CONSTRUCTION OF PRIMARY SUBSTATION ATSARAYA BANDAR CIVIL WORKS

1 Site Grading works Units Qty Remarks


Site Clearing work m2 1600
Soft Rock Cutting required level and Levelling m3 750
Imported Earth Filling & Compaction m3 375
1.1 CIVIL WORKS
Earth & Concrete Works
Excavation in soft rock m3 350
Backfilling with Imported Earth & Compaction m3 420
Disposal of Excavated Earth m3 350
Ready Mix Concrete - PCC C15 SRC OR OPC m3 109
Ready Mix Concrete - RCC C35 SRC OR OPC m3 550
Wastage of Concrete - RCC m3 26.0 4% wastage
Foundation --Reinforcement
Epoxy Coated OR Normal Reinforcement Steel MT 137
Wastage of Epoxy Coated Reinforcement Steel MT 4.80 3.5% wastage
BRC Mesh Reinforcement - A393 m2 100
Block Works( solid & hollow block)
Damp Proof Course - 300mm/200 Width rm 100
390 x 190 x 90 Solid Block work - Cavity wall m2 800
390 x 190 x 140 Hollow Block work - Cavity Wall m2 800
390 x 190 x 190 Hollow Block work - Building Internal m2 450
Block Work Acceries
Stainless steel Butterfly wall Ties - V 26 nos 1600
Stainless steel Butterfly Cavity wall Ties - V 01 nos 1600
Cavity Wall Insulation Board - 50 mm thick m2 800
Expanded Metal lath 150mm Width rm 2000
Expanded Metal Lath100mm Width rm 2000
Internal and External wall Plastering
20mm Thick External Plastering m2 775
15mm Thick Internal Plastering m2 1265
RCC Bonding Rush Coat Bags 120
GI Corner Angle Bead rm 56
Fibre Glass Plaster Mesh Roll 28
GI plaster stopper rm 285
Miscellaneous Items
GI Edge Angle - 50X50X6 rm 78
8mmThick Cheq. Plate m2 25
G I Channel - 100x50 rm 200
GI Unistrut rm 125
Cat Ladder to Cable Basement - 3M Height Nos 1
110 dia UPVC Pipe for Roof Water Drainage rm 112
200 dia UPVC pipe rm 24
110 dia Angled Roof Water Outlet Nos 157
Cat ladder to roof - 7.5M Height Nos 1
Cat ladder to roof - 11.5M Height Nos 1
Cat ladder to roof - 4.5M Height
PVC Water Stop - 250mm Wide rm 265
1000 Guage Polythene Sheet m2 2800
Water Proofing
Anti Termite Treatment m2 2650
Underground Protection to Concrete Members - Masterseal 550 m2 135
2.1mm Thick Self Adhesive Water Proofing Membrane m2 135
4mm Thick Protection Board m2 500
APP Membrane 4mm thick m2 500
Aluminium flashing of girth rm 100
Bitumen mastic into groove rm 100
50mm thick expanded insulation board m2 500
Geotextile separation layer m2 500
Light Weight Foam Screed - S/C Cost m2 500
Roof Tiling - (600x600x40mm) Material & Installation m2 500
Painting Works
External Medium Texture Paint m2 600
5mm thick Epoxy Floor Screed m2 450
Internal Painting on Walls - Oil Based m2 1675
Internal Emulsion Painting - Ceiling m2 795
Epoxy Painting on Walls & Floors m2 1100
Dust Proof Painting on CT Inside m2 100
Acid Alkali Resistant Painting m2 95
Door Painting - Single nos 6
Door Painting - Double nos 3
Wall / Floor - Acid Resistant Tiles m2 120
Acid Resistant Skirting Tiles rm 160
PVC Floor Tiles - 3mm thick m2 160
PVC Skirting Tiles rm 466
Grouting & Adhesive Materials m2 385
Ceramic floor and wall tiles m2 33
Bath room/kitch Corner Angle rm 12
Raised Access Floor System - 0.8M Height m2 125
Metal Panelled Suspended Ceiling m2 125
2 Hours Firerated Steel Doors
Double Door (2.5W x 3H) - Panic Steel Door Nos 2
Double Door (2.5W x 3H) - Panic with Vision Panel Steel Door Nos 1
Double Door (2W x 3H) - Lever Handle Steel Door Nos 1
