247.00 6044.00 7291.00 20774.00 22682.00 24445.00 30794.00 40631.00 65653.00 79798.00
B) LABOUR COMPONENT
6 Labour charges for fixing of Air valve 88.70 88.70 88.70 88.70 103.70 103.70 121.80 121.80 121.80 206.30 206.30
7 Labour charges for flanged joints (2 126.80 126.80 126.80 126.80 126.80 126.80 135.00 135.00 135.00 203.00 203.00
jobs)
8 Cost of RCC valve chamber #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
9 Add: LA & LI on labour comp at 13% 28.02 28.02 28.02 28.02 29.97 29.97 33.38 33.38 33.38 53.21 53.21
Part B - Total #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Grand total #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Data Sheet for fixing Sluice valves on BWSCP/ MS Mains
PN 1.6 2018-19
300mm sluice
Sno Discription of Item/ Dia of Sluice valve 80 mm 100 mm 125 mm 150 mm 200 mm 250 mm
valve
on 100mm dia on 125mm dia
Dia of the pipeline on80mm dia line 150mm line 200mm line 250mm line 300mm line
line line
Size of the valve chamber 0.90x0.75x1.05m 0.90x0.90x1.40m 0.90x0.90x1.40m 0.90x0.90x1.40m 0.90x0.90x1.40m 1.05x1.20x1.70m 1.05x1.20x1.70m
1 Resilient Seated Soft Sealing" Gate Valves 9922.00 12957.00 16679.00 20401.00 29975.00 38225.00 70965.00
(Sluice Valves) with Body and Bonnet of
Ductile Iron GGG-40/SG-400/15 or GGG-
50/SG-500/7 or Equivalent as per IS1865,
IS:3896-2, without bypass upto 400mm dia
and with bypass above 400mm dia
2 Transportation charges (5% of basic cost) 496.10 647.85 833.95 1,020.05 1,498.75 1,911.25 3,548.25
3 Cost of Dismantling Joint 5546.10 7245.00 9240.00 10265.85 14557.20 17329.20 27729.45
4 Cost of Flanged Tail Pieces with 10mm Thick 1,177.00 1,443.00 1,776.00 2,108.00 2,894.00 3,578.00 4,261.00
MS sheet fabricated including welding to main
line - 2Nos, 0.3 m length
5 Jointing materials such as bolts nuts and 154.22 254.51 263.93 402.72 440.93 635.27 667.85
rubber washers for dismantling joint including
cost of materials (1 joints)
6 Cost of Jointing materials for valve 122.25 190.49 360.32 612.78 674.02 1037.22 1070.33
fixing(Bolts nuts, rubbersheet) (2 joints)
7 Lowering of valve and keeping in postion 87.61 116.33 152.57 197.18 325.29 462.28 658.15
8 Cost of RCC valve chamber 16965.00 23120.00 23120.00 23120.00 23120.00 34782.00 34782.00
9 Add: Overheads & CP 2383.34 3111.60 3989.98 4766.28 6857.22 8601.71 14826.74
t for fixing Sluice valves on BWSCP/ MS Mains Data Sheet for fixing Sluice valves on BWSCP/ MS Mains
PN 1.6 2018-19
350mm sluice 400mm sluice 450mm sluice 500mm sluice 600mm sluice 700mm sluice 800mm sluice 900mm 1000mm
Sno Discription of Item/ Dia of Sluice valve
valve valve valve valve valve valve valve sluice valve sluice valve
Dia of the pipeline 350mm line 400mm line 450mm line 500mm line 600mm line 700mm line 800mm line 900mm line 1000mm line
3.00x2.00x2.50
Size of the valve chamber 1.05x1.20x1.70m 1.05x1.20x1.70m 1.20x1.20x2.10m 1.20x1.20x2.10m 1.70x1.20x2.10m 1.70x1.20x2.10m 3.00x2.00x2.50m 3.00x2.00x2.50m
m
1 Resilient Seated Soft Sealing" Gate Valves 98725.00 126225.00 210100.00 263725.00 337975.00 375100.00 317250.00 373500.00 516000.00
(Sluice Valves) with Body and Bonnet of
Ductile Iron GGG-40/SG-400/15 or GGG-
50/SG-500/7 or Equivalent as per IS1865,
IS:3896-2, without bypass upto 400mm dia
and with bypass above 400mm dia
2 Transportation charges (5% of basic cost) 4,936.25 6,311.25 10,505.00 13,186.25 16,898.75 18,755.00 15,862.50 18,675.00 25,800.00
