1. Refers to all laws, decrees, executive orders and other administrative issuances and parts thereof which are
inconsistent with the provisions of this Act are hereby modified, superseded or repealed accordingly
a) separability clause
b) enforcement
c) penalties
d) repealing clause
6. Comfortable clearance for knee and leg space under the table/ counter for a person in a wheelchair.
a) 0.85 m
b) 0.74m
c) 0.80 m
d) 0.70 m
a) 2 hrs
b) 1 hr
c) 4 hrs.
d) 3 hrs
8. A change in the use of or occupancy of a building/structure or portion thereof, which has different
requirements
a) conversion
b) demolition
c) alteration
d) renovation
11. Which among is not included in the scope of interior design practice?
a) planning
b) supervision
c) plumbing
d) specification
12. In the Interior Designer’s Code of Ethics, to whom does the ID have responsibility to consider needs and
aesthetic and functional requirements?
a) client
b) public
c) manufacturers/dealers
d) contractor
16. A more comprehensive system of time scheduling and permits a more realistic analysis of the daily problems
of construction project
a) logbook
b) bar chart
c) timetable
d) CPM
18. Refers to the act of planning, designing, specifying, supervising anf giving general administration and
responsible direction to the finishing of interior spaces
a) space planning
b) visual technique
c) interior design
22. Additional information on contract documents issued to bidders before date of bidding
a) Specifications
b) bid bulletin
c) bond
d) terms & conditions
25. A bond submitted by a bidder as a gurranty of entering into a contract with the owner for the construction
of the work if the contract is awarded to him
a) payment bond
b) guarantee bond
c) bid bond
d) proposal bond
26. A bond furnished by the contractor and his surety as a guaranty to the quality of the materials and
equipment installed and the workmanship performed
a) work bond
b) performance bond
c) guarantee bond
d) payment bond
33. Under building code, window openings shall equal at least of what percent of the floor area of the room?
a) 25%
b) 20%
c) 10%
d) 15%
34. Instructions which may be issued to supplement drawings and general conditions of the contract
a) specifications
b) contract documents
c) schedule of work
d) scope of work
35. An outline specification enumerating the type or trade names of materials to be used
a) schedule of materials & finishes
b) bid bulletin
c) contract documents
d) bid forms
36. Who shall be responsible for carrying out the provision of the Building Code as well as the enforcement of
orders?
a) Building Officials
b) Office of the City Engineer
c) Authority
d) DOH
38. Contracts take effect only between the parties, their assigns and heirs except in cases where te rights and
obligations arising from the contract are not transmissible by their nature, or by stipulation or by provision of
law
a) interdependence of contracts
b) relativity of contracts
c) mutuality of contracts
d) contract agreement
39. The board may entertain an application for new Certificate of Registration from the person whose certificate
has been revoked after the expiration from the date of revocation foe
a) 5 yrs
b) 4 yrs
c) 2 yrs
d) 3 yrs
40. Printed documents stipulating the procedural and administrative aspect of the contract
a) specification
b) general conditions
c) proposal
d) bid
41. A natural person who has been issued a certificate of registration and a valid professional license by the
Board of Interior Design.
a) Interior Planner
b) Professional Consultant
c) Space Planner
d) Interior Designer
42. To whom can a lump sum contract be advantageous when he knows right away the cost of the job and has
to pay the agreed amount upon the work is finished?
a) employer
b) owner
c) contractor
d) Interior designer
45. Original drawings and specifications duly signed, stamped or scaled as instruments of service are property of:
a) interior designer
b) building official
c) owner
d) employer
46. The person or firm ordering the project for execution, including duly appointed successors, or authorized
representatives
a) agent
b) supplier
c) contractor
d) owner
48. If the agreed Professional interior design fee for a project is P 850,000, how much is he/she will receive upon
acceptance or signing of the contract
a) P 85,000
b) P 42,500
c) P 12,750
d) P 85,000
51. In BP 344, urinals should have an elongated lip or through type with maximum height of the lip of:
a) 0.45m
b) 0.50m
c) 0.40m
d) 0.48 m
52. Design studies to describe a recommended solution of the problem in overall sense is
a) sketch
b) diagram
c) schematics
d) working drawing
e) matrix
54. Required by public policy, for want on acts that must be suppressed
a) nominal damages
b) liquidated damages
c) exemplary damages
d) temperate damages
56. A permanent roofed structure above a door attached to and supported by the building and projecting over a
wall or sidewalk.
