M.P. Projects STP Master Drawing List Sl. No. Drg. No - Drg. Title

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 7

M.P.

Projects STP
Master Drawing List
SL. NO. DRG. NO. DRG. TITLE
1 Main Pumping Station
2 Inlet Chamber, Channel
3 Grit Chamber- Manual, Mechanical
3a Oil and Grease removal chamber
3b Parshall Flume
4 SBR Air Blower Room
5 Chlorination and Chlorine tonner room
6a Sludge Sump cum pump house
6b DWPE tank, Fecl3 tank with dosing system
7 Chlorine leak absorption system
8 Civil GA of Main Pumping Station
9 Civil GA of Inlet Chamber, Channel
10 Civil GA of Grit Chamber- manual, Mechanical
11 Civil GA of Oil and grease removal chamber
12 Civil GA of Parshall Flume
13 Civil GA of SBR Air Blower Room
14 Civil GA of Chlorination & Chlorine tonner room
15 Civil GA of Sludge Sump cum pump house
16 Civil GA of DWPE tank, Fecl3 tank with dosing system
17 Civil GA of Chlorine leak absorption system
18 Interconnecting Pipe Layout
19 Electrical Load list
20 Transformer size calculation
21 Capacitor size calculation
22 DG size calculation
23 Single line diagram
24 Cable sizing Calculations
25 Illumination Calculations for STP
26 Earthing Calculation for STP
27 Cable Layout
28 Earthing Layout
29 Lighting Layout
30 Cable Schedule
31 List of Instruments
32 Control Philosphy
33 System Configuration
34 List of I/O's ( Othar than C-Tech)
35 Instrument Cable Schedule
36 Layout of Column and RCC wall
37 General Arrangement of RCC wall, Beams, Columns and slabs
38 Foundation reinforcement detail
39 Column and beam reinforcement detail
40 RCC slab reinforcement detail
S.No DATASHEETS
1 SAS pump
2 RAS pump
3 SBR air blower
4 Sludge air blower
5 Decanter
6 Isolation Valves -Sluice, Butterfly
7 Reflux Valves
8 Diaphragm Valves
9 Fine bubble diffuser
10 Gates
11 Manual Screen - Fine & Coarse
12 Mechanical Screen - Fine & Coarse
13 Dosing Pump
14 Sludge feed pump
15 Classifier/Grit Separator
16 Gas Chlorination system & chlorine absorption system
17 Chlorine Tonner
18 Oil Skimmer
19 MS Pipe
20 DI Pipe
21 SS Pipe
22 UPVC Pipe
23 RCC Pipe
24 GI Pipe
25 Centrifuge
26 Agitator
27 Centrifuge Sludge Pump
A. Submission of Mechanical Components of SBR at STP
1 SBR blower motor and sludge blower motor
2 Airman diffuser and piping
3 Decanter with Actuator
4 SBR basin blower
5 Submersible pumps (RAS & SAS Pumps)
6 Decanter Actuator with Decanter
7 SBR blower Already covered in 4
8 Centrifuge
9 Centrifuge feed pump
10 Ferric dosing pump
11 Thickener
12 Agitator
13 Poly dosing pump
14 Sludge sump blower
15 General ventilation
16 Hoist/crane
17 Isolation gate

B. Submission of Mechanical componentsfor chlorination at STP


1 Piping, control and mixing system
2 Chlorine cylinders and handling system
3 pumps and motors
4 Ventilation of plant room
In single Package
5 Electrical motors
6 EOT & Hoist
7 General mechanical items related to plant room
8 Chlorine leak detection arrangement

C. Submission of Mechanical components for raw sewer water system at STP


1 Grit
2 Mechanical fine screen
3 Manual fine screen
4 Pumps/piping/valves
5 Mechanical coarse screen
6 Manual Coarse screen
7 Electrical motors
8 EOT
9 General mechanical items related to plant room

D. Submission of SCADA-PLC at STP


1 MPS
2 Inlet chamber
3 Grit chamber
4 Air blower unit
5 SBR unit
6 CCT Unit Not required
7 Centrifuge Not required
8 MCC room/ SCADA Room details

E. Submission of Electrical components at STP


1 Complete plant load list
2 Transformer and switchgear sizing calculation
3 Electrical single line diagram
4 Switchyard and equipment layout
5 Cable sizing calculation and layout
6 Lighting design in software and layout
7 Earthing design and layout
8 Lighting protection system