Fundaciones Sp-2: S Adm
Fundaciones Sp-2: S Adm
Fundaciones Sp-2: S Adm
N V M L B H h s
T T T-m m m m m m
C1 1.51 0.73 0.60
C2 1.4 1.4 0.8 0.4 0.4
C3
C4
C5
C6 L
C7
C8
C9
C10
C11
b B
C12
C13
C14 l
C15
C16
C17 N
V M
4.- CARGAS SOBRE S.F: +
s
Ntot Vtot Mtot
T T T-m H
C1 5.27 0.73 1.47
h
C2 3.76 0.00 0.00
C3 3.76 0.00 0.00
C4 3.76 0.00 0.00
C5 3.76 0.00 0.00
C6 3.76 0.00 0.00
C7 3.76 0.00 0.00
C8 3.76 0.00 0.00
C9 3.76 0.00 0.00
C10 3.76 0.00 0.00
C11 3.76 0.00 0.00
C12 3.76 0.00 0.00
C13 3.76 0.00 0.00
C14 3.76 0.00 0.00
C15 3.76 0.00 0.00
C16 3.76 0.00 0.00
C17 3.76 0.00 0.00
d 28.2 cm punzonamiento
As 1.13097336 cm2 bo
Nbarras 2.33333333 barras Vc
Mn 3.60386044 tonf-m
Ast 2.63893783
a 1.77407585 cm
0.00150796
0.15079645 Vc
phiVc
19.05
1.905
2.8502295699
43.0701357233
3600
1.196392659
20.2682991639
Verifications
Demand (tonf-m/m) Capacity (tonf-m/m) D/C
0.54 5.01 0.11
0.53 5.01 0.11
4.13 5.01 0.82
4.09 5.01 0.82
unzonamiento
472.8 cm 1
kN 40
335192.046337753
249636.371259685
210812.607759593
8271.0953340534 tonf
6.2033215005 tonf
f'c fy Espesor (cm) ancho (cm) ∅(cm)
250 4200 20 100 1
250 4200 50 100 1.2
250 4200 40 100 1.2
250 4200 25 100 1.2
SUPUESTO ACERO TRACCIONADO EN
s (cm) r (cm) As min (cm2/m) As (cm2/m) ∅Mn (Ton-m) T a c
20 5 1.8 3.93 2.09 16493 0.78 0.96
20 5 4.5 5.65 9.37 23750 1.12 1.38
20 5 3.6 5.65 7.23 23750 1.12 1.38
20 5 2.25 5.65 4.03 23750 1.12 1.38
0 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
0 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
0 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
CERO TRACCIONADO EN FLUENCIA Capacidad a corte
Cc es A en fluencia ∅Vc (Ton-m)
16493 0.0454 SI 9.11
23750 0.0965 SI 27.91
23750 0.0748 SI 21.62
23750 0.0422 SI 12.19
#DIV/0! #DIV/0! #DIV/0! 0.00
#DIV/0! #DIV/0! #DIV/0! 0.00
#DIV/0! #DIV/0! #DIV/0! 0.00
Diseño a flexión detallado
Espesor (m)
f'c (Mpa)
Recubrimiento (mm)
Diametro barra (mm)
Espaciamiento (mm)
Capacidad (∅Mn)
flexión detallado
0,20
25
50
10
200
2,09