a) mezzanine
b) awning
c) marquee
d) attic
59. Maximum length of imprisonment imposed in the violation of any provisions of RA 8534
a) 3 yrs
b) 10 yrs
c) 1 yr
d) 5 yrs
61. Purchase and deliver to the jobsite or other location when so designated
a) delivery
b) furnish
c) manufacture
d) purchase order
67. Labor and materials for both as well as equipment, transportation, or other facilities necessary to commence
and complete the construction called for in the contract
a) schedule of work
b) specificatons
c) mobilization
d) work
68. The list of instructions stipulating the manner on how bids are to be prepared and conditions for the award
of contract
a) instruction to bidders
b) checklist
c) bid bulletin
d) general conditions
70. The notice published by the owner giving information as to the nature of the proposed project, conditions
for the issuance of contract documents and date of bidding
a) award
b) invitation to bid
c) contract documents
d) bid bulletin
72. Total amount to be paid to an interior designer after the schematic design phase
a) 30%
b) 20%
c) 10 %
d) 35%
73. Maximum distance of a handicapped parking space from the facility being served
a) 60.00m
b) 50.00m
c) 20.00 m
d) 10.00 m
75. Which of the following cannot be done by the employer If the contractor fails or refuses to comply with his
obligation?
a) Another work should be executed
b) Refuse delivery
c) Terminate the work
d) Have the defect removed
76. The built environment shall be designed to allow the disabled citizens to participate and contribute to
developmental goals.
a) Occupancy
b) workability and efficiency
c) reachability
d) safety
79. Minimum length of imprisonment imposed in the violation of any provisions of RA 8534
a) 12 months
b) 5 months
c) 3 months
d) 6 months
80. A bond furnished by the contractor and his surety as a guaranty of good faith on the part of the contractor to
pay all obligations arising from his contract
a) work bond
b) payment bond
c) surety bond
d) performance bond
83. A government entity created under PD No. 223 to administer, implement and enforce the various regulatory
laws and policies of the government relative to various professions
a) PRC
b) DPWH
c) Office of the President
d) NMC
85. A written notice from the owner to the successful bidder stating that its bid has been accepted and that, in
accordance with the terms of the tender/bid documents, he is required to enter into contract and to furnish the
required performance bond and other stipulated documents
a) notice to proceed
b) proposal
c) notice of award
d) bid bulletin
88. It consists in the omission of that diligence which is required by the nature of the obligation.
a) negligence
b) diligence
c) delay
d) mistake
90. An agreement by virtue of which the owner of credit transfer his credit and its accessory right to another
who acquires the power to enforce it to the same extent or the assignor duly approved by the client
a) deed of assignment
b) contract
c) transfer credit
d) credit line
92. Neither the employer nor the contractor or designer knows how much the job will cost until after its
completion
a) cost plus a fixed amount
b) cost plus certain percentage
c) percentage
d) Lump-sum
93. A written notice to the contractor of the date on which he is to begin the prosecution of the works he has
contracted
a) bid bulletin
b) notice of award
c) instruction to bidder
d) notice to proceed
95. Complaints regarding unethical practices against interior designer are directed to the
a) PIID President
b) DPWH
c) City Engineer
d) BOID Chairman
96. It includes any and all damages a human being may suffer in any and all manifestation of his life
a) temperate damages
b) moral damages
c) liquidated damages
d) civil damages
98. The life of the contract where the terms and conditions are being complied with or implement
a) termination
b) compliance with the contract
c) perfection of the contract
d) contract agreement
102. With regards to responsibilities to his CLIENT, which of the following is/are not expected of the interior
designer?
a) presents examples of professional experience
b) none
c) explains conditions of project cost estimates
d) ascertains exact nature/scope of services/professional fees
107. Under BP 344, the use of thresholds shall be minimized throughout the buildings. Where they are essential,
the maximum height shall be …
a) 10 mm
b) 15 mm
c) 20 mm
d) 25 mm
110. Every member of the board shall at the time of his appointment and thereafter have practice experience of
interior design for a period of...