Single Door (1 W x 2.2H) - Panic Steel Door Nos 7
Single Door (1 W x 2.2H) - Panic with Vision Panel Steel Door Nos 4
Single Door (1 W x 2.2H) - Steel Door with L/H Nos 2
Single Door (1 W x 2.2H) - Wooden Door Nos 2
Aluminium Works and Glazing
Aluminium Fixed High Level Windows - 0.8M Height NOS 13
Aluminium Sliding Windows - 1.5x1.2M Nos 2
Aluminium Louvered Window - Toilet & pantry Nos 1
Non Returnable Louver - 0.8X0.6m (Battery Room) Nos 1
Marble Sill Nos 15
Exhaust Fan - Explosion Proof Nos 1
Exhaust Fan - Toilet & Kitchen Nos 1
Water Supply Works (Plumbing & Sanitary Works)
Eye Wash in Battery Room Nos 1
EWC Nos 1
Wash Basin Nos 1
Kitchen Sink - Double Bowl Nos 1
Kitchen Cabinet Nos 1
Paper Holder Nos 1
Soap Dish Nos 1
Towell Rail Nos 1
Mirror Nos 1
Water Heater - 80 litre capacity Nos 1
Internal Water Supply Copper Pipes Lot 1
Gate Valves & Pipe Fittings Lot 2
Roof Water Tank - 250US Gallon Capacity Nos 1
1.2 20 MVA Transformer Foundation Works 3nr
Earth works soft Rock m3 230
Disposal of Surplus Earth m3 230
Backfilling With Imported Earth Filling & Compaction m3 230
Epoxy Coated Reinforcement Steel Mt 38
Wastage of Epoxy Coated Reinforcement Steel Mt 1.05
Ready Mix Concrete - PCC C15 SRC m3 7.5
Wastage of Concrete PCC C15 SRC m3 0.5
Ready Mix Concrete - RCC C35 SRC m3 168
Wastage of Concrete - RCC SRC 35 m3 5
GI Grating - 40X5 m2 72
UPN Supports (260x90) for GI Gratings rm 120
UPN Supports (100x50) for GI Gratings rm 120
Edge Angle - 80X80X6mm rm 43
Steel Inserts - 300x300x16mm Nos 75
Wadi Stone filling indise the Transformer m3 44
Anti Termite Treatment m2 188
Protection to U/G Concrete Members m2 188
1000 Guage Polythene Sheet m2 90
Dust Proof Painting on Exposed Concrete Surfaces m2 455
Precast Concrete Cover Slab m2 12
UPVC Pipes - 150mm Dia rm 61
1.3 20 MVA Transformer Fire Wall - 5 mts Height 2 nos
Epoxy Coated Reinforcement Steel mt 2.5
Wastage of Epoxy Coated Reinforcement Steel mt 0.060
NoramlReinforcement Steel mt 2.800
Wastage of Noraml Reinforcement Steel mt 0.020
Ready Mix Concrete - RCC C 35 SRC m2 36
Wastage of Concrete m2 1.5
Wall form works m2 145
Medium Texture External painting m2 145
1.4 Foundation for 500 kva - 2nr
Epoxy Coated Reinforcement Steel mt 1.10
Wastage of Epoxy Coated Reinforcement Steel mt 0
Ready Mix Concrete - PCC C15 SRC m3 1
Wastage of Concrete m3 0.2
Ready Mix Concrete - RCC C35 SRC m3 25.0
Form Works 18mm thick plywood m2 150.0
1.5 Foundation for Capcitor bank - 2nr
Epoxy Coated Reinforcement Steel mt 1.5
Ready Mix Concrete - PCC C15 SRC m3 1
Wastage of Concrete m3 0.4
Ready Mix Concrete - RCC C35 SRC m3 6
Form works walls, m2 22
Wastage of Concrete m3 0.05
Excavation soft rock m3 6
Imported Earth Filling & Compaction m3 4
Disposal of Surplus Earth m3 2
Anti Termite Treatment m2 15
Protection to U/G Concrete Members m2 15
1000 Guage Polythene Sheet m2 16
1.6 Outdoor RC Trenches and Ducts
External Cable Trenches - 1500x2000mm (45 rm)
Epoxy Coated Reinforcement Steel mt 12
Wastage of Epoxy Coated Reinforcement Steel mt 0
Ready Mix Concrete - PCC C15 SRC m3 11
Form Work 18mm thick plywood m2 270
Ready Mix Concrete - PCC C35 SRC m3 45
Wastage of Concrete m3 1
Edge Angle - 50x50x6 rm 83
Unistrut Channels rm 413
Precast Concrete Cover Slabs m2 68
