Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Time Table IMO Model Course 1.08

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

CENTRE FOR MARITIME EDUCATION AND TRAINING

TIME TABLE – RADAR, ARPA, BRIDGE TEAMWORK AND SEARCH AND RESCUE
IMO MODEL COURSE – 1.08

1st Period 2nd Period 3rd Period 4th Period 5th Period 6th Period 7th Period
Day
(0900-1000) (1000-1100) (1115-1215) (1215-1315) (1400-1500) (1500-1600) (1600-1700)
Introduction Simulator
and familiarise Familiarise
with own ship with own ship Factors Factors L Simulator Simulator Simulator
characteristics, characteristics, affecting affecting Carry out Carry out Carry out
Day 1 operate ARPA operate ARPA T Radar plotting Radar plotting U Radar Plotting Radar Plotting Radar Plotting
& Navigation & Navigation – 2 hrs – 2 hrs – 4 hrs , – 4 hrs , – 4 hrs ,
controls – 1 controls – 1 E (2.1) (2.1) N (2.2) (2.2) (2.2)
hrs hrs
(1.1) (1.1) A C

Simulator B Simulator Simulator H Simulator Simulator Simulator


Simulator Apply Colregs Apply Colregs Apply Colregs Apply Colregs Apply Colregs Apply Colregs
Carry out in open waters R in open waters in open waters in open waters in open waters in open waters
Day 2 Radar Plotting in restricted in restricted in restricted B in restricted in restricted in restricted
– 4 hrs , visibility – 6 E visibility – 6 visibility – 6 visibility – 6 visibility – 6 visibility – 6
(2.2) hrs , hrs , hrs , R hrs , hrs , hrs ,
(3.1) A (3.1) (3.1) (3.1) (3.1) (3.1)
E
K
Simulator Simulator A Simulator Simulator Simulator
Plan & control Plan & control
Plan & control Plan & control Plan & control Plan & control Plan & control
navigation in navigation in
navigation in navigation in K navigation in navigation in navigation in
Day 3 confined confined
confined confined confined confined confined
waters – 2 hrs waters – 2 hrs
waters – 2 hrs waters – 2 hrs waters – 2 hrs waters – 2 hrs waters – 2 hrs
(3.2) (3.2)
(3.2) (3.2) (3.2) (3.2) (3.2)
CENTRE FOR MARITIME EDUCATION AND TRAINING
TIME TABLE – RADAR, ARPA, BRIDGE TEAMWORK AND SEARCH AND RESCUE
IMO MODEL COURSE – 1.08

1st Period 2nd Period 3rd Period 4th Period 5th Period 6th Period 7th Period
Day
(0900-1000) (1000-1100) (1115-1215) (1215-1315) (1400-1500) (1500-1600) (1600-1700)
Simulator Simulator Simulator L Simulator Simulator Simulator
Plan & control Plan & control Plan & control Navigation in
Navigation in Navigation in Navigation in
navigation in navigation in T navigation in or near TSS – U
Day 4 or near TSS – or near TSS – or near TSS –
confined confined confined 1 hr
5 hrs 5 hrs 5 hrs
waters – 2 hrs waters – 2 hrs E waters – 2 hrs (3.3) N (3.3) (3.3) (3.3)
(3.2) (3.2) (3.2)
A C

Simulator Simulator B H Simulator Simulator


Manage a Respond to a Co-ordinate
Navigation in Navigation in Execute SAR Execute SAR
Bridge team – distress SAR operation
Day 5 or near TSS – or near TSS – R operation – 4 operation – 4
2 hrs message – 1 hr – 1 hr
5 hrs 5 hrs B hrs hrs
(3.4) (4.1) (4.2)
(3.3) (3.3) E (4.3) (4.3)
R
A
E
Simulator Simulator K Revision & Revision &
Execute SAR Execute SAR Free Free A Review and Review and Review and
Day 6 operation – 4 operation – 4 discussion on discussion on final final final
hrs hrs course course K assessment assessment assessment
(4.3) (4.3) subjects subjects

You might also like