a) 5 yrs
b) 8 yrs
c) 10 yrs
d) 6 yrs
111. A binding resolution of disputes by one or more neutral person as a substitute for judicial proceeding
a) Agreement
b) arbitration
c) final decision
d) legal action
112. It is the remedy in equity by means of which a written instrument is made or construed so as to express or
conform to the real intention of the parties
a) agreement
b) limitation
c) recission
d) reformation
115. The period of time allowed by the owner of the delay suffered by the contractor due to courses beyond his
control
a) deadline
b) supplementing time
c) contract time extension
d) delayed extension
116. In repetitive works, interior designer’s fee is paid except by:
a) a and c
b) full payment for 1 unit
c) percentage of all units including the model unit
d) percentage of one unit
118. The period of time allowed the contractor by the client in addition to the stipulated contract time
necessitated by a duly issued extra work or change order
a) charge fee
b) statue of limit
c) additional contract time
d) time limit
120. Situation: Ms. X, an interior designer entered into with Mr. Y binding himself to do the interior design of
Mr. Y’s house. The contract states as one of the terms that in case of failure of either party to comply with the
terms thereof, or in case of breach, the guilty party shall pay the other by way of damages, the amount of P
10,000. This is known as:
a) liquidated damage
b) Temperate damage
c) moderate damage
d) Exemplary damage
122. Minimum stair width for an occupant load that is less than 50
a) 0.90 m
b) 1.00 m
c) 0.80 m
d) 0. 75 m
124. Maximum height of doorknobs and other hardware above the floor
a) 1.06 m
b) 1.15 m
c) 1.05 m
d) 1.10 m
125. A remedy granted by law both to the contracting parties and the third persons in order to secure reparation
of damage caused them by a contract
a) Recission
b) annulment
c) reformation
d) void
126. A bar which extends across at least ½ the width of each door leaf, which will open the door if subjected to
pressure.
a) Guide Rail
b) Panic hardware
c) Lever Door Knob
d) Grab Bar
128. A breach or violation of contract by a contracting party entitles the aggrieved party to ask for
a) termination
b) damages
c) additional fee
d) Surcharge
131. To whom can a lump sum contract be advantageous when the accounting of the expenses is not required?
a) supplier
b) contractor
c) Interior designer
d) Owner
132. The Chairman of the Board of Interior design has to hold office for
a) 1 yr
b) 5 yrs
c) 2 yrs
d) 3 yrs
133. It is defined as an unconscious ignorance or forgetfulness of the existence or non-existence of a fact, past
or present, material to the contract
a) fraud
b) Negligence
c) avoidance
d) mistake
136. One who belongs to that group of men and women who are trained by education and experience to
perform certain functions better than their fellowmen is a ...
a) manager
b) Professional
c) practitioner
d) artist
137. Under Fire Code of the Philippines (FCP), CLASSIFICATION OF OCCUPANCY, COURT HOUSES SHALL BE
CLASSIFIED
a) Institution
b) residential
c) assembly
d) others
139. Habitable rooms provided with artificial ventilation shall have ceiling height not less than __________
measured from the floor to ceiling.
a) 3.00m
b) 2.40m
c) 2.00m
d) 1.80m
140. Written or printed description of work to be done describing qualities of materials and made of
construction
a) endorsement
b) proposal
c) specification
d) bid form
141. A person or organization who for a consideration promises to make good the debt or default of another
a) performance bond
b) surety
c) damages
d) professional fee
146. A written additional information, provision, and/or other document issued by the client prior to the closing
date for the receipt of bids, which is made an integral part of the Tender and Contract documents
a) contract document
b) proposal
c) bid tender
d) addendum
147. Number of wheelchair seating for an assembly with seating capacity of 51-300
a) 3
b) 4
c) 2
d) 5
149. Under BP 344, which of the following is NOT generally considered as a basic physical planning requirement?
a) orientation
b) durability
c) safety
d) accessibility
150. A specific period of time within which legal action must be brought for alleged damage or injury
a) deadline
b) contract time
c) deadlock
d) statue of limitation
152. A set of rules which serves to guide every professional in the practice of his profession is known as
a) Rules and Regulations
b) New Civil Code
c) Code of Ethics
d) Professional Regulations
154. The board in accordance with the Rules of the Commission shall report the rating obtained by each
candidate not more than
a) 12 days
b) 15 days
c) 10 days
d) 20 days
159. A bond furnished by the contractor and his surety as guaranty to execute the work in accordance with the
terms of the contract
a) guarantee bond
b) payment bond
c) performance bond
d) surety
163. Under PD 1096, what is referred to as construction in an existing building/structure involving physical
change to increase its value (area), utility, and/or improve its aesthetic quality?
