The document contains leveling notes and field data from a road project and geodetic leveling densification project. It provides station readings, elevations of benchmark points, and questions to calculate error of closure, loop distance, adjusted elevations, and accuracy of recovered benchmark points.
The document contains leveling notes and field data from a road project and geodetic leveling densification project. It provides station readings, elevations of benchmark points, and questions to calculate error of closure, loop distance, adjusted elevations, and accuracy of recovered benchmark points.
The document contains leveling notes and field data from a road project and geodetic leveling densification project. It provides station readings, elevations of benchmark points, and questions to calculate error of closure, loop distance, adjusted elevations, and accuracy of recovered benchmark points.
The document contains leveling notes and field data from a road project and geodetic leveling densification project. It provides station readings, elevations of benchmark points, and questions to calculate error of closure, loop distance, adjusted elevations, and accuracy of recovered benchmark points.
Download as DOCX, PDF, TXT or read online from Scribd
Download as docx, pdf, or txt
You are on page 1of 4
The leveling notes for a portion of a road project are tabulated below:
Station backsight (m) foresight (m)
BM No.6 1.352 0.921 0.486 TBM No.1 1.795 1.872 1.503 1.405 1.211 0.938 TBM No.2 1.607 1.588 1.286 1.272 0.965 0.957 TBM No.3 1.944 2.130 1.567 1.665 1.190 1.200 BM No.6 1.299 0.950 0.601 If the given elevation of BM no.6 is 53.456 meters above mean sea level, determine the error of closure in centimeters. a. 14 b. 16 c. 15 d. 17 Determine the loop distance in meters if the stadia constant=100. a. 60.3 b. 602.3 c. 616.2 d. 604.3 Determine the adjusted elevation of TBM No.3 in meters. a. 52.833 b. 52.823 c. 52.828 d. 52.839 Determine the adjusted elevation of TBM No. 2 a. 53.208 b. 53.108 c. 53.408 d. 53.308 If the given elevation of BM No.6 is 53.456 meters above mean sea level, determine the adjusted elevation of TBM No.1 a. 52.974 b. 52.944 c. 52.964 d. 52.954 A geodetic leveling team physically recovered three NAMRIA bench marks for a first-order geodetic leveling densification project. The published elevations are as follows: BM4 = 21.688 meters, BM5 = 24.034 meters and BM6 = 29.404 meters. The team conducted differential leveling <see field notes below To determine which of the bench mark might be used as reference stations for the project. Field notes Station BS<m> FS<m> BM4 1.621 1.455 1.289 TP1 1.183 1.141 1.540 1.488 1.299 1.368 TP2 1.346 1.566 1.200 1.290 1.054 1.054 TP3 1.717 1.426 1.584 1.290 1.451 1.154 TP4 2.426 1.386 2.138 1.253 1.850 1.120 BM5 2.122 0.566 2.000 0.300 1.878 0.034 TP5 2.219 0.955 2.081 0.832 1.943 0.709 TP6 2.016 0.688 1.888 0.546 1.760 0.404 TP7 2.623 1.016 2.451 0.870 2.279 0.724 TP8 1.118 0.724 0.993 0.552 0.868 0.380 TP9 1.590 2.160 1.384 2.021 1.178 1.882 BM6 0.822 0.604 0.386 1. Between BM4 and Bm6 what is the allowable error of closure, inmm? a. 4.5 b. 2.5 c. 6.5 d. 3.5 2. Between BM 4 and BM 5 what is the magnitude of the difference in published difference in elevation <ΔH-published> a-d field-based difference in elevation <ΔH-field>, in mm? a. 8 b. 14 c. 12 d. 10 3. What set of bench marks have been recovered within first-order geodetic leveling accuracy? a. BM 4 and BM 5 b. BM 4 and BM6 c. BM 4, BM 5 and BM 6 d. BM 5 and BM 6