Acknowledgement: Madavi Who Continuously Supported Us in Every Possible Way, From Initial Advice To Encouragement Till
Acknowledgement: Madavi Who Continuously Supported Us in Every Possible Way, From Initial Advice To Encouragement Till
Acknowledgement: Madavi Who Continuously Supported Us in Every Possible Way, From Initial Advice To Encouragement Till
Acknowledgement
It is always a pleasure to remind the fine people in Engineering program for their sincere guidance we
received to uphold our practical as well as theoretical skills in engineering. It is matter of privilege for us
to present this report of industrial implant training.
Firstly we would like to thank Dr. P. B. Mrunal for meticulously planning academic
curriculum in such a way that students are not only academically sound but also industry ready by
including such industrial training patterns. We would also like to thank Dr.S.B. Chikalthankar for the
positive attitude he showed for our work, always allowing us to question him and giving prompt replies
for our uncertainties in any field. We would also like to acknowledge and our heartfelt gratitude to K. R.
Madavi who continuously supported us in every possible way, from initial advice to encouragement till
this date.
We express our immense pleasure and deep sense of gratitude to Mr. Manoj Kulkarni
for providing us an opportunity to undergo training in Badve engineering pvt. Ltd., Aurangabad. Finally,
we would also like to thank for spending his valuable time and guiding me during the course of training.
I also wish to express my gratitude to the officials and other staff members of Badve Engineering Pvt. Ltd
, who rendered their help during the training program.
Kartik Shashank Chikhalikar T.E. Mechanical
CERTIFICATE
Dated: 8 December 2018
CONTENT
4
5
INTRODUCTION
Established in 1996, Badve Engineering Private Limited has gained
immense expertise in supplying & trading of Automotive parts, exhaust system, biw & chassis
etc. The supplier company is located in Aurangabad, Maharashtra and is one of the leading
sellers of listed products. Buy Automotive parts, exhaust system, biw & chassis in bulk from us
for the best quality products and service.
Outcomes of Training:
1. Awareness about the job functions in the industry
OUTCOME
In plant training provide exposure and experience to students in terms of
technological development, effective communication, team work,
practices, policies, procedures, regulation, professional perspective &
reporting. Industrial training will built momentum & proactive attitude
amongst students & increase the confidence to be a brilliant
7
COMPANY PROFILE
o Name of company : Badve Engineering pvt. Ltd.
o Address : Badve engineering limited plot No.- B-16,
MIDC IND. , Waluj, Aurangabad-431136
o Contact : 9881150575
o Website : www.badvergoup.com
o Department : HR, Store, Account, Purchase, TPM, IT,
Development, Finance, Production
o Operation day : Monday to Saturday 7 AM to 9 PM
COMPANY’S AIM
To become zero defect factory i.e. to establish manufacturing process
where quality inbuilt in the manufacturing process itself which lead to
consistent product performance and quality into the hands of customer.
COMPANY OBJECTIVE
To eliminate the customer complaint due to child part missing
phenomenon.
To improve customer satisfaction.
Resolve problems as fast as possible.
Follow through commitments.
Be flexible in solving problem.
Pro actively keep customer inform.
Get closer to the customer.
8
HR DEPARTMENT
TPM
A] KOBETSU KAIZEN:-
1)Following 5 ‘S’
Organization. )
5S :- Shitsuke = Self discipline (bring about self discipline among the employees.)
9
3) KK losses
o Breakdown loss
o Startup loss
o Setup loss
o Speed loss
o Motion loss
o Minor stoppage loss
o Tool change loss
o Management loss
o No electricity
o Defect loss
o Shutdown loss
o Logistic loss
o Major adjustment loss
o Yield loss
o Energy loss
o Die/jig/tool loss
10
B] JH ( Autonomous Maintenance ) :-
It is based on I operate and I maintain parameter to worker. In
this, ownership of each machine/robo is given to specific person and he/she has
to take care of the machine in all aspects. He should follow CLIRT ( C-clean, L-
lubricate, I-inspect, RT-retightening ).
C] PM ( PERSPECTIVE MAINTAINANCE) :-
Taking preventive measures of machine and production:-
D) QM (QUALITY MAINTAINANCE):-
Focuses on quality of machine and its part ( zero customer
complaints.