a) repair
b) renovation
c) alteration
d) conversion
171. Minimum height of doorknobs and other hardware above the floor
a) 0.90 m
b) 0.82 m.
c) 0.85 m
d) 0.80 m
172. One not expressed by the parties, but implied from facts and circumstances showing mutual intention to
contract, dictated by reason and justice and which the law presumes from the relation of the parties
a) bid contract
b) agreement
c) implied contract
d) express contract
174. A contract provision setting forth the damages a party must pay in the event of his breach
a) bond
b) penalty clause
c) guarantee
d) Damages
177. What can relieve the contractor of his liability for any defect in the work
a) Delay of work by the employer
b) Cancellation of work by the employer
c) Acceptance of work by the employer
d) Damages paid by the employer
178. Awarded to vindicate or recognize the right of the plaintiff which has been violated and not necessarily to
indemnify him for any loss suffered
a) exemplary damages
b) nominal damages
c) liquidated damages
d) temperate damages
179. The built environment shall be designed so that it shall be accessible to all people
a) accessibility
b) reachability
c) sustainability
d) usability
180. Contract for goods which are to be manufactured special order, and not for general market
a) contract for a piece of work
b) Cost plus
c) Lump sum contract
d) cost plus a certain percentage
----------Key----------
1. (d)
2. (b)
3. (c)
4. (d)
5. (c)
6. (d)
7. (c)
8. (a)
9. (a)
10. (a)
11. (c)
12. (a)
13. (c)
14. (c)
15. (a)
16. (d)
17. (c)
18. (c)
19. (b)
20. (d)
21. (d)
22. (b)
23. (d)
24. (c)
25. (c)
26. (c)
27. (c)
28. (a)
29. (d)
30. (c)
31. (b)
32. (c)
33. (c)
34. (a)
35. (a)
36. (a)
37. (b)
38. (b)
39. (c)
40. (b)
41. (d)
42. (b)
43. (b)
44. (b)
45. (a)
46. (d)
47. (a)
48. (a)
49. (b)
50. (b)
51. (d)
52. (c)
53. (d)
54. (d)
55. (b)
56. (c)
57. (b)
58. (a)
59. (a)
60. (d)
61. (b)
62. (d)
63. (d)
64. (d)
65. (a)
66. (c)
67. (c)
68. (a)
69. (c)
70. (b)
71. (d)
72. (a)
73. (a)
74. (c)
75. (c)
76. (b)
77. (d)
78. (b)
79. (d)
80. (b)
81. (b)
82. (c)
83. (a)
84. (a)
85. (c)
86. (b)
87. (c)
88. (a)
89. (b)
90. (a)
91. (b)
92. (a)
93. (d)
94. (b)
95. (d)
96. (b)
97. (b)
98. (b)
99. (b)
100. (c)
101. (c)
102. (a)
103. (a)
104. (a)
105. (c)
106. (c)
107. (d)
108. (b)
109. (b)
110. (c)
111. (b)
112. (d)
113. (d)
114. (a)
115. (c)
116. (c)
117. (b)
118. (c)
119. (d)
120. (a)
121. (a)
122. (a)
123. (c)
124. (a)
125. (a)
126. (b)
127. (a)
128. (b)
129. (a)
130. (d)
131. (b)
132. (d)
133. (d)
134. (d)
135. (b)
136. (b)
137. (c)
138. (c)
139. (b)
140. (c)
141. (b)
142. (d)
143. (b)
144. (d)
145. (c)
146. (d)
147. (a)
148. (c)
149. (b)
150. (d)
151. (c)
152. (c)
153. (b)
154. (d)
155. (c)
156. (b)
157. (c)
158. (c)
159. (c)
160. (a)
161. (d)
162. (d)
163. (b)
164. (c)
165. (a)
166. (b)
167. (c)
168. (d)
169. (a)
170. (b)
171. (b)
172. (c)
173. (c)
174. (b)
175. (d)
176. (b)
177. (c)
1 Minimum dimension of an accessible elevator
a. 1.00 x 1.20m b. 1.10m x 1.40m c. 1.20m x 1.40m
178. (b)
179. (a)
180. (a)
12 Neither the employer nor the contractor or designer knows how much the job will cost until after its
completion
a. Lump-sum b. cost plus a fixed amount c. cost plus certain percentage
16 It consists in the omission of that diligence which is required by the nature of the obligation.
a. delay b. negligence c. mistake
17 Refers to all laws, decrees, executive orders and other administrative issuances and parts thereof
which are inconsistent with the provisions of this Act are hereby modified, superseded or repealed
accordingly
a. enforcement b. penalties
c.. separability clause d. repealing clause
19 The built environment shall be designed so that it shall be accessible to all people
a. reachability b. usability c. accessibility
24 Labor and materials for both as well as equipment, transportation, or other facilities necessary to
commence and complete the construction called for in the contract
a. work b. mobilization c. schedule of work
30 A bond furnished by the contractor and his surety as a guaranty to the quality of the materials and
equipment installed and the workmanship performed
x. performance bond b. guarantee bond c. payment bond
34 Under building code, window openings shall equal at least of what percent of the floor area of the
room?