Excavation soft rock m3 145
Backfilling With Imported Earth & Compaction m3 10
Disposal of Surplus Earth m3 110
Protection to U/G Concrete Members m2 125
1000 Guage Polythene Sheet m3 130
1.7 External Cable Trench 72rm
Epoxy Coated Reinforcement Steel mt 18
Wastage of Epoxy Coated Reinforcement Steel mt 1
Ready Mix Concrete - PCC C15 SRC m3 22
Wastage of Concrete m3 1
Ready Mix Concrete - RCC C35 SRC m3 144
Form works walls, m2 925
Wastage of Concrete m3 2
Edge Angle - 50x50x6 rm 288
Unistrut Channels rm 415
Precast Concrete Cover Slabs m2 290
Excavation soft rock m3 295
Backfilling With Imported Earth & Compaction m3 75
Disposal of Surplus Earth m3 150
Protection to U/G Concrete Members m2 864
1000 Guage Polythene Sheet m2 864
1.9 Duct Banks - 3 Nos (5 RMT - 10 Nos of 200mm dia HDPE Pipe)
Reinforcement Materials
Epoxy Coated Reinforcement Steel Mt 3
Wastage of Epoxy Coated Reinforcement Steel Mt
Concrete
Ready Mix Concrete - RCC C35 SRC m3 6
Form work 12mm plywood m2 22
Wastage of Concrete m3
200mm dia UPVC Pipe rm 122
Excavation soft work m3 180
Backfilling With Imported Earth & Compaction m3 67
Disposal of Surplus Earth m3 167
1000 Guage Polythene Sheet m2 45
200mm dia HDPE Pipe rm 160
Protection to U/G Concrete Members m2 67
2.2 Drain & Stone Spreading out side arae
Storm Water Drainage Outside the Plot rm 45
2.3 External Water Supply
External Water Supply FRP Pipes rm 45
Water Meter Charges With Installation Nos 1
2.4 Holding Tank
Epoxy Coated Reinforcement Steel Mt 4.5
Wastage of Epoxy Coated Reinforcement Steel Mt
Ready Mix Concrete - PCC C15 SRC m3 3
Wastage of Concrete m3
Ready Mix Concrete - RCC C35 SRC m3 15.5
Wastage of Concrete m3 0.5
Form Work 18mm thick plywood m2 28
Heavy Duty Cast Iron Manhole Cover Nos 3
Excavation soft soil m3 48
Backfilling With Imported Earth & Compaction m3 6
Disposal of Surplus Earth m3 43
1000 Guage Polythene Sheet m2 45
Protection to U/G Concrete Members m2 48
GI Lings nos 12
110 dia UPVC Pipe rm 8
2.5 Soak Away
Reinforcement -Materials
Epoxy Coated Reinforcement Steel Mt 2.5
Wastage of Epoxy Coated Reinforcement Steel Mt
Form works 12mm thick plywood m2 16.5
Concrete
Ready Mix Concrete - PCC C15 SRC m3 1.5
Wastage of Concrete m3 0.075
Ready Mix Concrete - RCC C35 SRC m3 3.5
Wastage of Concrete m3 1.5
Heavy Duty Cast Iron Manhole Cover Nos 15
Excavation soft rock m3 25
Backfilling With Imported Earth & Compaction m3 8
Disposal of Surplus Earth m3 15
Broken Stone/Rubble Filling m3 22
1000 Guage Polythene Sheet m2 24
Protection to U/G Concrete Members m2 12
Solid Block Work m2 14
110 dia UPVC Pipe rm 12
Sanitary Works and Drainage Works
CI Floor Trap Nos 8
CI Gully Trap Nos 3
UPVC Drainage Pipes - 110mm Dia rm 135
Man Hole medium duty Nos 5
2.6 Compound Wall
Reinforcement
Epoxy Coated Reinforcement Steel Mt 32
Wastage of Epoxy Coated Reinforcement Steel Mt 0
Normal Reinforcement Steel mt 16
Wastage of Black Reinforcement steel Mt 1
Concrete -Materials
Cost of Ready Mix Concrete - PCC C15 SRC m3 22
Wastage of Concrete m3 2
Ready Mix Concrete - RCC C35 OPC m3 46
Ready Mix Concrete - RCC C35 OPC m3 28
Wastage of Concrete 10
Block Works( solid & hollow block)
390 x 190 x 190 Hollow Block work m2 1100
Butter Fly Wall Tiles
Galvanised Tiles - EBT Nos 1300
Expanded metal lath 200mm Width rm 3000
