PMP Inputs TT Output

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 10
At a glance
Powered by AI
The document discusses various project management processes such as scope management, time management, procurement management, and risk management.

The main processes discussed include scope management, time management, procurement management, and risk management. Other processes like integration management and quality management are also briefly covered.

Each process discusses typical inputs, tools and techniques, and outputs used. For example, risk management identifies risks as inputs and generates a risk response plan as an output.

No KnowledgeArea No Process Purpose No Input No Tools and Techniques No Output

1 Integration 1 Project Plan Integrating and 1 Other Planning Outputs 1 Project Planning Methodology 1 Project Plan
Development coordinating all project Stakeholder skills and
plans to create a 2 Historical Information 2 Knowledge 2 Supporting Detail
consistent, coherent 3 Organizational Policies 3 PMIS (Prj.Mngt.Inf.Sys)
document 4 Constraints 4 Earned Value Management
5 Assumptions
2 Project Plan Carrying out the 1 Project Plan 1 General Management Skills 1 Work Results
Execution project plan by 2 Supporting Detail 2 Product Skills & Knowledge 2 Change Requests
performing the 3 Organizational Policies 3 Work Authorization System
activities included 4 Preventive Action 4 Status Review Meetings
therein 5 Corrective Action 5 PMIS (PrjMngt.Inf.Sys)
6 Organizational Procedures
3 Integrated Coordinating changes 1 Project Plan 1 Change Control System 1 Project Plan Updates
Change Control across the entire 2 Performance Reports 2 Configuration Management 2 Corrective Action
project 3 Change Requests 3 Performance Measurement 3 Lessons Learned
4 Additional Planning
5 PMIS (PrjMngt.Inf.Sys)

2 Scope 1 Initiation Authorizing the project 1 Product Description 1 Project Selection Methods 1 Project Charter
Management or phase 2 Strategic Plan 2 Expert Judgement 2 PM Identified/Assigned

3 Project Selection Criteria 3 Constraints


4 Historical Information 4 Assumptions
2 Scope Planning Developing a written 1 Product Description 1 Product Analysis 1 Scope Statement
scope statement as 2 Project Charter 2 Benefit/Cost Analysis 2 Supporting Detail
the basis for future 3 Constraints 3 Alternatives Identification 3 Scope Management Plan
project decisions.
(Progressive
Elaboration)
4 Assumptions 4 Expert Judgement
3 Scope Definition Subdividing the major 1 Scope Statement 1 Work Breakdown Structure 1 Work Breakdown Structure
deliverables into Templates
smaller, more 2 Constraints 2 Decomposition 2 Scope Statement Updates
managable 3 Assumptions
components 4 Other Planning Outputs
5 Historical Information
4 Scope Formalising 1 Work Results 1 Inspection 1 Formal Acceptance
Verification acceptance of the 2 Product documentation
project scope. 3 WBS
4 Scope Statement
5 Project Plan
5 Scope Change Controlling changes to 1 WBS 1 Scope Change Control System 1 Scope Changes
Control the project scope 2 Performance Reports 2 Performance Measurement 2 Corrective Action
3 Change Requests 3 Additional Planning 3 Lesson Learned

