Subcontractor Document Review Cover Sheet

.
Project : Duqm Refinery – EPC Package 2- Utilities and Offsites
Contract No.: CNT-1100-1000-007, Purchaser Job No. JI-2037/30-001

Subcontract No. : CNT-1100-1000-007

Subcontract Description : TEMPORARY SITE FACILITY WORKS

Subcontractor Name : AL HAJIRY

Company Document Number : DRP001-OUF-AHT-PRO-L-000-006 Rev : 01


Subcontract Document Number : DRP001-OUF-AHT-PRO-L-000-006 Rev : 01

Document Description / Title : METHOD STATEMENT FOR TRANSFORMER &RMU

INSTALLATION
Equipment Tag Numbers : NA

PURCHASER APPROVAL STATUS


Approval
Status Code Description
Code
 1 Rejected
 2 Comments as noted

 3 Acceptable

 4 No Comments
 5 Information Only

Purchaser’s review of this document does not relieve Subcontractor of the responsibility for correctness under the
Subcontract Order. Permission to proceed does not constitute acceptance of design, detail and calculations, test
methods or materials developed or selected by the Subcontractor and does not relieve the Subcontractor from full
compliance with the Subcontract Order or any other obligations, nor detract from any of the Purchaser’s rights.
Reviewing Engineer’s Full Name (IN BLOCK LETTERS), Sign and Date

Name: Sign: Disp.: Date:

Total Nos. of Sheets Including Cover Page: 1 of 14