a. 15% b. 20% c. 10%
43 The list of instructions stipulating the manner on how bids are to be prepared and conditions for the
award of contract
a. checklist b. instruction to bidders c. general conditions
49 Complaints regarding unethical practices against interior designer are directed to the
a. City Engineer b. BOID Chairman c. DPWH
52 Under BP 344, the use of thresholds shall be minimized throughout the buildings. Where they are
essential, the maximum height shall be …
a. 20mm b. 15mm c. 25mm
53 A bond submitted by a bidder as a gurranty of entering into a contract with the owner for the
construction of the work if the contract is awarded to him
a. proposal bond b. bid bond c. payment bond
55 A contract provision setting forth the damages a party must pay in the event of his breach
a. Damages b. penalty clause c. bond
61 A bond furnished by the contractor and his surety as a guaranty of good faith on the part of the
contractor to pay all obligations arising from his contract
a. performance bond b. surety bond c. payment bond
62 Printed documents stipulating the procedural and administrative aspect of the contract
a. specification b. general conditions c. proposal
64 Every member of the board shall at the time of his appointment and thereafter have practice
experience of interior design for a period of
a. 5 yrs b. 8 yrs c. 10 yrs
65 The built environment shall be designed to allow the disabled citizens to participate and contribute to
developmental goals.
a. workability and efficiency b. Occupancy c. safety
67 Awarded to vindicate or recognize the right of the plaintiff which has been violated and not necessarily
to indemnify him for any loss suffered
a. temperate damages b. nominal damages c. exemplary damages
68 Who shall be responsible for carrying out the provision of the Building Code as well as the
enforcement of orders?
a. Authority b. Building Officials
c. Office of the City Engineer d. DOH
69 One who belongs to that group of men and women who are trained by education and experience to
perform certain functions better than their fellowmen is a
a. practitioner b. manager c. Professional
74 The person or firm ordering the project for execution, including duly appointed successors, or
authorized representatives
a. contractor b. owner c. agent
75 Number of wheelchair seating for an assembly with seating capacity of 51-300
a. 4 b. 3 c. 2 d. 5
76 Under BP 344, which of the following is NOT generally considered as a basic physical planning
requirement?
a. safety b. accessibility
c. durability d. orientation
81 In BP 344, urinals should have an elongated lip or through type with maximum height of the lip of:
a. 0.48 m b. 0.45m c. 0.40m
84 What can relieve the contractor of his liability for any defect in the work
a. Damages paid by the employer
b. Cancellation of work by the employer
c. Acceptance of work by the employer
d. Delay of work by the employer
85 To whom can a lump sum contract be advantageous when the accounting of the expenses is not
required?
a. Interior designer b. contractor
c. Owner d. supplier
90 A person or organization who for a consideration promises to make good the debt or default of
another
a. performance bond b. surety c. damages
91 Situation: Ms. X, an interior designer entered into with Mr. Y binding himself to do the interior
design of Mr. Y’s house. The contract states as one of the terms that in case of failure of either party
to comply with the terms thereof, or in case of breach, the guilty party shall pay the other by way of
damages, the amount of P 10,000. This is known as:
a. Temperate damage b. liquidated damage
c.Exemplary damage d. moderate damage
95 The Chairman of the Board of Interior design has to hold office for
a. 1 yr b. 2 yrs c. 5 yrs d. 3 yrs
96 A specific period of time within which legal action must be brought for alleged damage or injury
a. statue of limitation b. contract time c. deadline
97 A set of rules which serves to guide every professional in the practice of his profession is known as
a. New Civil Code b. Code of Ethics c. Rules and Regulations
99 With regards to responsibilities to his CLIENT, which of the following is/are not expected of the interior
designer?