4 Scope Management plan 4 Adjusted Baseline


No KnowledgeArea No Process Purpose No Input No Tools and Techniques No Output

3 Time 1 Activity Definition Identifying and 1 WBS 1 Decomposition 1 Activity List


Management documenting the 2 Scope Statement 2 Templates 2 Supporting Detail
specific activities that 3 Historical Information 3 WBS Updates
must be completed to 4 Constraints
produce the 5 Assumptions
deliverables identified
in WBS
6 Expert Judgement
2 Activity Identifying and PDM (Precedence diagramming
Sequencing documenting 1 Activity List 1 method) 1 Project network diagrams
interactivity ADM (Arrow diagramming
dependencies 2 Product Description 2 method) 2 Activity List Updates
Mandatory CDM (Conditional diagramming
3 Dependencies 3 methods)
Discretionary
4 Dependencies 4 Network Templates
5 External Dependencies
6 Milestones
3 Activity Duration Estimating the number 1 Activity List 1 Expert Judgement 1 Activity Duration Estimates
Estimating of work periods that 2 Constraints 2 Analogous Estimating 2 Basis of Estimates
will be needed to 3 Assumptions 3 Quantatively Based Durations 3 Activity List Updates
complete individual
activities 4 Resource Requirements 4 Reserve Time (contingency)
5 Resource Capabilities
6 Historical Information
7 Identified Risks
4 Schedule Analysing activity Project Network
Development sequences, activity 1 Diagrams 1 Mathematical analysis 1 Project Schedule
durations and Activity Duration
resource requirments 2 Estimates 2 Duration Compression 2 Supporting Detail
to create the project
schedule
3 Resource Requirements 3 Simulation 3 Schedule Management plan
Resource Pool Resource Requirement
4 Description 4 Resource Leveling Heuristics 4 Updates
5 Calendars 5 Project Management Software
6 Constraints 6 Coding Structure
7 Assumptions
8 Leads and Lags
9 Risk Management Plan
10 Activity Attributes
No KnowledgeArea No Process Purpose No Input No Tools and Techniques No Output
5 Schedule Control Influencing the factors Schedule Change Control
that create schedule 1 Project Schedule 1 System 1 Schedule Updates
changes to ensure 2 Performance Reports 2 Performance Measurement 2 Corrective Action
that the changes are 3 Change Requests 3 Additional Planning 3 Lesson Learned
agreed upon,
Determining that the Schdule Management
schedule has 4 Plan 4 Project Manangement Software
changed, Manage the
actual changes when
and as they occur
5 Variance Analysis
No KnowledgeArea No Process Purpose No Input No Tools and Techniques No Output

4 Cost 1 Resource Determining what 1 WBS 1 Expert Judgement 1 Resource Requirements


Management Planning resources (people, 2 Historical Information 2 Alternatives Identification
equipment, materials) 3 Scope Statement 3 PM software
and what quantities of 4 Resource Pool Descr
each should be used 5 Organizational Policies
and when they would
be needed to perform
project activities Activity Duration
6 Estimates
2 Cost Estimating Developing an 1 WBS 1 Analogous Estimating 1 Cost Estimates
approxmation
(estimate) of the costs 2 Resource Requirements 2 Parametric Modelling 2 Supporting Details
of the resources 3 Resource rates 3 Bottom-up Estimating 3 Cost Management Plan
needed to complete
the project activities Activity Duration
4 Estimates 4 Computerized Tools

5 Estimating Publications 5 Other Cost Estimating Methods


6 Historical Information
7 Chart of accounts
8 Risks
3 Cost Budgeting Allocating the overall 1 Cost Estimates 1 Cost Bud.tools&techns 1 Cost Baseline
cost estimates to 2 WBS
individual work 3 Project Schedule
activities to establish a
cost baseline for
measuring project
performance
4 Risk mngt plan
4 Cost Control Influencing the factors 1 Cost Baseline 1 Cost Change Control System 1 Revised Cost Estimates
that create changes to 2 Performance Reports 2 Performance Measurement 2 Budget Updates
the cost baseline to 3 Change Requests 3 Earned Value Mngt 3 Corrective Action
ensure that the 4 Cost Management Plan 4 Additional Planning 4 Estimate at completion
changes are agreed 5 Computerized Tools 5 Project Closeout
upon, Determining that
the cost baseline has
changed, Manage the
actual changes when
and as they occur

