Chakala BOQ Segregated 22032014
Chakala BOQ Segregated 22032014
Chakala BOQ Segregated 22032014
Inclusive of vat
Vat @8% 8.00% INR 616,528.56
Service Tax @4.95% 4.95% INR 381,477.05
Total Cost of the project (A+B+C) INR 8,704,612.61
EXCLUSIONS
1. The above given costing is based on the Carpet Area
2. The above calculations are strictly based on assumptions and are likely to change as per the final detailed specifications.
3. Strengthening/ altering of the existing structure (base building) if required, is not included above.
4. Any modifications/ alterations or cost attached to damage over existing glass facade of the building has not been included.
5. New Construction/ furnishing/ repair of common areas/ toilets/ lifts etc. Have not been included.
6. Cost of DG – Installation,UPS System connecting and commissioning has not been included
7. Only minor upgrades to existing base building (HS) electrical and HVAC works considered.
8. IN case provision of Floor Electrical panels is required, the same will be at additional cost.
9. IT Active works and components (Switches, Server Racks etc.) not included.
10. Kitchen Equipment (Coffee machines, fridge, microwave etc.) not included
11. Office Equipments (photocopiers, Fax machines etc.) not included.
12. AV equipment (Plasma, AV Conferencing, LCDs, projectors etc.) not included.
13. Cost of statutory approvals are not included in the above costing.
14.Design built included.
15.Any other cost such as Mathadi at site is not included it would be completely bare by client
Page 1
Civl and Interior Megas Architectural Services Pvt. Ltd.
3.05 Brickbat coba Toilets Providing & laying brick-bat coba - providing and laying water sqft
proofing treatment of 112 mm average thickness consisting of 12
mm thick layer in cement mortar 1:3 with water-proofing 180 105 18,900.00
compound at the rate of one kg. per bag of cement as base.
4.02 POP punning Over new and Punning with 12mm thick layer of super fine plaster of Paris sqft
existing walls (anhydrous gypsum) applied over selected existing plastered
surface on walls and columns finished smooth, surface prepared 2,000 25 50,000.00
by hacking and applying a coat of cement slurry if required
including all incidentals etc. complete
5.00 Flooring & Cladding 93,750.00
5.01 Ceramic tile dado Toilet and pantry Providing and cladding Ceramic Tiles for Dado of approved sqft
make and approved sample in pattern as per detailed drawings in
cement paste. The rate should be inclusive of cleaning joints and
grouting them with neat white cement paste with pigmented 750 125 93,750.00
additives to match shade of the tile etc complete
9.05 Above ceiling Reception area Providing & fixing Partition above false ceiling with plywood & sqft
partition sound proofing material ( Glass wool ) for cabin and meeting 140 235 32,900.00
rooms
10.00 Panelling & Boxing 76,850.00
10.01 Laminate reception area Providing and fixing Laminate as a finishing material as per sqft
40 245 9,800.00
the design
Cost of Laminate Rs. 35/sqft
10.02 Veneer Providing and fixing Veneer as a finishing material Inclusive of sqft
matt melamine polished to the veneer & all the edges as directed. 385 -
12.04 3'-0" x 7'-0" Toilets and Pantry, Single shutter,38mm thick blockboard, surfaces in laminate, On nos
server room floor spring of Enox or equivalent make, all other accessories,
hard ware etc. complete. as per detailed drawings etc. complete. 3 15,500 46,500.00
13.02 Plastic paint false ceiling Painting with Plastik Paint of approved shade and colour of sqft
approved shade and colour of ICI Dulux / Asian Paints or
equivalent make in minimum three coat , including preparation of 3,600 18 64,800.00
surface, scrapping, sand papering, scaffolding etc complete
13
Civl and Interior Megas Architectural Services Pvt. Ltd.
14.00 Trims 36,670.00
14.01 Stainless Steel Junction of hard Providing and fixing 1.5mm thick S.S. Flashing in the junction rft
16 350 5,600.00
Flashing floor and carpets of carpet and tiles etc complete as directed on site .