a. presents examples of professional experience
b. explains conditions of project cost estimates
c. ascertains exact nature/scope of services/professional fees
100 Required by public policy, for want on acts that must be suppressed
a. exemplary damages b. temperate damages c. nominal damages
102 The birth of the contract or the commencement of the contractor’s judicial life
a. contract agreement b. consumation of contract c. perfection of the contract
103 A binding resolution of disputes by one or more neutral person as a substitute for judicial proceeding
a. Agreement b. arbitration c. legal action
106 The notice published by the owner giving information as to the nature of the proposed project,
conditions for the issuance of contract documents and date of bidding
a. bid bulletin b. award c. invitation to bid
109 A listing of the different parts of the work indicating in each the value in materials and labor, including
an Allowance for profit and overhead
a. bill of materials b. breakdown of work c. production sheet
and corresponding value
111 Contract for goods which are to be manufactured special order, and not for general market
a. Lump sum contract b. contract for a piece of work
b. Cost plus d. cost plus a certain percentage
115 Under PD 1096, what is referred to as construction in an existing building/structure involving physical
change to increase its value (area), utility, and/or improve its aesthetic quality?
a. alteration b. repair
c. conversion d. renovation
117 To whom can a lump sum contract be advantageous when he knows right away the cost of the job
and has to pay the agreed amount upon the work is finished?
a. Interior designer b. contractor
b. Owner c. employer
121 A written notice to the contractor of the date on which he is to begin the prosecution of the works he
has contracted
a. instruction to bidder b. notice to proceed c. notice of award
123 Instructions which may be issued to supplement drawings and general conditions of the contract
a. specifications b. scope of work c. schedule of work
126 Total amount to be paid to an interior designer after the schematic design phase
a. 10 % b. 20% c. 30% d. 35%
128 Refers to the act of planning, designing, specifying, supervising anf giving general administration and
responsible direction to the finishing of interior spaces
a. visual technique b. space planning c. interior design
131 The life of the contract where the terms and conditions are being complied with or implement
a. contract agreement b. compliance with the contract c. perfection of the
contract
132 Percentage of the amount paid to an interior designer for the compliance of design development phase
a. 20% b. 35% c. 50% d. 15%
134 Which of the following cannot be done by the employer If the contractor fails or refuses to comply
with his obligation?
a. Have the defect removed b. Another work should be executed
b. Terminate the work d. Refuse delivery
136 Original drawings and specifications duly signed, stamped or scaled as instruments of service are
property of:
a. owner b. employer c. interior designer d. building
official
137 A remedy granted by law both to the contracting parties and the third persons in order to secure
reparation of damage caused them by a contract
a. reformation b. annulment c. Recission
141 An outline specification enumerating the type or trade names of materials to be used
a. bid forms b. bid bulletin c. schedule of materials & finishes
143 The board in accordance with the Rules of the Commission shall report the rating obtained by each
candidate not more than
a. 10 days b. 12 days c. 20 days
145 Maximum distance of a handicapped parking space from the facility being served
a. 50.00m b. 60.00m c. 10.00 m
146 One not expressed by the parties, but implied from facts and circumstances showing mutual intention
to contract, dictated by reason and justice and which the law presumes from the relation of the
parties
a. implied contract b. agreement c. express contract
149 A natural person who has been issued a certificate of registration and a valid professional license by
the Board of Interior Design.
a. Space Planner b. Professional Consultant
c. Interior Designer d. Interior Planner
150 In the Interior Designer’s Code of Ethics, to whom does the ID have responsibility to consider needs
and aesthetic and functional requirements?
a. contractor b. public c. manufacturers/dealers d.
client
152 The board may entertain an application for new Certificate of Registration from the person whose
certificate has been revoked after the expiration from the date of revocation foe
a. 3 yrs b. 2 yrs c. 4 yrs
153 A written additional information, provision, and/or other document issued by the client prior to the
closing date for the receipt of bids, which is made an integral part of the Tender and Contract
documents
a. bid tender b. contract document c. addendum
155 A change in the use of or occupancy of a building/structure or portion thereof, which has different
requirements
a. alteration b. conversion c. renovation d. demolition
156 A written notice from the owner to the successful bidder stating that its bid has been accepted and that,
in accordance with the terms of the tender/bid documents, he is required to enter into contract and to
furnish the required performance bond and other stipulated documents
a. notice to proceed b. notice of award c. bid bulletin
158 Written or printed description of work to be done describing qualities of materials and made of
construction
a. bid form b. proposal c. specification
160 A permanent roofed structure above a door attached to and supported by the building and projecting
over a wall or sidewalk.
