Vijay Kumar
Vijay Kumar
Vijay Kumar
Email:vjkrsingh@gmail.com; ~Mobile:+91-7838200098,7838242473
Increase productivity, Quality, and profitability through keen data analysis and process design; significantly improve operations
by recommending methods for improvements and providing efficient resolution to production issues. Identifying opportunities
for honing safety standards and maximizing ROI, Excel at completing projects on time and within Budget. Implementing training
programs and supporting Lean initiatives/facility/costing. Proven ability to determine and establish the most efficient methods
for maximum utilization of production facilities and personnel; as well as assisting line management in the development and
implementation of standard procedures.
Areas of Expertise
Lean Manufacturing – Six Sigma – Value Stream Mapping – Production Planning & control-Just in time – World Class
Manufacturing – Kanban – Kaizen – Statistical Process control- Demand Planning – Capacity Planning – Manpower Planning
– Layout Improvement – Vendor development – ISO Audits.
Career Overview
More than 13 years of experience in Lean Six Sigma, Project planning & Industrial Engineering.
Presently associated with Panasonic AVC Networks India Pvt. Ltd., Noida as DGM-Planning, ISP & Industrial
Engineering.
ISP, Demand planning & Negotiating with sales company for Model mix, delivery plan & Inventory management.
Production Planning for the all the products keeping in mind the despatch plan & capacity to optimize our resources.
Issue confirmed sales plan & forecast to concerned department for optimum planning of resources.
o Market study & forecast study based on seasonality and other parameters.
Completed and participated in setting up of new manufacturing plant projects.
o Coordinated and interfaced between the project team and plant personnel in layout design, installation review,
process validation, and results analysis for the project, scrap, lines capability, and productivity improvements.
Drive Business Excellence agenda, Integrating vision and strategy, Lean and Six Sigma and learning, to deliver
improving and predictable business results.
As a certified Manufacturing Assessor, To Drive WCM philosophy Of Panasonic Production System & to benchmark
and share best practices and continuously improve all the functions of the company.
To add value in the analysis of Cost of Poor Quality (CoPQ) data and identify wastes and opportunities for the
business to improve in (among others by using Lean principles and methodologies), as well as reporting and
celebrating past successes in these areas from a business perspective.
Gained significant exposure towards using various tools like Lean manufacturing, Manufacturing Assessment, Value
Stream Mapping, MOST, Six sigma, OEE, 5S, 3R, 5 WHY, etc.
To impart training on 5S & wastes, Motivation to line operators & leaders.
Handling Suggestion schemes, Creating and environment of employee empowerment in bringing improvements
Leading and work with the Process Owners, Engineers and Team Leaders, ensure high standards for safety, quality
and productivity.
Significant Achievements:
1) Coordinated and lead the project for productivity improvement in 32 inch TV model by 30% by automation,method
study, Line balancing.
2) Manpower Optimization: Role: Leader
Tools Used: LCA, Benchmarking, Ergonomics
Fabrication of in-house Battery operated towing cart, which runs on battery, and is used to pull trolleys from material
ware house to assembly line.
Result: One manpower saved, WIP reduced by 33%. Less fatigue to operator, Technical know and learning of our operators
increased.
3) Lead time Reduction (DMAIC Approach): Role: Coordinator
Tools: Value stream Mapping, Layout Modification, JIT.Mixed production, SMED
We have used Value stream mapping and take actions to reduce WIP to improve our current state and to reach our future
state. Delivery cycles of departments have been improved, Mix production for low Inventory, Just in time for 2 hours
material storage have been implemented. Layout has been modified to eliminate zig-zag material movement. We have
made a straight flow layout.
Result: Lead time reduced by 1 day
4) Visual Management: Role: Leader
Tools: JIT, Kitting system, Real time monitoring
We have introduced scanning system which on one side give real time status of production result Vs. target Plan And
on the other side gives an indication to material supply department to supply the material in right quantity at right place
and in right time.
Result: Better Capacity planning, Better traceability
5) Productivity Up(DMAIC): , Role: Leader
Tools used: LCA, Line balancing, Time study, Method study
Introduced Pacemaker which runs like a train’s engine pulling the assembly trolleys following it in a ‘O’ type cell.
Earlier these trolleys were manually pulled by operators so Approx 2.5 sec per set motion loss was there.
Result: Save 40 sec from its standard time.
6) Coordinating and working as liaison for various functional departments from Sales PASAP (Thailand), PAVCI in
planning and execution of New Car Audio project.
7) Handled planning, coordination, installation and execution of India’s first Panel assembly line in a clean room
maintain 10 ppm dust level.
8) Implementing standard Cell concept.
Professional Experience
Awarded MD’s achievement award for improving the productivity by 30% in Dec 2016.
Awarded Outstanding Overseas Employee for the Year 2009 in HQ Korea(DEC 2009)
Worked as Task force team in implementing Block cell concept in Gumi, Korea
Certified Manufacturing Assessor from Panasonic HQ,Japan
Published article in Isixsigma magazine in June 2010
Training on Dip soldering(selective soldering) process at Panasonic Malaysia, September 2010. To install dip soldering for the first
time in India.
Benchmarking of Panasonic at Utsunomiya-Japan ,November 2010
Benchmarking of Panasonic TV & Car Audio systems factory at Bangkok-Thailand, March 2012
Standard Time management Training & Dojo Training at Panasonic ,Utsunomiya-Japan, April 2012
MOST training at PAVCTH, Bangkok-Thailand, October 2012.
Dojo Manufacturing Training At Sanyo, Penang (Malaysia), April’13,
Dojo Manufacturing training at Panasonic Thailand,June'13
Benchmarking Daihatsu Motors plant & Panasonic Lighting Division,Indonesia,Sep'13
Manufacturing Assessor training At PAVCTH,Bangkok,Oct’2014
Benchmarking of Panasonic Manufacturing division,Malaysia.June’2015.
Benchmarking of Panasonic Manufacturing division, Mexico. August’2016.
IT Skills
Well versed with MS Office (Excel, Word, Project and Power point), Windows 9X / XP .
Auto cad 2D drafting ,Basic knowledge of solid works
Minitab
MOST
Academic Credentials
B.Tech.(Industrial Engineering)in 2005
S.B.S.C.E.T, FEROZEPUR (PUNJAB TECHNICAL UNIVERSITY, JALANDHAR)
Personal Details
Sex: Male
Nationality: Indian
Marital Status: Married
Date of Birth: 02ND October, 1983
Present Address : B-701,Shivalik Homes, Site-c, Surajpur Industrial Area, .Greater Noida
Permanent Address: A-4, J & K Guest House, Kautilya marg, Chanakayapuri, New Delhi–21
Languages Known: English, Hindi, and Punjabi