15mm Thick Plastering m2 2750
Fibre Glass Plaster Mesh roll 55
GI plaster stopper rm 950
Bonding Rush Coat bags 50
Expansion Joint Filler Board - 19mm thick m2 53
External Texture Painting m2 2600
Excavation soft soil m3 543
Backfilling With Imported Earth & Compaction m3 315
Disposal of Surplus Earth m2 145
Protection to U/G Concrete Members m2 50
1000 Guage Polythene Sheet m2 155
Barbed Wire Fencing( Y Angle 6 Ties) rm 3000
GI Y Angle nOS 200
MS Gates - 8M Wide No 1
MS Gates - 2M Wide No 1
3.3 Asphalt Road Inside the Substation Subcontrcat works
Sub base compaction 95% m2 400
150mm thick Granular Subbase m2 400
150mm thick Aggregate Base Course m2 400
Prime Coat MC 70 m2 400
50mm thick Asphalt Base Course m2 400
Tack Coat - RC 250 m2 400
30mm thick Asphalt wearing Course m2 400
Kerb Stone - Material & Installation rm 967
100mm thick interpaving black m2 135
3.5 Client offices Furnitures
Office Table Nos 1
Swivel Chair - Office Nos 1
Visitor Chair Nos 2
Steel Lockable Cupboard Nos 1
Drawing Cabinet Nos 1
Drawing Plan Chest Nos 1
Furniture for SCS Nos 3
CONSTRUCTION OF PRIMARY SUBSTATION ATSARAYA BANDAR CIVIL WORKS
LIST OF PROPSED CONSTRUCTION EQUIPMENT LIST
Sl No List of Construction Equipments Duration Remarks
1 54 Seater Bus with Driver
2 14 Seater Bus with Driver
3 1MT Pickup/ 3MT Pickup
4 Plate Compactor ( 3nrs)
5 JCB/ Front loadall
6 Bob Cat
7 50 MT mobile crane
8 60mm Vibrator with Needle(2nos)
9 40mm Vibrator with Needle(2nos)
10 20 mm Vibrator with Needle(2nos)
11 I mt Roller
12 Wood cutting Machine
13 BarBending Machine
14 Wood Cutting Handsaw 5nr
15 Office Cabin 2nr 40'( Contanier) with A/C
16 Store Cabin 2nr 40'( Contanier)
17 Heavy Duty Hilit M/C
18 Medium Duty Hilit M/C
19 Mobile Water Tank
20 DG set 250 watts
21 GRB 1000 Gullon water tank( Site Purpose)
22 GRB 250Gullon water tank(office & operatives)
23 3 Phase Welding Machine 1nos
24 9" Angle Grinder 3nos
25 4" Angle Grinder 5 nos
26 Steel Cutting Machine
27 Block Cutting Machine
28 Core Cutting Machine
29 0.3m3 Concrete Mixture Machine
30 Air Compressor Machine
31 1 HP Motor for Curing Purpose(2nos)
31 1m3 Dumper
CONSTRUCTION OF PRIMARY SUBSTATION ATSARAYA BANDAR CIVIL WORKS
Toatl Duration 24 weeks
1 Site Mobilization Works 2weeks 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days
1.2 33 KV CONTROL BULDING WORKS wk 1 wk2 wk3 wk4 wk5 wk6 wk7 wk8 wk9 wk10 wk11 wk12 wk13 wk14 wk15 wk16 wk17 wk18 wk19 wk20 wk21 wk22 wk23 wk24
9weeks

Excavation in soft rock 3weeks


Blindig Prepartion 1 week
Antitreament 1week
Blinding Concrete 1week
Rebar Cutting and Bending 3weeks
Plywood Shutter Making Raft and Wall 2weeks
Rebar Fixing Raft and Side Wall 1week
Raft Form work Fixing 1week
Raft Concrete 1week
Side Wall Form work Fixing Single Lift up to 2.4m Height 2weeks
Side Wall Concrete 2weeks
Ground Level Slab Form Work 1week
Slab Rebar making and Fixing/ concrete 1week
Concrete Protection Nitocote PE135 2weeks
Back Filling and Compaction up to GL 3weeks
1.3 Superstructure 8weeks
AFC Drawings/MAS
Column Rebar Fixing up 1Lift 1week
Column Form Work making 1week
Column Fom work Fixing/concrete 1week
Column Rebar Fixing up 2 Lift 1week
Column Fom work Fixing 2Lift/concrete 1week
Roof Level Grantry Beam Stageing&Roof slab Staging 3weeks