a. awning b. marquee c. mezzanine
162 Maximum height of doorknobs and other hardware above the floor
a. 1.06 m b. 1.10 m c. 1.05 m
164 Comfortable clearance for knee and leg space under the table/ counter for a person in a wheelchair.
a. 0.74m b. 0.85 m c. 0.70 m
165 A more comprehensive system of time scheduling and permits a more realistic analysis of the daily
problems of construction project
a. bar chart b. timetable c. CPM
166 Contracts take effect only between the parties, their assigns and heirs except in cases where te rights
and obligations arising from the contract are not transmissible by their nature, or by stipulation or by
provision of law
a. mutuality of contracts b. interdependence of contracts c. relativity of contracts
168 A breach or violation of contract by a contracting party entitles the aggrieved party to ask for
a. Surcharge b. additional fee c. damages
170 The period of time allowed the contractor by the client in addition to the stipulated contract time
necessitated by a duly issued extra work or change order
a. statue of limit b. time limit c. additional contract time
172 Minimum ID’s fee for a 502 sqm service for a renovation work excluding contingency fees
a. P 5,0200 b. P 200,800 c. P 20,800 d. P 502,000
174 Insidious word or machinations of one of the contracting parties, the other is induced to enter into a
contract, which without them he would have agreed to.
a. fraud b. threat c. intimidation
176 Remedial work done on any damaged or deteriorated portion/s of a building/structure to restore its
original condition
a. renovate b. repair c. alter d. design
177 Any movable structure, table showcase, cabinet and the like where foods and periodicals are
displayed
a. showcase b. display c. display stand d. display window
179 A vertical opening through a building for elevators, dumbwaiter, mechanical equipment, or similar
purposes
a. soffit b. hole c. shaft d. niche
180 Maximum ID’s fee for 76 – 300 sqm residential design
a. P 10,000 b. P 20,000 c. P 50,0000 d. P 3,000,000
181 The stipulated period of time within the contactor shall complete the contract works
a. time limit b. stature of limitation c. original contract time
182 The entire parcel of real property, divided or to be divided in condominium including structures thereon
a. unit b. project c. land use d. ownership
185 A document issued by a governmental authority having jurisdiction to authorize specific work by the
applicant
a. bond b. permit c. agreement
186 The shortest linear dimensions usually measured in the direction of the floor, beams and joists
a. building width b. vertical side c. horizontal side
187 Information, advice or notification delivered in person or sent by registered mail to individual, firm or
corporation, regarding items pertinent to the nature and/or execution of the work and the contract
related thereto
a. bid bulletin b. specifications c. written notice
189 Any new construction which increases the height or area of an existing building or structure
a. addendum b. renovation c. alteration d. addition
192 Mezzanine floor shall have a clear ceiling height not less than ________ above and below it.
a. 2.40m b. 2.70m
c. 2.00m d. 1.80m
198 The offer of a bidder to perform the work described by the contract documents when made out and
submitted on the prescribed form, properly signed and guaranteed
a. proposal b. bid c. contract
201 Habitable rooms provided with artificial ventilation shall have ceiling height not less than __________
measured from the floor to ceiling.
a. 3.00m b. 2.00m
c. 2.40m d. 1.80m
202 How many days shall an act take effect following its publication in the Official Gazette or in a major
daily newspaper of general circulation in the Philippines?
a. fifteen (15) b. ten (10) c. twelve (12) d. thirty (30)
203 A bar which extends across at least ½ the width of each door leaf, which will open the door if
subjected to pressure.
a. Panic hardware b. Grab Bar
c. Guide Rail d. Lever Door Knob
205 The parties agree on a basic price which both of them believe is reasonably the amount that will be
spent for labor and materials
a. Lump sum contract b. contract for a piece of work
c. Cost plus d. cost plus a certain percentage
208 An agreement by virtue of which the owner of credit transfer his credit and its accessory right to
another who acquires the power to enforce it to the same extent or the assignor duly approved by the
client
a. deed of assignment b. credit line c. contract
210 One where the intention of the parties and the terms of the agreement are declared or expressed by
the parties, in writing or orally, at the time it is entered into
a. implied contract b. agreement c. express contract
211 It includes any and all damages a human being may suffer in any and all manifestation of his life
a. temperate damages b. liquidated damages c. moral damages