6 Lessons Learned
No KnowledgeArea No Process Purpose No Input No Tools and Techniques No Output
5 Quality 1 Quality Planning Identifying which 1 Quality Policy 1 Benefit/Cost Analysis 1 Quality Management Plan
Management Quality standards are 2 Scope Statement 2 Benchmarking 2 Operational Definitions
relevant to the project 3 Product description 3 Flow-Charting 3 Checklists
& determining how to 4 Standards&Regulations 4 Design of experiments 4 Inputs to other Processes
satisfy them
5 Other Process Outputs 5 Cost of Quality
2 Quality Evaluating overall proj Quality Planning Tools and
Assurance performance on a 1 Quality Mngt Plan 1 Techniques 1 Quality improvement
regular basis to Results of quality control
provide confidence 2 measurement 2 Quality Audits
that the project will
satisfy the relevant
Quality standards
3 Operational Definitions
3 Quality Control Monitoring specific 1 Work Results 1 Inspection 1 Quality improvement
project results to 2 Quality Mngt Plan 2 Control Charts 2 Acceptance decisions
determine if they 3 Operational Definitions 3 Pareto Diagrams 3 Rework
comply with relevant 4 Checklists 4 Statistical Sampling 4 Completed Checklists
Quality standards & 5 Flow-Charting 5 Process Adjustments
identifying ways to
eliminate causes of
unsatisfactory
performance
6 Trend Analysis
No KnowledgeArea No Process Purpose No Input No Tools and Techniques No Output

6 Human 1 Organizational identifying, Role & Responsibility


Resource Planning documenting & 1 Project Interfaces 1 Templates 1 Assignments
Management assigning project 2 Staff Requirements 2 HR Practices 2 Staffing Mngt. Plan
roles, responsibilities, 3 Constraints 3 Organizational Theory 3 Organization Chart
and reporting
relationships
4 Stakeholder Analysis 4 Supporting Detail
2 Staff Acquisition Getting the human 1 Staffing Mngt.Plan 1 Negotiations 1 Project Staff Assigned
resources needed 2 Staffing Pool Desc. 2 Preassignment 2 Project Team Directory
assigned to & working
on the project.
3 Recruitment Practices 3 Procurement
3 Team Developing individual 1 Project Staff 1 Team building Activities 1 Performance Improvements
Development and group Input to performance
competencies to 2 Project Plan 2 General Management Skills 2 Appraisal
enhance project
performance 3 Staffing Mngt Plan 3 Reward & Recognition Systems
4 Performance Reports 4 Collocation
5 External Feedback 5 Training

7 Communication 1 Communications Determining the info. & Communications


Management Planning communication needs 1 requirements 1 Stakeholder Analysis 1 Communications Mngt. Plan
of the stakeholders: Communications
who needs what 2 technology
information, when they 3 Constraints
will need it and how it
will be given to them