3 Cost of Dismantling Joint 62774.25 71932.35 78041.25 93406.95 108690.75 120919.05 148,433.25 154,856.10 185,493.00
4 Cost of Flanged Tail Pieces with 10mm Thick 4,945.00 5,939.00 6,651.00 7,748.00 9,229.00 10,710.00 12,191.00 13,672.00 15,154.00
MS sheet fabricated including welding to main
line - 2Nos, 0.3 m length
5 Jointing materials such as bolts nuts and 959.07 1518.83 1770.80 2053.73 2855.62 3634.47 6836.00 8040.00 9259.00
rubber washers for dismantling joint including
cost of materials (1 joints)
6 Cost of Jointing materials for valve 1603.12 2698.58 3152.08 3685.13 5224.21 6716.29 7636.32 10770.90 13452.60
fixing(Bolts nuts, rubbersheet) (2 joints)
7 Lowering of valve and keeping in postion 1111.50 1364.67 1784.57 2068.62 3513.57 4099.17 4,684.76 5,270.36 5,855.95
Add MA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8 Cost of RCC valve chamber 34782.00 34782.00 59056.00 59056.00 79812.00 79812.00 171800.00 171800.00 171800.00
9 Add: Overheads & CP 23833.63 29407.00 42479.44 52536.70 65949.28 73512.01 69830.49 79618.39 104973.63
Grand total 36854.00 49086.00 56416.00 62894.00 80342.00 106562.00 158509.00
Grand total 233670.00 280179.00 413540.00 497466.00 630148.00 693258.00 754524.00 836203.00 1047788.00
Data Sheet for Fixing Scour valves on DI, BWSC, MS mains 2018-19
PN 1.6 DI Sluice valves without bypass upto 400mm dia DI Sluice valves above 4
80mm dia 100mm dia 125mm dia 150mm dia 200mm dia 300mm dia 500mm dia
SL No Discription of Item / Dia of valve 63-125mm dia >125-180mm >180-225mm >225-350mm >350-400mm >400-600mm 600-1000mm
line dia line dia line dia line dia line dia line dia line
0.90x0.75x 1.05m 0.90x0.90x 1.40m 0.90x0.90x 1.40m 0.90x0.90x 1.40m 0.90x0.90x 1.40m 1.05x1.20x1.70m 1.20x1.20x2.10m
Size of Chamber
1 Resilient Seated Soft Sealing" Gate Valves 9922.00 12957.00 16679.00 20401.00 29975.00 70965.00 263725.00
(Sluice Valves) with Body and Bonnet of
Ductile Iron GGG-40/SG-400/15 or GGG-
50/SG-500/7 or Equivalent as per IS1865,
IS:3896-2, without bypass upto 400mm dia
and with bypass above 400mm dia
2 Transportation chargers (5% of basic cost) 496.10 647.85 833.95 1020.05 1498.75 3548.25 13186.25
3 Cost of DI Duck foot bend 1734.60 1965.88 2544.08 3122.28 4394.32 7632.24 20325.12
4 Cost of 0.6m DI D/F pipes 3nos 4509.96 5550.72 7632.24 9366.84 15611.40 34345.08 114232.32
5 Cost of DI Semicircular bend 1618.96 2081.52 2775.36 3700.48 5666.36 13414.24 41808.00
6 Jointing materials such as bolts nuts and 616.88 1018.04 1055.72 1610.88 1763.72 2671.40 8214.92
rubber vouchers - 4 Jobs
7 Jointing materials such as bolts nuts 190.49 349.16 360.32 612.78 674.02 1070.33 3685.13
and rubber washers for valve fixing -
2Jobs
8 Labour charges for lowering CI pipes & 151.80 192.00 249.40 313.65 451.30 788.80 1705.35
Bends (5 jobs)
9 Sluice valve lowering and fixing charges 87.61 116.33 152.57 197.18 325.29 658.15 2068.62
10 Add MA 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 Cost of RCC valve chamber excluding TOT 16965.00 23120.00 23120.00 23120.00 23120.00 34782.00 59056.00
12 Add: Overheads & CP 2631.56 3387.21 4395.28 5492.99 8218.04 18392.98 63847.64
Grand total
38925.00 51386.00 59798.00 68958.00 91698.00 188268.00 591854.00
uice valves above 400mm dia
3.00x2.00x2.50m
650100.00
32505.00
32520.19
304619.52
66892.80
13143.87
5896.21
2728.56
3309.79
0.00
171800.00
151360.13
1434876.00
Data Sheet for fixing Scour Valves (PN -1.6) on PVC,HDPE, AC & PSC Mains 2018-19