15.00 Toilet PLUMBING and SANITARY WORK 174,450.00
15.01 GI inlet looping Providing and fixing in position ‘C’ class tested galvanised
line iron pipes conforming to IS 1239-1982, for sizes mentioned
below with all fittings like Tees, Bends, Elbows, Reducers, Unions,
Nipples etc. including concealing the pipes in the wall or under
the floors, chasing the walls, painting the pipe with bituminous
paint and enwrapping the pipes with plastic film tape, reinstating
the wall surface etc. complete, encasing in PVC sleeve where
required, including all testing as specified complete.
13
1.00 Loose Furniture
Sr.no Item Location Description Units Qty.
1.01 glass Projector Providing and fixing 6mm back painted Sq.ft
board Room glass board panel fixed as per design and
details given by architect, it will be be directly 30
stuck on partition with help of glue
1.02 soft board Providing and fixing soft board, As per sqft
detail. The rate should include the fabric on the 30
soft board (basic price Rs. 100/mt) .
1.03 Two Providing and fixing Double Seater Sofa with nos
Seater internal framework, foam, fabric upholstery. 1
Sofa
1.04 Three Providing and fixing Three Seater Sofa with nos
Seater internal framework, foam, fabric upholstery. 1
Sofa
1.05 Side table Providing and constructing, Side table with nos
glass top and SS/wooden supports etc. 1
complete. Size:1'-6"X1'-6"
GRAND TOTAL
Rate Amount
325 9,750.00
325 9,750.00
12,500 12,500.00
16,500 16,500.00
5,000 5,000.00
53,500.00
1.00 Loose Furniture
Sr.no Item Location Description Uni
ts Rate Amount
Qty.
12,500.00
331,500.00
108,000.00
31,500.00
21,000.00
36,000.00
540,500.00
1.00 Loose Furniture
Sr.no Item Location Description Units Qty.
1.01 Wooden waiting Providing and fixing wooden Flooring of approved sqft
flooring area make and approved sample in pattern as per detailed
drawings Basic cost is 350/sqft inclusive of delivery, 130
octroi, loading-uploading at site & all taxes thereon
1.02 Vitrified Pantry Providing and laying Vitrified Tiles for Flooring of sqft
tile approved make and approved sample in pattern as per
flooring detailed drawings up to 25mm thick bed of 1:4 cement
mortar including surface preparation, giving necessary 380
slopes, cleaning joints and grouting them in neat white
cement paste with pigmented additives to match shade
of the tile. etc complete
1.03 Ceramic Toilet Providing and laying Ceramic Tiles for Flooring of sqft
tile approved make and approved sample in pattern as per
flooring detailed drawings up to 25mm thick bed of 1:4 cement 170
mortar including surface preparation, giving necessary
slopes, cleaning joints and grouting them in neat white
cement paste with pigmented additives to match shade
1.04 Tile café of the tile etc complete rft
140
Skirting
GRAND TOTAL
Rate Amount
425 55,250.00
160 60,800.00
130 22,100.00
70 9,800.00
147,950.00
1.00 Loose Furniture
Sr.no Item Location Description Uni
Qty. Rate
ts
1.01 Carpet Providing & Fixing 8 mm thick Carpet in tile form sqft
2,700 115
Flooring
1.02 (PCC) Over all-- Providing and laying 100mm thick cement concrete sqft
100mm Not flooring with 1:2:4 cement concrete laid to proper level and
thick includs slope in alternate bays including compactions, filling joints,
Cement toilet area marking lines to give the appearance of tiles of 600mm X 2,700 75.0
Concrete 600mm or as directed, finishing smooth with cement Mortar
Flooring 1:1 of sufficient minimum thickness to give a smooth & even
surface and curing etc. complete
1.03 (IPS) Over all-- Providing and laying 100mm thick cement concrete sqft
Not flooring with 1:2:4 cement concrete laid to proper level and
includs slope in alternate bays including compactions, filling joints,
toilet area marking lines to give the appearance of tiles of 600mm X 2,700 52.0
600mm or as directed, finishing smooth with cement Mortar
1:1 of sufficient minimum thickness to give a smooth & even
surface and curing etc. complete
1.04 Pre- all over Providing and fixing 75mm high Pre-laminate strip rft
laminate office skirting finished in approved shade Laminate
skirting area, 478 65
except
toilets
GRAND TOTAL
Amount
310,500.00
202,500.00
140,400.00
31,070.00
684,470.00