11
2)health:-
3)Environment:-
F) DM (Development management):-
Maintenance prevention resources.
NOTE:- ALL THE PILLERS GIVEN ABOVE ARE RELATED TO EACAH OTHER.
FINANCE DEPARTMENT
PURCHASE DEPARTMENT:-
There are two types of purchases:-
In three wheeler chassis total 154 parts are required for 1 chassis.
We cannot manufacture all the parts in the plant so some parts are need to be
13
transported from outside. Ex:- Suppose we require 1000 parts to complete the
production target per day then we order parts from venders with extra 10%
allowance in case of failure.
1) Supply chain
2) Vendor development
3) Material planning
4) Material procurrment
2) Finalize the rate of component by taking care of company’s profit ( rate finalize
on the basis of press tonnage, press part, stock rate, die size, CGST, SGST)
IT DEPARTMENT
1)USER SUPPORT:- Solving day to day problems, hardware, providing networking
services.
DATA CENTER
CORPORATE IT
1)TECHNICAL:-
Plant works
Daily routine
Networking
Hard work
Software trouble shouting
Application support
15
2)FUNCTIONAL:-
MIS
Corporate IT
Master department ( master role vendor port create)
Item code
Management report
Provide back office work
DEVELOPMENT DEPARTMENT :-
(NPD) NEW PRODUCT DEVELOPMENT :-
PRODUCTION DEPARTMENT :-
The main work of production department of our company is to produce chassis .In
this company , there are mainly two types of chassis are manufactured .
16
Chassis is basically the main base of vehicle on which whole body of vehicle is
mounted .In this company there are two separate departments of production line
as 2 wheeler and 3 wheeler chassis . Each department is given with daily target
about 1000-1200 chassis/day ( 3 wheeler ).
In 3 wheeler department there are separate chambers for making the assembly
and manufacturing the full frame ,upper frsme , lower frame , half frame .
Different types of robot arms are used for the assembly of chassis .In this
department mainly 2 robots are used they are ,
VENDORS :-
1) Sri Lakshmi Industries
2) Shree Industries
3) Shreenath Enginnering
5) Dham Fasteners
6) Electromech
8) Pawan Enterprises
17
DEFECT PHENOMENON :-
1) Part Missing
2) Welding Spatter
3) BKT Position not OK
4) Welding Shift
5) Dent
6) Welding Missing
WELDING PROCESS :-
The application of bare wire welding with gas shielding was developed in the
1960s, and was quickly adopted for the welding of lighter steel structures in
shipyards, as well as for welding aluminum alloys. Gas shielded processes are
principally of an automatic or semiautomatic nature.
In the TIG welding process the arc is drawn between a water-cooled non-
consumable tungsten electrode and the plate. An inert gas shield is provided to
protect the weld metal from the atmosphere, and filler metal may be added to
the weld pool as required.
Ignition of the arc is obtained by means of a high frequency discharge across the
gap since it is not advisable to strike an arc on the plate with the tungsten
electrode.
Only plate thicknesses of less than 6mm would normally be welded by this
process, and in particular aluminum sheet, a skilled operator being required for
manual work. This may also be referred to as TAGS welding, i.e. tungsten arc gas-
shielded welding.
In MDL more economic mixture CO2 + Argon: Cargon is used. Using higher
current values with thicker steel plate a fine spray transfer of the metal from the
electrode across the arc is achieved, with a deep penetration. Wire diameters in
excess of 1.6mm are used, and currents above about 350 amps are required to
obtain this form of transfer.
3 Weld Inspection:
Inspecting welds can also reduce costs by detecting discontinuities in the early
stages of manufacturing, reducing the cost of rework and extending the life of
components by detecting and correcting flaws. NDT (non-destructive test)
methods can identify cracking, porosity, incomplete penetration, misalignment,
inclusions, lack of fusion and similar conditions, which can compromise weld
strength
20
21
Conclusion :-
It was learned that, quality at the right cost is the key to successful
manufacturing. Again thanks to college and also to the industry who helped all
through our training.
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39