DI Sluice valves without bypass upto 400mm dia DI Sluice valves above 4
Dia of pipeline 80mm dia 100mm dia 125mm dia 150mm dia 200mm dia 300mm dia 500mm dia
SL
No. 63-125mm dia >125-180mm >180-225mm >225-350mm >350-400mm >400-600mm 600-1000mm
Discription of Item/ Dia of valve
line dia line dia line dia line dia line dia line dia line
0.90x0.75x 1.05m 0.90x0.90x 1.40m 0.90x0.90x 1.40m 0.90x0.90x 1.40m 0.90x0.90x 1.40m 1.05x1.20x 1.20x1.20x
Size of Chamber
1.70m 2.10m
1 Resilient Seated Soft Sealing" Gate Valves (Sluice 9922.00 12957.00 16679.00 20401.00 29975.00 70965.00 263725.00
Valves) with Body and Bonnet of Ductile Iron GGG-
40/SG-400/15 or GGG-50/SG-500/7 or Equivalent
as per IS1865, IS:3896-2, without bypass upto
400mm dia and with bypass above 400mm dia
2 Transportation chargers (5% of basic cost) 496.10 647.85 833.95 1020.05 1498.75 3548.25 13186.25
3 Cost of CI Duck foot bend 1734.60 1965.88 2544.08 3122.28 4394.32 7632.24 20325.12
4 Cost of 0.6m CI D/F pipes 3nos 4509.96 5550.72 7632.24 9366.84 15611.40 34345.08 114232.32
5 Cost of CI Semicircular bend 1618.96 2081.52 2775.36 3700.48 5666.36 13414.24 41808.00
6 Jointing materials such as bolts nuts and rubber 616.88 1018.04 1055.72 1610.88 1763.72 2671.40 8214.92
vouchers - 4 Jobs
7 Jointing materials such as bolts nuts and 190.49 349.16 360.32 612.78 674.02 1070.33 3685.13
rubber washers for valve fixing - 2Jobs
8 Labour charges for lowering CI pipes & 151.80 192.00 249.40 313.65 451.30 788.80 1705.35
Bends (5 jobs)
9 Sluice valve lowering and fixing charges 87.61 116.33 152.57 197.18 325.29 658.15 2068.62
10 Cost of RCC valve chamber 16965.00 23120.00 23120.00 23120.00 23120.00 34782.00 59056.00
11 Add: Overheads & CP 2631.56 3387.21 4395.28 5492.99 8218.04 18392.98 63847.64
Grand total
38925.00 51386.00 59798.00 68958.00 91698.00 188268.00 591854.00
DI Sluice valves above 400mm dia
2 Transportation chargers (5% of basic cost) 1017.50 1361.25 1705.00 2461.25 3561.25 4248.75 6517.50 12911.25 23086.25 34292.50 60500.00
3 Cost of Dismantling Joint (upto 300mm dia 7245.00 10265.85 14557.20 17329.20 27729.45 62774.25 71932.35 93406.95 108690.75 120919.05 148433.25
CI and remaining MS) including 5%
transportation
4 Cost of DI flanged sockets - 2 Nos 2081.52 3237.92 4856.88 6475.84 8,557.36 11,101.44 14,108.08 22,202.88 33,960.96 42,708.48 56,858.88
5 Jointing materials such as bolts nuts and 254.51 402.72 440.93 635.27 667.85 959.07 1518.83 2053.73 2855.62 3634.47 6836.00
rubber washers for dismantling joint
including cost of materials (1 joints)
6 Cost of Jointing materials for valve 190.49 612.78 674.02 1037.22 1070.33 1603.12 2698.58 3685.13 5224.21 6716.29 7636.32
fixing(Bolts nuts, rubbersheet) (2 joints)
7 Jointing of DI S/S 2 Jobs Labour 265.10 397.92 459.82 521.58 689.46 844.50 929.28 1352.00 1655.74 2087.46 3139.46
8 Lowering of valve and keeping in postion 116.33 197.18 325.29 462.28 658.15 1111.50 1364.67 1474.00 2503.60 2920.87 3338.13
9 Add MA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10 Cost of RCC valve chamber 23120.00 23120.00 23120.00 34782.00 34782.00 34782.00 34782.00 59056.00 79812.00 79812.00 171800.00
11 Add: Overheads & CP 4291.51 5949.84 7776.77 10639.80 15542.73 22821.14 31235.44 53821.59 87095.44 122416.43 203781.43
12 Grand total 58932.00 72770.00 88016.00 ### 164484.00 225221.00 295437.00 508189.00 806610.00 1101358.00 1872323.00
h bypass above 300mm dia
1200mm
900mm line 1000mm line 1100mm line
line