Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Form I (Rule 5)

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

Form I

(See rule 5)
Application for grant of permission for undertaking repair/renovation in the prohibited area and
construction/ reconstruction/ repair/ renovation in the regulated area of protected monument or
archaeological site and remains declared as of national importance under the Ancient Monuments
and Archaeological Sites and Remains Act, 1958.
1. Name of the applicant:

2. Address of the applicant:

(a) Present
(b) Permanent
3. Name of the owner(s):
(If the applicant is other than the owner)

4. Address of the owner(s):


(a) Present
(b) Permanent
5. Whether the property is owned by individual or jointly
(furnish documents)

6. Whether the property is owned by Government/Public Sector


Undertaking/Private Sector Undertaking/Firm (if so, details
to furnished with complete address and phone numbers):

7. Locality of the proposed construction:


(with full details plot number, etc.,)

8. Name of the nearest monument or site:


(a) Locality:
(b) Taluk:
(c) District:
(d) State:
(Enclose area map showing the monument and the site of repair/ renovation/ construction/
reconstruction)

9. Distance of the site of construction related activities from the protected boundary of the
monument:

(a) Distance from the main monument:

(b) Distance from the protected wall of the monument:

Page 1 of 3
10. Nature of the Work proposed:
(Repair/renovation/construction etc.)

11. Details of work proposed


(furnish complete details with drawings of building/structure)

(i) Number of storeys


(ii) Floor area (storey-wise)
(iii) Height (excluding mumty, parapet,
water-storage tank, etc.)
(iv) Height (including mumty, parapet,
water-storage tank, etc.)
(v) Basement, if any proposed with details

(Enclose plan, section and elevation drawings of the existing building duly approved by the Building
Plan Sanctioning Authority and proposed building plan with section and elevation in case of
reconstruction. Enclose building plan, section and elevation of the proposed building in case of
construction/reconstruction.

12. Purpose of the proposed work:


(residential/commercial/institutional/public/community)

13. Approximate date of the commencement


of the proposed works:

14. Approximate duration for completion of the proposed work:

15. Maximum height of the existing modern buildings in


the close vicinity of-
(a) Near the Monument:
(b) Near the site of construction related activity:

16. Whether the monument is located within the limits of Municipal Corporation/ Municipalities/
Nagar Panchayat/ Village Panchayat

17. Does any Master Plan/zonal development plan/layout plan approved by concerned local
authorities

18. Status of modern constructions in the vicinity of the monument and the proposed site of
construction/ reconstruction:

19. Open space/park/green area close to protected monument/protected area:

20. Whether any road(s) exists between the monument and the site of construction/reconstruction:

21. Remarks/additional information, if any:

Page 2 of 3
I ……………………………………………………………………….. declare that the above
information is correct. I also undertake to observe the provisions of the Ancient Monuments and
Archaeological Sites and Remains Act, 1958 as amended by the, the Ancient Monuments and
Archaeological Sites and Remains (Amendment and Validation) Act, 2010 and the rules made
there under.

Place:

Seal of firm (if any)

Date: Signatur of applicant

Note:
1. If the application is on the behalf of the organisation/firm, the signature should be of the
head of that organisation/firm.
2. Enclose photographs showing the monument and the existing modern constructions.
3. Google Earth Images of the area under reference showing the monument and the site of
construction related activities.
4. Enclose ownership documents duly attested by an authorized officer of the Government.
5. In case of repairs/renovation a report from a duly authorized/licensed architect to be
submitted by the applicant.

Page 3 of 3

You might also like