HANDOVER LIST ( JG SUMMIT)

ITEM DESCRIPTION REMARKS


1 ISOMETRIC DRAWING OF QUENCH OIL FOR RECONFIRMATION / ACTUAL
MEASUREMENT
FOR CONFIRMARION OF CLIENT ISO DWG
2 ISOMETRIC DRAWING C-0501 VS INTERNAL ISO DWG.
3 ISOMETRIC DRAWING G-0402A/B FABRICATION IN PROGRESS
4 ISOMETRIC DRAWING G-0402A/B FABRICATION IN PROGRESS
5 DPT REPORTS OF QUENCH OIL COMPLETED FOR SIGN
6 DPT REPORTS OF G-0402A/B COMPLETED FOR SIGN
7 DPT REPORTS OF G-0402A/B COMPLETED FOR SIGN
8 DPT REPORTS OF C-0501 COMPLETED FOR SIGN
DOVER LIST ( JG SUMMIT)
REMARKS REPORTS
FOR RECONFIRMATION / ACTUAL
MEASUREMENT
FOR CONFIRMARION OF CLIENT ISO DWG
VS INTERNAL ISO DWG.
FABRICATION IN PROGRESS
FABRICATION IN PROGRESS
COMPLETED FOR SIGN remaining in progress
COMPLETED FOR SIGN remaining in progress
COMPLETED FOR SIGN remaining in progress
COMPLETED FOR SIGN
HANDOVER LIST ( SHELL DEPOT)
ITEM DESCRIPTION REMARKS
1 GANTRY 1 (GOLDEN JOINT) COMPLETED

NOT YET RELEASE ITS DWG (RECHECK BRANCH


2 GANTRY 1 (VPN) CONNECTION FOR DOUBLE CONFIRMATION)

NOT YET RELEASE ITS DWG (RECHECK FOR DOUBLE


3 GANTRY 1 (ADO) CONFIRMATION)

NOT YET RELEASE ITS DWG (RECHECK FOR DOUBLE


4 GANTRY 1 (ULG) CONFIRMATION)

IN PROGRESS FABRICATION / WAITING FOR FLANGE WN,


5 GANTRY 2 (CRFO # 3) 6"

6 GANTRY 2 (CRFO # 1) NOT YET RELEASE ITS DWG ( RECHECK FOR DOUBLE
CONFIRMATION) (CRITICAL)

NOT YET RELEASE ITS DWG ( RECHECK FOR DOUBLE


7 GANTRY 2 (ADO) CONFIRMATION) (CRITICAL)

8 GANTRY 2 (CRFO # 2) NOT YET STARTED FABRICATION


9 GANTRY 3 IN PROGRESS FABRICATION (FIT UP)
10 GANTRY 3 IN PROGRESS FABRICATION (FIT UP)
11 GANTRY 3 (FSG)
12 GANTRY 3 (VPNR) PT FOR ROOT PASS
13 JET A1 -A BALANCE FLANGE WN
14 JET A1 -B BALANCE FLANGE WN,CONCENTRIC REDUCER
20
HANDOVER LIST ( SHELL DEPOT)
REMARKS REPORTS
COMPLETED FOR RT

NOT YET RELEASE ITS DWG (RECHECK BRANCH


CONNECTION FOR DOUBLE CONFIRMATION)

NOT YET RELEASE ITS DWG (RECHECK FOR DOUBLE


CONFIRMATION)

NOT YET RELEASE ITS DWG (RECHECK FOR DOUBLE


CONFIRMATION)
ROOT PASS PT FOR REPORTING
IN PROGRESS FABRICATION / WAITING FOR FLANGE WN,
6"

NOT YET RELEASE ITS DWG ( RECHECK FOR DOUBLE


CONFIRMATION) (CRITICAL)

NOT YET RELEASE ITS DWG ( RECHECK FOR DOUBLE


CONFIRMATION) (CRITICAL)

NOT YET STARTED FABRICATION


IN PROGRESS FABRICATION (FIT UP)
IN PROGRESS FABRICATION (FIT UP)
FOR RT
PT FOR ROOT PASS
BALANCE FLANGE WN FOR RT
BALANCE FLANGE WN,CONCENTRIC REDUCER FOR RT