ADJW Creation

For Internal use only

METHOD
OF
PROCEDURE

3G

ADJW CREATION
(HO CREATION FOR 3G ICR)

Nokia Siemens Networks Pvt Ltd.

MS India
Process & Quality Team

Page 1
ADJW Creation
For Internal use only

Document History

Document Author Suresh Palani Specialist - Config Suresh.palani@nsn.co


Mgt m
Document Contributor(s) Soney M G Manager - BSS soney.m_g@nsn.com
O&M

Document Approver Vipindas Regional BSS vipindas.d@nsn.com


Manager-South
Document Release Authority Lalit Sharma National BSS- lalit.sharma@nsn.com
Head

Versions
Date Name Version Platform Contents of change
27/09/2011 Suresh Palani V1.0 Vendor Initial Document
Platform:
IPA 2800
Software
Version: RN
4.0 for RNC
2600

Page 2
ADJW Creation
For Internal use only

Table of contents

1. Purpose and Scope of Document .................................................................................................4


2. Prerequisite ..................................................................................................................................4
3. Compatibility / Dependencies to other products/system/owner ..................................................... 4
4. Acronym Glossary ........................................................................................................................4
5. Assumptions & Out of Scope details ............................................. Error! Bookmark not defined.
6. Relations with other work instructionns ........................................................................................4
7. Detailed description ......................................................................................................................5
7.1 Detailed job description..........................................................................................................5
7.2 Tools Used. ...........................................................................................................................5
7.3 Impact on Service ..................................................................................................................5
7.4 Identification of the Stakeholders ...........................................................................................5
7.5 Specific Instructions ( Entry / Exit Criteria) .............................................................................6
7.6 Software backup and change control requirements ............................................................... 6
7.7 Pre-Test Plan and expected results .......................................................................................6
7.8 Detailed step-by-step procedures ..........................................................................................6
7.9 Post-Test Plan and expected results......................................................................................7
7.10 Roll back Plan ....................................................................................................................7
7.11 Emergency Contact Details ................................................................................................7
7.12 Additional Document Reference .........................................................................................7
Appendix ..............................................................................................................................................7

Page 3
ADJW Creation
For Internal use only

1. Purpose and Scope of Document

This technical document covers the activity of ADJW CREATION (HO CREATION FOR
3G ICR) at site. The purpose of this document is to describe the actions needed for ADJW
CREATION (HO CREATION FOR 3G ICR) Definition in the site. This document is intended for the
use of Managed services professional only for the purpose of the agreement under which the
document is submitted, and no part of it may be used, reproduced, modified or transmitted without
the prior permission of Nokia Siemens Networks.

2. Prerequisite

• Engineer should have detailed knowledge about the architecture, Fault Management,
Configuration & Integration of Nokia BSC.

3. Compatibility / Dependencies to other products/system/owner

NA

4. Acronym Glossary

Table 4.1 Acronym and Glossary

S.No: Key Word Definition

1. BTS Base Transeiver Station

2. CI Cell Identity

3. LAC Location Area Code

4. ICR Inter Circle Roaming

5. RNC Radio Network Controller

6. BSC Base Station Controller

5. Assumptions & Out of Scope details

• NONE

Page 4
ADJW Creation
For Internal use only

6. Relations with other work instructions

None

7. Detailed description

7.1 Detailed job description

Step 1 : Prepare the command set for adjacency creation previously.

Step 2 : Execute the prepared command set.

Step 3 : Capture the logs and Debug the errors if any.

7.2 Tools Used.

(Vendor Platform, Software version, Application Details)

• Tools Used: Reflection

• Vendor platform: Nokia DX 200 BSC

7.3 Impact on Service

• NONE

7.4 Identification of the Stakeholders

• GNSC-CM team / GNSC-FM team

• RF team

Page 5
ADJW Creation
For Internal use only

7.5 Specific Instructions (Entry / Exit Criteria)

• Check the correct username and password of given BSC

• Check the user rights of particular user name

• Post check should be done befote exit

7.6 Software backup and change control requirements

• NA

7.7 Pre-Test Plan and expected results

STEP 1: Check for any incorrect or missing values in the data in CRF.
STEP 2: Check if BSC name specified matches with BSC C-NUM specified.
STEP 3: Check if data given is for one way or for two way neighbours. If given for one way, call
initiator and confirm the same.

7.8 Detailed step-by-step procedures

• Open Reflection

• Log into the specified BSC & Confirm the BSC name
ZQNI;

• Check the existing adjacencies to find the last next index number.
ZEAP:BTS=<BTS NUMBER>;
ZEAO:BTS=<BTS NUMBER>;

• Create new adjacency.


ZEAE:BTS=<BTS identification>:INDEX=<adjacent cell index>: RNC=<radio network
controller identifier>, CI=<cell identification>: LAC=<location area code>,
SAC=<service area code>, FREQ=<WCDMA downlink carrier
frequency>,SCC=<scrambling code>;

• Check the created adjacency as specified.


ZEAP:BTS=<BTS NUMBER>;
ZEAO:BTS=<BTS NUMBER>;

Page 6
ADJW Creation
For Internal use only

7.9 Post-Test Plan and expected results

• Inform to RF Team the site adjacency created.

7.10 Roll back Plan

• NONE

7.11 Emergency Contact Details

Mandatory
Name & Phone No. Contact details,time line Escalation Priority
RF Engg
SPOC

Escalation Matrix
Team Lead

7.12 Additional Document Reference

• NED of BSC

Appendix

Page 7
ADJW Creation
For Internal use only

Page 8

You might also like