Grantry beam Form work/rebar/concrete/Plate Fixing 1week
Roof Slab Stageing 1week
Roof Slab Rebar cutting and bending 2weeks
Roof Slab Form work 1week
Slab Rebar Fixing/slab Cocrete 1week
Roof Parpets structure works 2weeks
1.4 Finishing Activity
AFC Drawings/MAS 16weeks
Block work up roof level/staging/tiebeams 8weeks
Plastering Preparation Inside 2weeks
Inside Plastering 2weeks
External Plastering Prepartion 1week
External Plastering Prepartion 2weeks
Ground level slab Epoxy Preparation 1week
Epoxy Paints 1week
External and Internal Wall Painting 2weeks
Roof Water Proofing Works including light weight Conc 4weeks
Rolling Shutter/ Doors/ Alminium Windows Fixing 2week
Snaging/ Desnaging/Final Painting/handing over 2week
Roof ladder & Miscellance works 1week
2 33 kv CONTROL BUILDING
AFC Drawings/MAS 2week
2.1 Substructure 12weeks
Excavation in soft rock 3weeks
Blindig Prepartion 1 week
Antitreament 1week
Blinding Concrete 1week
Rebar Cutting and Bending 3weeks
Plywood Shutter Making Raft and Wall 2weeks
Rebar Fixing Raft and Side Wall 2week
Raft Form work Fixing/Concrete 1week
Side Wall Form work Fixing Single Lift up to 2.4m Height 2weeks
Side Wall Concrete 2weeks
Ground Level Slab Form Work 1week
Slab Rebar making and Fixing/ concrete 1week
Concrete Protection Nitocote PE135 2weeks
Back Filling and Compaction up to GL 3weeks
Cable Trench woorks/Gl Tie beams/Grade Slab 4weeks
2.2 SUPERSTRUCTURE
AFC Drawings/MAS 3weeks
Rebar cutting,bending and fixing columns 2week
Form work making and fixing columns 2week
Column/Tie Beams Concrete 1week
Roof Slab Staging Form work 3weeks
Roof Slab Rebar cutting and bending 3weeks
Form work slab 1week
Slab Rebar Fixing/slab Cocrete 1week
Roof Parpets structure works 4weeks
Roof Water Proofing Works including light weight Conc 4weeks
Grade Slab Concrete 1week
2.3 Finishing Activity 15weeks
Block work up roof level/staging/tiebeams 6weeks
Inside Plastering preparation/plastering 3weeks
External Plastering Prepartion/ plastering 3weeks
Epoxy Paints 1week
Acid/Alkalies Ties 2week
MEP Works 1week
Fale ceiling works 1week
Raised Access Floor 1week
Internal Painting 2weeks
External Painting 2weeks
Hot/ Cold water Serivices 1week
Steel/Wooden Doors Fixing 1week
Aluminium Windows Fixing 1week
Internal and External Ladder Fixing 1week
Snaging/ Desnaging/Final Painting/handing over 3weeks
CONSTRUCTION OF PRIMARY SUBSTATION ATSARAYA BANDAR CIVIL WORKS
Toatl Duration 24 weeks
1 Site Mobilization Works 2weeks 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days
1.2 33 KV CONTROL BULDING WORKS wk 1 wk2 wk3 wk4 wk5 wk6 wk7 wk8 wk9 wk10 wk11 wk12 wk13 wk14 wk15 wk16 wk17 wk18 wk19 wk20 wk21 wk22 wk23 wk24
3.0 20MV Transformers &ETA&NER Foundation Work 17weeks
AFC Drawings/MAS 1week
Substructure
Excavation in soft rock 2weeks
Blindig Prepartion 1week
Antitreatment&Blinding Concrete 1week
Rebar Cutting and Bending 2weeks
Plywood Shutter Making Raft and Wall 1week
Rebar Fixing Raft,Side Wall&Inserts Plate Fixing 2weeks
Raft Form work Fixing/Concrete 2weeks
Side Wall Form work & Concrete 2weeks
Concrete Protection Nitocote PE135 2weeks
Back Filling and Compaction up to GL 2weeks
Fire wall Rebar Fixing 1week
Form work fixing 1lift & Concrete 1week
Form work fixing 1lift & Concrete 1week
Expoxy Painting 1week
