Mástil Descripción
Mástil Descripción
Mástil Descripción
DESCRIPTION
N30-40XMR2, N25XMDR2 [C470]; N50XMA2 [C471];
N30XMDR2, N45XMR2 [G138]; N30XMXDR3,
N45XMXR3 [B264]; W30-40ZA [B454]; W20-30ZR [B455];
W25-30-40ZC [B453]; W20-30-40XTA [A453]; W20-30-
40XTC [A454]; W2030XTR [A455]; N30XMH, N30XMH 2 [C210];
V30ZMD [D210/E210]; W25-30ZA 2 [B495]
• DISCONNECT THE BATTERY CONNECTOR before doing any maintenance or repair on electric
lift trucks. Disconnect the battery ground cable on internal combustion lift trucks.
• Always use correct blocks to prevent the unit from rolling or falling. See HOW TO PUT THE LIFT
TRUCK ON BLOCKS in the Operating Manual or the Periodic Maintenance section.
• Keep the unit clean and the working area clean and orderly.
• Always use HYSTER APPROVED parts when making repairs. Replacement parts must meet
or exceed the specifications of the original equipment manufacturer.
• Make sure all nuts, bolts, snap rings, and other fastening devices are removed before using force
to remove parts.
• Always fasten a DO NOT OPERATE tag to the controls of the unit when making repairs, or if the
unit needs repairs.
• Gasoline, Liquid Petroleum Gas (LPG), Compressed Natural Gas (CNG), and Diesel fuel are
flammable. Be sure to follow the necessary safety precautions when handling these fuels and
when working on these fuel systems.
• Batteries generate flammable gas when they are being charged. Keep fire and sparks away from
the area. Make sure the area is well ventilated.
NOTE: The following symbols and words indicate safety information in this
manual:
WARNING
Indicates a hazardous situation which, if not avoided, could result in
death or serious injury.
CAUTION
Indicates a hazardous situation which, if not avoided, could result in
minor or moderate injury and property damage.
On the lift truck, the WARNING symbol and word are on orange back-
ground. The CAUTION symbol and word are on yellow background.
Mast Table of Contents
TABLE OF CONTENTS
General ............................................................................................................................................................... 1
Mast Weldments ................................................................................................................................................ 3
Carriages ............................................................................................................................................................ 4
Two-Stage Mast.................................................................................................................................................. 7
Description ..................................................................................................................................................... 7
Operation ....................................................................................................................................................... 12
Three-Stage Mast............................................................................................................................................... 12
Description ..................................................................................................................................................... 12
Operation ....................................................................................................................................................... 15
HYSTER
APPROVED
PARTS
4000 SRM 480 General
General
This section has the description and the operation for
the two-stage and the three-stage mast assemblies.
1
General 4000 SRM 480
2
4000 SRM 480 Mast Weldments
Mast Weldments
The main vertical frames of a mast assembly are The two-stage LFL (Limited Free Lift) masts gener-
called weldments. These weldments are assembled ally have two main-lift cylinders installed vertically
so they telescope. The inner mast weldment moves on the outer weldment that raise the inner mast
inside the outer mast weldment. The carriage moves weldment and chains attached to the weldments
inside the inner mast weldment. On a three-stage that simultaneously raise the carriage. Two-stage
mast, there is an intermediate mast weldment lo- FFL (Full Free Lift) masts also have a free-lift
cated between the inner mast and outer mast weld- cylinder centered in the inner weldment which
ments. The outer mast weldment is attached to the activates first to pull the chains that raise the car-
lift truck frame. The outer mast weldment can also riage. However, models W25/30ZA 2, W30/40ZA, and
be a support for the overhead guard on certain lift W25/30/40ZC lift trucks with two-stage LFL have
trucks. only one main lift cylinder centered in the inner
weldment which pulls chain that raise both the
When the telescopic weldments and the carriage lift inner weldment and the carriage.
a load, forces are put on the mast assembly. To de-
crease friction caused by these forces, load rollers, The three-stage FFL models have two main lift
wear plugs, side rollers, and thrust rollers are in- cylinders installed vertically on the outer weldment
stalled between the moving parts. Wear strips are that raise the intermediate mast weldment and lift
also used on certain models. The side rollers and load chains attached to the weldments which raise the
rollers, with the wear plugs, travel along the chan- inner mast weldment simultaneously. Three-stage
nels within the weldments. The thrust rollers and FFL masts also have a free-lift cylinder centered in
wear strips travel on the outside edges of the weld- the inner weldment which activates first to pull the
ments. chains that raise the carriage.
