Manual Testing Interview Questions
Manual Testing Interview Questions
9. Define retesting.
81. Are severity and priority are related to each other. If yes, how?
110. How you will decide which SDLC model is perfect for your AUT?
125. Why testers are needed when developers can do the same task?
138. You have been given 100 test case. How you will start when you
have given no time limit.
139. You have been given 100 test case. How you will start when you
have given time limit.
142. What is the difference between white box, black box, and gray
box testing?
150. How you will decide you have enough number of test cases?
153. How you decide test case for smoke test suite?
154. How you decide test case for sanity test suite?
159. What are the things you consider when you are reviewing test
cases?
162. You have been given a new project. How you will start?
163. How to ensure your test cases are good test cases?
171. You find existing testing process is not up to mark in your current
organisation. How you will approach to your manager to bring
changes?
173. If you have ‘n’ requirements and you have less time how do you
prioritize the requirements?
174. What all types of testing you could perform on a web based
application?
175. What all types of testing you could perform on a stand alone
application?
177. What are two of your strengths that you will bring to our
QA/testing team?
186. Clients found a bug in nodule which you were tested. How you
will handle this situation?
197. How can you report the defect using excel sheet?
198. If you have executed 100 test cases ,every test case passed but
apart from these test case you found some defect for which test
case is not prepared, them how you can report the bug?
199. If a bug has high severity then usually that is treated as high
priority, then why do priority given by test engineers/project
managers and severity given by testers?
201. What are the different types of bugs we normally see in any of
the project?
203. If we found the bug in SRS or FRS, how to categorize that bug?