45 RM External Cable Trench&Duct Banks 11weeks
4.1 AFC Drawings/MAS(ALL TREBCHS&DUCT BANKS) 2weeks
Excavation in soft rock 1week
Blindig Prepartion 1week
Antitreatment&Blinding Concrete 1week
Rebar Cutting and Bending 1week
Plywood Shutter Making Raft and Wall 1week
Rebar Fixing Raft,Side Wall&Inserts Plate Fixing 2weeks
Raft Form work Fixing/Concrete 1week
Side Wall Form work & Concrete 2weeks
Concrete Protection Nitocote PE135 1week
Back Filling and Compaction up to GL 1week
4.2 72 RM External Cable Trench 18weeks
Excavation in soft rock 2week
Blindig Prepartion 1week
Antitreatment&Blinding Concrete 1week
Rebar Cutting and Bending 2weeks
Plywood Shutter Making Raft and Wall 2weeks
Rebar Fixing Raft,Side Wall&Inserts Plate Fixing 2weeks
Raft Form work Fixing/Concrete 2weeks
Side Wall Form work & Concrete 2weeks
Concrete Protection Nitocote PE135 2weeks
Back Filling and Compaction up to GL 2weeks
5.3 Finishing Activity
Block work up roof level/staging/tiebeams 2weeks
Inside Plastering preparation/plastering 2weeks
External Plastering Prepartion/ plastering
Epoxy Paints 1week
MEP Works 1week
Internal Painting 1week
External Painting 1week
Steel/Wooden Doors Fixing 1week
Aluminium Windows Fixing 1week
Internal and External Ladder Fixing 1week
Snaging/ Desnaging/Final Painting/handing over 1week
7.1 Holding TANK
Excavation in soft rock 1week
Blindig Prepartion 1week
Antitreatment&Blinding Concrete 1week
Rebar Cutting and Bending 1week
Plywood Shutter Making Raft and Wall 1week
Rebar Fixing Raft,Side Wall&Inserts Plate Fixing 2weeks
Raft Form work Fixing/Concrete 1week
Side Wall Form work & Concrete 2week
Concrete Protection Nitocote PE135 1week
Back Filling and Compaction up to GL 1week
8.3 Finishing Activity
Block work up roof level/staging/tiebeams 1week
Inside Plastering preparation/plastering 1week
Wall & Floor Tile Fixing 1week
External Plastering Prepartion/ plastering 1week
Internal Painting 1week
External Painting 1week
Steel/Wooden Doors Fixing 1week
Aluminium Windows Fixing 1week
Internal and External Ladder Fixing 1week
Snaging/ Desnaging/Final Painting/handing over 1week
9.0 Compound Wall
9.1 AFC Drawings/MAS
Excavation in soft rock 2weeks
Blindig Prepartion 2weeks
Antitreatment&Blinding Concrete 1week
Rebar Fixing footing & ColumnsFixing
Raft Form work Fixing/Footing Concrete 3weeks
Concrete Protection Nitocote PE135 2weeks
Back Filling and Compaction up to GL 2weeks
SUPERSTRUCTURE
9.2 Column/Tie Beams Concrete 3weeks
Block Works 4weeks
Plesterin Internal & External works 2weeks
Barbedwire fixing,Gate & Steel Door Fixing 2weeks
Wall Painting Internal & External works 1week
AFC Drawings/MAS
10.0 Chain link Fencing 1week
AFC Drawings/MAS
11.0 Aggregate Spreading 2weeks
CONSTRUCTION OF PRIMARY SUBSTATION ATSARAYA BANDAR CIVIL WORKS
Toatl Duration 24 weeks
1 Site Mobilization Works 2weeks 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days 6days
1.2 33 KV CONTROL BULDING WORKS wk 1 wk2 wk3 wk4 wk5 wk6 wk7 wk8 wk9 wk10 wk11 wk12 wk13 wk14 wk15 wk16 wk17 wk18 wk19 wk20 wk21 wk22 wk23 wk24
AFC Drawings/MAS
12.0 Asphalt Road,Kerb Stone Fixing&Pavement Block 3weeks
SL .NO EVALUATION OF EXCAVATION CONTRACTORS PROFILES
OVERALL
EXPERIENCE
M/S MURTAFAT LOHAIM TRAD
M/S MORDEN DEVOPLEMENT LLC
TORS PROFILES