3
Carriages 4000 SRM 480
Carriages
The standard straddle carriage is a separate assem- sits on forks attached to the carriage. The forks are
bly that only moves vertically within the channels held in place by lock pins. See Figure 5.
of the inner mast weldment. See Figure 3. Side
rollers and load rollers with wear plugs, attached to NOTE: Some lift trucks have reach carriages that ex-
the straddle carriage, travel in the channels of the tend and retract. These carriages have a separate
inner mast weldment. Thrust rollers travel on the fork carriage as part of the carriage assembly.
outer edges of the mast weldment. These rollers de-
See the section Reach Carriages 4500 SRM 971 for
crease friction and keep the carriage aligned between
information on the reach carriages.
the inner channels. The load backrest extension is
attached to this fork carriage. See Figure 4. The load
Figure 3. Carriage
4
4000 SRM 480 Carriages
1. FORKS
2. CARRIAGE FRAME
3. LOAD BACKREST
4. LATCH ASSEMBLY (KNOB TYPE SHOWN)
5
Carriages 4000 SRM 480
A. LEVER TYPE LOCK PIN ASSEMBLY (OLD B. KNOB TYPE LOCK PIN ASSEMBLY (NEW
STYLE) STYLE)
1. FORK 6. WEDGE
2. LOCK PIN 7. KNOB
3. SPRING 8. LEVER
4. WASHER 9. COTTER PIN
5. WASHER 10. LOCK PIN ASSEMBLY
6
4000 SRM 480 Two-Stage Mast
Two-Stage Mast
DESCRIPTION For masts with a single lift cylinder, the two-stage
mast assembly has one single-stage main cylinder.
The two-stage mast assembly has two weldments. This main cylinder is installed vertically in the cen-
See Figure 6 or Figure 7. They are the inner mast ter of the mast weldments. The base of the main
weldment and the outer mast weldment. The in- cylinder is bolted to the center of the bottom cross-
ner mast weldment has a load roller on each bottom member of the outer mast weldment. The cylinder
channel section. The load rollers travel along the rod is bolted to the center of the top crossmember of
channels within the outer mast weldment. The outer the inner mast weldment. The main cylinder has the
mast weldment has one load roller located at the top chain anchors welded to it. See Figure 9. The inner
of the inside of each channel. The outside channels of mast weldment extends from the outer mast weld-
the inner mast weldment travel on these load rollers ment as the cylinder rods extend.
during channel movement. The load rollers permit
them to control the forces during movement of the For masts with dual lift cylinders, two lift chains con-
mast. These forces are from the front, back, and trol the movement of the carriage. See Figure 10.
sides. Wear strips are also used on some models to The chains fasten to the chain anchor supports that
control side forces. The wear strips are installed at are welded on each channel of the outer mast weld-
the bottom of the inner mast weldment. The wear ment. The chains go up and over the chain sheaves
strips are on the outer edge of the channels of the in- and then connect to the carriage. The chain sheaves
ner mast weldment. Shims are used under the wear are installed at the inside of the channels near the
strips to keep the correct clearance between the weld- top of the inner mast weldment. The chains transfer
ments. the force from the main cylinders to the carriage.
For masts with dual lift cylinders, the two-stage mast For masts with a single lift cylinder, two lift chains
assembly has two single-stage main cylinders. Both control the movement of the carriage. See Figure 11.
cylinders are installed vertically behind each chan- The chains fasten to the chain anchor supports that
nel of the outer mast weldment. See Figure 8. The are welded on the single cylinder. The chains go
base of the main cylinders fit into pins that are lo- up and over the chain sheaves and then connect to
cated in the bottom crossmember of the outer mast the carriage. The chain sheaves are installed to the
weldment. Lock plates are used to position the main bracket above the single cylinder. The chains trans-
cylinders. These lock plates are bolted to the lower fer the force from the main cylinder to the carriage.
end of each outer mast channel. Removable supports
for the main cylinders are bolted to the chain anchor
weldments. The rods of each main cylinder are fas-
tened to the top crossmember of the inner mast weld-
ment with a snap ring. The inner mast weldment ex-
tends from the outer mast weldment as the cylinder
rods extend.