4 Assumptions
2 Information Making needed info 1 Work Results 1 Communication Skills 1 Project Records
Distribution available to project Communications Mngt.
stakeholders in a 2 Plan 2 Information Retrieval systems 2 Project Reports
timely manner
3 Project Plan 3 Information distribution methods 3 Project Presentations
3 Performance Collecting & dissem- 1 Project Plan 1 Performance reviews 1 Preformance Reports
Reporting inating performance 2 Work Results 2 Variance Analysis 2 Change Requests
info. This includes 3 Other Project Records 3 Trend Analysis
status reporting, 4 Earned Value Analysis
progress
measurement &
forecasting Information Distribution Tools &
5 techniques
No KnowledgeArea No Process Purpose No Input No Tools and Techniques No Output
4 Adminstrative Generating,gathering, Performance
Closure & disseminating Measurment Performance Reporting Tools &
information to 1 documentation 1 Techniques 1 Project Archives
formalize a phase or 2 Product Documentation 2 Project Reports 2 Project Closure
project completion
3 Other Project Records 3 Project Presentations 3 Lessons Learned
No KnowledgeArea No Process Purpose No Input No Tools and Techniques No Output
8 Risk 1 Risk Management Deciding how to 1 Project Charter 1 Planning Meetings 1 Risk Management Plan
Management Planning approach and plan the Organization's risk
risk management 2 Management Policies
activities for a project. Defined roles &
3 responsibilities
Stakeholder risk
4 tolerances
Templates for
organization's risk
5 management plan
6 WBS
2 Risk Determining which 1 Risk management plan 1 Documentation reviews 1 Risks
Identification risks might affect the Information Gathering
project and 2 Project Planning Outputs 2 Techniques 2 Triggers
documentating their 3 Risk Categories 3 Checklists 3 Inputs to other processes
characteristics 4 Historical Information 4 Assumptions Analysis
5 Diagramming Techniques
3 Qualitative Risk Performing a Overall risk ranking for the
Analysis qualitative analysis of 1 Risk management plan 1 Risk probability & impact 1 project
risks and conditions to Probability / impact risk rating
prioritize their effects 2 Identified Risks 2 matrix 2 List of prioritized risks
on project objectives
List of risks for additional
3 Project Status 3 Project Assumptions testing 3 analysis and management
Trends in qualitative risk
4 Project Type 4 Data precision ranking 4 analysis results
5 Data Precision
Scales of probability and
6 Impact
7 Assumptions
4 Quantative Risk Measuring the Prioritized list of quantified
Analysis probability and 1 Risk management plan 1 Interviewing 1 risks
consequences of risks Probabilistic analysis of the
and estimating their 2 Identified Risks 2 Sensitivity Analysis 2 project
implications for project
objectives Probability of achieving the
3 List of prioritized risks 3 Decision tree analysis 3 cost & time objectives
List of risks for additional
analysis and Trends in quantative risk
4 management 4 Simulation 4 analysis results
5 Historical Information
6 Expert Judgement
7 Other Planning outputs
No KnowledgeArea No Process Purpose No Input No Tools and Techniques No Output
5 Risk Response Developing 1 Risk management plan 1 Avoidance 1 Risk response plan
Planning procedures and 2 List of prioritized risks 2 Transference 2 Residual risks
techniques to enhance Risk Ranking of the
opportunities and 3 project 3 Mitigation 3 Secondary risks
reduce threats to the
project's objectives Prioritized list of
4 quantified risks 4 Acceptance 4 Contractual agreements
Probabilistic analysis of Contigency reserve amounts
5 the project 5 needed
Probability of achieving
the cost and time
6 objectives 6 Inputs to other processes
List of potential Inputs to a revised project
7 responses 7 plan
8 Risk Thresholds
9 Risk Owners
10 Common Risk causes
Trends in qualitative and
quantative risk analysis
11 results
6 Risk Monitoring Monitoring residual 1 Risk management plan 1 Project risk response audits 1 Workaround plans
and Control risks, identifying new 2 Risk Response Plan 2 Periodic project risk reviews 2 Corrective Action
risks, executing risk 3 Project comunication 3 Earned Value Analysis 3 Project change requests
reduction plans, and Additional Risk Technical performance Updates to the risk response
evaluating their 4 identification & analysis 4 measurement 4 plan
effectiveness throught
the project life cycle.
5 Scope Changes 5 Additional risk response planning 5 Risk Database
Updates to Risk identification
6 checklists

9 Procurement 1 Procurement Determining what to Procurement Management


Management Planning procure and when 1 Scope Statement 1 Make-or-buy analysis 1 Plan
2 Product description 2 Expert Judgement 2 Statement(s) of work
3 Procurement resources 3 Contract type selection
4 Market conditions
5 Other Planning outputs
6 Constraints
7 Assumptions
2 Solicitation Documenting product Procurement
Planning requirments and 1 Management Plan 1 Standard forms 1 Procurement documents
identifying potential 2 Statement(s) of work 2 Expert Judgement 2 Evaluation criteria
resources 3 Other Planning outputs 3 Statement of work updates
3 Solicitation Obtaining quotations,
bids offers, or 1 Procurement documents 1 Bidder conferences 1 Proposals
proposals as
appropriate
2 Qualified seller list 2 Advertising
No KnowledgeArea No Process Purpose No Input No Tools and Techniques No Output
4 Source Selection Choosing from among 1 Proposals 1 Contract negotiation 1 Contract
potential sellers 2 Evaluation criteria 2 Weighting system
3 Organizational policies 3 Screening system
4 Independent estimates
5 Contract Managing the
Adminstration relationship with the 1 Contract 1 Contract change control system 1 Correspondence
seller 2 Work Results 2 Performance reporting 2 Contract changes
3 Change Requests 3 Payment system 3 Payment requests
4 Seller invoices
6 Contract Completion and
Closeout settlement of contract, 1 Contract documentation 1 Procurement audits 1 Contract file
including resolution of
any open items
Formal acceptance and
2 closure

Legends:
Core process
Facilitating
process