7
Two-Stage Mast 4000 SRM 480
8
4000 SRM 480 Two-Stage Mast
9
Two-Stage Mast 4000 SRM 480
1. CAPSCREW
2. WASHER
3. LIFT CYLINDER
4. FITTING
A. BACK VIEW 5. TUBE
6. FITTING
1. LIFT CYLINDER 7. FLOW REGULATOR
2. OUTER WELDMENT 8. HOUSING
3. HYDRAULIC TUBE (LIFT) 9. FITTING
4. REGULATOR MOUNT PLATE 10. CAPSCREW
5. FLOW REGULATOR HOUSING
6. HYDRAULIC HOSE (LIFT) Figure 9. Two-Stage Single Lift Cylinder-
7. ELECTRIC CABLE FOR REACH CARRIAGE Hydraulic Connections
8. HOSES FOR REACH OR SIDESHIFT CARRIAGE
10
4000 SRM 480 Two-Stage Mast
1. SNAP RING
2. CAPSCREW AND LOCKWASHER
3. SUPPORT
4. SHAFT
5. SPACER
6. SHEAVE
7. BALL BEARING
8. RETAINING RING
NOTE: REACH CARRIAGE SHOWN. CHAIN AN- 9. WASHER
10. CHAIN
CHOR ON STRADDLE CARRIAGE SIMILAR. 11. COTTER PIN
12. PIN
1. INNER WELDMENT 13. CHAIN ANCHOR
2. CHAIN SHEAVE 14. NUT
3. BEARING 15. LOCKWASHER
4. SNAP RING 16. PIN
5. LIFT CHAIN 17. CHAIN ANCHOR
6. COTTER PIN 18. SNAP RING
7. PIN 19. LUBE FITTING
8. CHAIN ANCHOR 20. COTTER PIN
9. ADJUSTMENT NUTS
10. OUTER WELDMENT
Figure 11. Lift Chains and Sheaves Single Lift
Figure 10. Lift Chains and Sheaves Dual Lift Cylinder
Cylinders
11
Three-Stage Mast 4000 SRM 480
A. POSITION 1 B. POSITION 2
1. OUTER WELDMENT 4. INNER WELDMENT
2. LIFT CYLINDERS (1 OR 2) 5. CHAIN SHEAVE (2)
3. LIFT CHAINS (2) 6. CARRIAGE
Three-Stage Mast
DESCRIPTION Figure 15. They are all single-stage lift cylinders.
The free-lift cylinder fastens to the inner mast weld-
The three-stage mast assembly has three weldments. ment and controls the movement of the carriage. The
See Figure 13. There is an outer mast weldment, free-lift chains transfer force from the free-lift cylin-
an intermediate mast weldment, and an inner mast der to the carriage. The two main cylinders fasten
weldment. The weldments are telescopic and have a to the intermediate mast weldment and control the
load roller and wear strip (similar to the two-stage movement of the intermediate mast. The two outer
mast) or wear plug arrangement. The three-stage lift chains transfer the force from the main cylinders
masts have three hydraulic cylinders: the free-lift to the inner mast weldment.
cylinder and two main cylinders. See Figure 14 and
12
4000 SRM 480 Three-Stage Mast
13
Three-Stage Mast 4000 SRM 480
14
4000 SRM 480 Three-Stage Mast
The free-lift chain fastens to a bracket welded to the The three main cylinders are connected hydraulically
rear of the free-lift cylinder. The chain then goes in parallel. When the LIFT function begins, the pres-
through the sheave support and fastens to the car- sure of the oil is increased in all the main cylinders.
riage. When the free-lift cylinder rod extends, the The free-lift cylinder raises the weight of the car-
carriage travels at two times the speed of the rod. riage and the load on the forks. The main cylinders
must raise the carriage, the load on the forks, plus
The two main cylinders control the movement of the the weight of the intermediate and inner mast weld-
intermediate mast weldment. The cylinders are in- ments. It takes less force to extend the rod of the
stalled vertically behind the channels of the weld- free-lift cylinder, so this rod and the carriage will
ments. The cylinders fasten to the outer mast weld- move first.
ment at the back of each channel. The base of each
cylinder is located by a pin installed in the lower When the LOWER function begins, the oil from the
crossmember bracket of the outer mast weldment. main cylinders returns to the hydraulic tank. The
Removable supports for the main cylinder are bolted main cylinders lower first since they have a greater
to the chain anchor weldments. The rods of each load. When the main cylinder rods have fully re-
main cylinder are fastened to the top crossmember tracted, the free-lift rod retracts. All the oil from
of the intermediate mast weldment with snap rings. the cylinders returns to the hydraulic tank through
the flow control valves, located in the manifold at-
The hoist chains fasten to the anchors near the tached to the bottom of the outer mast weldment.
top rear of the outer mast weldment. The chains Each cylinder has a lowering control valve installed
go over the sheaves at the top of the intermediate in its base. These lowering control valves control the
mast weldment. The other end of the chains fasten lowering speed of a load if a hydraulic line breaks.
to the chain anchors at the bottom of the inner
mast weldment. When the main cylinders raise the
intermediate mast weldment, the chains raise the
inner mast weldment, the free-lift cylinder, and the
carriage.
15
Three-Stage Mast 4000 SRM 480
16
TECHNICAL PUBLICATIONS